THESE MINUTES ARE DRAFT UNTIL CONFIRMED AT THE NEXT MONTHLY MEETING OF THIS COUNCIL AND/OR COMMITTEE

 

MINUTES OF Planning Committee Meeting of the

Council of the City of Randwick HELD ON

Tuesday, 14 May 2013 AT 6:28pm

 

Present:

The Mayor, Councillor T Bowen (East Ward)

 

North Ward                                          -  Councillors K Neilson, L Shurey &

                                                             K Smith (Chairperson),

                                                            

South Ward                                          -  Councillors R Belleli, D’Souza & P Garcia

 

East Ward                                            -  Councillor M Matson

                                                              

West Ward                                           -  Councillors G Moore, S Nash (arrived 6.55pm) & H Stavrinos

 

Central Ward                                        -  Councillors A Andrews (arrived 6.55pm),        T Seng & G Stevenson (Deputy Chairperson)

Officers present:

General Manager                                             Mr R Brownlee

Director City Services                                      Mr J  Frangoples

Director City Planning                                       Ms S Truuvert

Director Governance & Financial Services             Mr G Banting

Manager Development Assessment                     Mr K Kyriacou

Communications Manager                                  Mr J Hay

Manager strategic planning                               Ms K Armstrong

Senior Administrative Coordinator                       Ms J Hartshorn

 

The meeting was adjourned at 6.28pm and was resumed 6.47pm.

 

Apologies/Granting of Leave of Absences 

 

An apology was received from Cr Roberts.

 

RESOLVED: (Neilson/Mayor, Cr Bowen) that the apology received from Cr Roberts be accepted and leave of absence from the meeting be granted.

 

Confirmation of the Minutes

 

Confirmation of the Minutes of the Planning Committee Meeting held on Tuesday 9 April 2013

PL37/13

RESOLUTION: (Neilson/Mayor, Cr Bowen) that the Minutes of the Planning Committee Meeting held on Tuesday 9 April 2013 (copies of which were circulated to all Councillors) be and are hereby confirmed as a correct record of the proceedings of that meeting.

Procedural Motion

RESOLVED: (Matson/Mayor, Cr Bowen) that Items D33/13 and M8/13 be brought forward and considered immediately.

Declarations of Pecuniary and Non-Pecuniary Interests

 

a)            Cr Garcia declared a non significant non pecuniary interest in Item D35/13 as a member of the Coogee Surf Life Saving Club and also a member of the Trust.

b)            Cr Garcia declared a pecuniary interest in Item M9/13 as his parents live in vicinity of the proposal. Cr Garcia indicated that he would not take part in the debate or the vote on the matter.

c)            The Mayor, Cr Bowen,  declared a non significant non pecuniary interest in Item D35/13 as a member of the Trust.

d)            Cr Matson declared a significant non pecuniary interest in Item M9/13 as a member of the JRPP. Cr Matson indicated that he would not take part in the debate or the vote on the matter.

e)            Cr Moore declared a non significant non pecuniary interest in Item D36/13 as the objector is known to him.

f)              Cr Moore declared a significant non pecuniary interest in Item M9/13 as a member of the JRPP. Cr Moore indicated that he would not take part in the debate or the vote on the matter.

g)            Cr Neilson declared a non significant non pecuniary interest M9/13 as some of the objectors are known to her.

h)            Cr Neilson declared a non significant non pecuniary interest in Item D35/13 as some of the objectors are known to her.

i)               Cr Nash declared a non significant non pecuniary interest in Item D35/13 as a member of the Trust.

 

Address of Council by Members of the Public

Prior to consideration of the Agenda by the Committee, deputations were received in respect of the following matters:

Crs Andrews and Nash arrived at the meeting at this point (6.55pm).

 

D34/13      189 Fitzgerald Avenue, Maroubra (DA/462/2012)

 

Objector             Josef Pilger

 

Applicant           David Gray

 

D36/13      211-213 Anzac Parade, Kensington (DA/744/2012)

 

Applicant           Tony Robb (representing the applicant)

 

D38/13      94 & 96 Storey Street, Maroubra (DA/696/2012)

 

Objector             Edna Lee

 

Having declared an interest in Item M9/13 earlier in the meeting, Crs Garcia, Matson and Moore left the meeting during the public address in relation to the matter.

 

M9/13       Inglis Planning Proposal (Rezoning) - Council Submission to JRPP

 

Against               Andrew Roydhouse

 

The meeting was adjourned at 7.30pm and was resumed at 7.52pm.

 

Urgent Business

Nil.

 

Development Application Reports

 

D33/13     Development Application Report - 6 Palmer Street, South Coogee (DA/496/2012)

PL38/13

RESOLUTION: (Matson/Mayor, Cr Bowen) that the application be deferred to enable a peer review of the assessment of the application.

 

MOTION: (Matson/Bowen) CARRIED - SEE RESOLUTION.

 

 

 

D34/13     Development Application Report - 189 Fitzgerald Avenue, Maroubra (DA/462/2012)

PL39/13

RESOLUTION: (Mayor, Cr  Bowen/Andrews)

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20F(1) and 20G(3) of Randwick Local Environmental Plan 1998 (Consolidation), relating to floor space ratio and external wall height respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not unreasonably affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 462/2012 for demolition of the existing dwelling and construction of a 3-storey residential flat building comprising 8 units, basement car parking for 7 vehicles, landscaping and associated works, at No. 189 Fitzgerald Avenue, Maroubra, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan Number / Title

Dated

Received

Prepared By

A2.01(J) Site Plan

30 Apr 12

2 Apr 2013

Level Orange

A3.01(H) Basement Floor Plan

30 Apr 12

2 Apr 2013

Level Orange

A3.02(E) Site / Ground Floor Plan

30 Apr 12

2 Apr 2013

Level Orange

A3.02-1(M) Ground Floor Plan

30 Apr 12

2 Apr 2013

Level Orange

A3.03(K)  First Floor Plan

30 Apr 12

2 Apr 2013

Level Orange

A3.04(K) Loft Floor Plan

30 Apr 12

2 Apr 2013

Level Orange

A3.05(I) Roof Plan

30 Apr 12

2 Apr 2013

Level Orange

A4.01(H) Section AA

30 Apr 12

2 Apr 2013

Level Orange

A4.02(H) Section BB

30 Apr 12

2 Apr 2013

Level Orange

A4.03(C) Section CC

30 Apr 12

2 Apr 2013

Level Orange

A4.04 Privacy Screen Details

30 Apr 12

2 Apr 2013

Level Orange

A5.01(J) Streetscape Elevation

30 Apr 12

2 Apr 2013

Level Orange

A5.02(L) East Elevation

30 Apr 12

2 Apr 2013

Level Orange

A5.02.1(L) East Elevation

30 Apr 12

2 Apr 2013

Level Orange

A5.03(L) North & South Elevation

30 Apr 12

2 Apr 2013

Level Orange

A5.04(K) West Elevation

30 Apr 12

2 Apr 2013

Level Orange

LA01(B) Landscape Plan

11.07.2012

23 Jul 2012

Taylor Brammer Landscape Architects Pty. Ltd.

 

BASIX Certificate No.

Dated

Received

434312M_02

11 April 2013

11 Apr 2013

 

Amendment of Plans & Documentation

2.       The approved plans and documents must be amended in accordance with the following requirements and details are to be included in the Construction Certificate:

 

(a)  The privacy screens as shown on the approved plans must be permanently fixed. The screens must be constructed with metal or timber slats, horizontally or vertically positioned, with any openings not exceeding 25% of the surface areas of the screens.

 

(b)  Suitable security lighting must be installed along the main pedestrian entry path to the building, which is adjacent to the eastern boundary of the site. The above lighting device must be low level lighting where the light source is not located higher than 1.2m above the finished ground level, and must be directed towards the ground.

 

(c)  A minimum of four (4) bicycle parking spaces must be provided within the proposed development. The design and construction of the bicycle parking facilities must be compliant with Australian Standard 2890.3: Bicycle Parking Facilities. 

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either an Accredited Certifier or Randwick City Council.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

3.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

4.       The colours, materials and surface finishes to the development must be consistent with the approved drawings stated in Condition 1 above.

 

Section 94A Development Contributions

5.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $1,519,242, the following applicable monetary levy must be paid to Council: $15,192.42.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Long Service Levy Payments

6.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Security Deposit

7.       The following damage / civil works security deposit requirement must be complied with, as security for making good any damage caused to the roadway, footway, verge or any public place; and as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

·     $5000.00    -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash, cheque or credit card payment and is refundable upon a satisfactory inspection by Council upon the completion of the civil works which confirms that there has been no damage to Council's infrastructure.

     

      The owner/builder is also requested to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

To obtain a refund of relevant deposits, a Security Deposit Refund Form is to be forwarded to Council’s Director of City Services upon issuing of an occupation certificate or completion of the civil works.

 

Sydney Water

8.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved plans must be submitted to a Sydney Water Quick Check agent, to determine whether the development will affect Sydney Water’s waste water and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For details please refer to the Sydney Water web site at www.sydneywater.com.au for:

 

·           Quick Check agents details -  see Building and Developing then Quick Check and

·           Guidelines for Building Over/Adjacent to Sydney Water Assets – see Building and Development then Building and Renovating, or telephone 13 20 92.

 

The Principal Certifying Authority must ensure that a Sydney Water Quick Check Agent has appropriately stamped the plans.

        

Street Tree Removal

9.       The applicant shall submit a total payment of $845.25 (including GST), being to cover:

 

a.       The cost for Council to remove, stump grind and dispose of the Banksia serrata (Saw Toothed Banksia) from the Fitzgerald Avenue verge, adjacent the northwest corner of the site, so as to accommodate the curved crossing design as shown;

 

b.       The cost for Council to supply and install 1 x 25 litre street tree of the same species back on the Fitzgerald Avenue verge, centrally within the area bounded by the eastern edge of the new curved crossing and front property boundary at the completion of all works;

 

c.       A loss of amenity fee in recognition that this semi-mature native species is only being removed from public property so as to accommodate the proposed development, and will be used towards additional plantings in the surrounding area.

 

The contribution shall be paid into Tree Amenity Income at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development.

 

The applicant must contact Council’s Landscape Development Officer on 9399-0613 (quoting the receipt number), and giving at least four working weeks notice to arrange for removal of the street tree prior to the commencement of site works, as well as upon completion, to arrange for planting of the replacement tree.

 

Protection of Street Tree

10.     In order to ensure retention of the Ficus rubiginosa (Port Jackson Fig) located on Council’s Fitzgerald Avenue verge in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the Construction Certificate application must show the retention of this street tree, with the position and diameter of both its trunk and canopy in relation to the crossing to be clearly and accurately shown on all drawings.

 

b.       All Construction Certificate plans must show that any excavations associated with the proposed curved crossing will be setback at a minimum radius of 5 metres off its trunk, measured off its outside edge at ground level.

 

c.       Any excavations associated with the installation of new services, pipes, stormwater systems or similar over public property in this area will need to be located either along the western site boundary, or; hard up against the western side of the curved crossing.

 

d.       This tree is to be physically protected by the installation of 1.8 metre high steel mesh/chainwire fencing, which shall be located a minimum distance of 4 metres on all four sides (measured off the outside edge of its trunk at ground level), so as to completely enclose the tree for the duration of works, to which, shade cloth or similar shall be attached, from ground level to the top of the fencing.

 

e.       This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER". Council’s Landscape Development Officer may be contacted on 9399-0613 should any issues arise with installation of the TPZ.

 

f.        In order to prevent soil/sediment being washed into the TPZ, and over its root system, erosion control measures shall be provided around the perimeter of the TPZ at ground level.

 

g.       Any alterations to existing ground levels along the western side of the curved crossing must be graded smoothly and evenly so as to match back in with the existing levels.

 

h.       The applicant is not authorised to perform any works to this tree, and shall contact Council’s Landscape Development Officer on 9399-0613 should pruning or any similar such work appear necessary, with the applicant required to cover all associated costs, to Council’s satisfaction, prior to the issue of a Final Occupation Certificate.

 

i.        Within the TPZ, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble, with all Site Management Plans needing to acknowledge these requirements.

 

j.        Any roots encountered during the course of the approved works must be cut cleanly by hand, and the affected area backfilled with clean site soil as soon as practically possible.

 

k.       A refundable deposit in the form of cash, credit card or cheque for an amount of $2,500.00 shall be paid at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development, in order to ensure compliance with the conditions listed in this consent, and ultimately, preservation of the tree.

 

The refundable deposit will be eligible for refund following the issue of a Final Occupation Certificate, subject to completion and submission of Council’s ‘Security Deposit Refund Application Form’, and pending a satisfactory inspection by Council’s Landscape Development Officer (9399-0613).

 

Any contravention of Council's conditions relating to the tree at any time during the course of the works, or prior to the issue of a Final Occupation Certificate, may result in Council claiming all or part of the lodged security in order to perform any rectification works necessary, as per the requirements of 80A (6) of the Environmental Planning and Assessment Act 1979.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

Compliance with the Building Code of Australia & Relevant Standards

11.     In accordance with section 80A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

12.     Access and facilities for people with disabilities must be provided in accordance with the relevant requirements of the Building Code of Australia, Disability (Access to Premises – Buildings) Standards 2010, relevant Australian Standards and conditions of consent, to the satisfaction of the Certifying Authority. 

 

BASIX Requirements

13.     In accordance with section 80A (11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Site stability and construction work

14.     A report must be obtained from a suitably qualified and experienced professional engineer, which includes the following details, to the satisfaction of the Certifying Authority for the development:-

 

a)     Geotechnical details which confirm the suitability and stability of the site for the development and relevant design and construction requirements to be implemented to ensure the stability and adequacy of the development and adjacent land.

 

b)     Details of the proposed methods of excavation and support for the adjoining land (including any public place) and buildings.

 

c)     Details to demonstrate that the proposed methods of excavation, support and construction are suitable for the site and should not result in any damage to the adjoining premises, buildings or any public place, as a result of the works and any associated vibration.

 

d)     The adjoining land and buildings located upon the adjoining land must be adequately supported at all times throughout demolition, excavation and building work, to the satisfaction of the Principal Certifying Authority.

 

e)     Written approval must be obtained from the owners of the adjoining land to install any ground or rock anchors underneath the adjoining premises (including any public roadway or public place) and details must be provided to the Certifying Authority.

 

Building & Design

15.     Any gate openings shall be constructed so that the gates, when hung, will be fitted in such a manner that they will not open over the footway or public place.

 

16.     Street and unit numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the development.

         

          In this regard, an Application must be submitted to and approved by Council’s Director of City Planning, together with the required fee, for the allocation of appropriate street and unit numbers for the development, prior to issuing an occupation certificate.

 

17.     Power supply and telecommunications cabling to the development shall be underground.

 

18.     A single common television aerial, and/or satellite dish (having a maximum diameter of 700mm and not located on the front or street elevation of the building) is to be installed to serve the development.

 

19.     The finished ground levels external to the building are to be consistent with the development consent and are not to be raised (other than for the provision of paving or the like on the ground) without the written consent of Council.

 

20.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

21.     In accordance with the provisions of clauses 143A and 154A of the Environmental Planning & Assessment Regulation 2000, a ‘Design Verification Certificate’ must be provided to the Certifying Authority and the Council, prior to issuing a construction certificate and an occupation certificate, respectively.

 

Traffic conditions

22.     Adequate provisions are to be made to provide pedestrian visibility and safety.  All new walls (and/or landscaping) adjacent to vehicular crossings should not exceed a height of 600mm above the internal driveway level for a distance of 1.5m within the site or new walls (including landscaping) should splayed 1.5 metres by 1.5 metres. Details of compliance, to the satisfaction of the certifying authority, are to be included in the construction certificate documentation.

 

§ The vehicular access driveways, internal circulation ramps and the carpark areas, (including, but not limited to, the ramp grades, carpark layout and height clearances) are to be in accordance with the requirements of AS2890.1:2004. 

 

Alignment Levels

23.     The design alignment level (the finished level of concrete, paving or the like) at the property boundary for driveways, access ramps and pathways or the like, shall be:

       

         Driveway

·           RL 21.10 (AHD) western edge

·           RL 21.00 (AHD) eastern edge

 

Pedestrian entrances

·           RL 21.05 (AHD)

 

The design alignment levels at the property boundary as issued by Council must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

      Any enquiries regarding this matter should be directed to Council’s Development Engineer on 9399 0881.

 

24.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $834 calculated at $48.00 (inclusive of GST) per metre of site frontage. This amount is to be paid prior to a construction certificate being issued for the development.

 

25.     Stormwater drainage plans have not been approved as part of this development consent. Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage shall be prepared by a suitably qualified Hydraulic Engineer and submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issued, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)       A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

 

b)       A layout of the proposed drainage system including pipe sizes, type, grade, length, invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system. 

 

c)       The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

 

i.        Roof areas

ii.       Paved areas

iii.       Grassed areas

iv.      Garden areas

 

e)       Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

 

f)       Proposed finished surface levels and grades of car parks, internal driveways and access aisles which are to be related to Council's design alignment levels.

 

g)       The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

26.     The written approval of Council is required to be obtained in relation to all drainage and infrastructure works which are located externally from the site within the road reserve/public place, in accordance with the requirements of the Roads Act 1993.  Detailed plans and specifications of the proposed works are to be submitted to and approved by the Director of City Services prior to commencing any works within the road reserve/public place.

 

All works within the road reserve/public place must be carried out to the satisfaction of Council and certification from a professional engineer is to be provided to Council upon completion of the works.

 

Relevant Council Assessment and Inspection fees, as specified in Council's adopted Pricing Policy, are required to be paid to Council prior to commencement of the works.

 

27.     The site stormwater drainage system is to be provided in accordance with the following requirements;

 

a)     The stormwater drainage system must be provided in accordance with the relevant requirements of Building Code of Australia and the conditions of this consent, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate.

 

b)     The stormwater must be discharged (by gravity) either:

 

i)     Council’s street drainage system located in Yorktown Parade via a private drainage easement through adjoining land/premises; or

 

ii)    To a suitably designed infiltration system (subject to confirmation in a geotechnical investigation that the ground conditions are suitable for the infiltration system).

 

If the owner/applicant is able to demonstrate to Council that he/she has been unable to procure a private drainage easement through adjoining premises and the ground conditions preclude the use of an infiltration system, a pump-out system may be permitted.

 

Pump-out systems must be provided with two pumps connected in parallel (with each pump being capable of discharging at the required discharge rate) and connected to a control board so that each pump will operate alternatively. The pump wet well is required to be sized for the 1 in 100 year, 2 hour storm assuming both pumps are not working. All pump-out water must pass through a stilling pit prior to being discharged by gravity to the kerb and gutter

 

Pump-out systems must be designed by a suitably qualified and experienced hydraulic consultant/engineer and the pump-out system designed and constructed generally in accordance with Council's Stormwater Code.

 

c)     Should stormwater be discharged to Council’s street drainage system, an on-site stormwater detention system must be provided to ensure that the maximum discharge from the site does not exceed that which would occur during a 1 in 10 year storm of one hour duration for the existing site conditions. All other stormwater run-off from the site for all storms up to the 1 in 20 year storm is to be retained on the site for gradual release to the street drainage system, to the satisfaction of the certifying authority.

 

An overland escape route or overflow system (to Council’s street drainage system) must be provided for storms having an average recurrence interval of 100 years (1 in 100 year storm), or, alternatively the stormwater detention system is to be provided to accommodate the 1 in 100 year storm.

 

d)     Should stormwater be discharged to an infiltration system, the infiltration area shall be  sized for all storm events up to the 1 in 20 year storm event with provision for a formal overland flow path to Council’s Street drainage system.

 

Should no formal overland escape route be provided for storms greater than the 1 in 20 design storm, the infiltration system shall be sized for the 1 in 100 year storm event.

 

e)     Determination of the required cumulative storage (in the on-site detention and/or infiltration system) must be calculated by the mass curve technique as detailed in Technical Note 1, Chapter 14 of the Australian Rainfall and Run-off Volume 1, 1987 Edition.

 

Where possible any detention tanks should have an open base to infiltrate stormwater into the ground. Infiltration should not be used if ground water and/or any rock stratum is within 2.0 metres of the base of the tank.

 

f)      Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (i.e. above the 1 in 20 year storm) to the proposed drainage (detention/infiltration) system.

 

g)     A sediment/silt arrestor pit must be provided within the site near the street boundary prior to discharge of the stormwater to Council’s drainage system and prior to discharging the stormwater to any absorption/infiltration system.

 

Sediment/silt arrestor pits are to be constructed generally in accordance with the following requirements:

 

·         The base of the pit being located a minimum 300mm under the invert level of the outlet pipe.

·         The pit being constructed from cast in-situ concrete, precast concrete or double brick.

·         A minimum of 4 x 90 mm diameter weep holes (or equivalent) located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

·         A galvanised heavy-duty screen being provided over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

·         The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

·         A child proof and corrosion resistant fastening system being provided for the access grate (e.g. spring loaded j-bolts or similar).

·         Provision of a sign adjacent to the pit stating, “This sediment/silt arrester pit shall be regularly inspected and cleaned”.

 

Sketch details of a standard sediment/silt arrester pit may be obtained from Council’s Drainage Engineer.

 

h)     The floor level of all habitable, retail, commercial and storage areas located adjacent to any detention and/or infiltration systems with above ground storage must be a minimum of 300mm above the maximum water level for the design storm or alternately a permanent 300mm high water proof barrier is to be provided.

 

(In this regard, it must be noted that this condition must not result in any increase in the heights or levels of the building.  Any variations to the heights or levels of the building will require a new or amended development consent from the Council prior to a construction certificate being issued for the development).

 

i)      Infiltration systems/Absorption Trenches must be designed and constructed generally in accordance with "Section 8.5 ABSORPTION TRENCHES" of Randwick City Council's Private Stormwater Code.

 

j)      The maximum depth of ponding in any above ground detention areas and/or infiltration systems with above ground storage shall be as follows (as applicable):

i.     150mm in uncovered open car parking areas (with an isolated maximum depth of 200mm permissible at the low point pit within the detention area)

i.     300mm in landscaped areas (where child proof fencing is not provided around the outside of the detention area and sides slopes are steeper than 1 in 10)

ii.    600mm in landscaped areas where the side slopes of the detention area have a maximum grade of 1 in 10

iii.   1200mm in landscaped areas where a safety fence is provided around the outside of the detention area

iv.   Above ground stormwater detention areas must be suitably signposted where required, warning people of the maximum flood level.

 

Note: Above ground storage of stormwater is not permitted within basement car parks or store rooms.

 

k)     A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

 

l)      A ‘V’ drain (or equally effective provisions) are to be provided to the perimeter of the property, where necessary, to direct all stormwater to the detention/infiltration area.

 

m)     The site stormwater system must be regularly cleaned and maintained to ensure it operates as required by the design.

 

n)     Mulch or bark is not to be used in on-site detention areas.

 

o)     Site discharge pipelines shall cross the verge at an angle no less than 45 degrees to the kerb line.

 

p)     Any onsite detention/infiltration systems shall be located in areas accessible by residents of all units.

 

q)     Should a charged system be required to drain any portion of the site, the charged system must be designed with suitable clear-outs/inspection points at pipe bends and junctions.

 

Site seepage & Dewatering

28.     Site seepage and sub-soil drainage (from planter boxes etc) must comply with the following requirements:

 

a)    Seepage/ground water and subsoil drainage (from planter boxes etc) must not be collected & discharged directly or indirectly to  Council’s street gutter or underground drainage system

 

b)    Adequate provision is to be made for ground water to drain around the basement carpark (to ensure the basement will not dam or slow the movement of the ground water through the development site).

 

c)    The walls of the basement level/s of the building are to be waterproofed/tanked to restrict the entry of any seepage water and subsoil drainage into the basement level/s of the building and the stormwater drainage system for the development.

 

d)    Sub-soil drainage systems may discharge via infiltration subject to the hydraulic consultant/engineer being satisfied that the site and soil conditions are suitable and the seepage is able to be fully managed within the site, without causing a nuisance to any premises and ensuring that it does not drain or discharge (directly or indirectly) to the street gutter.

               

e)    Details of the proposed stormwater drainage system including methods of tanking/waterproofing the basement level/s and any sub-soil drainage systems (as applicable) must be prepared or approved by a suitably qualified and experienced Professional Engineer to the satisfaction of the Certifying Authority and details are to be included in the construction certificate documentation.

 

Waste  Management

29.     A Waste Management Plan detailing the waste and recycling storage and removal strategy for all of the development, is required to be submitted to and approved by Council’s Director of City Services.

 

The Waste Management plan is required to be prepared in accordance with Council's Waste Management Guidelines for Proposed Development and must include the following details (as applicable):

 

·       The use of the premises and the number and size of occupancies.

·       The type and quantity of waste to be generated by the development.

·       Demolition and construction waste, including materials to be re-used or recycled.

·       Details of the proposed recycling and waste disposal contractors.

·       Waste storage facilities and equipment.

·       Access and traffic arrangements.

·       The procedures and arrangements for on-going waste management including collection, storage and removal of waste and recycling of materials.

 

Further details of Council's requirements and guidelines, including pro-forma Waste Management plan forms can be obtained from Council's Customer Service Centre.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Certification and Building Inspection Requirements

30.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work and the requirements of the Home Building Act 1989 must be satisfied accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

 Dilapidation Reports

31.     A dilapidation report prepared by a professional engineer or suitably qualified and experienced building surveyor shall be submitted to the certifying authority prior to the commencement of demolition, excavation or building works detailing the current condition and status of all buildings and ancillary structures located upon all of the premises adjoining the subject site (e.g. dwellings, residential flat buildings, commercial/industrial building, garages, carports, verandah’s, fences, retaining walls, swimming pools and driveways etc).

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage and other structures located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report must be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Site Management Plan

32.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·            location and construction of protective site fencing / hoardings;

·            location of site storage areas/sheds/equipment;

·            location of building materials for construction;

·            provisions for public safety;

·            dust control measures;

·            details of proposed sediment and erosion control measures;

·            site access location and construction

·            details of methods of disposal of demolition materials;

·            protective measures for tree preservation;

·            location and size of waste containers/bulk bins;

·            provisions for temporary stormwater drainage;

·            construction noise and vibration management;

·            construction traffic management details;

·            provisions for temporary sanitary facilities.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

33.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

 

·        The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·            Details of hazardous materials (including asbestos)

·        Method/s of demolition (including removal of any asbestos)

·        Measures and processes to be implemented to ensure the health & safety of workers and community

·        Measures to be implemented to minimise any airborne dust and asbestos

·        Methods and location of disposal of any hazardous materials (including asbestos)

·        Other relevant details, measures and requirements to be implemented

·        Details of re-use, recycling and disposal of waste materials

·        Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Construction Noise & Vibration Management Plan

34.     A Construction Noise & Vibration Management Plan, prepared in accordance with the Department of Climate Change Guidelines for Construction Noise and Assessing Vibration, by a suitably qualified person, is to be developed and implemented prior to commencing site work and throughout the course of construction.

 

a)     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents. 

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

b)     The Construction Noise & Vibration Management Plan must include details of measurements, analysis and relevant criteria and demonstrate that the noise and vibration emissions from the work satisfy the relevant provisions of the Protection of the Environment Operations Act 1997, current DECC Guidelines for Construction Noise and Assessing Vibration and Councils conditions of consent.

 

c)     A further report/correspondence must be obtained from the consultant as soon as practicable upon the commencement of works, which reviews and confirms the implementation and suitability of the noise and vibration strategies in the Construction Noise & Vibration Management Plan and which demonstrates compliance with relevant criteria.

 

d)     Any recommendations and requirements contained in the Construction Noise & Vibration Management Plan and associated reports are to be implemented accordingly and should noise and vibration emissions not comply with the terms and conditions of consent, work must cease forthwith and is not to recommence until details of compliance are submitted to Council and the PCA.

 

A copy of the Construction Noise & Vibration Management Plan and associated acoustic/vibration report/s must be maintained on-site and a copy must be provided to Council and the Principal Certifying Authority accordingly.

 

Public Liability

35.     The owner/builder is required to hold Public Liability Insurance, with a minimum liability of $10 million and a copy of the Insurance cover is to be provided to the Principal Certifying Authority and Council.

 

Landscaping

36.     The PCA must ensure that the Landscape Plan by Taylor Brammer Landscape Architects, dwg no LA01, job no 12-064S, revision B, dated 11.07.2012 has been amended/updated to reflect any of the architectural changes that have been made to this current scheme.

 

Civil Works

37.     A separate written approval from Council is required to be obtained in relation to all works which are located externally from the site within the road reserve/public place, in accordance with the requirements of the Roads Act 1993.  Detailed plans and specifications of the proposed driveway and any other works are to be submitted to and approved by the Director of City Services prior to commencing any works within the road reserve/public place.

 

All works within the road reserve/public place must be carried out to the satisfaction of Council and certification from a certified practicing engineer is to be provided to Council upon completion of the works.

 

Relevant Council assessment and inspection fees, as specified in Council's adopted Pricing Policy, are required to be paid to Council prior to commencement of the works.

 

Construction Traffic Management

38.     A detailed Construction Site Traffic Management Plan must be submitted to and approved by Council, prior to commencement of any site work.

 

The Construction Site Traffic Management Plan must be prepared by a suitably qualified person and must include the following details, to the satisfaction of Council:

·       A description of the demolition, excavation and construction works

·       A site plan/s showing the site, roads, footpaths, site access points and vehicular movements

·       Any proposed road and/or footpath closures

·       Proposed site access locations for personnel, deliveries and materials

·       Size, type and estimated number of vehicular movements (including removal of excavated materials, delivery of materials and concrete to the site)

·       Provision for loading and unloading of goods and materials

·       Impacts of the work and vehicular movements on the road network, traffic and pedestrians

·       Proposed hours of construction related activities and vehicular movements to and from the site

·       Current/proposed approvals from other Agencies and Authorities (including NSW Roads & Traffic Authority, Police and State Transit Authority)

·       Any activities proposed to be located or impact upon Council’s road, footways or any public place

·       Measures to maintain public safety and convenience

 

39.     Any necessary approvals must be obtained from NSW Police, Roads & Maritime Services, Transport, and relevant Service Authorities, prior to commencing work upon or within the road, footway or nature strip.

         

Public Utilities

40.     A public utility impact assessment must be carried out on all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.  The assessment should include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of services.

 

41.     Documentary evidence from the relevant public utility authorities confirming they have agreed to the proposed works and that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any demolition, excavation or building works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Ausgrid, Sydney Water and other service authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Inspections during Construction

42.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

Building & Demolition Work Requirements

43.     All work and activities must be carried out in accordance with the relevant regulatory requirements and Randwick City Council policies, including:

 

·           Work Health and Safety Act 2011 & Regulations

·           Occupational Health and Safety (Hazardous Substances) Regulation 2001

·            Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·           WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·           Australian Standard 2601 (2001) – Demolition of Structures

·           The Protection of the Environment Operations Act 1997

·           Protection of the Environment Operations (Waste) Regulation 2005

·            Relevant Office of Environment & Heritage / Environment Protection Authority (EPA) and WorkCover NSW Guidelines.

·           Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

44.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·           Occupational Health & Safety legislation and WorkCover NSW requirements

 

·           Randwick City Council’s Asbestos Policy

 

·           A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·           On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·           Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·           A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Excavations, Back-filling & Retaining Walls

45.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring, piling or other measures are to be submitted to and approved by the Principal Certifying Authority.

 

Support of Adjoining Land

46.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

Sediment & Erosion Control

47.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details must be shown in a Sediment and Erosion Control Plan, including; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

A copy of the Sediment and Erosion Control Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Dust Control

48.     During demolition, excavation and construction works, dust emissions must be minimised, so as not to result in a nuisance to nearby residents or result in a potential pollution incident.

 

Adequate dust control measures must be provided to the site prior to the works commencing and the measures and practices must be maintained throughout the demolition, excavation and construction process, to the satisfaction of Council.

 

Dust control measures and practices may include:-

·       Provision of geotextile fabric to all perimeter site fencing (attached on the prevailing wind side of the site fencing).

·       Covering of stockpiles of sand, soil and excavated material with adequately secured tarpaulins or plastic sheeting.

·       Installation of a water sprinkling system or provision hoses or the like.

·       Regular watering-down of all loose materials and stockpiles of sand, soil and excavated material.

·       Minimisation/relocation of stockpiles of materials, to minimise potential for disturbance by prevailing winds.

·       Landscaping and revegetation of disturbed areas.

 

Temporary Site Fencing

49.     Temporary site safety fencing or site hoarding must be provided to the perimeter of the site throughout demolition, excavation and construction works, to the satisfaction of Council, in accordance with the following requirements:

 

a)     Temporary site fences or hoardings must have a height of 1.8 metres and be a cyclone wire fence (with geotextile fabric attached to the inside of the fence to provide dust control), or heavy-duty plywood sheeting (painted white), or other material approved by Council.

 

b)     Hoardings and site fencing must be designed to prevent any substance from, or in connection with, the work from falling into the public place or adjoining premises and if necessary, be provided with artificial lighting.

 

c)     All site fencing and hoardings must be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

d)     An overhead (‘B’ Class) type hoarding is required is be provided to protect the public (unless otherwise approved by Council) if:

·       materials are to be hoisted (i.e. via a crane or hoist) over a public footway;

·       building or demolition works are to be carried out on buildings which are over 7.5m in height and located within 3.6m of the street alignment;

·       it is necessary to prevent articles or materials from falling and causing a potential danger or hazard to the public or occupants upon adjoining land;

·       as may otherwise be required by WorkCover, Council or the PCA.

 

Notes:

·       Temporary site fencing may not be necessary if there is an existing adequate fence in place having a minimum height of 1.5m.

·       If it is proposed to locate any site fencing, hoardings, amenities or articles upon any part of the footpath, nature strip or public place at any time, a separate Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any fencing, hoarding or other article on the road, footpath or nature strip.

 

Public Safety & Site Management

50.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with to the satisfaction of Council:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other articles must not be placed upon the footpath, roadway or nature strip at any time.

 

b)     The road, footpath, vehicular crossing and nature strip must be maintained in a good, safe, clean condition and free from any excavations, obstructions, trip hazards, goods, materials, soils or debris at all times.  Any damage caused to the road, footway, vehicular crossing, nature strip or any public place must be repaired immediately, to the satisfaction of Council.

 

c)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)     Access gates and doorways within site fencing, hoardings and temporary site buildings or amenities must not open outwards into the road or footway.

 

e)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

f)      Adequate provisions must be made to ensure pedestrian safety and traffic flow during the site works and traffic control measures are to be implemented in accordance with the relevant provisions of the Roads and Traffic Manual “Traffic Control at Work Sites” (Version 4), to the satisfaction of Council.

 

Site Signage

51.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·     name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·     name, address and telephone number of the Principal Certifying Authority,

·     a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

52.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

 

·   Monday to Friday - 8.00am to 1.00pm only

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

Additional requirements for all development

·   Saturdays and Sundays where the preceding Friday and/or the following Monday is a public holiday - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Survey Requirements

53.     A Registered Surveyor’s check survey certificate or other suitable documentation must be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority (PCA):

 

·        prior to construction (pouring of concrete) of footings and boundary retaining structures,

·            prior to construction (pouring of concrete) of each floor slab,

·            upon completion of the building, prior to issuing an Occupation Certificate,

·            as otherwise may be required by the PCA.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the Principal Certifying Authority for the development.  

 

Building Encroachments

54.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Road/Asset Opening Permit

55.     Any openings within or upon the road, footpath, nature strip or in any public place (i.e. for proposed drainage works or installation of services), must be carried out in accordance with the following requirements, to the satisfaction of Council:

 

a)     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

b)     Council’s Road / Asset Opening Officer must be notified at least 48 hours in advance of commencing any excavation works and also immediately upon completing the works (on 9399 0691 or 0409 033 921 during business hours), to enable any necessary inspections or works to be carried out.

 

c)     Relevant Road / Asset Opening Permit fees, construction fees, inspection fees and security deposits, must be paid to Council prior to commencing any works within or upon the road, footpath, nature strip or other public place.

 

d)     The owner/developer must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate or occupation of the development (whichever is sooner).

 

e)     Excavations and trenches must be back-filled and compacted in accordance with AUSPEC standards 306U.

 

f)      Excavations or trenches located upon a road or footpath are required to be provided with 50mm depth of cold-mix bitumen finish, level with the existing road/ground surface, to enable Council to readily complete the finishing works at a future date.

 

g)     Excavations or trenches located upon turfed areas are required to be back-filled, compacted, top-soiled and re-turfed with Kikuyu turf.

 

h)     The work and area must be maintained in a clean, safe and tidy condition at all times and the area must be thoroughly cleaned at the end of each days activities and upon completion.

 

i)      The work can only be carried out in accordance with approved hours of building work as specified in the development consent, unless the express written approval of Council has been obtained beforehand.

 

j)      Sediment control measures must be implemented in accordance with the conditions of development consent and soil, sand or any other material must not be allowed to enter the stormwater drainage system or cause a pollution incident.

 

k)     The owner/developer must have a Public Liability Insurance Policy in force, with a minimum cover of $10 million and a copy of the insurance policy must be provided to Council prior to carrying out any works within or upon the road, footpath, nature strip or in any public place.

 

Traffic Management

56.     Adequate provisions must be made to ensure pedestrian safety and traffic flow during the site works and traffic control measures are to be implemented in accordance with the relevant provisions of the Roads and Traffic Manual “Traffic Control at Work Sites” (Version 4), to the satisfaction of Council.

 

57.     All work, including the provision of barricades, fencing, lighting, signage and traffic control, must be carried out in accordance with the NSW Roads and Traffic Authority publication - ‘Traffic Control at Work Sites’ and Australian Standard AS 1742.3 – Traffic Control Devices for Works on Roads, at all times.

 

Stormwater Drainage

58.     Adequate provisions must be made to collect and discharge stormwater drainage during construction of the building to the satisfaction of the principal certifying authority.

 

The prior written approval of Council must be obtained to connect or discharge site stormwater to Council’s stormwater drainage system or street gutter.

 

            Tree Removal

59.     Approval is granted for removal of the following, subject to full implementation of the approved landscaping:

 

a)          The group of shrubs in the front yard, close to the front boundary, including the two Callistemon viminalis (Bottlebrush);

 

b)          In the rear yard, the self-seeded Grevillea robusta (Silky Oak) and other shrubs/small trees along the western boundary, close to the southwest corner of the existing dwelling, as well as the other group of shrubs/small trees around the southeast corner of the site.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Occupation Certificate Requirements

60.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

Fire Safety Certificates

61.     Prior to issuing an interim or final Occupation Certificate, a single and complete Fire Safety Certificate, encompassing all of the essential fire safety measures contained in the fire safety schedule must be obtained and be submitted to Council, in accordance with the provisions of the Environmental Planning and Assessment Regulation 2000.  The Fire Safety Certificate must be consistent with the Fire Safety Schedule which forms part of the Construction Certificate.

 

A copy of the Fire Safety Certificate must be displayed in the building entrance/foyer at all times and a copy must also be forwarded to Fire and Rescue NSW.

 

Structural Certification

62.     A Certificate must be obtained from a professional engineer, which certifies that the building works satisfy the relevant structural requirements of the Building Code of Australia and approved design documentation, to the satisfaction of the Principal Certifying Authority. A copy of which is to be provided to Council.

 

BASIX Requirements & Certification

63.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that any relevant BASIX commitments and requirements have been satisfied.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Principal Certifying Authority and Council upon issuing an Occupation Certificate.

 

Occupant Safety - Windows

64.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·        The window having a minimum sill height of 1.5m above the internal floor level,

·        Providing a window locking device at least 1.5m above the internal floor level,

·        Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·        Installing a fixed heavy-duty gauge metal screen over the opening (excluding openings upon the front or any street elevation of the building), such as a metal security screen or metal security mesh and frame system, but not standard fly-screen material,

·        Other appropriate effective safety measures or barriers.

 

The relevant safety measures must be implemented prior to the issue of an Occupation Certificate.

 

Noise Control Requirements & Certification

65.     The operation of plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Office of Environment and Heritage (EPA) Noise Control Guidelines.

 

66.     A report must be obtained from a suitably qualified and experienced consultant in acoustics, which demonstrates and certifies that noise and vibration from any plant and equipment (e.g. mechanical ventilation systems and air-conditioners) satisfies the relevant provisions of the Protection of the Environment Operations Act 1997, NSW Office of Environment and Heritage (EPA) Noise Control Manual, Industrial Noise Policy and Council’s development consent.

 

A copy of the report must be provided to the Principal Certifying Authority and Council prior to an occupation certificate being issued.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

67.     The owner/developer must meet the full cost for Council or a Council approved contractor to:

 

a)   Construct concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site in accordance with the approved plans.

 

NOTE:

The crossing must maintain a minimum 5.0m setback from the Ficus rubiginosa (Port Jackson Fig) on Council’s verge, refer also to Street Tree Protection condition.

 

b)   Remove the redundant concrete vehicular crossing and to reinstate the area with turf and integral kerb and gutter to Council's specification.

c)   Construct a concrete footpath between pedestrian entrance and vehicle crossing to Council’s specification.

d)   Install bollards on both sides of new crossing consistent with neighbouring driveways.

 

68.     Prior to issuing a final occupation certificate or occupation of the development (whichever is sooner), the owner/developer must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

69.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements: 

 

a)     All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)     Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to an occupation certificate being issued for the development, together with payment of the relevant fees.

 

c)     If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)     The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Landscaping

70.     Prior to issuing a Final (or any type of interim) Occupation Certificate, certification from a qualified professional in the landscape/horticultural industry must be submitted to the PCA, confirming that landscaping at this site has been installed substantially in accordance with the Landscape Plan by Taylor Brammer Landscape Architects, dwg no LA01, job no 12-064S, revision B, dated 11.07.2012, and relevant conditions of consent, with the owner/s to implement strategies to ensure that it is maintained in a healthy and vigorous state until maturity.

 

71.     The nature-strip upon Council's footway shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

Service Authorities

Sydney Water Requirements

72.     A section 73 Compliance Certificate, under the Sydney Water Act 1994 must be obtained from Sydney Water Corporation.  An Application for a Section 73 Certificate must be made through an authorised Water Servicing Coordinator.  For details, please refer to the Sydney Water web site www.sydneywater.com.au > Building and developing > Developing your Land > Water Servicing Coordinator or telephone 13 20 92.

 

Please make early contact with the Water Servicing Co-ordinator, as building of water/sewer extensions may take some time and may impact on other services and building, driveway or landscape design.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority and the Council prior to issuing an Occupation Certificate.

 

Stormwater Drainage

73.     A "restriction on the use of land” and “positive covenant" (under section 88E of the Conveyancing Act 1919) shall be placed on the title of the subject property to ensure that the onsite detention/infiltration system is maintained and that no works which could affect the design function of the detention/infiltration/pump-out system are undertaken without the prior consent (in writing) from Council. Such restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

 

Notes:

a.    The “restriction on the use of land” and “positive covenant” are to be to the satisfaction of Council. A copy of Council’s standard wording/layout for the restriction and positive covenant may be obtained from Council’s Development Engineer.

b.    The works as executed drainage plan and hydraulic certification must be submitted to Council prior to the “restriction on the use of land” and “positive covenant” being executed by Council.

 

74.     A works-as-executed drainage plan prepared by a registered surveyor and approved by a suitably qualified and experienced hydraulic consultant/engineer must be forwarded to the Principal Certifying Authority and the Council. The works-as-executed plan must include the following details (as applicable):

 

·      The location of any detention basin/s with finished surface levels;

·      Finished site contours at 0.2 metre intervals;

·      Volume of storage available in any detention areas/wet wells;

·      The location, diameter, gradient and material (i.e. PVC, RC etc) of all stormwater pipes;

·      The orifice size/s (if applicable);

·      Details of any infiltration/absorption systems; and

·      Details of any pumping systems installed (including wet well volumes).

 

75.     The applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer, which confirms that the design and construction of the stormwater drainage system complies with the Building Code of Australia, Australian Standard AS3500.3:2003 (Plumbing & Drainage- Stormwater Drainage) and conditions of this development consent. 

 

The certification must be provided following inspection/s of the site stormwater drainage system by the Hydraulic Engineers to the satisfaction of the PCA.

 

76.     The applicant shall submit to the Principal Certifying Authority (PCA) and Council certification from a suitably qualified and experienced professional engineer, confirming that the walls of the basement have been fully tanked and waterproofed to prevent the entry of all ground/seepage water in the basement level/s and that any required sub-soil drainage systems have been provided in accordance with the conditions of this consent.

 

Waste Management

77.     Prior to the occupation of the development, the owner or applicant is required to contact Council’s City Services department, to make the necessary arrangements for the provision of waste services for the premises.

 

78.     The waste storage areas shall be clearly signposted.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

Fire Safety Statements

79.     A single and complete Fire Safety Statement (encompassing all of the fire safety measures upon the premises) must be provided to the Council in accordance with the requirements of the Environmental Planning & Assessment Regulation 2000

 

The Fire Safety Statement must be provided on an annual basis each year following the issue of the Fire Safety Certificate, and other period if any of the fire safety measures are identified as a critical fire safety measure in the Fire Safety Schedule

 

The Fire Safety Statement is required to confirm that all the fire safety measures have been assessed by a properly qualified person and are operating in accordance with the standards of performance specified in the Fire Safety Schedule.

 

A copy of the Fire Safety Statement must be displayed in the building entrance/foyer at all times and a copy must also be forwarded to Fire & Rescue NSW.

 

Stormwater Detention/Infiltration  System

80.     Any detention area/infiltration system must be regularly cleaned and maintained to ensure it functions as required by the design.

 

GENERAL ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and requirements.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1      The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

A2      Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from an Accredited Certifier or Council

§  An Accredited Certifier or Council has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

A3      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA), Disability (Access to Premises – Buildings) Standards 2010 and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards.  You are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A4      Any proposed amendments to the design and construction of the building may require a new development application or a section 96 amendment to the existing consent to be obtained from Council, before carrying out such works

 

A5      Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

A6      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A7      This consent does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the land owner or principal contractor must obtain:

 

§  the consent of the owners of such adjoining or supported land to trespass or encroach, or

§  an access order under the Access to Neighbouring Land Act 2000, or

§  an easement under section 88K of the Conveyancing Act 1919, or

§  an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

A8      External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to any adjoining land.

 

A9      Finished ground levels external to the building are to be consistent with the development consent and are not to be raised, other than for the provision of approved paving or the like on the ground.

 

A10     Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

A11     A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

A12     The necessary development consent and a construction certificate or a complying development certificate (as applicable) must be obtained for proposed external plant and equipment, if not included in this consent.

 

A13     An application must be submitted to an approved by Council prior to the installation and operation of any proposed greywater or wastewater treatment systems, in accordance with the Local Government Act 1993.

 

Greywater/Wastewater treatment systems must comply with the relevant requirements and guidelines produced by NSW Health, NSW Office of Environment and Heritage and other relevant regulatory requirements.

 

A14     The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

A15     Underground assets may exist in the area that is subject to your application. In the interests of health and safety and in order to protect damage to third party assets please contact Dial before you dig at www.1100.com.au or telephone on 1100 before excavating or erecting structures (This is the law in NSW). If alterations are required to the configuration, size, form or design of the development upon contacting the Dial before You Dig service, an amendment to the development consent (or a new development application) may be necessary. Individuals owe asset owners a duty of care that must be observed when working in the vicinity of plant or assets. It is the individual’s responsibility to anticipate and request the nominal location of plant or assets on the relevant property via contacting the Dial before you dig service in advance of any construction or planning activities.

 

A16     The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

A17     Further information and details on Council's requirements for trees on development sites can be obtained from the recently adopted Tree Technical Manual, which can be downloaded from Council’s website at the following link, http://www.randwick.nsw.gov.au - Looking after our environment – Trees – Tree Management Technical Manual; which aims to achieve consistency of approach and compliance with appropriate standards and best practice guidelines.

 

MOTION: (Mayor, Cr Bowen/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D35/13     Development Application Report - 175-249R Arden Street, Coogee (DA/150/2013)

PL40/13

RESOLUTION: (Andrews/D'Souza) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 150/2013 for the construction of a memorial for fallen life savers at southern end of Goldstein Reserve consisting of a sculpture, memorial wall, flagpole, retaining walls, stairs, paved and turfed areas, landscaping and lighting at No. 175-249R Arden Street, Coogee, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received by Council

NMFLS-DA-A1- Site Analysis

 

Thompson Berrill Landscape Design P/L

 

15/03/13

 

15/03/2013

NMFLS-DA-A2 – Site Management

NMFLS-DA-B1 – General Arrangement Plan

NMFLS-DA-B2 - Elevations

NMFLS-DA-B3 – Sculpture details

NMFLS-DA-E – Landscape Plan

NMFLS-DA-F – Drainage Plan

NMFLS-DA-G – Sediment and erosion control plan

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

2.       The applicant is to liaise with Sydney Water and any other relevant service provider during the detailed engineering and construction phases to ensure the safety of workers and the general public and the continuation of essential services during this time. Confirmation of liaison with Sydney Water is to be provided with any Construction Certificate application.

 

3.       Prior to the application for a construction certificate the applicant shall submit an amended lighting plan to be approved by Council’s Coordinator of Engineering Services that demonstrates compliance with the following requirements;

 

§  The amount of overhead lighting shall be adequate to allow for safe and well-lit public spaces along the promenade.

§  The lighting is to be provided in accordance with the relevant Australian Standards

§  Full details are to be provided on how the proposed lighting is going to be served (Eg connection to existing street lighting system, separate meter/s etc)

 

4.       A separate written approval from Council is required to be obtained in relation to all works within the road reserve/public place, in accordance with the requirements of the Roads Act 1993.  Detailed plans and specifications of the proposed works are to be submitted to and approved by the Director of City Services prior to commencing any works within the road reserve/public place.

 

All works within the road reserve/public place must be carried out to the satisfaction of Council and certification from a certified practicing engineer is to be provided to Council upon completion of the works.

 

Relevant Council assessment and inspection fees, as specified in Council's adopted Pricing Policy, are required to be paid to Council prior to commencement of the works.

 

Sydney Water

5.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved plans must be submitted to a Sydney Water Quick Check agent, to determine whether the development will affect Sydney Water’s waste water and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For details please refer to the Sydney Water web site at www.sydneywater.com.au for:

 

·           Quick Check agents details -  see Building and Developing then Quick Check and

·           Guidelines for Building Over/Adjacent to Sydney Water Assets – see Building and Development then Building and Renovating, or telephone 13 20 92.

 

The Principal Certifying Authority must ensure that a Sydney Water Quick Check Agent has appropriately stamped the plans.

 

          Stormwater Drainage

6.       Detailed drainage plans with levels reduced to Australian Height Datum (AHD), shall be prepared by a suitably qualified Hydraulic Engineer and be submitted to and approved by the certifying authority.  A copy of the plans shall be forwarded to Council, if Council is not the certifying authority.

 

The drainage plans must demonstrate compliance with the Building Code of Australia, Australian Standard AS3500.3:2003 (Plumbing and Drainage - Stormwater Drainage) and the relevant conditions of this development approval.

 

7.       The drainage system shall be designed and installed in general accordance with the Drainage Plan submitted with the application by Thompson Berrill P/L Drawing No. NMFLS-DA-F and stamped by Council 15th March 2013.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Public Utilities

8.       A Public Utility Impact Assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

9.       The applicant must meet the full cost for telecommunication companies, gas providers, Ausgrid, and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

Construction Traffic Management

10.     As it appears construction related activities will require the reserving of on-street parking in Carr St an application for a ‘Works Zone’ and Construction Traffic Management Plan must be submitted to Councils Integrated Transport Department, and approved by the Randwick Traffic Committee, for a ‘Works Zone’ to be provided in Carr Street. 

 

The ‘Works Zone’ must have a minimum length of 12m and extend for a minimum duration of three months.  The suitability of the proposed length and duration is to be demonstrated in the application for the Works Zone.  The application for the Works Zone must be submitted to Council at least six (6) weeks prior to the commencement of work on the site to allow for assessment and tabling of agenda for the Randwick Traffic Committee.

 

Works Zones may be varied or waived only if it can be demonstrated in the Construction Traffic Management Plan (to the satisfaction of Council’s Traffic Engineers) that all construction related activities (including all loading and unloading operations) can and will be undertaken wholly within the site.  The written approval of Council must be obtained to provide a Works Zone or to waive the requirement to provide a Works Zone prior to the commencement of any site work.

 

11.     A detailed Construction Site Traffic Management Plan must be submitted to and approved by Council, prior to commencement of any site work.

 

The Construction Site Traffic Management Plan must be prepared by a suitably qualified person and must include the following details, to the satisfaction of Council:

 

·       A description of the demolition, excavation and construction works

·       A site plan/s showing the site, roads, footpaths, site access points and vehicular movements

·       Any proposed road and/or footpath closures

·       Proposed site access locations for personnel, deliveries and materials

·       Size, type and estimated number of vehicular movements (including removal of excavated materials, delivery of materials and concrete to the site)

·       Provision for loading and unloading of goods and materials

·       Impacts of the work and vehicular movements on the road network, traffic and pedestrians

·       Proposed hours of construction related activities and vehicular movements to and from the site

·       Current/proposed approvals from other Agencies and Authorities (including NSW Roads & Traffic Authority, Police and State Transit Authority)

·       Any activities proposed to be located or impact upon Council’s road, footways or any public place

·       Measures to maintain public safety and convenience

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

12.     A Management and Maintenance Strategy for the proposed memorial is to be prepared to ensure the location is kept clean and in a state fit for public use at all times. Graffiti prevention and removal is to be considered within this policy.

 

Tree Protection Measures

13.     In order to ensure retention of the row of three Araucaria columnaris (Cooks Pines) within Council’s Carr Street footpath, to the south of the proposed works, as well as the stand of three Banksia integrifolia (Coastal Banksia’s) at the southern end of the existing garden bed within Goldstein Reserve in good health, the following measures are to be undertaken:

 

a.       All documentation must show the retention of these public trees, with the position and diameter of both their trunks and canopies to be clearly and accurately shown in relation to the proposed works, as well as to any temporary access points.

 

b.       Any excavations associated with the installation/redirection of services, pipes, stormwater systems or similar across the footpath must be located an equal distance between the trunks of the Cooks Pines, and for within the reserve, a minimum distance of 2 metres from the Coastal Banksia’s, measured off the outside edge of their trunks at ground level.

 

c.       Any roots from the Banksia’s which are encountered during excavations for the new retaining walls/terraces, paved pathways and drainage works and need to be cut cleanly must be pruned cleanly by hand, and are not to be left exposed to the atmosphere, with the affected areas to be backfilled with clean site soil as soon as practically possible.

 

d.       Prior to the commencement of any site works, their trunks are to be physically protected by geo-textile, underfelt, carpet or layers of Hessian, from ground level up to a height of approximately 2m (or to the first rung of branches), to which, 2m lengths of 50mm x 100mm hardwood timbers, spaced at 150mm centres shall be placed vertically around their circumference, and are to be secured by 8 gauge wires or steel strapping at 300mm spacing. NO NAILING TO THE TRUNK.

 

e.       This shall be installed prior to the commencement of demolition and construction works and must remain in place until all works are completed, to which, signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION, DO NOT REMOVE".

 

f.        There is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble around their trunks, or, placed in an area where these materials could run-off towards the trees, with all Site Management Plans needing to acknowledge these requirements.

 

Tree Management

14.     No objections are raised to removing the existing vegetation within the garden bed so as to accommodate the proposed works as shown, including Westringia fruticosa (Coastal Rosemary), Lomandra longifolia (Lomandra), as well as the small, dead Banksia integrifolia (Coastal Banksia) within the stand of trees at the southern end of the works, subject to full implementation of the approved landscape plan.

 

Pruning

15.     Should pruning of either the Cooks Pine street trees or Coastal Banksia’s within the area of the proposed monument be required as part of the proposed works, Council’s Co-ordinator - Tree Management must be contacted on 9399-0609 to determine the exact location and extent that is permissible, and can only be performed by Council’s authorised staff.

 

Landscaping

16.     The applicant must ensure that the proposed sandstone paving must is a material that is compatible with the existing, surrounding surfaces, with the use of skateboard prevention devices to be investigated for the new feature/seating walls, particularly the lowest, most eastern wall adjacent the promenade.

 

Road / Asset Opening Permit

17.     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:        For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

          Landscaping

18.     The PCA must ensure that the landscaping is installed in accordance with the Architectural Plans by Thompson Berrill Landscape Design Pty Ltd, dwg NMFLS-DA-A1 – G, review P2, dated 15/03/13 and stamped 15 March 2013, and relevant conditions of consent, prior to the issue of a Final Occupation Certificate.

 

19.     Those areas of Goldstein Reserve which are damaged during the course of the proposed works shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu turf rolls, or a similar alternative to Council’s satisfaction.

 

20.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

21.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements: 

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to an occupation certificate being issued for the development, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Stormwater Drainage

22.     The applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer confirming that the design and construction of the stormwater drainage system complies with Australian Standard 3500.3:2003 (Plumbing & Drainage- Stormwater Drainage) and the conditions of this development approval. The certification must be provided following inspection/s of the site stormwater drainage system by the certifying engineers and shall be provided to the satisfaction of the PCA.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

·          Underground assets (eg pipes, cables etc) may exist in the area that is subject to your application. In the interests of health and safety and in order to protect damage to third party assets please contact Dial before you dig at www.1100.com.au or telephone on 1100 before excavating or erecting structures (This is the law in NSW). If alterations are required to the configuration, size, form or design of the development upon contacting the Dial before You Dig service, an amendment to the development consent (or a new development application) may be necessary. Individuals owe asset owners a duty of care that must be observed when working in the vicinity of plant or assets. It is the individual’s responsibility to anticipate and request the nominal location of plant or assets on the relevant property via contacting the Dial before you dig service in advance of any construction or planning activities.

·          The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or reserve prior to the commencement of any building/demolition works.

·          Further information and details on Council's requirements for trees on development sites can be obtained from the recently adopted Tree Technical Manual, which can be downloaded from Council’s website at the following link, http://www.randwick.nsw.gov.au - Looking after our environment – Trees – Tree Management Technical Manual; which aims to achieve consistency of approach and compliance with appropriate standards and best practice guidelines.

 

MOTION: (Andrews/D'Souza) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Matson

Councillor Belleli

Councillor Seng

Councillor Bowen

Councillor Shurey

Councillor D'Souza

 

Councillor Garcia

 

Councillor Moore

 

Councillor Nash

 

Councillor Neilson

 

Councillor Smith

 

Councillor Stavrinos

 

Councillor Stevenson

 

Total (11)

Total (3)

 

 

 

D36/13     Development Application Report - 211-213 Anzac Parade, Kensington (DA/744/2012)

PL41/13

RESOLUTION: (Moore/Nash) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 744/2012 for demolition of existing structures, removal of underground fuel tanks, retention of existing acoustic wall on western boundary, construction of new service station comprising 4 double sided bowsers, canopy, convenience store with enclosed service yard at rear, waste storage area, car parking, extension of acoustic wall, landscaping, and operation on a 24 hours/7 days basis, at No. 211-213 Anzac Parade, Kensington, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

 

Amendment of Plans & Documentation

2.       The approved plans and documents must be amended in accordance with the following requirements and details are to be included in the Construction Certificate:

 

a)    The three graphics panels on the eastern elevation of the convenience store building must not be illuminated at all times.

 

b)    The proposed signage must not contain or utilize any of the following:

·      Flashing lights

·      Animated display, moving parts or simulated movements

·      A method and level of illumination that distracts or dazzles

 

c)    Any external lighting to the premises must be designed in accordance with Australian Standard AS 4282: Control of the Obtrusive Effects of Outdoor Lighting, so as not to cause a nuisance to nearby residents or motorists and to ensure that light overspill does not affect the amenity of the area.

 

d)    The palisade fence enclosing the landscaped areas in the northern part of the site must maintain a minimum of 70% openness.

 

e)    The western wall of the convenience store building must be finished in a light toned colour (for instance, white, off-white or light grey).

 

f)    The design and construction of the acoustic fences / walls must be consistent with the recommendations of the Noise Assessment Report, Report No. 610.07939.05636-R1, dated 15 August 2011, prepared by SLR Global Environmental Solutions.

 

g)    The interface between the western wall of the convenience store building and the existing acoustic fences to the north and south must be appropriately sealed off to ensure proper noise insulation to the adjoining dwellings on Doncaster Avenue.

 

h)    The 50mm gap between the western wall of the convenience store building and the retained acoustic fence to the west must be appropriately sealed off to prevent vermin access and collection of dirt.

 

Hours of Operation

3.       The hours of operation of the service station are restricted to the following and are subject to a 12-month trial period:

 

Monday – Sunday:      24 hours a day

 

A Section 96 modification application must be submitted to Council within 12 months of the issuing date of the Occupation Certificate to enable Council to review the hours of operation. Appropriate supporting evidence (including, but not limited to, relevant acoustics measurements) must be submitted with the above application to demonstrate compliance with all conditions of this consent as part of the review.

 

Should an application not be received by Council to modify the consent within the period stipulated above, the hours of operation shall revert to: 7am to 10pm, Monday to Sunday.

 

4.       a) All deliveries for fuel and waste must be made between the following hours:

 

·        Monday to Saturday 7.00am to 7.00pm

 

          b) All other deliveries must be made within the following hours:

 

·      Monday to Sunday 6.00am to 9.00 pm

 

5.       Within one (1) month of commencement of use and from time to time as may be requested by Council, a report must be obtained from a suitably qualified and experienced consultant in acoustics, and submitted to Council which demonstrates and certifies that noise from the use and operation from the development complies with the relevant provisions of the Protection of the Environment Operations Act 1997, NSW EPA/DECC Noise Control Manual & Industrial Noise Policy and conditions of Council’s consent.

 

The acoustic report is to include (but not be limited) to;

 

·          Noise emission from the proposed development (e.g. operational noise, mechanical noise, monitoring from nearest affected residential premises during the use and operation of the premises when there is maximum occupancy to satisfy intrusiveness and amenity criteria)

·          Background noise levels shall be taken between 10:00pm – 11:00pm in the absence of any other restaurants/cafes operating in the area.

 

Any recommendations or requirements which form part of this acoustic report are to be accepted in writing by Council’s Manager Health & Building Regulatory Services prior to their implementation.

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either an Accredited Certifier or Randwick City Council.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

6.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

7.       The colours, materials and surface finishes to the development must be consistent with the approved drawings.

 

Section 94A Development Contributions

8.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $4,032,424, the following applicable monetary levy must be paid to Council: $40,324.24.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Long Service Levy Payments

9.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

Security Deposit

10.     The following damage / civil works security deposit requirement must be complied with, as security for making good any damage caused to the roadway, footway, verge or any public place; and as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

·           $4000.00    -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash, cheque or credit card payment and is refundable upon a satisfactory inspection by Council upon the completion of the civil works which confirms that there has been no damage to Council's infrastructure.

 

The owner/builder is also requested to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

To obtain a refund of relevant deposits, a Security Deposit Refund Form is to be forwarded to Council’s Director of City Services upon issuing of an occupation certificate or completion of the civil works.

 

Sydney Water

11.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved plans must be submitted to a Sydney Water Quick Check agent, to determine whether the development will affect Sydney Water’s waste water and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For details please refer to the Sydney Water web site at www.sydneywater.com.au for:

 

·           Quick Check agents details -  see Building and Developing then Quick Check and

·           Guidelines for Building Over/Adjacent to Sydney Water Assets – see Building and Development then Building and Renovating, or telephone 13 20 92.

 

The Principal Certifying Authority must ensure that a Sydney Water Quick Check Agent has appropriately stamped the plans.

 

Street Tree Protection Measures

12.     In order to ensure the retention of the row of Platanus x hybrida (London Plane Trees) located on the Anzac Parade verge in good health, being two between the two existing vehicle crossing, then one towards the bus stop near the northeast corner of the site, the following measures are to be undertaken:

 

a.       All documentation submitted for the Construction Certificate application must show the retention of these three trees, with the position and diameter of both their trunks and canopies to be clearly shown in relation to the works.

 

b.       Any excavations associated with the installation of new services, pipes, stormwater systems or similar over public property, must be setback a minimum distance of 2.5 metres off their trunks, measured off their base at ground level, with all hydraulic plans and similar needing to comply with this requirement.

 

c.       Prior to the commencement of any site works, the trunk of each tree is to be physically protected by geo-textile, underfelt or layers of Hessian, to a height of approximately 2m above ground level, to which, 2m lengths of 50mm x 100mm hardwood timbers, spaced at 150mm centres shall be placed around its circumference, and are to be secured by 8 gauge wires or steel strapping at 300mm spacing. NO nailing to the trunk.

 

d.       The applicant is not authorised to perform any other works to these trees, and shall contact Council’s Landscape Development Officer on 9399-0613 should pruning or any similar work appear necessary, either so as to avoid damage to the trees; or; interference with the works.

 

e.       If pruning is required, the applicant must give 4 weeks notice for this to be performed, only by Council, and wholly at the applicant’s cost, with the required fee to be paid into Tree Amenity Income at Council’s Customer Service Centre, prior to the issue of a Final Occupation Certificate.

 

f.        There is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble around their trunks, with all Site Management Plans needing to acknowledge these requirements.

 

g.       Any roots encountered during the course of the approved works must be cut cleanly by hand, and the affected area backfilled with clean site soil as soon as practically possible.

 

h.       A refundable deposit in the form of cash, credit card or cheque for an amount of $2000.00 shall be paid at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development, in order to ensure compliance with the conditions listed in this consent, and ultimately, preservation of the trees.

 

The refundable deposit will be eligible for refund following the issue of a Final Occupation Certificate, subject to completion and submission of Council’s ‘Security Deposit Refund Application Form’, and pending a satisfactory inspection by Council’s Landscape Development Officer (9399-0613).

 

Any contravention of Council's conditions relating to the trees at any time during the course of the works, or prior to the issue of a Final Occupation Certificate, may result in Council claiming all or part of the lodged security in order to perform any rectification works necessary, as per the requirements of 80A (6) of the Environmental Planning and Assessment Act 1979.

 

13.     The premises must be designed, constructed and operated in accordance with relevant regulatory requirements, guidelines and standards, including:

 

·              Protection of the Environment Operations Act 1997

·              Protection of the Environment Operations (Underground Petroleum Storage Systems) Regulation 2008

·              DECC Guidelines (including Environmental Action for Service Stations)

·              Australian Standard AS 1940 (2004) – The Storage and Handling of Flammable and Combustible Liquids

·              WorkCover NSW requirements and guidelines

·              Sydney Water requirements and licences

 

A report detailing compliance with the relevant regulatory requirements, guidelines and standards must be prepared by a suitably qualified person and be submitted to the certifying authority prior to issuing the construction certificate for the development, with a copy forwarded to Council.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

Compliance with the Building Code of Australia & Relevant Standards

14.     In accordance with section 80A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

Access & Facilities

15.     Access and facilities for people with disabilities must be provided in accordance with the relevant requirements of the Building Code of Australia, Disability (Access to Premises – Buildings) Standard 2010, relevant Australian Standards and conditions of consent, to the satisfaction of the Certifying Authority.

 

Building & Design

16.     The installation of roller shutters or security grilles to the shopfront is not permitted, unless a specific development consent has been obtained from Council.

 

Car spaces

17.     Car spaces and parking layout must be designed and constructed in accordance with AS 2890.1 (2004) – Off Street Car Parking. Details of compliance are to be included in plans submitted for the construction certificate.

 

Flooding

18.     To ensure compliance with Council’s flood protection requirements the following measures are to be undertaken with details included in plans submitted for the construction certificate;

a.  All on-site car spaces are to be provided a minimum of 200mm above adjacent gutter levels to provide protection against the 5% AEP (1 in 20yr) flood event.

b.  The proposed retail building shall be constructed at minimum RL 26.55 (AHD) to provide protection against the 1% AEP (1 in 100yr) flood event.

 

Stormwater Drainage

19.     Stormwater drainage plans have not been approved as part of this development consent. Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage shall be prepared by a suitably qualified Hydraulic Engineer and submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issued, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)       A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

 

b)       A layout of the proposed drainage system including pipe sizes, type, grade, length, invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system. 

 

c)       The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

 

i.        Roof areas

ii.       Paved areas

iii.       Grassed areas

iv.      Garden areas

 

d)       Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

 

e)       Proposed finished surface levels and grades of car parks, internal driveways and access aisles.

 

f)       Proposed finished surface levels and grades of car parks, internal driveways and access aisles.

 

g)       The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

h)       The stormwater drainage plans shall include details on how stormwater which may contain spillage of polluting materials is to be drained (this stormwater is not to be dispersed to the kerb and gutter/ street drainage system).

 

20.     The site stormwater drainage system is to be provided in accordance with the following requirements;

 

a)     The stormwater drainage system must be provided in accordance with the relevant requirements of Building Code of Australia and the conditions of this consent, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate.

 

b)     The stormwater must be discharged (by gravity) directly to the kerb and gutter or underground drainage system located at the front of the subject site in Anzac Parade.

 

c)     An on-site stormwater detention system must be provided to ensure that the maximum discharge from the site does not exceed that which would occur during a 1 in 10 year storm of one hour duration for existing site conditions. All other stormwater run-off from the site for all storms up to the 1 in 20 year storm is to be retained on the site for gradual release to the street drainage system, to the satisfaction of the certifying authority.

 

An overland escape route or overflow system (to Council’s street drainage system) must be provided for storms having an average recurrence interval of 100 years (1 in 100 year storm), or, alternatively the stormwater detention system is to be provided to accommodate the 1 in 100 year storm.

 

d)     Determination of the required cumulative storage (in the on-site detention system) must be calculated by the mass curve technique as detailed in Technical Note 1, Chapter 14 of the Australian Rainfall and Run-off Volume 1, 1987 Edition.

 

Where possible any detention tanks should have an open base to infiltrate stormwater into the ground. Infiltration should not be used if ground water and/or any rock stratum is within 2.0 metres of the base of the tank.

 

e)     Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (i.e. above the 1 in 20 year storm) to the proposed drainage (detention/infiltration) system.

 

f)     A sediment/silt arrestor pit must be provided within the site near the street boundary prior to discharge of the stormwater to Council’s drainage system and prior to discharging the stormwater to any absorption/infiltration system.

 

Sediment/silt arrestor pits are to be constructed generally in accordance with the following requirements:

·         The base of the pit being located a minimum 300mm under the invert level of the outlet pipe.

·         The pit being constructed from cast in-situ concrete, precast concrete or double brick.

·         A minimum of 4 x 90 mm diameter weep holes (or equivalent) located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

·         A galvanised heavy-duty screen being provided over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

·         The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

·         A child proof and corrosion resistant fastening system being provided for the access grate (e.g. spring loaded j-bolts or similar).

·         Provision of a sign adjacent to the pit stating, “This sediment/silt arrester pit shall be regularly inspected and cleaned”.

 

Sketch details of a standard sediment/silt arrester pit may be obtained from Council’s Drainage Engineer.

 

g)     The floor level of all habitable, retail, commercial and storage areas located adjacent to any detention and/or infiltration systems with above ground storage must be a minimum of 300mm above the maximum water level for the design storm or alternately a permanent 300mm high water proof barrier is to be provided.

 

(In this regard, it must be noted that this condition must not result in any increase in the heights or levels of the building.  Any variations to the heights or levels of the building will require a new or amended development consent from the Council prior to a construction certificate being issued for the development).

 

h)     The maximum depth of ponding in any above ground detention areas and/or infiltration systems with above ground storage shall be as follows (as applicable):

i.     150mm in uncovered open car parking areas (with an isolated maximum depth of 200mm permissible at the low point pit within the detention area)

ii.    300mm in landscaped areas (where child proof fencing is not provided around the outside of the detention area and sides slopes are steeper than 1 in 10)

iii.   600mm in landscaped areas where the side slopes of the detention area have a maximum grade of 1 in 10

iv.   1200mm in landscaped areas where a safety fence is provided around the outside of the detention area

v.    Above ground stormwater detention areas must be suitably signposted where required, warning people of the maximum flood level.

 

i)      A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

 

j)     A ‘V’ drain (or equally effective provisions) are to be provided to the perimeter of the property, where necessary, to direct all stormwater to the detention/infiltration area.

 

k)     Mulch or bark is not to be used in on-site detention areas.

 

l)      Site discharge pipelines shall cross the verge at an angle no less than 45 degrees to the kerb line.

 

Waste Management

21.     A Waste Management Plan detailing the waste and recycling storage and removal strategy for all of the development, is required to be submitted to and approved by Council’s Director of City Services.

 

The Waste Management plan is required to be prepared in accordance with Council's Waste Management Guidelines for Proposed Development and must include the following details (as applicable):

 

·    The use of the premises and the number and size of occupancies.

·    The type and quantity of waste to be generated by the development.

·    Demolition and construction waste, including materials to be re-used or recycled.

·    Details of the proposed recycling and waste disposal contractors.

·    Waste storage facilities and equipment.

·    Access and traffic arrangements.

·    The procedures and arrangements for on-going waste management including collection, storage and removal of waste and recycling of materials.

 

Further details of Council's requirements and guidelines, including pro-forma Waste Management plan forms can be obtained from Council's Customer Service Centre.

 

22.     A report must be obtained from a suitably qualified and experienced consultant in acoustics, which demonstrates and certifies that noise and vibration from the development (including all fixed plant and equipment) satisfy the relevant provisions of the Protection of the Environment Operations Act 1997, NSW Office of Environment & Heritage/Environment Protection Authority Noise Control Manual & Industrial Noise Policy, recommendations detailed in section 6 of the noise report number 610.07939.05636-R1 prepared by SLR dated 15 August 2011, and conditions of Council’s development consent.  A copy of the report is to be forwarded to the Council with or prior to the issue of a construction certificate.

 

Design, Construction & Fit-out of Food Premises

23.     The premises is to be designed and constructed in accordance with the Food Act 2003, Food Regulation 2010, Australia & New Zealand Food Standards Code, and Australian Standard AS 4674-2004: Design, construction and fit-out of food premises.  Details of the design and construction of the premises are to be included in the documentation for the construction certificate to the satisfaction of the certifying authority.

 

24.     The design and construction of the food premises must comply with the following requirements (as applicable):

 

·          Floors of food preparation and food areas and the like are to be constructed of materials which are impervious, non slip and non abrasive.  The floor is to be finished to a smooth even surface, graded and drained to a floor waste connected to the sewer.  The intersection of walls with floor and plinths is to be coved, to facilitate cleaning.

 

·          Walls of food areas and the like are to be of suitable construction finished in a light colour with glazed tiles, stainless steel, laminated plastics or similar approved material adhered directly to the wall adjacent to cooking and food preparation facilities or areas.

 

Glazed tiling or other approved material is to extend up to the underside of any mechanical exhaust ventilation hoods and a minimum of 450mm above bench tops, wash hand basins, sinks and equipment.

 

Walls where not tiled are to be cement rendered or be of rigid smooth faced non-absorbent material (i.e. fibrous cement sheeting, plasterboard or other approved material) and finished to a smooth even surface, painted with a washable paint of a light colour or sealed with other approved materials.

 

·          Ceilings of kitchens, food preparation areas and storerooms are to be of rigid smooth-faced, non absorbent material (i.e. fibrous plaster, plasterboard, fibre cement sheet, cement render or other approved material) painted with a light-coloured washable paint.  ‘Drop-down’ ceiling panels must not be provided in food preparation or cooking areas.

 

·          All stoves, refrigerators, bain-maries, stock pots, washing machines, hot water heaters, large scales, food mixers, food warmers, cupboards, counters, bars etc must be supported on wheels, concrete plinths a minimum 75mm in height, metal legs minimum 150mm in height, brackets or approved metal framework of the like.

 

·          Cupboards, cabinets, benches and shelving may be glass, metal, plastic, timber sheeting or other approved material.  The use of particleboard or similar material is not permitted unless laminated on all surfaces.

 

·          Fly screens and doors with self-closing devices, (where applicable), are to be provided to all external door and window openings and an electronic insect control device must also be provided within food premises.

 

·          A mechanical ventilation exhaust system is to be installed where cooking or heating processes are carried out in the kitchen or in food preparation areas, where required under the provisions of Clause F4.12 of the BCA and Australian Standard AS 1668 Parts 1 & 2.

 

·          Wash hand basins must be provided in convenient positions located in the food preparation areas, with hot and cold water, together with a sufficient supply of soap and clean towels.  The hot and cold water must be supplied to the wash hand basins through a suitable mixing device.

 

·          Cool rooms or freezers must have a smooth epoxy coated concrete floor, which is to be sloped to the door.  A floor waste connected to the sewer is to be located outside the cool room/freezer.  The floor waste should be provided with a removable basket within a fixed basket arrestor and must comply with Sydney Water requirements.

 

·          All cool rooms and freezers must be able to be opened from the inside without a key and fitted with an alarm (bell) that can only be operated from within the cool room/freezer.

 

·          Any space or gap between the top of any cool room or freezer and the ceiling must be fully enclosed and kept insect and pest proof (e.g. plasterboard partition with gaps sealed).

 

Sydney Water Requirements

25.     Liquid trade waste materials are to be disposed of to the sewer (via a suitable grease trap) and details of compliance are to be submitted to the Certifying Authority.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Certification and Building Inspection Requirements

26.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)   a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

a)   a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

b)   the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

c)   at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

Dilapidation Reports

27.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·        excavations for new buildings, additions to existing buildings which are proposed to be located within the zone of influence of the footings of a building located upon an adjoining  premises,

·        buildings sited up to shared boundaries,

·        excavations for new buildings, additions to existing buildings which are within rock and may result in vibration and or potential damage to any building located upon an adjoining  premises,

·        as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) is required to detail the current condition and status of the relevant building/s located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Site Management Plan

28.     A Construction Site Management Plan must be developed and implemented throughout the site works, to Council’s satisfaction.  The construction site management plan must include the following measures, (as applicable):

 

·          location and construction of temporary site fencing / hoardings;

·          location of site storage areas/sheds/equipment;

·          location of building materials for construction;

·          provisions for public safety;

·          dust control measures;

·          details of proposed sediment and erosion control measures;

·          site access location and construction;

·          details of methods of disposal of demolition materials;

·          protective measures for tree preservation;

·          location and size of waste containers/bulk bins;

·          provisions for temporary stormwater drainage;

·          construction noise and vibration management;

·          construction traffic management details;

·          provisions for temporary sanitary facilities.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Construction Noise & Vibration Management Plan

29.     A Construction Noise & Vibration Management Plan, prepared in accordance with the Department of Climate Change Guidelines for Construction Noise and Assessing Vibration, by a suitably qualified person, is to be developed and implemented prior to commencing site work and throughout the course of construction.

 

a)     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents. 

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

b)     The Construction Noise & Vibration Management Plan must include details of measurements, analysis and relevant criteria and demonstrate that the noise and vibration emissions from the work satisfy the relevant provisions of the Protection of the Environment Operations Act 1997, current DECC Guidelines for Construction Noise and Assessing Vibration and Councils conditions of consent.

 

c)     Any recommendations and requirements contained in the Construction Noise & Vibration Management Plan and associated reports are to be implemented accordingly and should noise and vibration emissions not comply with the terms and conditions of consent, work must cease forthwith and is not to recommence until details of compliance are submitted to Council and the PCA.

 

A copy of the Construction Noise & Vibration Management Plan and associated acoustic/vibration report/s must be maintained on-site and a copy must be provided to Council and the Principal Certifying Authority accordingly.

 

Public Liability

30.     The owner/builder is required to hold Public Liability Insurance, with a minimum liability of $10 million and a copy of the Insurance cover is to be provided to the Principal Certifying Authority and Council.

 

Construction Traffic Management

31.     The applicant/developer is to arrange with the RMS’s Transport Management centre (TMC) for any required road occupancy license during construction.

 

32.     A detailed Construction Site Traffic Management Plan must be submitted to and approved by Council, prior to commencement of any site work.

 

The Construction Site Traffic Management Plan must be prepared by a suitably qualified person and must include the following details, to the satisfaction of Council:

·       A description of the demolition, excavation and construction works.

·       A site plan/s showing the site, roads, footpaths, site access points and vehicular movements.

·       Any proposed road and/or footpath closures.

·       Proposed site access locations for personnel, deliveries and materials.

·       Size, type and estimated number of vehicular movements (including removal of excavated materials, delivery of materials and concrete to the site).

·       Provision for loading and unloading of goods and materials.

·       Impacts of the work and vehicular movements on the road network, traffic and pedestrians.

·       Proposed hours of construction related activities and vehicular movements to and from the site.

·       Current/proposed approvals from other Agencies and Authorities (including NSW Roads & Traffic Authority, Police and State Transit Authority).

·       Any activities proposed to be located or impact upon Council’s road, footways or any public place.

·       Measures to maintain public safety and convenience.

 

33.     Any necessary approvals must be obtained from NSW Police, Roads & Maritime Services, and relevant Service Authorities, prior to commencing work upon or within the road, footway or nature strip.

 

          Public Utilities

34.     A public utility impact assessment must be carried out on all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.  The assessment should include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of services.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the principal certifying authority prior to the commencement of any demolition, excavation or building works.

 

35.     The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Ausgrid, Sydney Water and other service authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Inspections during Construction

36.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

Building & Demolition Work Requirements

37.     All demolition and building work and associated activities must be carried out in accordance with the following requirements:

 

·          Work Health & Safety Act 2011 & Regulations

·          WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·          WorkCover NSW Requirements, Guidelines and Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997

·          The Protection of the Environment Operations (Waste) Regulation 2005

·          DECC/EPA Waste Classification Guidelines

·          Randwick City Council’s Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

38.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA) and Council, not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

Removal of Asbestos Materials

39.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·        The requirements of WorkCover NSW and Randwick City Council’s Asbestos Policy.

 

·        A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·        On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·        Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority and Council.

 

·        A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal Certifying Authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Excavations, Back-filling & Retaining Walls

40.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring, piling or other measures are to be submitted to and approved by the Principal Certifying Authority.

 

Support of Adjoining Land

41.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

Sediment & Erosion Control

42.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details must be shown in a Sediment and Erosion Control Plan, including; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

A copy of the Sediment and Erosion Control Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Dust Control

43.     During demolition excavation and construction works, dust emissions must be minimised, so as not to result in a nuisance to nearby residents or result in a potential pollution incident.

 

Adequate dust control measures must be provided to the site prior to the works commencing and the measures and practices must be maintained throughout the demolition, excavation and construction process, to the satisfaction of Council.

 

Dust control measures and practices may include:-

·      Provision of geotextile fabric to all perimeter site fencing (attached on the prevailing wind side of the site fencing).

·      Covering of stockpiles of sand, soil and excavated material with adequately secured tarpaulins or plastic sheeting.

·      Installation of a water sprinkling system or provision hoses or the like.

·      Regular watering-down of all loose materials and stockpiles of sand, soil and excavated material.

·      Minimisation/relocation of stockpiles of materials, to minimise potential for disturbance by prevailing winds.

·      Landscaping and revegetation of disturbed areas.

 

Temporary Site Fencing

44.     Temporary site safety fencing or site hoarding must be provided to the perimeter of the site throughout demolition, excavation and construction works, to the satisfaction of Council, in accordance with the following requirements:

 

a)     Temporary site fences or hoardings must have a height of 1.8 metres and be a cyclone wire fence (with geotextile fabric attached to the inside of the fence to provide dust control), or heavy-duty plywood sheeting (painted white), or other material approved by Council.

 

b)     Hoardings and site fencing must be designed to prevent any substance from, or in connection with, the work from falling into the public place or adjoining premises and if necessary, be provided with artificial lighting.

 

c)     All site fencing and hoardings must be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

d)     An overhead (‘B’ Class) type hoarding is required is be provided to protect the public (unless otherwise approved by Council) if:

 

·       materials are to be hoisted (i.e. via a crane or hoist) over a public footway;

·       building or demolition works are to be carried out on buildings which are over 7.5m in height and located within 3.6m of the street alignment;

·       it is necessary to prevent articles or materials from falling and causing a potential danger or hazard to the public or occupants upon adjoining land;

·       as may otherwise be required by WorkCover, Council or the PCA.

 

Notes:

·       Temporary site fencing may not be necessary if there is an existing adequate fence in place having a minimum height of 1.5m.

 

·       If it is proposed to locate any site fencing, hoardings, amenities or articles upon any part of the footpath, nature strip or public place at any time, a separate Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any fencing, hoarding or other article on the road, footpath or nature strip.

 

Public Safety & Site Management

45.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other articles must not be placed upon the footpath, roadway or nature strip at any time.

 

b)     The road, footpath, vehicular crossing and nature strip must be maintained in a good, safe, clean condition and free from any excavations, obstructions, trip hazards, goods, materials, soils or debris at all times.  Any damage caused to the road, footway, vehicular crossing, nature strip or any public place must be repaired immediately, to the satisfaction of Council.

 

c)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)     Access gates and doorways within site fencing, hoardings and temporary site buildings or amenities must not open outwards into the road or footway.

 

e)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

f)      Adequate provisions must be made to ensure pedestrian safety and traffic flow during the site works and traffic control measures are to be implemented in accordance with the relevant provisions of the Roads and Traffic Manual “Traffic Control at Work Sites” (Version 4), to the satisfaction of Council.

 

Site Signage

46.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·     name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·     name, address and telephone number of the Principal Certifying Authority,

·     a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

47.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Survey Requirements

48.     A Registered Surveyor’s check survey certificate or other suitable documentation must be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority (PCA):

 

·          prior to construction (pouring of concrete) of footings and boundary retaining structures,

·          prior to construction (pouring of concrete) of each floor slab,

·          upon completion of the building, prior to issuing an Occupation Certificate,

·          as otherwise may be required by the Principal Certifying Authority.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the Principal Certifying Authority for the development.  

 

Building Encroachments

49.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Road/Asset Opening Permit

50.     Any openings within or upon the road, footpath, nature strip or in any public place (i.e. for proposed drainage works or installation of services), must be carried out in accordance with the following requirements, to the satisfaction of Council:

 

a)     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

b)     Council’s Road / Asset Opening Officer must be notified at least 48 hours in advance of commencing any excavation works and also immediately upon completing the works (on 9399 0691 or 0409 033 921 during business hours), to enable any necessary inspections or works to be carried out.

 

c)     Relevant Road / Asset Opening Permit fees, construction fees, inspection fees and security deposits, must be paid to Council prior to commencing any works within or upon the road, footpath, nature strip or other public place.

 

d)     The owner/developer must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate or occupation of the development (whichever is sooner).

 

e)     Excavations and trenches must be back-filled and compacted in accordance with AUSPEC standards 306U.

 

f)     Excavations or trenches located upon a road or footpath are required to be provided with 50mm depth of cold-mix bitumen finish, level with the existing road/ground surface, to enable Council to readily complete the finishing works at a future date.

 

g)     Excavations or trenches located upon turfed areas are required to be back-filled, compacted, top-soiled and re-turfed with Kikuyu turf.

 

h)     The work and area must be maintained in a clean, safe and tidy condition at all times and the area must be thoroughly cleaned at the end of each days activities and upon completion.

 

i)      The work can only be carried out in accordance with approved hours of building work as specified in the development consent, unless the express written approval of Council has been obtained beforehand.

 

j)      Sediment control measures must be implemented in accordance with the conditions of development consent and soil, sand or any other material must not be allowed to enter the stormwater drainage system or cause a pollution incident.

 

k)     The owner/developer must have a Public Liability Insurance Policy in force, with a minimum cover of $10 million and a copy of the insurance policy must be provided to Council prior to carrying out any works within or upon the road, footpath, nature strip or in any public place.

 

l)      All works/regulatory signposting associated with the proposed development are to be at no cost to RMS.

 

            Stormwater Drainage

51.     Adequate provisions must be made to collect and discharge stormwater drainage during construction of the building to the satisfaction of the principal certifying authority.

 

The prior written approval of Council must be obtained to connect or discharge site stormwater to Council’s stormwater drainage system or street gutter.

 

52.     Any required dewatering must be monitored by the consulting Engineer/s to the satisfaction of the principal certifying authority and documentary evidence of compliance with the relevant conditions of consent and dewatering requirements must be provided to the principal certifying authority and the Council.

 

The site conditions and fluctuations in the water table are to be reviewed by the consulting Engineer prior to and during the excavation/construction process, to ensure the suitability of the excavation and dewatering process and compliance with Council's conditions of consent.

 

53.     A separate written approval from Council is required to be obtained in relation to any proposed discharge of groundwater into Council’s drainage system external to the site, in accordance with the requirements of Section 138 of the Roads Act 1993.

 

            Tree Removal

54.     No objections are raised to the removal of any existing vegetation within the site where necessary in order to accommodate the proposed works as shown, subject to full implementation of the approved landscaping.

 

Remediation

55.     Any fill importation to the site is to be monitored and classified by the Site Auditor appointed for remediation of the site or a person with his qualifications. Only ‘Virgin Excavated Natural Material’ (VENM) is to be imported to the site, as detailed in the NSW DECC Waste Classification Guidelines (2008).

 

56.     The works shall not cause any environmental pollution, public nuisance or, result in an offence under the Protection of the Environment Operations Act 1997 or NSW Occupational Health & Safety Act (2000) & Regulations (2001).

 

57.     Any new information which is identified during remediation, demolition or construction works that has the potential to alter previous conclusions about site contamination or the remediation strategy shall be notified to the site Auditor and Council immediately in writing.

 

58.     The decommissioning work and removal of tanks must be carried out in accordance with relevant Regulations and Standards including:-

 

·      The UPSS Regulation 2008

·      The Occupation Health & Safety Regulation 2001

·      AS1940 (2004) – Storage and handling of flammable and combustible liquids

·      AS4976 (2008) – The removal and disposal of underground petroleum storage systems

·      WorkCover NSW requirements and guidelines.

 

59.     A validation report must be prepared by a suitably qualified person and be submitted to Council on completion of the contamination remedial works and prior to any building works certifying the site is suitable for the intended use.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Occupation Certificate Requirements

60.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

Fire Safety Certificates

61.     Prior to issuing an interim or final Occupation Certificate, a single and complete Fire Safety Certificate, encompassing all of the essential fire safety measures contained in the fire safety schedule must be obtained and be submitted to Council, in accordance with the provisions of the Environmental Planning and Assessment Regulation 2000.  The Fire Safety Certificate must be consistent with the Fire Safety Schedule which forms part of the Construction Certificate.

 

A copy of the Fire Safety Certificate must be displayed in the building entrance/foyer at all times and a copy must also be forwarded to Fire and Rescue NSW.

 

Structural Certification

62.     A Certificate must be obtained from a professional engineer, which certifies that the building works satisfy the relevant structural requirements of the Building Code of Australia and approved design documentation, to the satisfaction of the Principal Certifying Authority. A copy of which is to be provided to Council.

 

Sydney Water Certification

63.     A section 73 Compliance Certificate, under the Sydney Water Act 1994 must be obtained from Sydney Water Corporation.  An Application for a Section 73 Certificate must be made through an authorised Water Servicing Coordinator.  For details, please refer to the Sydney Water web site www.sydneywater.com.au > Building and developing > Developing your Land > Water Servicing Coordinator or telephone 13 20 92.

 

Please make early contact with the Water Servicing Co-ordinator, as building of water/sewer extensions may take some time and may impact on other services and building, driveway or landscape design.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority and the Council prior to issuing an Occupation Certificate or Subdivision Certificate, whichever the sooner.

 

Noise Control Requirements & Certification

64.     The proposed use of the premises and the operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the premises and plant and equipment shall not give rise to a sound pressure level at any affected premises that exceeds the background (LA90), 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A).  The source noise level shall be assessed as an LAeq, 15 min and adjusted in accordance with the NSW Environmental Protection Authority’s Industrial Noise Policy 2000 and Environmental Noise Control Manual (sleep disturbance).

 

Waste Management

65.     Adequate provisions are to be made within the premises for the storage, collection and disposal of trade/commercial waste and recyclable materials, to the satisfaction of Council.

 

Trade/commercial waste materials must not be disposed in or through Council’s domestic garbage service.  All trade/commercial waste materials must be collected by Council’s Trade Waste Service or a waste contractor authorised by the Waste Service of New South Wales and details of the proposed waste collection and disposal service are to be submitted to Council prior to commencing operation of the business.

 

The operator of the business must also arrange for the recycling of appropriate materials and make the necessary arrangements with an authorised waste services contractor accordingly.

 

66.     Any liquid trade waste materials are to be disposed of in accordance with the requirements of the Sydney Water, Trade Waste Department (i.e. via a grease trap) and details of compliance are to be submitted to the certifying authority prior to the commencement of any works.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

67.     The owner/developer must meet the full cost for Council or a Council approved contractor to:

a)     Reconstruct/extend the concrete vehicular crossings if required.

b)       Re construct a 1.8m wide concrete footpath along the full site frontage.  Any unpaved areas on the nature strip must be turfed and landscaped to Council’s specification.

 

68.     Prior to issuing a final occupation certificate or occupation of the development (whichever is sooner), the owner/developer must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

69.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements: 

 

a)     All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)     Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to an occupation certificate being issued for the development, together with payment of the relevant fees.

 

c)     If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)     The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Landscaping

70.     The PCA must ensure that landscaping at this site is installed substantially in accordance with the Landscape Plans by Caltex, dwg 22316-L100 – 103, revision C, dated 27.09.12, prior to issuing a Final (or any other type of Interim) Occupation Certificate/s, with the owners to ensure it is maintained in a healthy and vigorous state until maturity.

 

71.     That part of the nature-strip upon Council's footway which is damaged during the construction of the proposed works shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu turf or similar. Such works shall be completed at the applicant’s expense prior to the issue of a final Occupation Certificate.

 

Service Authorities

72.     The applicant shall meet the full cost for the overhead power lines and telecommunication cables located along the Anzac Parade site frontage to be relocated underground. The applicant shall liaise directly with the relevant service utility authorities to organise for the cables to be relocated. All cables must be relocated underground to the satisfaction of the relevant service utility authority prior to the issuing of an occupation certificate for the development.

 

Stormwater Drainage

73.     A "restriction on the use of land” and “positive covenant" (under section 88E of the Conveyancing Act 1919) shall be placed on the title of the subject property to ensure that the onsite detention/infiltration system is maintained and that no works which could affect the design function of the detention/infiltration system are undertaken without the prior consent (in writing) from Council. Such restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

 

Notes:

a.     The “restriction on the use of land” and “positive covenant” are to be to the satisfaction of Council. A copy of Council’s standard wording/layout for the restriction and positive covenant may be obtained from Council’s Development Engineer.

b.     The works as executed drainage plan and hydraulic certification must be submitted to Council prior to the “restriction on the use of land” and “positive covenant” being executed by Council.

 

74.     A works-as-executed drainage plan prepared by a registered surveyor and approved by a suitably qualified and experienced hydraulic consultant/engineer must be forwarded to the Principal Certifying Authority and the Council. The works-as-executed plan must include the following details (as applicable):

 

·      The location of any detention basin/s with finished surface levels;

·      Finished site contours at 0.2 metre intervals;

·      Volume of storage available in any detention areas;

·      The location, diameter, gradient and material (i.e. PVC, RC etc) of all stormwater pipes;

·      The orifice size/s (if applicable);

·      Details of any infiltration/absorption systems; and

·      Details of any pumping systems installed (including wet well volumes).

 

75.     The applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer, which confirms that the design and construction of the stormwater drainage system complies with the Building Code of Australia, Australian Standard AS3500.3:2003 (Plumbing & Drainage- Stormwater Drainage) and conditions of this development consent. 

 

The certification must be provided following inspection/s of the site stormwater drainage system by the Hydraulic Engineers to the satisfaction of the PCA.

 

Flood protection

76.     The PCA shall be satisfied that the development has been constructed to the approved levels to ensure the building and car spaces are protected from flooding as per the requirements specified in this consent.

 

77.     An Emergency Response Management Plan must be prepared by a suitably qualified person and be submitted to Council prior to the issue of the Occupation Certificate.  The Plan shall include the following:

·              list of chemicals and maximum quantities to be stored at the site;

·              identification of potentially hazardous situations;

·              procedure for incident reporting;

·              details of spill stations and signage;

·              containment and clean-up facilities and procedures; and

·              the roles of all staff in the Plan and details of staff training.

 

78.     A report must be obtained from a suitably qualified person, and be submitted to Council prior to issuing an occupation certificate for the development which provides details of the petroleum storage systems and compliance with the Act, UPSS Regulation, relevant Guidelines, Standards and conditions of this consent.

 

Food Premises - Inspection

79.     The premises must be inspected by Council’s Environmental Health Officer to ascertain compliance with relevant Food Safety Standards and the written approval of Council (being the relevant Food Authority for this food business) must be obtained prior to the operation of the food business.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

Fire Safety Statements

80.     A single and complete Fire Safety Statement (encompassing all of the fire safety measures upon the premises) must be provided to the Council in accordance with the requirements of the Environmental Planning & Assessment Regulation 2000

 

The Fire Safety Statement must be provided on an annual basis each year following the issue of the Fire Safety Certificate, and other period if any of the fire safety measures are identified as a critical fire safety measure in the Fire Safety Schedule

 

The Fire Safety Statement is required to confirm that all the fire safety measures have been assessed by a properly qualified person and are operating in accordance with the standards of performance specified in the Fire Safety Schedule.

 

A copy of the Fire Safety Statement must be displayed in the building entrance/foyer at all times and a copy must also be forwarded to Fire & Rescue NSW.

 

Operational Requirements

81.     The storage of boxes, cartons, pallets, goods or any other material relating to the operation of the business other than a commercial garbage bin must be wholly contained within the premises.

 

82.     All loading and unloading associated with the use or operation of the premises shall be carried out within the site.

 

83.     No goods, or machinery or advertising signs are to be placed on Council’s footway at any time, unless the prior written approval has been obtained from Council.

 

Stormwater Detention/Infiltration  System

84.     The detention area/infiltration system must be regularly cleaned and maintained to ensure it functions as required by the design.

 

85.     The use of the premises and the operation of plant and equipment shall not give rise to the transmission of a vibration nuisance or damage to other premises.

 

Environmental amenity

86.     There are to be no emissions or discharges from the premises, which will give rise to a public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

87.     Delivery tankers shall be parked within the site during unloading. Tankers shall enter and exit the site in a forward direction and tankers shall only remain on site during unloading operations. All tanker deliveries only being made between 7.00am and 7.00pm, Monday to Saturday only.

 

Food Storage

88.     All food preparation, cooking, display and storage activities must only be carried out within the approved food premises.

 

Storage shall be within appropriate shelves, off the floor and in approved storage containers.  External areas or structures must not be used for the storage, preparation or cooking of food, unless otherwise approved by Council in writing and subject to any necessary further approvals.

 

Food Safety Requirements

89.     The food premises must be registered with Council's Health, Building & Regulatory Services Department and the NSW Food Authority in accordance with the Food Safety Standards, prior to commencing business operations.

 

90.     A Food Safety Supervisor must be appointed for the business and the NSW Food Authority and Council must be notified of the appointment, in accordance with the Food Act 2003, prior to commencing business operations.  A copy of which must be maintained on site and be provided to Council officers upon request.

 

91.     A numerically scaled indicating thermometer or recording thermometer, accurate to the nearest degree Celsius being provided to refrigerators, cool rooms, other cooling appliances and bain-maries or other heated food storage/display appliances.  The thermometer is to be located so as to be read easily from the outside of the appliance.  A digital probe type thermometer must also be readily available to check the temperature of food items.

 

92.     All food that is to be kept hot should be heated within one (1) hour from the time when it was prepared or was last kept cold, to a temperature of not less than 60°C and keep this food hot at or above the temperature.  Food that is to be kept cold should be cooled, within four (4) hours from the time when it was prepared or was last kept hot, to a temperature of not more that 5°C and keep this food cold at or below that temperature.

 

93.     Food safety practices and the operation of the food premises must be in accordance with the Food Act 2003, Food Regulation 2004, Food Standards Code and Food Safety Standards at all times, including the requirements and provisions relating to:

·       Food handling – skills, knowledge and controls.

·       Health and hygiene requirements.

·       Requirements for food handlers and businesses.

·       Cleaning, sanitising and maintenance.

·       Design and construction of food premises, fixtures, fitting and equipment.

 

The Proprietor of the food business and all staff carrying out food handling and food storage activities must have appropriate skills and knowledge in food safety and food hygiene matters, as required by the Food Safety Standards.

 

Failure to comply with the relevant food safety requirements is an offence and may result in legal proceedings, service of notices and/or the issuing of on-the-spot penalty infringement notices.

 

94.     The food premises must be kept in a clean and sanitary condition at all times, including all walls, floors, ceilings, fixtures, fittings, appliances, equipment, fridges, freezers, cool rooms, shelving, cupboards, furniture, crockery, utensils, storage containers, waste bins, light fittings, mechanical ventilation & exhaust systems & ducting, storage areas, toilet facilities, basins and sinks.

 

Waste Management

95.     Adequate provisions are to be made within the confines of the premises for the storage, collection and disposal of waste and recyclable materials, to the satisfaction of Council, prior to commencing business operations.

 

The waste storage area must be located within the property and not within any areas used for the preparation or storage of food.

 

Waste/recyclable bins and containers must not be placed on the footpath (or road), other than for waste collection, in accordance with Council’s requirements.

 

96.     Trade/commercial waste materials must not be disposed via council’s domestic garbage service.  All trade/commercial waste materials must be collected by Council’s Trade Waste Service or a waste contractor authorised by the Waste Service of New South Wales and details of the proposed waste collection and disposal service are to be submitted to Council prior to commencing operation of the business.

 

Sanitary Facilities

97.     Sanitary facilities, plus wash hand basin and paper towel dispenser or hand dryer and appropriate signage, must be available for customers and staff and be maintained in a clean and sanitary condition at all times.

 

GENERAL ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and requirements.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1    The following conditions are applied to satisfy the requirements of the NSW Roads and Maritime Services:

 

 

A2    The Office of Water, NSW Department of Primary Industry provides the following advisory comments on the proposal:

 

 

A3      The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $3,000) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

A4      Building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from an Accredited Certifier or Council

§  An Accredited Certifier or Council has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

A5    This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA), Disability (Access to Premises – Buildings) Standards 2010 and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards.  You are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A6    Any proposed amendments to the design and construction of the building may require a new development application or a section 96 amendment to the existing consent to be obtained from Council, before carrying out such works

 

A7    The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

A8    Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A9    This consent does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the land owner or principal contractor must obtain:

 

§  the consent of the owners of such adjoining or supported land to trespass or encroach, or

§  an access order under the Access to Neighbouring Land Act 2000, or

§  an easement under section 88K of the Conveyancing Act 1919, or

§  an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

A10    Finished ground levels external to the building are to be consistent with the development consent and are not to be raised, other than for the provision of approved paving or the like on the ground.

 

External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to any adjoining land.

 

A11    Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

A12   A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article in a public place.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

A13   There are to be no emissions or discharges from the premises, which will give rise to an environmental or public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

A14   Any external lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

A15   Street numbering must be provided to the front of premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council.

 

A16    The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

A17    Further information and details on Council's requirements for trees on development sites can be obtained from the recently adopted Tree Technical Manual, which can be downloaded from Council’s website at the following link, http://www.randwick.nsw.gov.au - Looking after our environment – Trees – Tree Management Technical Manual; which aims to achieve consistency of approach and compliance with appropriate standards and best practice guidelines.

 

A18    The assessment of this development application does not include an assessment of the proposed building work under the Food Act 2003, Food Safety Standards or Building Code of Australia (BCA).

 

All new building work must comply with relevant regulatory requirements and Australian Standards and details of compliance are to be provided in the construction certificate application.

 

A19    The design and construction of the premises must satisfy the requirements of the Food Act 2003, Food Standards Code and AS 4674 (2004). Prior to finalising the design and fit-out for the development and prior to a construction certificate being obtained, advice should be obtained from an accredited Food Safety Consultant (or Council’s Environmental Health Officer).

 

A20    The applicant/operator is advised to engage the services of a suitably qualified and experienced Acoustic consultant, prior to finalising the design and construction of the development, to ensure that the relevant noise criteria and conditions of consent can be fully satisfied.

 

MOTION: (Moore/Nash) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D37/13     Development Application Report - 710 Anzac Parade, Kingsford (DA/234/2012)

PL42/13

RESOLUTION: (Andrews/Mayor, Cr Bowen)

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20 (1) of Randwick Local Environmental Plan 1998, relating to floor space ratio, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/234/2012 for a change of use of existing dwelling house to a boarding house comprising eight (8) boarding rooms, at No. 710 Anzac Parade, Kingsford, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Issue

Drawn by

Dated

Received by Council

120301–DA01 – Site Plan

C

H & D Studio Design

21 July 2012

7 August 2012

120301–DA02 - Ground Floor Plan

120301–DA03 -  First Floor Plan

D

120301–DA04 - Elevations

120301–DA05 - Elevations & Section

C

 

BASIX Certificate

No.

Dated

Single dwelling

422283S

16 April 2012

 

No retrospective consent issued for works already undertaken

2.       The unauthorised works carried out historically on the site and highlighted in yellow on the approved plans in Condition No. 1, are not approved under this determination.

 

This determination applies only to the use of the existing building as a boarding house and subsequent BASIX, BCA and fire safety upgrade works that have been required by this consent.

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

 

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either an Accredited Certifier or Randwick City Council.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

3.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

Long Service Levy Payments

4.       Any required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Compliance with BCA Report

5.       The recommendations of the BCA report prepared by ‘Holmes Fire’, dated 3 December 2012 and submitted to Council on 14 December 2012 shall be implemented and incorporated into the approved plans, prior to the issue of a Construction Certificate, to the satisfaction of the certifying authority.

 

a)     The new window to the “Media Room’ discussed in Section 3.7.1.5(b) of the BCA report has not been proposed within the subject application. Should the applicant wish to incorporate a window to this room, a separate application will be required. As an alternative, a skylight located a minimum of 900mm off the boundary may be provided to the media room to achieve necessary light and ventilation requirements of the BCA.

 

Access & facilities

6.       An external stair lift is to be provided at the front entry to the premises to afford access up the flight of stairs leading to the main entrance to the building and the existing toilet is to be upgraded to provide a reasonable level of access and facilities for persons with disabilities, to the satisfaction of the certifying authority.  Further, the initial small step from the front gate is to be altered to a suitable step ramp. Details are to be included in the construction certificate.

 

7.       One bedroom is to be modified to be suitable for use by a person with an  ambulant disability and details are to be included in the construction certificate.

 

          Sydney Water

8.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved plans must be submitted to a Sydney Water Quick Check agent, to determine whether the development will affect Sydney Water’s waste water and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For details please refer to the Sydney Water web site at www.sydneywater.com.au for:

 

·           Quick Check agents details -  see Building and Developing then Quick Check and

·           Guidelines for Building Over/Adjacent to Sydney Water Assets – see Building and Development then Building and Renovating, or telephone 13 20 92.

 

The Principal Certifying Authority must ensure that a Sydney Water Quick Check Agent has appropriately stamped the plans.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

Compliance with the Building Code of Australia & Relevant Standards

9.       In accordance with section 80A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

10.     Access and facilities for people with disabilities must be provided in accordance with the relevant requirements of the Building Code of Australia, Disability (Access to Premises – Buildings) Standards 2010, relevant Australian Standards and conditions of consent, to the satisfaction of the Certifying Authority. 

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations and to provide for reasonable levels of safety and amenity:

 

Regulatory

Building regulation & construction conditions

11.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

12.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance are to be proved in the construction certificate.

 

BASIX Requirements

13.     In accordance with section 80A (11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Waste Management

14.     A Waste Management Plan detailing the waste and recycling storage and removal strategy for all of the development, is required to be submitted to and approved by Council’s Director of City Services.

 

The Waste Management Plan is required to be prepared in accordance with Council's Waste Management Guidelines for Proposed Development and must include the following details (as applicable):

 

·       The use of the premises and the number and size of occupancies.

·       The type and quantity of waste to be generated by the development.

·       Demolition and construction waste, including materials to be re-used or recycled.

·       Details of the proposed recycling and waste disposal contractors.

·       Waste storage facilities and equipment.

·       Access and traffic arrangements.

·       The procedures and arrangements for on-going waste management of the boarding house including collection, storage and removal of waste and recycling of materials.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Certification and Building Inspection Requirements

15.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work and the requirements of the Home Building Act 1989 must be satisfied accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

16.     Prior to the commencement of any building (including any ‘fit-out’ works), a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment

 

17.     Prior to the commencement of any building works, the person having the benefit of the development consent must:-

 

·       appoint a Principal Certifying Authority for the building work, and

·       appoint a principal contractor for the building work notify the Principal Certifying Authority and Council accordingly in writing, and

·       notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

·       give at least two days notice to the Council, in writing, prior to commencing building works.

 

18.     The works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

Home Building Act 1989

19.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the relevant requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council.

 

Construction Site Management Plan

20.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·           location and construction of protective site fencing / hoardings;

·           location of site storage areas/sheds/equipment;

·           location of building materials for construction;

·           provisions for public safety;

·           dust control measures;

·           details of proposed sediment and erosion control measures;

·           site access location and construction

·           details of methods of disposal of demolition materials;

·           protective measures for tree preservation;

·           location and size of waste containers/bulk bins;

·           provisions for temporary stormwater drainage;

·           construction noise and vibration management;

·           construction traffic management details;

·           provisions for temporary sanitary facilities.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Public Liability

21.     The owner/builder is required to hold Public Liability Insurance, with a minimum liability of $10 million and a copy of the Insurance cover is to be provided to the Principal Certifying Authority and Council.

 

            Public Utilities

22.     A public utility impact assessment must be carried out on all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.  The assessment should include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of services.

 

23.     The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Ausgrid, Sydney Water and other service authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Inspections during Construction

24.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

Building & Demolition Work Requirements

25.     All work and activities must be carried out in accordance with the relevant regulatory requirements and Randwick City Council policies, including:

 

·           Work Health and Safety Act 2011 & Regulations

·           Occupational Health and Safety (Hazardous Substances) Regulation 2001

·           Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·           WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·           Australian Standard 2601 (2001) – Demolition of Structures

·           The Protection of the Environment Operations Act 1997

·           Protection of the Environment Operations (Waste) Regulation 2005

·           Relevant Office of Environment & Heritage / Environment Protection Authority (EPA) and WorkCover NSW Guidelines.

·           Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

26.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·           Occupational Health & Safety legislation and WorkCover NSW requirements

 

·           Randwick City Council’s Asbestos Policy

 

·           A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·           On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·           Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·           A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Sediment & Erosion Control

27.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details must be shown in a Sediment and Erosion Control Plan, including; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

A copy of the Sediment and Erosion Control Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Dust Control

28.     During demolition excavation and construction works, dust emissions must be minimised, so as not to result in a nuisance to nearby residents or result in a potential pollution incident.

 

Adequate dust control measures must be provided to the site prior to the works commencing and the measures and practices must be maintained throughout the demolition, excavation and construction process, to the satisfaction of Council.

 

Dust control measures and practices may include:-

·       Provision of geotextile fabric to all perimeter site fencing (attached on the prevailing wind side of the site fencing).

·       Covering of stockpiles of sand, soil and excavated material with adequately secured tarpaulins or plastic sheeting.

·       Installation of a water sprinkling system or provision hoses or the like.

·       Regular watering-down of all loose materials and stockpiles of sand, soil and excavated material.

·       Minimisation/relocation of stockpiles of materials, to minimise potential for disturbance by prevailing winds.

·       Landscaping and revegetation of disturbed areas.

 

Temporary Site Fencing

29.     Temporary site safety fencing or site hoarding must be provided to the perimeter of the site throughout demolition, excavation and construction works, to the satisfaction of Council, in accordance with the following requirements:

 

a)     Temporary site fences or hoardings must have a height of 1.8 metres and be a cyclone wire fence (with geotextile fabric attached to the inside of the fence to provide dust control), or heavy-duty plywood sheeting (painted white), or other material approved by Council.

 

b)     Hoardings and site fencing must be designed to prevent any substance from, or in connection with, the work from falling into the public place or adjoining premises and if necessary, be provided with artificial lighting.

 

c)     All site fencing and hoardings must be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

d)     An overhead (‘B’ Class) type hoarding is required is be provided to protect the public (unless otherwise approved by Council) if:

 

·       materials are to be hoisted (i.e. via a crane or hoist) over a public footway;

·       building or demolition works are to be carried out on buildings which are over 7.5m in height and located within 3.6m of the street alignment;

·       it is necessary to prevent articles or materials from falling and causing a potential danger or hazard to the public or occupants upon adjoining land;

·       as may otherwise be required by WorkCover, Council or the PCA.

 

Notes:

·       Temporary site fencing may not be necessary if there is an existing adequate fence in place having a minimum height of 1.5m.

 

·       If it is proposed to locate any site fencing, hoardings, amenities or articles upon any part of the footpath, nature strip or public place at any time, a separate Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any fencing, hoarding or other article on the road, footpath or nature strip.

 

Public Safety & Site Management

30.     Public health, safety and convenience must be maintained at all times during demolition and building works and the following requirements must be complied with at all times (as applicable):

 

a)       Demolition work must be carried out in accordance with Australian Standard, AS2601 (2001) - The Demolition of Structures and a Demolition Work Plan is required to developed and implemented to the satisfaction of the Principal Certifying Authority prior to commencing such works.

 

b)       The demolition, removal, storage and disposal of any materials containing asbestos must be carried out in accordance with the relevant requirements of WorkCover NSW, Council’s Asbestos Policy and the following requirements:

 

·         A licence must be obtained from WorkCover NSW for the removal of friable asbestos and or more than 10m2  of bonded asbestos (i.e. fibro)

·         Asbestos waste must be disposed of in accordance with the Protection of the Environment Operations Act 1997 & relevant Regulations

·         A sign must be provided to the site/building stating “Danger Asbestos Removal In Progress”

·         A Clearance Certificate or Statement must be obtained from a suitably qualified person (i.e. Occupational Hygienist) upon completion of the asbestos removal works, which is to be submitted to the Principal Certifying Authority and Council prior to issuing an Occupation Certificate.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

c)       A sign must be provided and maintained in a prominent position, which contains the following details:

 

·     name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details,

·     name, address and telephone number of the Principal Certifying Authority,

·     a statement stating that “unauthorised entry to the work site is prohibited”.

 

d)       The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, trip hazards, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

e)       Building materials, sand, soil, waste materials, construction equipment or other materials or articles must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

f)       Bulk bins, waste containers or other articles must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container or other articles in a public place can be made to Council’s Building Services section.

 

g)       During demolition and construction, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council.

 

h)       Public safety must be maintained at all times and public access to any demolition and building works, materials and equipment on the site is to be restricted. If necessary, a temporary safety fence or hoarding is to be provided to protect the public. Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

If it is proposed to locate any site fencing, hoardings or items upon any part of the footpath, nature strip or any public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services department beforehand. Details and plans are to be submitted with the application, together with payment of the weekly charge in accordance with Council’s adopted Pricing Policy.

 

i)        Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant provisions of the Protection of the Environment Operations Act 1997 must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

Restriction on Working Hours

31.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Internal work only within a commercial or industrial development, located in a commercial or industrial zone, which is not audible within any residential dwelling or commercial or industrial premises

·   Monday to Saturday - No time limits (subject to column 1)

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Building Encroachments

32.   There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Occupation Certificate Requirements

33.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation or use of the development encompassed in this development consent (including alterations, additions and ‘fit-out’ works to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

Prior to the issuing of an interim or final occupation certificate, the Principal Certifying Authority must be satisfied that the development is not inconsistent with the development consent and all of the relevant conditions of development consent and Building Code of Australia requirements have been satisfied.

 

34.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation as a Class 1b-Boarding House in this development, in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

         An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

35.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon must also be provided to Council with the occupation certificate.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations and to provide for reasonable levels of fire safety:

 

36.     In accordance with clause 93 of the Environmental Planning and Assessment Regulation 2000, the levels of fire safety within the existing building are to be upgraded and the following measures are to be implemented prior to commencement of the change of use:

 

·          .. Provide a suitable fire extinguisher and fire blanket to the kitchen area in the premises.

 

·             Provide smoke alarms and lighting to assist in evacuation throughout the premises in accordance with Part 3.7.2 of the BCA-Volume 2.

 

In accordance with clause 168 of the Environmental Planning and Assessment Regulation 2000, the fire safety measures contained in the attached ‘fire safety schedule’ must be implemented in the building premises and the fire safety schedule forms part of this consent.

 

The fire safety measures are to be implemented in accordance with the minimum standards of performance as specified in the schedule and the provisions of Part 9 of the Environmental Planning and Assessment Regulation 2000 are to be complied with.

 

A copy of the fire safety certificate, encompassing all the existing and new fire safety measures, is to be submitted to the Council with the occupation certificate prior to commencement of the change of use.

 

A Principal Certifying Authority must be appointed to inspect the installation of the required fire extinguisher and fire blanket, smoke alarms and lighting to assist in evacuation throughout the premises and to confirm that the requirements of condition 2 of this approval in relation to compliance with the category 1 fire safety provisions and also Part 3.7.2 of the BCA –Volume 2 and to issue the   required Occupation Certificate.

 

37.     A Fire Safety Certificate must be submitted to Council prior to the issuing of an Occupation Certificate, in accordance with the requirements of the Environmental Planning and Assessment Regulation 2000.

 

The Fire Safety Certificate must include details of all of the fire safety measures contained in the building as detailed in the fire safety schedule attached to the Construction Certificate.

 

Prior to issuing any Occupation Certificate the Principal Certifying Authority must be satisfied that all of the relevant fire safety measures have been included and are sufficiently detailed within the Fire safety Certificate. A copy of the fire safety certificate must be displayed in the building near the entrance and a copy must be forwarded to the NSW Fire Brigades.

 

An annual Fire Safety Statement is also required to be submitted to the Council and the NSW Fire Brigades, each year after the date of the Fire Safety Certificate, in accordance with the Environmental Planning & Assessment Regulation 2000.

 

The essential fire safety measures to be included in the fire safety certificate and annual fire safety statement (as a minimum) are detailed below:

 

FIRE SAFETY MEASURE

BUILDING CODE OF AUSTRALIA REFERENCE

MINIMUM STANDARD OF PERFORMANCE

(To be specified in the Fire Safety Certificate / Statement)

Portable fire extinguisher and a fire blanket to the kitchen area

 

AS 2444 (1995, as amended)

Smoke alarms and lighting to assist evacuation throughout the premises

BCA-Vol 2-Part 3.7.2

AS 1670 (1995), AS 3786 (1993), as applicable

 

38.     Buildings in which there is a change of building use must comply with the category 1 fire safety provisions (as defined in the Environmental Planning & Assessment Regulation 2000) as applicable to the proposed new use, in accordance with clause 93 of the Environmental Planning and Assessment Regulation 2000, unless an exemption is in force under clause 187 or 188 of the Regulation.  Details of compliance are to be provided to the certifying authority and the Council, prior to issuing an occupation certificate.

 

Sydney Water Certification

39.     A section 73 Compliance Certificate, under the Sydney Water Act 1994 must be obtained from Sydney Water Corporation.  An Application for a Section 73 Certificate must be made through an authorised Water Servicing Coordinator.  For details, please refer to the Sydney Water web site www.sydneywater.com.au > Building and developing > Developing your Land > Water Servicing Coordinator or telephone 13 20 92.

 

Please make early contact with the Water Servicing Co-ordinator, as building of water/sewer extensions may take some time and may impact on other services and building, driveway or landscape design.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority and the Council prior to issuing an Occupation Certificate or Subdivision Certificate, whichever the sooner.

 

BASIX Requirements & Certification

40.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that any relevant BASIX commitments and requirements have been satisfied.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Principal Certifying Authority and Council upon issuing an Occupation Certificate.

 

Occupant Safety - Windows

41.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·           The window having a minimum sill height of 1.5m above the internal floor level,

·           Providing a window locking device at least 1.5m above the internal floor level,

·           Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·           Installing a fixed heavy-duty gauge metal screen over the opening (excluding openings upon the front or any street elevation of the building), such as a metal security screen or metal security mesh and frame system, but not standard fly-screen material,

·           Other appropriate effective safety measures or barriers.

 

The relevant safety measures must be implemented prior to the issue of an Occupation Certificate.

 

Noise Control Requirements & Certification

42.     The operation of plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Office of Environment and Heritage (EPA) Noise Control Guidelines.

 

43.     A report must be obtained from a suitably qualified and experienced consultant in acoustics, which demonstrates and certifies that noise and vibration from any plant and equipment (e.g. mechanical ventilation systems and air-conditioners) satisfies the relevant provisions of the Protection of the Environment Operations Act 1997, NSW Office of Environment and Heritage (EPA) Noise Control Manual, Industrial Noise Policy and Council’s development consent.

 

A copy of the report must be provided to the Principal Certifying Authority and Council prior to an occupation certificate being issued.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

44.     Prior to issuing a final occupation certificate or occupation of the development (whichever is sooner), the owner/developer must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip, street trees etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

Internal amenity:

45.   Ceiling fans are to be provided to all boarding rooms and the communal living and media rooms, in order to improve internal amenity. The fans shall be indicated on the plans prior to the issue of any occupation certificate, to the satisfaction of the certifying authority.

 

Internal facilities:

46.   The following laundry facilities shall be available for use of occupants:

 

a)       A communal clothes drying area within the rear open space shall be available for use of occupants;

b)       Laundry facilities located within the building shall be available for use of occupants.

 

Additional storage space to be provided

47.   Due to the size of boarding rooms numbered four (4), five (5), six (6), eight (8) and nine (9), additional storage space external to the rooms will be necessary.

 

The plans shall be amended to indicate additional storage of minimum two (2) cubic metres, for the exclusive use of the above rooms and located within the building. Detail shall be submitted to the satisfaction of Council, prior to the issue of any Occupation Certificate.

 

Bicycle parking

48.   Provision shall be made for a minimum of three (3) bicycle parking spaces within a bike rack on the site, either within the garage (vehicular parking must not be compromised as a result) or the rear open space.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

The following conditions are applied to ensure proper operation and management of the premises:

 

49.     All the items listed in The Plan of Management for 710 Anzac Parade, Kingsford, and as amended by Condition No. 4 of this consent, shall be implemented at all times. 

 

50.     A manager / caretaker for the boarding house must be available at all times (i.e. 24 hours; seven (7) days per week) and must be a person over the age of 18 years.

 

51.     The manager shall ensure the following identification signage/notices are provided and maintained on the premises:

 

a)  A notice shall be placed near the entrance to the property in a visible position to the public, advising of the manager’s name and 24 hour, seven (7) day contact number;

 

b)  Individual identification numbers shall be provided to each boarding room;

 

c)  Internal signage identifying house rules, rental terms, occupancy maximums, emergency contacts, fire safety/ emergency egress routes shall be provided to the internal common area.

 

52.     The manager shall maintain a record of all residents with details of their names, length of stay & number of persons in each room. This information shall be stored for a minimum of 12 months on site and made available to Council Officers upon request.

 

53.     All residents in the boarding house accommodation are to sign a lease or licence agreeing to comply with the Plan of Management (PoM) for the boarding house, with the length of the lease to be determined by the management. 

 

Maximum occupancy

54.     The following maximums apply to the use of the premises:

 

a)     A maximum of eight (8) lodgers may be accommodated within the premises at any one time;

 

b)     No more than one (1) occupant shall be accommodated within each approved bedroom at any one time.

 

The above occupancy rates shall be enforced by the appointed Manager at all times. Any variation of the above occupancy rates shall be subject to Council approval.

 

Plan of Management

55.     All the items listed in the Plan of Management for 710 Anzac Parade, Kingsford received by Council on 7 August 2012, prepared by Willana and Associates, shall be implemented at all times. The Manager shall be responsible for ongoing implementation of the plan.

 

The Plan of Management shall be amended to include the following additional measures and submitted to the satisfaction of Council, prior to issue of any Occupation Certificate. Additional information shall include:

 

a)     Measures to ensure compliance with the relevant conditions of approval;

b)     Additional ‘House rules’ inclusive of the following:

·      Lodger behaviour policy;

·      Visitor and party policy;

·      Activities and noise control;

·      Use and operation hours of internal common areas.

c)     Schedule of minimum furnishings and facilities being provided and maintained within the premises;

d)     Professional cleaning and vermin control arrangements;

e)     Waste Management provisions and procedure in accordance with the requirements of Condition No. 14 of this consent;

f)     Manager to maintain and enforce ongoing implementation of the proposed community contact number and incident register, with measures to effectively manage and respond to complaints,

 

Fire Safety Statements

56.     A single and complete Fire Safety Statement (encompassing all of the fire safety measures upon the premises) must be provided to the Council in accordance with the requirements of the Environmental Planning & Assessment Regulation 2000

 

The Fire Safety Statement must be provided on an annual basis each year following the issue of the Fire Safety Certificate, and other period if any of the fire safety measures are identified as a critical fire safety measure in the Fire Safety Schedule

 

The Fire Safety Statement is required to confirm that all the fire safety measures have been assessed by a properly qualified person and are operating in accordance with the standards of performance specified in the Fire Safety Schedule.

 

A copy of the Fire Safety Statement must be displayed in the building entrance/foyer at all times and a copy must also be forwarded to Fire & Rescue NSW.

 

Environmental Amenity

57.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

The following conditions are applied to satisfy the relevant pollution control criteria and to maintain reasonable levels of health, safety and amenity to the locality:

 

58.     The use and operation of the premises shall not give rise to an environmental health or public nuisance.

 

59.     There are to be no emissions or discharges from the premises which give rise to a public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

60.     The individual rooms, common areas, shared facilities and yard are to be maintained in a clean and tidy state at all times and individual’s rubbish is to be placed in the appropriate receptacles.

 

61.     Adequate provisions are to be made within the premises for the storage, collection and disposal of waste and recyclable materials.

 

62.     The waste storage areas shall be clearly signposted.

 

GENERAL ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and requirements.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1      The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

A2      Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from an Accredited Certifier or Council

§  An Accredited Certifier or Council has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

A3      The assessment of this development application does not include a full assessment of the proposed building work under the Building Code of Australia (BCA).

 

A4      The applicant/owner is advised that this approval does not guarantee compliance with the provisions of the Disability Discrimination Act 1992 and the applicant should therefore consider their liability under the Act.  In this regard, the applicant is advised that compliance with the requirements of the Building Code of Australia and Australian Standard 1428.1 - Design for Access and Mobility does not necessarily satisfy the objectives of the Disability Discrimination Act 1992.

 

A5      Any proposed amendments to the design and construction of the building may require a new development application or a section 96 amendment to the existing consent to be obtained from Council, before carrying out such works

 

A6      Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

A7      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A8      This consent does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the land owner or principal contractor must obtain:

 

§  the consent of the owners of such adjoining or supported land to trespass or encroach, or

§  an access order under the Access to Neighbouring Land Act 2000, or

§  an easement under section 88K of the Conveyancing Act 1919, or

§  an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

A9      External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to any adjoining land.

 

A10     Finished ground levels external to the building are to be consistent with the development consent and are not to be raised, other than for the provision of approved paving or the like on the ground.

 

A11     Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

A12     A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

A13     The necessary development consent and a construction certificate or a complying development certificate (as applicable) must be obtained for proposed external plant and equipment, if not included in this consent.

 

A14     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

§  before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

§  before 7.00am or after 10.00pm on any other day.

 

A15     The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

A17    Underground assets (eg pipes, cables etc) may exist in the area that is subject to your application. In the interests of health and safety and in order to protect damage to third party assets please contact Dial before you dig at www.1100.com.au or telephone on 1100 before excavating or erecting structures (This is the law in NSW). If alterations are required to the configuration, size, form or design of the development upon contacting the Dial before You Dig service, an amendment to the development consent (or a new development application) may be necessary. Individuals owe asset owners a duty of care that must be observed when working in the vicinity of plant or assets. It is the individual’s responsibility to anticipate and request the nominal location of plant or assets on the relevant property via contacting the Dial before you dig service in advance of any construction or planning activities.

 

A18    The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Andrews/Mayor, Cr Bowen) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D38/13     Development Application Report - 94 & 96 Storey Street, Maroubra (DA/696/2012)

PL43/13

RESOLUTION: (Stevenson/Mayor, Cr Bowen) that the application be deferred to allow mediation between the parties.

 

MOTION: (Stevenson/Mayor, Cr Bowen) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Smith

Councillor Belleli

 

Councillor Bowen

 

Councillor D'Souza

 

Councillor Garcia

 

Councillor Matson

 

Councillor Moore

 

Councillor Nash

 

Councillor Neilson

 

Councillor Seng

 

Councillor Shurey

 

Councillor Stavrinos

 

Councillor Stevenson

 

Total (13)

Total (1)

 

Miscellaneous Reports

 

M7/13       Miscellaneous Report - Affordable Housing Dwelling at 109/2-8 Pine Avenue, Little Bay Classification of Land under Local Government Act 1993 (F2004/07991)

PL44/13

RESOLUTION: (Andrews/Mayor, Cr Bowen) that Council resolve to classify the affordable housing units located at 109/2-8 Pine Avenue Little Bay as ‘operational’ land in accordance with the provisions of the Local Government Act 1993.

 

MOTION: (Andrews/ Mayor, Cr Bowen) CARRIED - SEE RESOLUTION.

 

 

M8/13       Miscellaneous Report - Draft Comprehensive Development Control Plan - Post Exhibition Report (F2007/00568)

PL45/13

RESOLUTION: (Matson/Mayor, Cr Bowen) that this matter be deferred to the Council Meeting of 28 May 2013 given difficulties which occurred in dispatching email notifications.

 

MOTION: (Matson/Mayor, Cr Bowen) CARRIED - SEE RESOLUTION.  

 

 


 

 

M9/13       Miscellaneous Report - Inglis Planning Proposal (Rezoning) - Council Submission to JRPP (F2013/00156)

 

 

 

 

PL46/13

Having declared an interest in this matter earlier in the meeting, Crs Garcia, Matson and Moore left the meeting during the debate and the vote in relation to the matter.

 

RESOLUTION: (Nash/Stavrinos) that:

 

1.      Council endorse the attached submission on the exhibited Inglis Planning Proposal (Attachment 1) for referral to the Joint Regional Planning Panel subject to the following resolutions:

2.      Council opposes the current proposed zones, for the site and requests that the JRPP be advised that Council supports a low density residential zone and the B1 Neighbourhood Centre Zone in place of the B4 Mixed Use zone.

3.      Council opposes the current proposed building heights and requests that the JRPP be advised that the maximum height along Barker Street should be no more than 15m and the maximum height along the eastern and southern boundaries of the site should be a maximum of 3 storeys with the third storey set back.

4.      Council opposes the current proposed density and floor space and requests that the JRPP be advised that low density residential is the appropriate form of development for the site and the maximum number of dwellings should not exceed 600, commercial floor space should not to exceed 1300 sq metres and at least 775 car parking spaces should be provided.

5.       Council request the JRPP to ensure that there should be at least 5% affordable housing which should be dedicated for a period of 20 years.

6.      Council further refer the NSW Government Architect’s previous advice on the applicant’s Planning Proposal to the JRPP for their consideration specifically in relation to:

·         Buildings along the eastern boundary within Precinct 4 should have a street address and direct car access Parking proposals for the site should be shown in plan form to give an understanding of building access for vehicles 

·         Adaptive re use of heritage buildings should be indicated

·         The scale of new development should be reduced near heritage buildings and the Struggletown Heritage Conservation Area

·         A Planning Agreement or similar mechanism for the care, maintenance and ownership of the public open space and streets.

7.      Council request the JRPP to hold a public hearing on the exhibited Proposal given the issues that surround the site are of such significance as to warrant a hearing under S.57 of the Environmental Planning and Assessment Act.

8.      Council seek an explanation from the Minister for Planning and Infrastructure as to why this proposal has been referred to the JRPP and, in addition, request that it be returned back to the Council.

MOTION: (Nash/Stavrinos) CARRIED UNANIMOUSLY - SEE RESOLUTION.

  

 

 

Notice of Rescission Motions

Nil. 

 

The meeting closed at 8.30pm.

 

 

The minutes of this meeting were confirmed at the Planning Committee Meeting of the Council of the City of Randwick held on Tuesday, 11 June 2013.

 

 

 

 

 

 

...................................................

CHAIRPERSON