THESE MINUTES ARE DRAFT UNTIL CONFIRMED AT THE NEXT MONTHLY MEETING OF THIS COUNCIL AND/OR COMMITTEE

 

MINUTES OF Planning Committee Meeting of the

Council of the City of Randwick HELD ON

Tuesday, 14 February 2012 AT 6:10pm

 

Present:

 

The Mayor, Councillor S Nash (West Ward)

 

North Ward                                           -  Councillors K Smith (Chairperson),

                                                             P Tracey & M Woodsmith

 

South Ward                                          -  Councillors R Belleli & C Matthews 

                                                         

East Ward                                            -  Councillors T Bowen & M Matson 

                                                                             

West Ward                                           - Councillors B Hughes (Deputy Chairperson) & J Procopiadis

 

Central Ward                                        - Councillors A Andrews, T Seng & G Stevenson

 

Officers present:

 

Acting General Manager                                    Ms S Truuvert

Director City Services                                      Mr J  Frangoples

Acting Director City Planning                             Mr K Kyriacou

Director Governance & Financial Services             Mr G Banting

Senior Administrative Coordinator                       Ms J Hartshorn

Communications Manager                                  Mr J Hay

Manager Organisational Staff Services                 Ms F Calabrese

 

The meeting was adjourned at 6.10pm and was resumed at 6.35pm.

 

Apologies/Granting of Leave of Absences 

 

Apologies were received from Crs Notley-Smith and White.

 

RESOLVED: (Andrews/Belleli) that the apologies received from Crs Notley-Smith and White be accepted and leave of absences from the meeting be granted.

 

Confirmation of the Minutes

 

Confirmation of the Minutes of the Planning Committee Meeting held on Tuesday 6 December 2011

PL1/12

RESOLUTION: (Andrews/Belleli) that the Minutes of the Planning Committee Meeting held on Tuesday 6 December 2011 (copies of which were circulated to all Councillors) be and are hereby confirmed as a correct record of the proceedings of that meeting.

 


Declarations of Pecuniary and Non-Pecuniary Interests

 

a)     Cr Bowen declared a non significant non pecuniary interest in Item D3/12 as one of objectors is a former tenant of a property he owns.

b)     Cr Bowen declared a non significant non pecuniary interest in Item D7/12 as the speaker in favour of the application is a colleague.

c)     Cr Procopiadis declared a significant non pecuniary interest in Items D2/12, D7/12 and D13/12 as relatives of his are involved in the applications in question. Cr Procopiadis indicated that he would not take part in the debate or the vote on these matters.

d)     Cr Matson declared a non significant non pecuniary interest in Item D12/12 as he lives in close proximity to the property in question.

e)     Cr Matson declared a significant non pecuniary interest in Items D14/12 and D15/12 as one of Council’s delegates on the JRPP. Cr Matson indicated that he would not take part in the debate or the vote on these matters.

f)     The Mayor, Cr Nash declared a significant non pecuniary interest in Items D14/12 and D15/12 as one of Council’s delegates on the JRPP. The Mayor, Cr Nash, indicated that he would not take part in the debate or the vote on these matters.

g)     Cr Nash declared a non significant non pecuniary interest in Item D7/12 as the         speaker in favour of the application is a colleague.

h)     Cr Hughes declared a significant non pecuniary interest in Items D14/12 and D15/12 as Council’s alternate delegate on the JRPP. Cr Hughes indicated that he would not take part in the debate or the vote on these matters.

i)      Cr Andrews declared a non significant non pecuniary interest in Items D3/12 as  he knows the objector and the owner of the property.

j)      Cr Bowen declared a non significant non pecuniary interest in Items D1/12 knows one of the applicants.

k)     Cr Matthews declared a non significant non pecuniary interest in Item D3/12 as he knows the objector.

l)      Cr Matthews declared a non significant non pecuniary interest in Item D12/12 as he lives in close proximity to the property in question.

m)    Cr Matthews declared a non significant non pecuniary interest in Items D7/12 and D13/12 as he knows the owners of the property in question.

Address of Council by Members of the Public

Prior to consideration of the Agenda by the Committee, deputations were received in respect of the following matters:

D1/12       128 Marine Parade, Maroubra (DA/618/2010/A)

 

For                      Angelo Karantonis - applicant

 

Having declared a significant non pecuniary interest in Item D2/12 earlier in the meeting Cr Procopiadis left the meeting during the public address on the matter.

 

D2/12       32-34 Grosvenor St, Kensington (DA/618/2011)

 

For                      Spiro Stavis – representing the applicant

 

Cr Procopiadis returned to the meeting.

 

D3/12       1609-1611 ANZAC PARADE, LA PEROUSE (DA/76/2009/A)

 

Against               Brett Daintree - objector

 

D5/12       28 The Avenue, Randwick (DA/646/2011)

 

For                      Tom Ferguson  - representing the applicant

 

D6/12       80 Alison Road, Randwick (DA/611/2011)

 

Against               Anthony Betros  - representing the applicant

 

Procedural motion

MOTION: (Andrews/Matthews) that Item D6/12 be brought forward for immediate consideration and be deferred in accordance with the applicant’s request. LOST.

 

For                      Neil Workman - objector

 

Having declared a significant non pecuniary interest in Item D7/12 earlier in the meeting Cr Procopiadis left the meeting during the public address on the matter.

 

D7/12       52 Milroy Avenue, Kensington (DA/1048/2010/A)

 

Against               Francine Alexandrou - objector

 

For                      Richard Beasley - applicant

 

Cr Procopiadis returned to the meeting.

 

D8/12       16 Walenore Avenue, Kingsford (DA/641/2011)

 

Against               Jodie Mitchell - applicant

 

D9/12       18-20 Stanley Street, Randwick (DA/891/2008/D)

 

Against               John Clayton - objector

 

For                      Helen Deegan – representing the applicant

 

D11/12      8-10 Wood Street, Randwick (DA/225/2004/B)

 

Against               Don Bruce - objector

 

For                      Kevin Driver – representing the applicant

 

D12/12      1 Meagher Avenue, Maroubra (DA/29/1990/A)

 

Against               Patrick Lebon - applicant

 

For                      Andrew Prutton - objector

 

Having declared a significant non pecuniary interest in Item D13/12 earlier in the meeting Cr Procopiadis left the meeting during the public address on the matter.

 

D13/12      50 Milroy Avenue, Kensington (DA/783/2011)

 

Against               Steve Wheen - objector

 

For                      Francine Alexandrou - applicant

 

Cr Procopiadis returned to the meeting.

 

Having declared a significant non pecuniary interest in Items D14/12 and D15/12 earlier in the meeting Crs Matson, Nash (the Mayor) and Hughes left the meeting during the public address on the matters.

 

Cr Andrews also left the Chamber during the public address on Items D14/12 and D15/12.

 

D14/12      jrpp – 1408 anzac parade, little bay (DA/812/2011)

 

For                      Ian Cady - representing the applicant

 

D15/12      JRPP - 330 Anzac Parade, Kensington - UNSW (DA/748/2011)

 

For                      Peter Strudwick – representing the UNSW

 

The meeting was adjourned at 8.13pm and was resumed at 8.28pm.

 

Urgent Business

Nil.

 

Development Application Reports

 

D1/12        Development Application Report - 128 Marine Parade, Maroubra (DA/618/2010/A)

PL2/12

RESOLUTION: (Andrews/Bowen) hat Council, as the consent authority, grant its consent under Section 96 of the Environmental Planning and Assessment Act 1979 as amended to modify Development Consent No DA/618/2010 for the modification of the approved development to amend conditions 2 and 3 relating to the provision of privacy screens, provide privacy screens to the western end of all south facing balconies and construct a garbage receptacle enclosure adjacent to the eastern side of the building for 128 Marine Parade, Maroubra in the following manner:

 

A.        Amend Condition No. 1 to read:

1.       The development must be implemented substantially in accordance with the plans numbered 07/10 1 of 10, 2 of 10, 3 of 10, 4 of 10, 5 of 10, 6 of 10, 7 of 10, 8 of 10, 9 of 10 and 10 of 10, dated 16/07/10 and received by Council on 4 August 2010, the application form and on any supporting information received with the application, except as may be amended  by the following conditions and as may be shown in red on the attached plans and as amended by the Section 96 plans numbered dwg No. 07/10 of 1-7 (Issue A-S96), dated 12/10/2011 and received by Council on 12 October 2011 only in so far as they relate to the modifications highlighted on the Section 96 plans and detailed in the Section 96 application, except as may be amended  by the following conditions and as may be shown in red on the attached plans:

 

B.        Amend Conditions Nos 2 and 3 as follows:

2.       Privacy screens shall be provided along the entire edge of the balconies for units 4 and 7 facing 130B Marine Parade. The privacy screens shall be constructed from balcony floor to ceiling height between the southern wall of the units and the approved southern pylon. The privacy screens between the approved southern pylon and the southern end of the approved balconies shall be constructed to a maximum height of 1.6m above balcony floor level. The Construction Certificate plans shall demonstrate compliance with this requirement.

 

3.       The privacy screen between the approved southern pylon and the southern end of the approved balcony must be fixed in place and must not be operable. The Construction Certificate plans shall demonstrate compliance with this requirement.

 

C.        Add new Condition No. 26 to read as follows:

26.     The privacy screens to must be constructed from louvres which are fixed at an angle to prevent the direct overlooking of adjoining dwellings.

 

MOTION: (Andrews/Bowen) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D2/12        Development Application Report - 32-34 Grosvenor St, Kensington (DA/618/2011)

 

 

 

 

PL3/12

Having declared a significant non pecuniary interest in this item earlier in the meeting Cr Procopiadis left the meeting during the debate and the vote on the matter.

 

RESOLUTION: (Tracey/Matson) -

 

A.     That Council support the objections under State Environmental Planning No. 1 (SEPP No.1) in respect to non-compliance with Clause 20F and Clause 20G of the Randwick Local Environmental Plan 1998 (Consolidation), relating to maximum floor space ratio and maximum building and external wall height, on the grounds that the proposed development is consistent with the relevant objectives of the clauses and will not adversely affect the amenity of the surrounding locality and that the Department of Planning be advised accordingly.

 

B.     That Council as the responsible authority grant its development consent under Section 80 and 80A of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No DA/618/2011 for the demolition of existing structures and construction of a part 3 and part 4 storey multi unit housing development including an above ground parking level with 12 spaces, 11 dwelling units over 3 levels and associated works at 32-34 Grosvenor Street,  Kensington, subject to the following conditions:

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans numbered 1.00 Revision C, 1.01 Revision C, 1.02 Revision C, 1.03 Revision C, 1.04 Revision C, 2.00 Revision E, 2.01 Revision D, 2.02 Revision D, 2.03 Revision D, 3.00 Revision C, 3.01 Revision D, 3.02 Revision D, 3.03 Revision C, 4.00 Revision C, 4.02 Revision C, 4.03 Revision A, 4.04 Revision A, 4.05 Revision A, and 4.06 Revision A, and all dated 10 November 2011, and stamped received by Council on 11 November 2011, the application form, and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

BASIX Certificate

No.

Dated

 

390075M_02

9 December 2011

 

and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Should the approval be granted to the application, the following conditions should be included in the development consent:

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either an Accredited Certifier or Randwick City Council.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

2.       The colours, materials and finishes of the external surfaces to the proposed development are to be compatible with adjacent developments to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

3.       Details of bicycle storage as required in the Development Control Plan – Parking shall be submitted to and approved by Council’s Director City Planning Council prior to a Construction Certificate being issued for the development in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

4.       The following amendments to the proposal shall be undertaken:

 

·      Extension of the western wall of the north-facing balconies of Units L1.01, L2.01 and L3.01 by 600mm to mitigate privacy impacts on the adjoining western property.   

·      Provision of fire protection devices for all openings exposed to the side boundaries comprising open sensor triggered fire shutters within colorbond box located above the opening

·      Provision of a magnetic ‘hold open’ fire door to the stair of the lobby so as to provide to natural light and ventilation to the internalised lobby

·      Provision of ventilating skylights for all internal top floor bathrooms and laundries.

·      Provision of ceiling fans in all habitable rooms.

·      Installation of insulation in the form of polystyrene sheets covered with pebble ballast on the concrete roof slab to effectively stop heat transfer to the living spaces below.  This method of construction should be shown on the sections.

·      Provision of clothes lines located in the rear garden.

 

Details shall be submitted to and approved by Council’s Director City Planning prior to a Construction Certificate being issued for the development in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

       

5.       The floor level of the ground floor inclusive of the carpark and entry foyer shall be increased by 200mm from the proposed RL 25.89 to a new RL 26.09 to protect the  ground level up to the calculated 1 in 100 flood level plus free board. The floor to floor heights of Levels 1, 2 and 3 above shall, correspondingly, be reduced by a maximum 70mm per floor to accommodate the required increase in the ground floor level.

 

Details shall be submitted to and approved by Council’s Director City Planning prior to a Construction Certificate being issued for the development in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

6.       The reflectivity index of glass used in the external façade of the development must not exceed 20 percent. Details shall be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

7.       In accordance with the provisions of clauses 143A and 154A of the Environmental Planning & Assessment Regulation 2000, a ‘Design Verification Certificate’ must be provided to the Certifying Authority, prior to issuing a construction certificate.

 

The following condition is applied to meet additional demands for public facilities:

 

8.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, the following monetary levy must be paid to Council.

 

Category

Cost

Applicable Levy

S94A Levy

Development Cost more than $200,000

$ 2,317,451

1%

$23,174.51

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Consent Requirements

9.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

Long Service Levy Payments

10.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

Security Deposit

11.     The following damage / civil works security deposit requirement must be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; and as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

·           $5000.00    -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash, cheque or credit card payment and is refundable upon a satisfactory inspection by Council upon the completion of the civil works which confirms that there has been no damage to Council's infrastructure.

 

The owner/builder is also requested to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

To obtain a refund of relevant deposits, a Security Deposit Refund Form is to be forwarded to Council’s Director of City Services upon issuing of an occupation certificate or completion of the civil works.

 

Sydney Water Requirements

12.     The relevant requirements of the Sydney Water Act 1994 must be complied with and a Section 73 Compliance Certificate under the Sydney Water Act 1994 must be obtained from Sydney Water. 

 

An Application for a Section 73 Certificate must be made through an authorised Water Servicing Co-ordinator. For details, please refer to the “Your Business” section of Sydney Water’s web site www.sydneywater.com.au then the “e-developer” icon or telephone 13 20 92.

 

Following the application, a “Notice of Requirements” will be provided, detailing water and sewer extensions to be built and charges to be paid.  Please make early contact with the Water Servicing Co-ordinator, as building of water/sewer extensions can be time consuming and may impact on other services and building, driveway or landscape design.

 

A copy of Sydney Water’s ‘Notice of Requirements’ must be submitted to the Certifying Authority prior to issuing a Construction Certificate.

The Section 73 Compliance Certificate is required to be obtained before an occupation certificate or subdivision certificate is issued, whichever the sooner.

 

Electricity Substation

13.     The applicant must liaise with Energy Australia prior to obtaining a construction certificate (for any above ground works), to determine whether or not an electricity substation is required for the development. Any electricity substation required for the site as a consequence of this development shall be located within the site and shall be screened from view. The proposed location and elevation shall be shown on relevant construction certificate and landscape plans.

 

Street Tree Management

14.     The applicant shall submit a payment of $214.50 (inclusing GST), being to cover the cost for Council to supply and install 2 x 25 litre street trees, Lophostemon confertus (Brush Box) on the Grosvenor Street verge, spaced evenly between the southern edge of the vehicle crossing and in the intersection of Lorne Avenue.

 

The contribution shall be paid into Tree Amenity Income at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development.

 

The applicant must contact Council’s Landscape Development Officer on 9399-0613 (quoting the receipt number), and giving at least four working weeks notice to arrange for planting of the new trees upon the completion of all site works.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

15.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

16.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Compliance with the Building Code of Australia & Relevant Standards

17.     In accordance with section 80A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

18.     Access and facilities for people with disabilities must be provided in accordance with the relevant requirements of the Building Code of Australia, Disability (Access to Premises – Buildings) Standard 2010, relevant Australian Standards and conditions of consent, to the satisfaction of the Certifying Authority.  Details of the required access and facilities for people with disabilities are to be included in the plans/specifications for the construction certificate.

 

Site stability and construction work

19.     A report must be obtained from a suitably qualified and experienced professional engineer, which includes the following details, to the satisfaction of the Certifying Authority for the development:-

 

a)     Geotechnical details which confirm the suitability and stability of the site for the development and relevant design and construction requirements to be implemented to ensure the stability and adequacy of the development and adjacent land.

 

b)     Details of the proposed methods of excavation and support for the adjoining land (including any public place) and buildings.

 

c)     Details to demonstrate that the proposed methods of excavation and construction are suitable for the site and should not result in any damage to the adjoining premises, buildings or any public place, as a result of the works and any associated vibration.

 

d)     The adjoining land and buildings located upon the adjoining land must be adequately supported at all times throughout demolition, excavation and building work, to the satisfaction of the Principal Certifying Authority.

 

e)     Written approval must be obtained from the owners of the land to install any ground or rock anchors underneath the adjoining premises (including any public roadway or public place) and details must be provided to the Certifying Authority.

 

Traffic conditions

20.     Adequate provisions are to be made to provide pedestrian visibility and safety.  All new walls (and/or landscaping) adjacent to vehicular crossings should not exceed a height of 600mm above the internal driveway level for a distance of 1.5m within the site or new walls (including landscaping) should splayed 1.5 metres by 1.5 metres. Details of compliance, to the satisfaction of the certifying authority, are to be included in the construction certificate documentation.

 

21.     The vehicular access driveways, internal circulation ramps and the carpark areas, (including, but not limited to, the ramp grades, carpark layout and height clearances) are to be in accordance with the requirements of AS2890.1:2004. The Construction Certificate plans must demonstrate compliance with these requirements.

 

Design Alignment levels

22.     The design alignment level (the finished level of concrete, paving or the like) at the Grosvenor Street boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

The design alignment level/s at the property boundary as issued by Council and their relationship to the roadway/kerb/footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

Any enquiries regarding this matter should be directed to Council’s Development Engineer on 9399 0924.

 

23.     The design alignment level (the finished level of concrete, paving or the like) at the Lorne Avenue boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

The design alignment levels at the property boundary as issued by Council and their relationship to the roadway/kerb/footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

Any enquiries regarding this matter should be directed to Council’s Development Engineer on 9399 0924.

 

24.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the roadway/kerb/footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

25.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $1065 calculated at $44.00 (inclusive of GST) per metre of site frontage to Green Street. This amount is to be paid prior to a construction certificate being issued for the development.

 

26.     The gradient of the internal access driveway must be designed and constructed in accordance with AS 2890.1 (2004) – Off Street Car Parking and the levels of the driveway must match the alignment levels at the property boundary (as specified by Council). Details of compliance are to be included in the construction certificate.

 

The height of the building must not be increased to satisfy the required driveway gradients.

 

Stormwater Drainage & Flood Management

27.     The floor level of all habitable and storage areas shall be at a minimum RL of 26.09 metres (AHD) or be suitably waterproofed up to this same level. Details demonstrating compliance with this condition are to be included in the construction certificate documentation.

 

28.     The proposed internal driveway shall be designed with a high point at least RL 26.09 metres (AHD). The level of the entire ground floor carpark must be at least RL 26.09 metres AHD or suitably waterproofed up to this same level. Details demonstrating compliance with this condition are to be included in the construction certificate documentation.

 

29.     All windows, vents and other openings into the ground floor carpark are to be located at or above RL 26.09 metres (AHD). Details demonstrating compliance with this condition are to be included in the construction certificate documentation.

 

30.     The ground floor foyer level shall be a minimum of RL 26.09 metres AHD. The lift, service room and garbage room shall also be at RL 26.09 metres AHD or suitably waterproofed to this level. Details demonstrating compliance with this condition are to be included in the construction certificate documentation.

 

31.     The ground floor level located along the Grosvenor Street and Lorne Avenue site frontages, including any proposed walls around the ground floor carpark, shall be designed to structurally withstand hydrostatic pressure/stormwater inundation from floodwater during the probable maximum flood (PMF) event as defined in the Floodplain Management Manual (New South Wales Government, January 2001). Structural Engineering certification confirming that this condition has been complied with shall be submitted to the certifying authority with the construction certificate.

 

This requirement does not necessitate the development being flood proof/water tight up to the PMF event, rather the requirement is to ensure that the development will not be structurally damaged in manner that could endanger lives during the PMF event.

 

32.     Stormwater drainage plans have not been approved as part of this development consent. Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage shall be prepared by a suitably qualified Hydraulic Engineer and submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issued, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)       A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

 

b)       A layout of the proposed drainage system including pipe sizes, type, grade, length, invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system. 

 

c)       The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

 

i.        Roof areas

ii.       Paved areas

iii.       Grassed areas

iv.      Garden areas

 

e)       Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

 

f)       Proposed finished surface levels and grades of car parks, internal driveways and access aisles which are to be related to Council's design alignment levels.

 

g)       The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

Internal Drainage

33.     The site stormwater drainage system is to be provided in accordance with the following requirements;

 

a)     The stormwater drainage system must be provided in accordance with the relevant requirements of Building Code of Australia and the conditions of this consent, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate.

 

b)     The stormwater must be discharged (by gravity) Directly to the kerb and gutter or drainage system located at the front of the subject site in Grosvenor Street and / or Lorne Avenue.

 

c)     On-site stormwater detention system must be provided to ensure that the maximum discharge from the site does not exceed that which would occur during a 1 in 10 year storm of one hour duration for existing site conditions. All other stormwater run-off from the site for all storms up to the 1 in 20 year storm is to be retained on the site for gradual release to the street drainage system, to the satisfaction of the certifying authority.

 

An overland escape route or overflow system (to Council’s street drainage system) must be provided for storms having an average recurrence interval of 100 years (1 in 100 year storm), or, alternatively the stormwater detention system is to be provided to accommodate the 1 in 100 year storm.

 

d)     Determination of the required cumulative storage (in the on-site detention system) must be calculated by the mass curve technique as detailed in Technical Note 1, Chapter 14 of the Australian Rainfall and Run-off Volume 1, 1987 Edition.

 

Where possible any detention tanks should have an open base to infiltrate stormwater into the ground. Infiltration should not be used if ground water and/or any rock stratum is within 2.0 metres of the base of the tank.

 

e)     If connecting to Council’s underground drainage system, a reflux valve shall be provided (within the site) over the pipeline discharging from the site to ensure that stormwater from Council drainage system does not surcharge back into the site stormwater system.

 

f)     Any new kerb inlet pits (constructed within Council’s road reserve) are to be constructed generally in accordance with Council’s standard detail for the design of kerb inlet pits (drawing number SD6 which is available from Council).

 

g)     Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (i.e. above the 1 in 20 year storm) to the proposed drainage (detention/infiltration) system.

 

h)     A sediment/silt arrestor pit must be provided within the site near the street boundary prior to discharge of the stormwater to Council’s drainage system and prior to discharging the stormwater to any absorption/infiltration system.

 

Sediment/silt arrestor pits are to be constructed generally in accordance with the following requirements:

·          The base of the pit being located a minimum 300mm under the invert level of the outlet pipe.

·          The pit being constructed from cast in-situ concrete, precast concrete or double brick.

·          A minimum of 4 x 90 mm diameter weep holes (or equivalent) located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

·          A galvanised heavy-duty screen being provided over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

·          The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

·          A child proof and corrosion resistant fastening system being provided for the access grate (e.g. spring loaded j-bolts or similar).

·          Provision of a sign adjacent to the pit stating, “This sediment/silt arrester pit shall be regularly inspected and cleaned”.

 

       Sketch details of a standard sediment/silt arrester pit may be obtained from Council’s Drainage Engineer.

 

i)      The floor level of all habitable, retail, commercial and storage areas located adjacent to any detention and/or infiltration systems with above ground storage must be a minimum of 300mm above the maximum water level for the design storm or alternately a permanent 300mm high water proof barrier is to be provided.

 

(In this regard, it must be noted that this condition must not result in any increase in the heights or levels of the building.  Any variations to the heights or levels of the building will require a new or amended development consent from the Council prior to a construction certificate being issued for the development).

 

j)     The maximum depth of ponding in any above ground detention areas and/or infiltration systems with above ground storage shall be as follows (as applicable):

i.    300mm in landscaped areas (where child proof fencing is not provided around the outside of the detention area and sides slopes are steeper than 1 in 10)

ii.    600mm in landscaped areas where the side slopes of the detention area have a maximum grade of 1 in 10

iii.   1200mm in landscaped areas where a safety fence is provided around the outside of the detention area

iv.   Above ground stormwater detention areas must be suitably signposted where required, warning people of the maximum flood level.

 

Note: Above ground storage of stormwater is not permitted within basement or ground floor car parks or store rooms.

 

k)     A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

 

l)      A ‘V’ drain (or equally effective provisions) are to be provided to the perimeter of the property, where necessary, to direct all stormwater to the detention/infiltration area.

 

m)    The site stormwater system must be regularly cleaned and maintained to ensure it operates as required by the design.

 

n)     Mulch or bark is not to be used in on-site detention areas.

 

o)     Site discharge pipelines shall cross the verge at an angle no less than 45 degrees to the kerb line.

 

p)     Any onsite detention/infiltration systems shall be located in areas accessible by residents of all units.

 

q)     Should a charged system be required to drain any portion of the site, the charged system must be designed with suitable clear-outs/inspection points at pipe bends and junctions.

 

Waste Management

34.     Prior to the issuing of a construction certificate for the proposed building, a Waste Management Plan detailing the waste and recycling storage and removal strategy for all of the development, is required to be submitted to and approved by Council’s Director of City Services.

 

The Waste Management plan is required to be prepared in accordance with Council's Waste Management Guidelines for Proposed Development and must include the following details (as applicable):

 

·       The use of the premises and the number and size of occupancies.

·       The type and quantity of waste to be generated by the development.

·       Demolition and construction waste, including materials to be re-used or recycled.

·       Details of the proposed recycling and waste disposal contractors.

·       Waste storage facilities and equipment.

·       Access and traffic arrangements.

·       The procedures and arrangements for on-going waste management including collection, storage and removal of waste and recycling of materials.

 

Further details of Council's requirements and guidelines, including pro-forma Waste Management plan forms can be obtained from Council's Customer Service Centre.

 

35.     The garbage room shall be sized to contain a total of 12 x 240 litre bins (comprising 6 garbage bins & 6 recycle bins) and with adequate provisions for access to all bins.  Details showing compliance are to be included in the construction certificate.

 

36.     The waste storage areas are to be provided with a tap and hose and the floor is to be graded and drained to the sewer to the requirements of Sydney Water.

 

            Street Tree Management

37.     In order to ensure preservation of the large and significant Ficus microcarpa var. ‘Hillii’ (Hills Weeping Figs) street tree growing in Council’s Lorne Avenue road reserve, roughly in line with the common boundary between 34 Grosvenor Street and 2A Lorne Avenue, in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the construction certificate application MUST show the retention of this tree, with the position of its trunk and full diameter/spread of its canopy to be clearly and accurately shown on all drawings.

 

b.       Following demolition, all initial excavations associated with footings or structures for a distance of 5m along both the eastern and southern boundaries, closest to the tree, must be undertaken by hand, measuring a minimum depth of 600mm and width of 200mm, being mindful not to damage any roots encountered during this process.

 

c.       Upon completion of this trench, but prior to commencing any footings, structures or similar in these two areas, the applicant must contact Council's Landscape Development Officer on 9399-0613, giving at least 2 working days notice,  to arrange an inspection of this trench and any roots found, and where approval is given for their pruning in order to accommodate the proposed works, they must be cut cleanly by hand, with the affected area to be backfilled with clean site soil as soon as practically possible.

 

d.       The tree shall be physically protected by the installation of 1.8 metre high steel mesh/chainwire fencing which shall be located a distance of 3m to its southwest and northeast (measured off the outside edge of its trunk at ground level), matching up with the back of the kerb to its south, and the footpath to its north, in order to completely enclose this tree for the duration of works.

 

e.       This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT ENTER".

 

f.        The applicant is not authorised to perform any work to this street tree, and shall contact Council’s Landscape Development Officer on 9399-0613 should further pruning or any similar such work appear necessary, with the applicant required to cover all associated costs with such work, to Council’s satisfaction, prior to the issue of a Final Occupation Certificate.

 

g.       Within the TPZ specified in point ‘d’ above, there is to be no storage of materials or machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble.

 

h.       A refundable deposit in the form of cash, credit card, cheque or bank guarantee for an amount of $10,000.00 shall be paid at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development, in order to ensure compliance with the conditions listed in this consent, and ultimately, preservation of this street tree.

 

          The refundable deposit will be eligible for refund following the issue of a Final Occupation Certificate, subject to completion and submission of Council’s ‘Security Deposit Refund Application Form’, and pending a satisfactory inspection by Council’s Landscape Development Officer (9399-0613).

 

          Any contravention of Council's conditions relating to the tree at any time during the course of the works, or prior to the issue of a Final Occupation Certificate, may result in Council claiming all or part of the lodged security in order to perform any rectification works necessary, as per the requirements of 80A (6) of the Environmental Planning and Assessment Act 1979.

 

38.     Any contravention of Council's conditions relating to this tree at any time during the course of the works, or prior to the issue of a final occupation certificate, may result in Council claiming all or part of the lodged security in order to perform any rectification works necessary.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

39.     Any metal roof sheeting is to be pre-painted and form part of the colour scheme and external finishes for the development. The reflectivity index of materials used in the external façade of the development must not exceed 20 percent.  The details and samples of the materials to be used are to be submitted with the colour and material schedule for the approval of Council’s Director of City Planning, prior to the commencement of works.

 

Certification and Building Inspection Requirements

40.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

Home Building Act 1989

41.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council.

 

Dilapidation Reports

42.     A dilapidation report prepared by a professional engineer or suitably qualified and experienced building surveyor shall be submitted to the certifying authority prior to the commencement of demolition, excavation or building works detailing the current condition and status of all buildings and ancillary structures located upon No.2a Lorne Ave, Kensington, immediately adjoining the subject site (e.g. dwellings, residential flat buildings, commercial/industrial building, garages, carports, verandahs, fences, retaining walls, swimming pools and driveways etc).

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage and other structures located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report must be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

43.     A Construction Noise & Vibration Management Plan, prepared in accordance with the Department of Climate Change Guidelines for Construction Noise and Assessing Vibration, by a suitably qualified person, is to be developed and implemented prior to commencing site work and throughout the course of construction.

 

a)     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents. 

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

b)     The Construction Noise & Vibration Management Plan must include details of measurements, analysis and relevant criteria and demonstrate that the noise and vibration emissions from the work satisfy the relevant provisions of the Protection of the Environment Operations Act 1997, current DECC Guidelines for Construction Noise and Assessing Vibration and Councils conditions of consent.

 

c)     A further report/correspondence must be obtained from the consultant as soon as practicable upon the commencement of works, which reviews and confirms the implementation and suitability of the noise and vibration strategies in the Construction Noise & Vibration Management Plan and which demonstrates compliance with relevant criteria.

 

d)     Any recommendations and requirements contained in the Construction Noise & Vibration Management Plan and associated reports are to be implemented accordingly and should noise and vibration emissions not comply with the terms and conditions of consent, work must cease forthwith and is not to recommence until details of compliance are submitted to Council and the PCA.

 

A copy of the Construction Noise & Vibration Management Plan and associated acoustic/vibration report/s must be maintained on-site and a copy must be provided to Council and the Principal Certifying Authority accordingly.

 

Temporary Site Fencing

44.     Temporary site safety fencing must be provided to the perimeter of the site throughout demolition, excavation and construction works.

 

Temporary site fences must have a height of 1.8 metres and be a cyclone wire fence (with geotextile fabric attached to the inside of the fence to provide dust control), or heavy-duty plywood sheeting (painted white), or other material approved by Council.

 

A ‘B Class’ overhead type hoarding is required is be provided to protect the public, located adjacent to the development, prior to the commencement of any works on the site which comprise:

 

·       any works or hoisting of materials over a public footway or adjoining premises, or

·       any building or demolition works on buildings which are over 7.5m in height and located within 3.6 metres of the street alignment.

 

All site fencing and hoardings must be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

If it is proposed to locate any site fencing, hoardings, amenities or articles upon any part of the footpath, nature strip or public place at any time, a separate Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any fencing, hoarding or other article on the road, footpath or nature strip.

 

Construction Site Management

45.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·            location and construction of protective site fencing / hoardings;

·            location of site storage areas/sheds/equipment;

·            location of building materials for construction;

·            provisions for public safety;

·            dust control measures;

·            details of proposed sediment and erosion control measures;

·            site access location and construction

·            details of methods of disposal of demolition materials;

·            protective measures for tree preservation;

·            location and size of waste containers/bulk bins;

·            provisions for temporary stormwater drainage;

·            construction noise and vibration management;

·            construction traffic management details;

·            provisions for temporary sanitary facilities.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

46.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

 

·            The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·            Details of hazardous materials (including asbestos)

·            Method/s of demolition (including removal of any asbestos)

·            Measures and processes to be implemented to ensure the health & safety of workers and community

·            Measures to be implemented to minimise any airborne dust and asbestos

·            Methods and location of disposal of any hazardous materials (including asbestos)

·            Other relevant details, measures and requirements to be implemented

·            Details of re-use, recycling and disposal of waste materials

·            Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Public Liability

47.     The owner/builder is required to hold Public Liability Insurance, with a minimum liability of $10 million and a copy of the Insurance cover is to be provided to the Principal Certifying Authority and Council.

 

Demolition & Construction Waste

48.     A Demolition and Construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

Construction Traffic Management

49.     Prior to the commencement of any works on the site, an application for a ‘Works Zone’ must be submitted to Councils Integrated Transport Department, and approved by the Randwick Traffic Committee, for a ‘Works Zone’ to be provided in Grosvenor Street for the duration of the demolition & construction works. 

 

The ‘Works Zone’ must have a minimum length of 12m and extend for a minimum duration of three months.  The suitability of the proposed length and duration is to be demonstrated in the application for the Works Zone.  The application for the Works Zone must be submitted to Council at least six (6) weeks prior to the commencement of work on the site to allow for assessment and tabling of agenda for the Randwick Traffic Committee.

 

The requirement for a Works Zone may be varied or waived only if it can be demonstrated in the Construction Traffic Management Plan referenced below (to the satisfaction of Council’s Traffic Engineers) that all construction related activities (including all loading and unloading operations) can and will be undertaken wholly within the site.  The written approval of Council must be obtained to provide a Works Zone or to waive the requirement to provide a Works Zone prior to the commencement of any site work.

 

50.     A detailed Construction Traffic Management Plan must be submitted to and approved by Council, prior to a construction certificate being issued for the development.

 

The Construction Traffic Management Plan must be prepared by a suitably qualified person and must include the following details, to the satisfaction of Council:

·     A description of the demolition, excavation and construction works

·       A site plan/s showing the site, roads, footpaths, site access points and vehicular movements

·       Any proposed road and/or footpath closures

·       Proposed site access locations for personnel, deliveries and materials

·       Size, type and estimated number of vehicular movements (including removal of excavated materials, delivery of materials and concrete to the site)

·       Provision for loading and unloading of goods and materials

·       Impacts of the work and vehicular movements on the road network, traffic and pedestrians

·       Proposed hours of construction related activities and vehicular movements to and from the site

·       Current/proposed approvals from other Agencies and Authorities (including NSW Roads & Traffic Authority, Police and State Transit Authority)

·       Any activities proposed to be located or impact upon Council’s road, footways or any public place

·       Measures to maintain public safety and convenience

 

Civil Works

51.     A separate written approval from Council is required to be obtained in relation to all works which are located externally from the site within the road reserve/public place, in accordance with the requirements of the Roads Act 1993.  Detailed plans and specifications of the proposed works are to be submitted to and approved by the Director of City Services prior to commencing any works within the road reserve/public place.

 

All works within the road reserve/public place must be carried out to the satisfaction of Council and certification from a certified practicing engineer is to be provided to Council upon completion of the works.

 

Relevant Council assessment and inspection fees, as specified in Council's adopted Pricing Policy, are required to be paid to Council prior to commencement of the works.

 

Sydney Water

52.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

          Public Utilities

53.     A public utility impact assessment must be carried out on all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.  The assessment should include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of services.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the principal certifying authority prior to the commencement of any demolition, excavation or building works.

 

54.     The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

Street Tree Management

55.     A minimum of 4 weeks prior to the commencement of any site works, the applicant must contact Council's Landscape Development Officer on 9399-0613, to arrange for the selective pruning of only those lower growing branches from the significant Ficus microcarpa var. 'Hillii' (Hills Weeping Fig) which is located on Council's Lorne Avenue verge, roughly in line with the common boundary between 34 Grosvenor Street and 2A Lorne Avenue, and will only be performed where they overhang into the site and need to be pruned in order to either avoid damage to the tree, or, interference with the proposed works.

 

56.     Pruning of this tree can only be performed by Council or Council's nominated contractor, wholly at the applicant's cost, and in this regard, a payment of $104.50 (including GST) will need to be made into Tree Amenity Income, at the Cashier on the Ground Floor of the Administrative Centre, prior to the PCA issuing a Final Occupation Certificate for the development.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Building regulation and construction site management

57.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

Inspections during Construction

58.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Building & Demolition Work Requirements

59.     All work and activities must be carried out in accordance with the relevant regulatory requirements, including:

 

·            Occupational Health & Safety Act 2000 & Regulations

·            WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·            WorkCover NSW Requirements, Guidelines and Codes of Practice

·            Australian Standard 2601 (2001) – Demolition of Structures

·            The Protection of the Environment Operations Act 1997

·            The Protection of the Environment Operations (Waste) Regulation 2005

·            DECC/EPA Waste Classification Guidelines

·            Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

60.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·           Occupational Health & Safety legislation and WorkCover NSW requirements

 

·           Randwick City Council’s Asbestos Policy

 

·           A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

·           On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·           Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·           A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Sediment & Erosion Control

61.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details must be shown in a Sediment and Erosion Control Plan, including; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

A copy of the Sediment and Erosion Control Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Dust Control

62.     During demolition, excavation and construction works, dust emissions must be minimised, so as not to result in a nuisance to nearby residents or result in a potential pollution incident.

 

Adequate dust control measures must be provided to the site prior to the works commencing and the measures and practices must be maintained throughout the demolition, excavation and construction process, to the satisfaction of Council.

 

Dust control measures and practices may include:-

·       Provision of geotextile fabric to all perimeter site fencing (attached on the prevailing wind side of the site fencing).

·       Covering of stockpiles of sand, soil and excavated material with adequately secured tarpaulins or plastic sheeting.

·       Installation of a water sprinkling system or provision hoses or the like.

·       Regular watering-down of all loose materials and stockpiles of sand, soil and excavated material.

·       Minimisation/relocation of stockpiles of materials, to minimise potential for disturbance by prevailing winds.

·       Landscaping and revegetation of disturbed areas.

 

Public Safety & Site Management

63.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

·      Building materials, sand, soil, waste materials, construction equipment or other articles must not be placed upon the footpath, roadway or nature strip at any time.

 

·      The road, footpath, vehicular crossing and nature strip must be maintained in a good, safe, clean condition and free from any excavations, obstructions, trip hazards, goods, materials, soils or debris at all times.  Any damage caused to the road, footway, vehicular crossing, nature strip or any public place must be repaired immediately, to the satisfaction of Council.

 

·      Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

·      Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

Excavations, Back-filling & Retaining Walls

64.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority prior to commencing such excavations or works.

 

Support of Adjoining Land

65.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

Site Signage

66.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·           name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours,

·           name, address and telephone number of the Principal Certifying Authority,

·           a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

67.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

 

·   Monday to Friday - 8.00am to 1.00pm only

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

Additional requirements for all development

·   Saturdays and Sundays where the preceding Friday and/or the following Monday is a public holiday - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Survey Requirements

68.     A Registered Surveyor’s check survey certificate or other suitable documentation must be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority (PCA):

 

·            prior to construction (pouring of concrete) of footings and retaining structures,

·            prior to construction (pouring of concrete) of each floor slab,

·            upon completion of the building, prior to issuing an Occupation Certificate,

·            as otherwise may be required by the PCA.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the Principal Certifying Authority for the development.  

 

Building Encroachments

69.     There must be no encroachment of any structures or building work onto any adjoining premises, Council’s road reserve, footway, nature strip or public place.

 

Road/Asset Opening Permit

70.     Any openings within or upon the road, footpath, nature strip or in any public place (i.e. for proposed drainage works or installation of services), must be carried out in accordance with the following requirements, to the satisfaction of Council:

 

a)     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

b)     Council’s Road / Asset Opening Officer must be notified at least 48 hours in advance of commencing any excavation works and also immediately upon completing the works (on 9399 0691 or 0409 033 921 during business hours), to enable any necessary inspections or works to be carried out.

 

c)     Relevant Road / Asset Opening Permit fees, construction fees, inspection fees and security deposits, must be paid to Council prior to commencing any works within or upon the road, footpath, nature strip or other public place,

 

d)     The owner/developer must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate or occupation of the development (whichever is sooner).

 

e)     Excavations and trenches must be back-filled and compacted in accordance with AUSPEC standards 306U.

 

f)     Excavations or trenches located upon a road or footpath are required to be provided with 50mm depth of cold-mix bitumen finish, level with the existing road/ground surface, to enable Council to readily complete the finishing works at a future date.

 

g)     Excavations or trenches located upon turfed areas are required to be back-filled, compacted, top-soiled and re-turfed with Kikuyu turf.

 

h)     The work and area must be maintained in a clean, safe and tidy condition at all times and the area must be thoroughly cleaned at the end of each days activities and upon completion.

 

i)      The work can only be carried out in accordance with approved hours of building work as specified in the development consent, unless the express written approval of Council has been obtained beforehand.

 

j)     Sediment control measures must be implemented in accordance with the conditions of development consent and soil, sand or any other material must not be allowed to enter the stormwater drainage system or cause a pollution incident.

 

k)     The owner/developer must have a Public Liability Insurance Policy in force, with a minimum cover of $10 million and a copy of the insurance policy must be provided to Council prior to carrying out any works within or upon the road, footpath, nature strip or in any public place.

 

Stormwater Drainage

71.     Adequate provisions must be made to collect and discharge stormwater drainage during construction of the building to the satisfaction of the principal certifying authority.

 

The prior written approval of Council must be obtained to connect or discharge site stormwater to Council’s stormwater drainage system or street gutter.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Occupation Certificate Requirements

72.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

Fire Safety Certificate Requirements

73.     Prior to issuing an interim or final Occupation Certificate, a single and complete Fire Safety Certificate, which encompasses all of the essential fire safety measures contained in the fire safety schedule must be obtained and be submitted to Council, in accordance with the provisions of the Environmental Planning and Assessment Regulation 2000.  The Fire safety Certificate must be consistent with the Fire Safety Schedule which forms part of the Construction Certificate.

 

A Fire Safety Statement must be provided to the Council on an annual basis, each year following the issue of a Fire Safety Certificate, which confirms that all the fire safety measures are operating in accordance with the relevant standards of performance.

 

A copy of the Fire Safety Certificate/Fire Safety Statement must be displayed in the building entrance/foyer at all times and a copy must also be forwarded to Fire and Rescue NSW.

 

Structural Certification

74.     A Certificate must be obtained from a professional engineer, which certifies that the building works satisfy the relevant structural requirements of the Building Code of Australia and approved design documentation, to the satisfaction of the Principal Certifying Authority. A copy of which is to be provided to Council.

 

Occupant Safety - Windows

75.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·            The window having a minimum sill height of 1.5m above the internal floor level,

·            Providing a window locking device at least 1.5m above the internal floor level,

·            Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·            Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·            Other appropriate effective safety measures or barrier.

 

The relevant safety measures must be implemented prior to the issue of an Occupation Certificate.

 

Noise Control Requirements & Certification

76.     The operation of plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Office of Environment and Heritage (EPA) Noise Control Guidelines.

 

77.     A report must be obtained from a suitably qualified and experienced consultant in acoustics, which demonstrates and certifies that noise and vibration from any plant and equipment (e.g. mechanical ventilation systems and air-conditioners) satisfies the relevant provisions of the Protection of the Environment Operations Act 1997, NSW Office of Environment and Heritage (EPA) Noise Control Manual, Industrial Noise Policy and Council’s development consent.

 

A copy of the report must be provided to the Principal Certifying Authority and Council prior to an occupation certificate being issued.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

78.     Prior to issuing a final occupation certificate for the development, the owner/developer must meet the full cost for Council or a Council approved contractor to:

a)     Construct a full width heavy duty concrete vehicular crossing and layback at kerb in Grosvenor Street opposite the vehicular entrance to the site.

b)     Remove the redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

c)     Remove the existing stone kerb and stone gutter and to reconstruct new kerb and gutter for the full Grosvenor Street site frontage except opposite the vehicular entrance and exit point.

d)     Carry out a full depth, minimum 1.0 metre wide, road construction in front of the kerb and gutter along the full site frontage.

e)     Remove the existing concrete footpath in Grosvenor Street and to construct a new  concrete footpath along the full site frontage.  Any unpaved areas on the nature strip must be turfed and landscaped to Council’s specification.

 

79.     Prior to issuing a final occupation certificate or occupation of the development (whichever is sooner), the owner/developer must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

80.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)     All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)     Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)     If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)     The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

81.     The naturestrip upon Council's footway shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

Service Authorities

82.     The Section 73 Compliance Certificate must be submitted to the Principal Certifying Authority prior to issuing an Occupation Certificate or Subdivision Certificate (whichever the sooner).

 

83.     The applicant shall meet the full cost for the overhead power lines located along the Grosvenor Street site frontage to be relocated underground. The applicant shall liaise directly with the relevant service utility authorities to organise for the cables to be relocated. All cables most be relocated underground to the satisfaction of the relevant service utility authority prior to the issuing of an occupation certificate for the development.

 

Stormwater Drainage

84.     Prior to occupation of the development, a "restriction on the use of land” and “positive covenant" (under section 88E of the Conveyancing Act 1919) shall be placed on the title of the subject property to ensure that the onsite detention/infiltration system is maintained and that no works which could affect the design function of the detention/infiltration system are undertaken without the prior consent (in writing) from Council. Such restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

Notes:

a. The “restriction on the use of land” and “positive covenant” are to be to the satisfaction of Council. A copy of Council’s standard wording/layout for the restriction and positive covenant may be obtained from Council’s Development Engineer.

b. The works as executed drainage plan and hydraulic certification must be submitted to Council prior to the “restriction on the use of land” and “positive covenant” being executed by Council.

 

85.     Upon completion of the works and prior to the issuing of an Occupation Certificate, a works-as-executed drainage plan prepared by a registered surveyor and approved by a suitably qualified and experienced hydraulic consultant/engineer must be forwarded to the Principal Certifying Authority and the Council. The works-as-executed plan must include the following details (as applicable):

 

·      The location of any detention basin/s with finished surface levels;

·      Finished site contours at 0.2 metre intervals;

·      Volume of storage available in any detention areas;

·      The location, diameter, gradient and material (i.e. PVC, RC etc) of all stormwater pipes;

·      The orifice size/s (if applicable);

·      Details of any infiltration/absorption systems; and

·      Details of any pumping systems installed (including wet well volumes).

 

86.     Prior to the issuing of an Occupation Certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer, which confirms that the design and construction of the stormwater drainage system complies with the Building Code of Australia, Australian Standard AS3500.3:2003 (Plumbing & Drainage- Stormwater Drainage) and conditions of this development consent. 

 

The certification must be provided following inspection/s of the site stormwater drainage system by the Hydraulic Engineers to the satisfaction of the PCA.

 

87.     Prior to the issuing of an Occupation Certificate certification must be obtained from a suitably qualified and experienced professional Engineer, to the satisfaction of the Principal Certifying Authority confirming that the basement tanking/waterproofing and any sub-soil drainage systems (as applicable) have been provided in accordance with the conditions of consent and relevant Standards. A copy of the certification must be provided to the Council with the Occupation Certificate.

 

Landscaping

88.     The PCA must ensure that landscaping at this site is installed substantially in accordance with the DA Landscape - Amended Plan, by Taylor Brammer Landscape Architects Pty Ltd, project number 11-088S, and stamped 11 November 2011, prior to issuing a Final (or any other type of Interim) Occupation Certificate/s, with the owner/s to ensure it is maintained in a healthy and vigorous state until maturity.

 

Waste Management

89.     Prior to the occupation of the development, the owner or applicant is required to contact Council’s City Services department, to make the necessary arrangements for the provision of waste services for the premises.

 

90.     The waste storage areas shall be clearly signposted.

 

91.     In accordance with the provisions of clauses 143A and 154A of the Environmental Planning & Assessment Regulation 2000, a ‘Design Verification Certificate’ must be provided to the Council, prior to issuing an occupation certificate.

 

92.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue a final Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments has been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing the final Occupation Certificate.

 

93.     A report, prepared by a suitably qualified and experienced consultant in acoustics, shall be submitted to the Council prior to an occupation certificate being issued for the development, which demonstrates and certifies that noise and vibration emissions from the development comply with the relevant provisions of the Protection of the Environment Operations Act 1997, NSW Environmental Protection Authority Noise Control Manual & Industrial Noise Policy and conditions of Council’s approval, to the satisfaction of Council’s Manager Health, Building & Regulatory Services.

 

94.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon must also be provided to Council with the occupation certificate.

 

95.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority or other suitably qualified independent person, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

Environmental Amenity

96.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

97.     Street numbering must be provided to the front of the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council.

 

In this regard, an Application must be submitted to and approved by Council’s Director of City Planning, together with the required fee, for the allocation of appropriate street and unit numbers for the development.

 

98.     Public access to any visitor’s car parking spaces is to be maintained at all times and an intercom system is to be provided adjacent to the vehicular entrance to the car park, together with appropriate signage providing instructions for use.

 

The following conditions have been applied to maintain reasonable levels of amenity to the area:

 

99.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment (excluding plant and equipment during the construction phase) shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

100.    There are to be no emissions or discharges from the premises, which will give rise to a public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

Stormwater Detention System

101.    The detention area must be regularly cleaned and maintained to ensure it functions as required by the design.

 

GENERAL ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and requirements.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1      The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

A2      Building or excavation work must not be commenced until;

§  A Construction Certificate has been obtained from an Accredited Certifier or Council

§  An Accredited Certifier or Council has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

A3      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA), Disability (Access to Premises – Buildings) Standards 2010 and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards.  You are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A4      Any proposed amendments to the design and construction of the building may require a new development application or a section 96 amendment to the existing consent to be obtained from Council, before carrying out such works

 

A5      Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

A6      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A7      This consent does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the land owner or principal contractor must obtain:

§  the consent of the owners of such adjoining or supported land to trespass or encroach, or

§  an access order under the Access to Neighbouring Land Act 2000, or

§  an easement under section 88K of the Conveyancing Act 1919, or

§  an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

A8      External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to any adjoining land.

 

A9      Finished ground levels external to the building are to be consistent with the development consent and are not to be raised, other than for the provision of approved paving or the like on the ground.

 

A10     Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

A11     A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

A12     The necessary development consent and a construction certificate or a complying development certificate (as applicable) must be obtained for proposed external plant and equipment, if not included in this consent.

 

A13     An application must be submitted to an approved by Council prior to the installation and operation of any proposed greywater or wastewater treatment systems, in accordance with the Local Government Act 1993.

 

Greywater/Wastewater treatment systems must comply with the relevant requirements and guidelines produced by NSW Health, NSW Office of Environment and Heritage and other relevant regulatory requirements.

 

A14     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

§  before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

§  before 7.00am or after 10.00pm on any other day.

 

·              Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

·              The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Tracey/Matson) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Bowen

Councillor Belleli

Councillor Nash

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor Tracey

 

Councillor Woodsmith

 

Total (10)

Total (2)

 

 

 

D3/12        Development Application Report - 1609-1611 Anzac Parade, La Perouse (DA/76/2009/A)

PL4/12

RESOLUTION: (Woodsmith/Andrews) that Council, as the consent authority, refuses development consent under Section 96 of the Environmental Planning and Assessment Act 1979 to modify Development Consent No. DA/76/2009 by extending the hours of operation to 10am to 10pm Monday to Thursday and 9am to 11pm Friday, Saturday and Sunday at No. 1609-1611 Anzac Parade, La Perouse.

 

AMENDMENT: (Matson/Stevenson) that the S96 Application be deferred to enable further information to be sought from the local Precinct Committee and the Ward Councillors in relation to trading in the precinct. LOST.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Belleli

Councillor Andrews

Councillor Matson

Councillor Bowen

Councillor Stevenson

Councillor Hughes

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Tracey

 

Councillor Woodsmith

Total (3)

Total (10)

 

MOTION: (Woodsmith/Andrews) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Bowen

Councillor Belleli

Councillor Hughes

Councillor Matson

Councillor Procopiadis

Councillor Matthews

Councillor Smith

Councillor Nash

Councillor Stevenson

Councillor Seng

Councillor Tracey

Councillor Woodsmith

 

Total (7)

Total (6)

 

 

 

D4/12        Development Application Report - 16 Houston Road, Kensington (DA/518/2011)

PL5/12

RESOLUTION: (Belleli/Andrews) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20B of Randwick Local Environmental Plan 1998, relating to Minimum Allotment Size on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/518/2011 for the demolition of existing structures and construction of multi unit development comprising two separate two storey buildings with garaging, torrens title subdivision and associated works at No. 16 Houston Road, Kensington subject to the following conditions:

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Issue

Drawn by

Stamped

H52-01

02

3D Archplan (J.L.)

25 August 2011

H52-02

02

3D Archplan (J.L.)

25 August 2011

H52-03

02

3D Archplan (J.L.)

25 August 2011

H52-04

02

3D Archplan (J.L.)

25 August 2011

H52-05

02

3D Archplan (J.L.)

25 August 2011

H52-06

02

3D Archplan (J.L.)

25 August 2011

H52-07

02

3D Archplan (J.L.)

25 August 2011

H52-08

02

3D Archplan (J.L.)

25 August 2011

H52-09

02

3D Archplan (J.L.)

25 August 2011

H52-10

02

3D Archplan (J.L.)

25 August 2011

H52-11

02

3D Archplan (J.L.)

25 August 2011

H52-12

02

3D Archplan (J.L.)

25 August 2011

H52-15 (subdivision)

02

3D Archplan (J.L.)

25 August 2011

 

BASIX Certificate

No.

Dated

16 Houston Road

386245S

06 July 2011

 

Amendment of Plans & Documentation

2.       The approved plans and documents must be amended in accordance with the following requirements:

 

a.   North facing windows off bedrooms at first floor level associated with Unit A and Unit B are to be glazed with translucent, obscured, frosted or sandblasted glazing below 1.5m from floor level.

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

3.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

4.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Section 94A Development Contributions

5.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $495,000.00, the following applicable monetary levy must be paid to Council: $4,950.00

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate or subdivision certificate being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Long Service Levy Payments

6.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Security Deposit

7.       The following damage / civil works security deposit requirement must be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; and as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

·           $3000.00    -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash, cheque or credit card payment and is refundable upon a satisfactory inspection by Council upon the completion of the civil works which confirms that there has been no damage to Council's infrastructure.

 

The owner/builder is also requested to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

To obtain a refund of relevant deposits, a Security Deposit Refund Form is to be forwarded to Council’s Director of City Services upon issuing of an occupation certificate or completion of the civil works.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

Design Alignment levels

8.       The design alignment level (the finished level of concrete, paving or the like) at the property boundary for driveways, access ramps and pathways or the like, shall be:

 

Houston Road frontage

·  Match the back of the existing footpath  at all points opposite, along the full site frontage.

 

Houston Lane frontage

·  100 mm above the centreline of the existing asphalt laneway at all points opposite.

 

The design alignment levels at the property boundary as issued by Council and their relationship to the footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

       Any enquiries regarding this matter should be directed to Council’s Development Engineer on 9399 0881.

 

9.       The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $462 calculated at $46.00 (inclusive of GST) per metre of site frontage. This amount is to be paid prior to a construction certificate being issued for the development.

 

10.     The top of footings of any structures constructed on the boundary alignment must be at least 150mm below the alignment level as specified for the vehicular accesses. 

 

Driveway Design

11.     The gradient of the internal access driveways must be designed and constructed in accordance with AS 2890.1 (2004) – Off Street Car Parking and the levels of the driveway must match the alignment levels at the property boundary (as specified by Council). Details of compliance are to be included in the construction certificate.

 

The height of the building must not be increased to satisfy the required driveway gradients.

         

Sydney Water

12.     The relevant requirements of the Sydney Water Act 1994 must be complied with and a Section 73 Compliance Certificate under the Sydney Water Act 1994 must be obtained from Sydney Water. 

 

An Application for a Section 73 Certificate must be made through an authorised Water Servicing Co-ordinator. For details, please refer to the “Your Business” section of Sydney Water’s web site www.sydneywater.com.au then the “e-developer” icon or telephone 13 20 92.

 

Following the application, a “Notice of Requirements” will be provided, detailing water and sewer extensions to be built and charges to be paid.  Please make early contact with the Water Servicing Co-ordinator, as building of water/sewer extensions can be time consuming and may impact on other services and building, driveway or landscape design.

 

A copy of Sydney Water’s ‘Notice of Requirements’ must be submitted to the Certifying Authority prior to issuing a Construction Certificate.

The Section 73 Compliance Certificate is required to be obtained prior to issuing an Occupation Certificate or Subdivision Certificate (whichever the sooner).

 

13.     Prior to the issuing of a construction certificate the approved plans must be submitted to a Sydney Water Quick Check agent or Customer Centre to determine whether the development will affect any Sydney Water asset’s sewer and water mains, stormwater drains and/or easement, and if further requirements need to be met. Plans will be appropriately stamped.

 

         Please refer to the web site www.sydneywater.com.au for Quick Check agent details and Guidelines for Building Over/Adjacent to Sydney Water Assets.

 

Stormwater Drainage

14.     Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage shall be prepared by a suitably qualified Hydraulic Engineer and submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issued, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)       A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

 

b)       A layout of the proposed drainage system including pipe sizes, type, grade, length, invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system. 

 

c)       The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

 

i.        Roof areas

ii.       Paved areas

iii.       Grassed areas

iv.      Garden areas

 

e)       Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

 

f)       Proposed finished surface levels and grades of car parks, internal driveways and access aisles which are to be related to Council's design alignment levels.

 

g)       The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

15.     The site stormwater drainage system is to be provided in accordance with the following requirements;

 

a)     The stormwater drainage system must be provided in accordance with the relevant requirements of the Building Code of Australia and the conditions of this consent, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate.

 

b)     The stormwater must be discharged (by gravity) either:

i.     Directly to the kerb and gutter or drainage system located at the front of the subject site in Houston Road; or

 

ii.    To a suitably designed infiltration system (subject to confirmation in a geotechnical investigation that the ground conditions are suitable for the infiltration system)

 

c)     Should stormwater be discharged to Council’s street drainage system, an on-site stormwater detention system must be provided to ensure that the maximum discharge from the site does not exceed that which would occur during a 1 in 10 year storm of one hour duration for existing site conditions. All other stormwater run-off from the site for all storms up to the 1 in 20 year storm is to be retained on the site for gradual release to the street drainage system, to the satisfaction of the certifying authority.

 

An overland escape route or overflow system (to Council’s street drainage system) must be provided for storms having an average recurrence interval of 100 years (1 in 100 year storm), or, alternatively the stormwater detention system is to be provided to accommodate the 1 in 100 year storm.

 

d)     Should stormwater be discharged to an infiltration system, the infiltration area shall be  sized for all storm events up to the 1 in 20 year storm event with provision for a formal overland flow path to Council’s Street drainage system.

 

Should no formal overland escape route be provided for storms greater than the 1 in 20 design storm, the infiltration system shall be sized for the 1 in 100 year storm event.

 

e)     Determination of the required cumulative storage (in the on-site detention and/or infiltration system) must be calculated by the mass curve technique as detailed in Technical Note 1, Chapter 14 of the Australian Rainfall and Run-off Volume 1, 1987 Edition.

 

Where possible any detention tanks should have an open base to infiltrate stormwater into the ground. Infiltration should not be used if ground water and/or any rock stratum is within 2.0 metres of the base of the tank.

 

f)     If connecting to Council’s underground drainage system, a reflux valve shall be provided (within the site) over the pipeline discharging from the site to ensure that stormwater from Council drainage system does not surcharge back into the site stormwater system.

 

g)     Any new kerb inlet pits (constructed within Council’s road reserve) are to be constructed generally in accordance with Council’s standard detail for the design of kerb inlet pits (drawing number SD6 which is available from Council).

 

h)     Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (i.e. above the 1 in 20 year storm) to the proposed drainage (detention/infiltration) system.

 

i)      A sediment/silt arrestor pit must be provided within the site near the street boundary prior to discharge of the stormwater to Council’s drainage system and prior to discharging the stormwater to any absorption/infiltration system.

 

Sediment/silt arrestor pits are to be constructed generally in accordance with the following requirements:

 

·         The base of the pit being located a minimum 300mm under the invert level of the outlet pipe.

·         The pit being constructed from cast in-situ concrete, precast concrete or double brick.

·         A minimum of 4 x 90 mm diameter weep holes (or equivalent) located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

·         A galvanised heavy-duty screen being provided over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

·         The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

·         A child proof and corrosion resistant fastening system being provided for the access grate (e.g. spring loaded j-bolts or similar).

·         Provision of a sign adjacent to the pit stating, “This sediment/silt arrester pit shall be regularly inspected and cleaned”.

 

Sketch details of a standard sediment/silt arrester pit may be obtained from Council’s Drainage Engineer.

 

j)     The floor level of all habitable, retail, commercial and storage areas located adjacent to any detention and/or infiltration systems with above ground storage must be a minimum of 300mm above the maximum water level for the design storm or alternately a permanent 300mm high water proof barrier is to be provided.

 

(In this regard, it must be noted that this condition must not result in any increase in the heights or levels of the building.  Any variations to the heights or levels of the building will require a new or amended development consent from the Council prior to a construction certificate being issued for the development).

 

k)     Infiltration systems/Absorption Trenches must be designed and constructed generally in accordance with "Section 8.5 ABSORPTION TRENCHES" of Randwick City Council's Private Stormwater Code.

 

l)      The maximum depth of ponding in any above ground detention areas and/or infiltration systems with above ground storage shall be as follows (as applicable):

 

i.   150mm in uncovered open car parking areas (with an isolated maximum depth of 200mm permissible at the low point pit within the detention area)

ii.   300mm in landscaped areas (where child proof fencing is not provided around the outside of the detention area and sides slopes are steeper than 1 in 10)

iii.  600mm in landscaped areas where the side slopes of the detention area have a maximum grade of 1 in 10

iv.  1200mm in landscaped areas where a safety fence is provided around the outside of the detention area

v.  Above ground stormwater detention areas must be suitably signposted where required, warning people of the maximum flood level.

 

Note: Above ground storage of stormwater is not permitted within basement car parks or store rooms.

 

m)    A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

 

n)     A ‘V’ drain (or equally effective provisions) are to be provided to the perimeter of the property, where necessary, to direct all stormwater to the detention/infiltration area.

 

o)     The site stormwater system must be regularly cleaned and maintained to ensure it operates as required by the design.

 

p)     Mulch or bark is not to be used in on-site detention areas.

 

q)     Seepage waters are required to be drained and disposed of within the site and are not to be drained into Council’s stormwater drainage system.

 

r)     Site discharge pipelines shall cross the verge at an angle no less than 45 degrees to the kerb line.

 

Protection of Street Tree

16.     In order to ensure retention of the Melaleuca quinquinervia (Broad Leafed Paperbark) on the Houston Road verge, towards the northern site boundary in good health, the following measures are to be undertaken:

 

a.     All documentation submitted for the Construction Certificate application must show the retention of this street tree, with the position and diameter of both its trunk and canopy to be clearly and accurately shown on all drawings.

 

b.     The northern edge of the vehicle crossing must be setback a minimum distance of 2.8m off the base of the tree (refer also Civil Conditions).

 

c.     Any excavations associated with the installation of new services, pipes, stormwater systems or similar over public property must be lcoated along either of the sites side boundaries; or, against either side of the new crossing.

 

d.         It is to be physically protected by the installation of 1.8 metre high steel mesh/chainwire fencing, which shall be located a minimum distance of 2 metres to its north and south (measured off the outside edge of its trunk at ground level), matching up with the back of the kerb to its west, and pedestrian footpath to its east, in order to completely enclose this tree for the duration of works.

 

e.         This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

f.     The applicant is not authorised to perform any works to this street tree, and shall contact Council’s Landscape Development Officer on 9399-0613 should pruning or any similar such work appear necessary, with the applicant required to cover all associated costs with such work, to Council’s satisfaction, prior to the issue of a final occupation certificate.

 

g.     Within the TPZ, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble, with all Site Management Plans needing to acknowledge these requirements.

 

h.     Any roots encountered during the course of the approved works must be cut cleanly by hand, and the affected area backfilled with clean site soil as soon as practically possible.

 

i.      A refundable deposit in the form of cash, credit card or cheque for an amount of $1,500.00 shall be paid at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development, in order to ensure compliance with the conditions listed in this consent, and ultimately, preservation of the tree.

 

The refundable deposit will be eligible for refund following the issue of a Final Occupation Certificate, subject to completion and submission of Council’s ‘Security Deposit Refund Application Form’, and pending a satisfactory inspection by Council’s Landscape Development Officer (9399-0613).

 

Any contravention of Council's conditions relating to the tree at any time during the course of the works, or prior to the issue of a final occupation certificate, may result in Council claiming all or part of the lodged security in order to perform any rectification works necessary, as per the requirements of 80A (6) of the Environmental Planning and Assessment Act 1979.

 

17.     The applicant must also submit $250 to Council, being a loss of amenity fee in recognition that the existing Jacaranda mimosifolia (Jacaranda) on Council’s Houston Road nature strip, located towards the southern site boundary is only being removed in order to accommodate the proposed development, with a replacement not possible given a lack of available space, with this fee to be used towards new plantings in the surrounding area.

 

The contribution shall be paid into Tree Amenity Income at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development.

 

18.     A minimum 1 metre wide pedestrian path shall be provided from proposed Lot B through proposed Lot A to Houston Road. Plans submitted for the construction certificate shall demonstrate compliance with this requirement.

 

Compliance with the Building Code of Australia

19.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Smoke Alarms

20.     Smoke alarms are required to be installed in accordance with the relevant provisions of the Building Code of Australia (volume 2) and smoke alarms must comply with AS3786.  Smoke alarms must be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

BASIX Requirements

21.     In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Building & Design

22.     The external walls of the dwelling must be located not less than 900mm from the northern side site boundary at ground floor level and 1500mm from the northern side site boundary at first floor level.

 

23.     The external walls of the dwelling must be located not less than 1210mm from the southern side site boundary at ground floor level and 1500mm from the southern side site boundary at first floor level.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Demolition & Construction Waste

24.     A Demolition and Construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

Work Zone

25.     Prior to the commencement of any works on the site, an Application for a ‘Works Zone’ and Construction Traffic Management Plan must be submitted to Councils Integrated Transport Department, and approved by the Randwick Traffic Committee, for a ‘Works Zone’ to be provided in Houston Road for the duration of the demolition & construction works. 

 

The ‘Works Zone’ must have a minimum length of 12m and extend for a minimum duration of three months.  The suitability of the proposed length and duration is to be demonstrated in the application for the Works Zone.  The application for the Works Zone must be submitted to Council at least six (6) weeks prior to the commencement of work on the site to allow for assessment and tabling of agenda for the Randwick Traffic Committee.

 

The requirement for a Works Zone may be varied or waived only if it can be demonstrated in the Construction Traffic Management Plan (to the satisfaction of Council’s Traffic Engineers) that all construction related activities (including all loading and unloading operations) can and will be undertaken wholly within the site.  The written approval of Council must be obtained to provide a Works Zone or to waive the requirement to provide a Works Zone prior to the commencement of any site work.

 

Public Utilities

26.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

Landscaping

27.     For the type of development being proposed, and both the size and quantity of trees that need to be removed, the Landscape Plan by Archplan, dwg no H52-13, issue 01, dated 07/07/11 shows an insufficient level of treatment and cannot be accepted.

 

28.     A landscape plan prepared by a qualified professional in the Landscape/Horticultural industry (must be a registered member of either AILDM or AILA) must be submitted to, and be approved by, the PCA, prior to the commencement of site works, and must detail the following:

 

a)     A Planting Plan & Plant Schedule which includes proposed species, botanic and common names, pot size at the time of planting, quantity, location, dimensions at maturity, maintenance practices (hedging, shaping etc), as well as any other landscape details to describe the proposed works;

 

b)     The small areas of lawn currently shown at the southwest and southeast corner of the site are to be deleted and replaced as garden areas containing a suitable mixture of decorative species that will assist with presentation of the development to the respective frontages;

 

c)     Deletion of Melaleuca armillaris (Bracelet Honey Myrtle) as this species is not associated with high quality residential developments, and must be replaced with a more suitable, decorative species of similar dimensions;

 

d)     A predominance of species that are not reliant on high rates of moisture and/or fertiliser for survival;

 

e)     In order to maintain reasonable levels of environmental amenity, at least 1 x 25 litre/300mm (pot size at the time of planting) tree must be planted within the rear yard of each proposed dwelling, selecting those species which will attain a minimum height of between 4-7 metres at maturity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

29.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

Home Building Act 1989

30.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council.

 

Dilapidation Reports

31.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

32.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works on site.

 

Temporary Site Fencing

33.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres). 

 

Temporary site fences are to have a height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings, amenities or articles upon any part of the footpath, nature strip or public place at any time, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management

34.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·           location and construction of protective fencing / hoardings to the perimeter of the site;

·           location of site storage areas/sheds/equipment;

·           location of building materials for construction;

·           provisions for public safety;

·           dust control measures;

·           site access location and construction

·           details of methods of disposal of demolition materials;

·           protective measures for tree preservation;

·           provisions for temporary sanitary facilities;

·           location and size of waste containers/bulk bins;

·           details of proposed sediment and erosion control measures;

·           provisions for temporary stormwater drainage;

·           construction noise and vibration management;

·           construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

35.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

·           The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·           Details of hazardous materials (including asbestos)

·           Method/s of demolition (including removal of any asbestos)

·           Measures and processes to be implemented to ensure the health & safety of workers and community

·           Measures to be implemented to minimise any airborne dust and asbestos

·           Methods and location of disposal of any hazardous materials (including asbestos)

·           Other relevant details, measures and requirements to be implemented

·           Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Sydney Water

36.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

 

Inspections During Construction

37.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Site Signage

38.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·           name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·           name, address and telephone number of the Principal Certifying Authority,

·           a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

39.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Demolition Work Requirements

40.     All work and activities must be carried out in accordance with the relevant regulatory requirements and Randwick City Council policies, including:

 

·           Occupational Health & Safety Act 2000 & Regulations

·           WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·           WorkCover NSW Guidelines and Codes of Practice

·           Australian Standard 2601 (2001) – Demolition of Structures

·           The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·           Relevant DECCW/EPA Guidelines

·           Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

41.     Work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·           Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·           Randwick City Council’s Asbestos Policy

 

·           A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·           On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·           Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·           A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Sediment & Erosion Control

42.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details must be shown in a Sediment and Erosion Control Plan, including; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

A copy of the Sediment and Erosion Control Plan must be provided to the Principal Certifying Authority and a copy must be maintained on site and be made available to Council officers upon request.

 

Public Safety & Site Management

43.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

·       Building materials, sand, soil, waste materials, construction equipment or other articles must not be placed upon the footpath, roadway or nature strip at any time.

 

·       The road, footpath, vehicular crossing and nature strip must be maintained in a good, safe, clean condition and free from any excavations, obstructions, trip hazards, goods, materials, soils or debris at all times.  Any damage caused to the road, footway, vehicular crossing, nature strip or any public place must be repaired immediately, to the satisfaction of Council.

 

·       Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

·       Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

·       Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Support of Adjoining Land, Excavations & Retaining Walls

44.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

45.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

46.     Prior to undertaking any demolition, excavation or building work in the following circumstances, a report must be obtained from a professional engineer which details the methods of support for the dwelling or associated structure on the adjoining land, to the satisfaction of the Principal Certifying Authority:

 

·      when undertaking excavation or building work within the zone of influence of the footings of a dwelling or associated structure that is located on the adjoining land;

·      when undertaking demolition work to a wall of a dwelling that is built to a common or shared boundary (eg. semi-detached or terrace dwelling);

·      when constructing a wall to a dwelling or associated structure that is located within 900mm of a dwelling located on the adjoining land.

 

The demolition, excavation and building work and the provision of support to the dwelling or associated structure on the adjoining land, must also be carried out in accordance with the abovementioned report, to the satisfaction of the Principal Certifying Authority.

 

Survey Requirements

47.     A Registered Surveyor’s check survey certificate or other suitable documentation must be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority (PCA):

 

·           prior to construction (pouring of concrete) of the footings or first completed floor slab,

·           upon completion of the building, prior to issuing an occupation certificate,

·           as otherwise may be required by the PCA.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the Principal Certifying Authority for the development.  

 

Building Encroachments

48.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Site Amenities

49.     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

Road/Asset Opening Permit

50.     A Road / Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

           

            Drainage

51.     Adequate provisions must be made to collect and discharge stormwater drainage during construction of the building to the satisfaction of the principal certifying authority.

 

The prior written approval of Council must be obtained to connect or discharge site stormwater to Council’s stormwater drainage system or street gutter.

 

Tree Removals

52.     Approval is granted for removal of the following trees from the rear yard in order to accommodate proposed Unit B as shown, subject to full implementation of the approved landscaping:

 

a)   From south to north, a Cedrus deodara (Cedar), close to the southern site boundary, due to its poor health and condition and being suppressed under larger, more dominant trees in this area;

 

b)   The mature Corymbia citriodora (Lemon Scented Gum) as it is already exempt due to its inappropriate location close to the western edge of the existing garage;

 

c)   The Jacaranda mimosifolia (Jacaranda) located centrally due to its insignificance; and

 

d)   The mature Populus deltoides (Poplar) towards the northern site boundary, as it has not reached its full dimensions, and could not be retained as part of this proposal given the substantial setbacks required.

 

53.     The applicant must remove and dispose of (at their own cost) the existing Jacaranda mimosifolia (Jacaranda) on Council’s Houston Road nature strip, located towards the southern site boundary, during excavations associated with the proposed vehicle crossing as shown, and must satisfy themselves as to the location of all site services prior to the commencement of any works on public property.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

54.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)   Construct a concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site in Houston Road.

 

NOTE:

The northern edge of the vehicle crossing must be setback a minimum distance of 2.8m off the base of the Melaleuca quinquinervia (Broad Leafed Paperbark) located on Council’s street verge.

 

b)   Construct a concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site in Houston Lane.

c)   Remove any redundant vehicular crossings and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

d)   Re-construct concrete footpath along the full site frontage in Houston Road if required.  Any unpaved areas on the nature strip must be turfed and landscaped to Council’s specification.

e)   Construct concrete kerb and gutter along the full site frontage in Houston Lane except opposite the vehicular entry point. This shall include minimum 1.0 metre wide full depth road reconstruction in front of the new kerb and gutter.

f)   Construct full width concrete footpath between the back of the new kerb and gutter in Houston Lane and the western side of the proposed 0.9 metre parcel of land to be dedicated to Council along the Houston Lane site frontage.

 

55.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

56.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)   All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)  Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)  If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)  The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

57.     Prior to the issuing of an Occupation Certificate the applicant shall, at no cost to Council, dedicate a 0.9 metre wide strip of land along the full Houston Lane site frontage for road widening purposes. The strip of land is required to facilitate the provision of a concrete footpath along the site frontage in Houston Lane.

 

Service Authorities

58.     The Section 73 Compliance Certificate must be submitted to the Principal Certifying Authority prior to issuing an Occupation Certificate or Subdivision Certificate (whichever the sooner).

 

Stormwater Drainage

59.     Prior to occupation of the development, a "restriction on the use of land” and “positive covenant" (under section 88E of the Conveyancing Act 1919) shall be placed on the title of the subject property to ensure that the onsite detention/infiltration system is maintained and that no works which could affect the design function of the detention/infiltration system are undertaken without the prior consent (in writing) from Council. Such restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

 

Notes:

a.   The “restriction on the use of land” and “positive covenant” are to be to the satisfaction of Council. A copy of Council’s standard wording/layout for the restriction and positive covenant may be obtained from Council’s Development Engineer.

b.   The works as executed drainage plan and hydraulic certification must be submitted to Council prior to the “restriction on the use of land” and “positive covenant” being executed by Council.

 

60.     Upon completion of the works and prior to the issuing of an Occupation Certificate, a works-as-executed drainage plan prepared by a registered surveyor and approved by a suitably qualified and experienced hydraulic consultant/engineer must be forwarded to the Principal Certifying Authority and the Council. The works-as-executed plan must include the following details (as applicable):

 

·      The location of any detention basin/s with finished surface levels;

·      Finished site contours at 0.2 metre intervals;

·      Volume of storage available in any detention areas;

·      The location, diameter, gradient and material (i.e. PVC, RC etc) of all stormwater pipes;

·      The orifice size/s (if applicable);

·      Details of any infiltration/absorption systems; and

·      Details of any pumping systems installed (including wet well volumes).

 

61.     Prior to the issuing of an Occupation Certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer, which confirms that the design and construction of the stormwater drainage system complies with the Building Code of Australia, Australian Standard AS3500.3:2003 (Plumbing & Drainage- Stormwater Drainage) and conditions of this development consent. 

 

The certification must be provided following inspection/s of the site stormwater drainage system by the Hydraulic Engineers to the satisfaction of the PCA.

 

Landscaping

62.     The PCA must ensure that the landscaping is installed in accordance with the approved plan and relevant conditions of consent, prior to the issue of a Final Occupation Certificate, with the owner/s to maintain it in a healthy and vigorous state until maturity.

 

63.     The naturestrip upon Council's footway shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

Waste Management

64.     Prior to the occupation of the development, the owner or applicant is required to contact Council’s City Services department, to make the necessary arrangements for the provision of waste services for the additional premises.

 

Occupation Certificate Requirements

65.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

BASIX Requirements

66.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

67.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·           The window having a minimum sill height of 1.5m above the internal floor level,

·           Providing a window locking device at least 1.5m above the internal floor level,

·           Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·           Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·           Other appropriate effective safety measures or barrier.

 

The relevant measures must be implemented prior to issue of an occupation certificate.

 

REQUIREMENTS PRIOR TO THE ISSUE OF A SUBDIVISON CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing a ‘Subdivision certificate’ or ‘Strata Certificate’.

 

These conditions have been applied to satisfy the provisions of Council’s environmental plans, policies and codes for subdivision works.

 

68.     A formal subdivision application is required to be submitted to and approved by the Council or an accredited certifier and all relevant conditions of this development consent are required to be satisfied prior to the release of the subdivision plans.

 

69.     All floors, external walls and ceilings depicted in the proposed strata plan must be constructed prior to the issue of a strata subdivision certificate.

 

70.     All floors, external walls and ceilings depicted in the proposed strata plan must correspond to those depicted in this development consent and construction certificate  for the building.

 

71.     Details of critical stage inspections carried out by the principal certifying authority, together with any other certification relied upon, must be provided to Council or the accredited certifier prior to the issuing of a Subdivision Certificate or Strata Certificate.

 

72.     A minimum 1 metre wide pedestrian path shall be provided from proposed Lot B through proposed Lot A to Houston Road. The pedestrian path shall be either allocated as common property or created as a right of way over proposed Lot A benefiting proposed Lot B.

 

73.     A "restriction on the use of land” and “positive covenant" (under section 88B of the Conveyancing Act 1919) shall be placed on the title of the subject property (in conjunction with registration of the plan of strata subdivision) to ensure that the onsite detention system and/or infiltration system is maintained and that no works which could affect the design function of the infiltration/detention system are undertaken without the prior consent (in writing) from Council. The restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

 

The “restriction on the use of land” and “positive covenant” are to be prepared and specified to the satisfaction of Council. A copy of Council’s standard wording/layout for the restriction and positive covenant may be obtained from Council’s City Services Department.

 

74.     The applicant shall create suitable right of carriageway, easements for services and internal stormwater lines, as required. The applicant shall be advised that the minimum easement width for any internal stormwater line is 0.9 metres.

 

75.     The conditions of development consent must be satisfied and all public roads and reserves must be satisfactorily restored prior to endorsement of the strata subdivision plans.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

External Lighting

76.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

Use of premises

77.     The premises is to be used as a single residential dwelling only at all times and must not be used for dual or multi-occupancy purposes.

 

Street Numbering

78.     Street numbering must be provided to the front of the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council.

 

Waste Management

79.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council.

 

Protection of the Environment Operations Act 1997 – Air Conditioners

80.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Air Conditioning & Equipment

81.     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

Protection of the Environment Operations Act 1997 – Rainwater Tanks

82.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Rainwater Tank Requirements

83.     The installation of rainwater tanks shall comply with the following noise control requirements:

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tanks are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with rainwater tanks are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

·       before 8.00am or after 8.00pm on weekends or public holiday; or

·       before 7.00am or after 8.00pm on weekdays.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1      The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

A2      Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

A3      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A4      Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

A5      A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

A6      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A7      This consent does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the land owner or principal contractor must obtain:

 

§  the consent of the owners of such adjoining or supported land to trespass or encroach, or

§  an access order under the Access to Neighbouring Land Act 2000, or

§  an easement under section 88K of the Conveyancing Act 1919, or

§  an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

A8      The finished ground levels external to the building must be consistent with the development consent and are not to be raised, other than for the provision of approved paving or the like on the ground.

 

Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

Note: Cr Procopiadis was not present in the Chamber during the vote on the above resolution.

 

 

 

D5/12        Development Application Report - 28 The Avenue, Randwick (DA/646/2011)

PL6/12

RESOLUTION: (Belleli/Andrews) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 Development Standards in respect to non-compliance with Clauses 20E(2) and 20F(2) of Randwick Local Environmental Plan 1998 (Consolidation), relating to landscaped area and floor space ratio respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning and Infrastructure be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 646/2011 for demolition of the existing outbuilding at the rear, construction of a new 2-storey outbuilding with garage and studio fronting the right of way, alterations and additions to the existing dwelling, installation of roof-mounted photovoltaic panels and air-conditioning units and associated landscape works, at No. 28 The Avenue, Randwick, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan Number

Dated

Received

Drawn By

DA01(B)

5.12.2011

7 December 2011

TFAD Pty. Ltd.

DA02(B)

5.12.2011

DA03(A)

Dec 2011

DA04(A)

Dec 2011

DA05(B)

5.12.2011

DA01(A)

09.08.11

24 August 2011

Jane Irwin Landscape Architecture

DA02(A)

01.08.11

 

BASIX Cert. No.

Project Name

Dated

Received

A120344

28 The Avenue

15 August 2011

24 August 2011

 

2.       The colours, materials and finishes of the external surfaces to the buildings are to be consistent with the approved drawings and the Revised Exterior Paint Schedule, dated 17.11.11, prepared by Arent & Pyke and stamp-received by Council on 7 December 2011.

 

Heritage Conservation

3.       The following General Terms of Approval are issued by the Office of Environment and Heritage under Section 91A of the Environmental Planning and Assessment Act 1979:

 

Advisory: The architectural drawings stipulated in General Terms of Approval 1a above have already been superseded by those listed under Condition 1 of this consent.

4.       The proposed column to be installed at the first floor front balcony / verandah shall be in general accordance with drawing number DA08, dated Dec 2011, prepared by TFAD Pty. Ltd., and stamp-received by Council on 10 January 2012, with the exception that the surface to the shaft of the column shall be un-fluted (that is, without indentations). Details demonstrating compliance shall be submitted to the satisfaction of Council’s Director of City Planning, prior to the issuing of any Construction Certificate.

 

5.       The proposed bathroom facilities are to be carefully installed to minimize impacts on the original fabric, including the original floors, skirting, picture rails and ceilings.

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

6.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

Section 94A Development Contributions

7.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $400,000, the following applicable monetary levy must be paid to Council: $4,000.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Long Service Levy Payments

8.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Security Deposits

9.       The following security deposits requirement must be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to Council’s assets and infrastructure; and as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

·           $600.00     -      Damage / Civil Works Security Deposit

 

Security deposits may be provided by way of a cash, cheque or credit card payment and is refundable upon a satisfactory inspection by Council upon the completion of the civil works which confirms that there has been no damage to Council's infrastructure.

 

The owner/builder is also requested to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

To obtain a refund of relevant deposits, a Security Deposit Refund Form is to be forwarded to Council’s Director of City Services upon issuing of an occupation certificate or completion of the civil works.

 

Stormwater Drainage

10.     Stormwater runoff from the site shall be discharged to the kerb and gutter in The Avenue.  

 

Tree Protection Measures

11.     In order to ensure retention of the mature Livistona australis (Cabbage Palm) located within the northern half of the front garden in good health, the Tree Protection Measures in Appendix 2, and Tree Protection Plan in Appendix 7, of the Development Impact Assessment Report by Earthscape Horticultural Services dated August 2011 (“the Arborists Report”), shall be fully implemented throughout the course of the works.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

Compliance with the Building Code of Australia

12.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Smoke Alarms

13.     Smoke alarms are required to be installed in accordance with the relevant provisions of the Building Code of Australia (volume 2) smoke alarms must comply with AS3786.  Smoke alarms must be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

BASIX Requirements

14.     In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

15.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

Home Building Act 1989

16.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council.

 

Dilapidation Reports

17.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·      excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·      new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·      excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·      as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

18.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works on site.

 

Temporary Site Fencing

19.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary site fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management Plan

20.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·      location and construction of protective fencing / hoardings to the perimeter of the site;

·      location of site storage areas/sheds/equipment;

·      location of building materials for construction;

·      provisions for public safety;

·      dust control measures;

·      site access location and construction;

·      details of methods of disposal of demolition materials;

·      protective measures for tree preservation;

·      provisions for temporary sanitary facilities;

·      location and size of waste containers/bulk bins;

·      details of proposed sediment and erosion control measures;

·      provisions for temporary stormwater drainage;

·      construction noise and vibration management;

·      construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

21.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

·      The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·      Details of hazardous materials (including asbestos)

·      Method/s of demolition (including removal of any asbestos)

·      Measures and processes to be implemented to ensure the health & safety of workers and community

·      Measures to be implemented to minimise any airborne dust and asbestos

·      Methods and location of disposal of any hazardous materials (including asbestos)

·      Other relevant details, measures and requirements to be implemented

·      Details of re-use, recycling and disposal of waste demolition/building materials

·      Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Sydney Water

22.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

23.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

Public Utilities

24.     A Public Utility Impact Assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

25.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Inspections During Construction

26.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Site Signage

27.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·      name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·      name, address and telephone number of the Principal Certifying Authority,

·      a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

28.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Demolition Work Requirements

29.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment, Climate Change & Water and Randwick City Council policies, including:

 

·      Occupational Health & Safety Act 2000 & Regulations

·      WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·      WorkCover NSW Guidelines and Codes of Practice

·      Australian Standard 2601 (2001) – Demolition of Structures

·      The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·      Relevant DECCW/EPA Guidelines

·      Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

30.     Work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·      Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·      Randwick City Council’s Asbestos Policy

 

·      A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·      On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·      Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·      A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Sediment & Erosion Control

31.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.  Details are to be included in the Construction Site Management Plan.

 

Public Safety & Site Management

32.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

·        Building materials, sand, soil, waste materials, construction equipment or other articles must not be placed upon the footpath, roadway or nature strip at any time.

 

·        The road, footpath, vehicular crossing and nature strip must be maintained in a good, safe, clean condition and free from any excavations, obstructions, trip hazards, goods, materials, soils or debris at all times.  Any damage caused to the road, footway, vehicular crossing, nature strip or any public place must be repaired immediately, to the satisfaction of Council.

 

·        Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

·        Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

·        Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Support of Adjoining Land, Excavations & Retaining Walls

33.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

34.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

35.     Prior to undertaking any demolition, excavation or building work in the following circumstances, a report must be obtained from a professional engineer which details the methods of support for the dwelling or associated structure on the adjoining land, to the satisfaction of the Principal Certifying Authority:

 

·      when undertaking excavation or building work within the zone of influence of the footings of a dwelling or associated structure that is located on the adjoining land;

·      when undertaking demolition work to a wall of a dwelling that is built to a common or shared boundary (eg. semi-detached or terrace dwelling);

·      when constructing a wall to a dwelling or associated structure that is located within 900mm of a dwelling located on the adjoining land.

 

The demolition, excavation and building work and the provision of support to the dwelling or associated structure on the adjoining land, must also be carried out in accordance with the abovementioned report, to the satisfaction of the Principal Certifying Authority.

 

Building Encroachments

36.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Road/Asset Opening Permit

37.     A Road / Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

Tree Management

38.     Approval is granted for removal of the following trees, subject to full implementation of the approved landscaping:

 

a)   The Cyathea australis (Tree Fern, Tree 7) as well as the Phoenix robelinii (Dwarf Date Palm, Tree 6) both within the front setback, against the front verandah;

 

b)   The various shrubs/small trees around the perimeter of the rear yard, being a Gordonia axillaris (Gordonia, Tree 1) in the southeast corner, the Magnolia x soulangeana (Magnolia, Tree 2), along the northern boundary, adjacent the existing paved carport and garage, as well as Trees 3 & 4, both Camelia’s, along the northern boundary, and Tree 5, a Lagerstroemia indica (Crepe Myrtle) to the southwest of Tree 4.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Occupation Certificate Requirements

39.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

BASIX Requirements

40.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments has been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

41.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·      The window having a minimum sill height of 1.5m above the internal floor level,

·      Providing a window locking device at least 1.5m above the internal floor level,

·      Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·      Other appropriate effective safety measures or barrier.

 

The relevant measures must be implemented prior to the issue of an occupation certificate.

 

Swimming Pool Safety

42.     Swimming pools are to be provided with childproof fences and self-locking gates, in accordance with the Swimming Pools Act 1992 and regulations.

 

The swimming pool is to be surrounded by a fence having a minimum height of 1.2m, that separates the pool from any residential building situated on the premises and from any place (whether public or private) adjoining the premises; and that is designed, constructed and installed in accordance with AS 1926.1 - 2007.

 

Gates to pool area shall be a maximum width of 1 metre, and be self-closing and latching; the gate is required to open outwards from the pool area and prevent a small child opening the gate or door when the gate or door is closed.

 

A ‘warning notice’ must be erected in a prominent position in the immediate vicinity of the swimming pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

Swimming Pool & Spa Pool Requirements

43.     Swimming pools (and spa pools) are to be designed, installed and operated in accordance with the following general requirements:

 

a)     Backwash of the pool filter and other discharge of water is to be drained to the sewer in accordance with the requirements of the Sydney Water Corporation; and

 

b)     All pool overflow water is to be drained away from the building and adjoining premises, so as not to result in a nuisance or damage to premises; and

                 

c)     Water recirculation and filtrations systems are required to comply with AS 1926.3 – 2003:  Swimming Pool Safety – Water Recirculation and Filtration Systems; and

 

d)     Pool plant and equipment is to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

Notification of Swimming Pools & Spa Pools

44.     Written notification must be provided to Council advising of the installation and completion of the Swimming Pool (or Spa Pool), to satisfy the requirements of the Swimming Pools Act 1992.

 

Council’s “Notification & Registration of a Swimming Pool” form must be completed and forwarded to Council prior to any Occupation Certificate being issued for the pool.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

45.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)     All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)     Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)     If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)     The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Council’s Infrastructure, street verge

46.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

47.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

·      All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

·      Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

·      If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

·      The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Landscaping

48.     The PCA must ensure that landscaping at this site is installed substantially in accordance with the Landscape Plans & Sections and Plant Schedule by Jane Irwin Landscape Architecture, dwg’s DA01-02, issue A, dated 09.08.11, prior to issuing a Final (or any other type of Interim) Occupation Certificate/s, with the owners to ensure it is maintained in a healthy and vigorous state until maturity.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

Use of premises

49.     The premises must only be used as a single residential dwelling and must not be used for dual or multi-occupancy purposes.

 

External Lighting

50.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

Protection of the Environment Operations Act 1997 – Swimming Pools & Spa Pools

51.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Pool Plant & Equipment

52.     The pool plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 8.00pm on any Sunday or public holiday; or

·       before 7.00am or after 8.00pm on any other day.

 

Protection of the Environment Operations Act 1997 – Air Conditioners

53.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Air Conditioning & Equipment

54.     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

Protection of the Environment Operations Act 1997 – Rainwater Tanks

55.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Rainwater Tank Requirements

56.     The installation of rainwater tanks shall comply with the following noise control requirements:

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tanks are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with rainwater tanks are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

·       before 8.00am or after 8.00pm on weekends or public holiday; or

·       before 7.00am or after 8.00pm on weekdays.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1      The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

A2      Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

A3      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A4      Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

A5      A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

A6      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A7      Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

A8      This consent does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the land owner or principal contractor must obtain:

 

§  the consent of the owners of such adjoining or supported land to trespass or encroach, or

§  an access order under the Access to Neighbouring Land Act 2000, or

§  an easement under section 88K of the Conveyancing Act 1919, or

§  an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

A9      Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

Further information and details on Council's requirements for trees on development sites can be obtained from the recently adopted Tree Technical Manual, which can be downloaded from Council’s website at the following link, http://www.randwick.nsw.gov.au - Looking after our environment – Trees – Tree Management Technical Manual; which aims to achieve consistency of approach and compliance with appropriate standards and best practice guidelines.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

Note: Cr Procopiadis was not present in the Chamber during the vote on the above resolution.

 

 

 

D6/12        Development Application Report - 80 Alison Road, Randwick (DA/611/2011)

PL7/12

RESOLUTION: (Andrews/Hughes) that the application be deferred to allow the applicant to submit amended plans.

 

MOTION: (Andrews/Hughes) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Matson

Councillor Belleli

Councillor Matthews

Councillor Bowen

Councillor Seng

Councillor Hughes

Councillor Smith

Councillor Nash

Councillor Woodsmith

Councillor Procopiadis

 

Councillor Stevenson

 

Councillor Tracey

 

Total (8)

Total (5)

 

 

 

D7/12        Development Application Report - 52 Milroy Avenue, Kensington (DA/1048/2010/A)

PL8/12

Having declared a significant non pecuniary interest in this item earlier in the meeting Cr Procopiadis left the meeting during the debate and the vote on the matter.

 

RESOLUTION: (Hughes/Bowen) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/1048/2010 for modification to approved development consent by relocating the rain water tank, replace front entry door, amend condition 5 relating to obscured glazing for bedroom windows at first floor level, extend the rear ground floor deck, changes to external shutters on side and new air conditioning unit on the southern side of the dwelling, at No. 52 Milroy Avenue, Kensington, subject to the following conditions:

 

Amend Condition No. 1 to read:

1.       The development must be implemented substantially in accordance with the plans numbered 1001/DA02, 1001/DA03, 1001/DA04, 1001/DA05, 1001/DA06, 1001/DA07, dated November 2010 and received by Council on the 26th November 2010, the application form and on any supporting information received with the application, as amended by the Section 96 plans numbered 1001/DA14/B, 1001/DA03/B, 1001/DA04/B, 1001/DA05/B, 1001/DA06/B, all dated 9 November 2011 and all received by Council on 10 November 2011, only in so far as they relate to the modifications highlighted on the Section 96 plans and detailed in the Section 96 application, except as may be amended  by the following conditions and as may be shown in red on the attached plans:

 

Amend Condition No. 5 to read:

5.       The first floor bedroom windows shall be treated as follows:

 

5.1     The sill height of the windows (W16 & W17) to the first floor north western elevation must be increased to be a minimum height of 1.2m above floor level, or alternatively, these windows are to be fixed and provided with translucent, obscured, frosted or sandblasted glazing below 1.2m above floor level.

 

5.2     The shutters to the north-west facing master bedroom window (W18) shall be fixed and configured so that there is no direct overlooking into the private open space area of No. 50 Milroy Avenue.

 

5.3     The south-east facing first floor bedroom window (W24) shall be treated with fixed and obscured glazing up to 1.5m above the internal floor level.

 

Note: where necessary the BASIX certificate shall be amended to comply with the above conditions. Details of compliance shall be included in an amended construction certificate issued for the development.

 

Add the following Conditions:

 

Heritage condition

58.     The proposed new front door is to match as closely as possible the detail of the existing 5 panelled front door in terms of size, proportions and detailing of solid and glazed panels, in order to retain the stylistic integrity of the existing dwelling.  Amended drawings are to be submitted to and approved by Council’s Director City Planning, in accordance with Section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development. 

 

Protection of the Environment Operations Act 1997 – Air Conditioners

59.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Air Conditioning & Equipment

60.     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or a fter 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

AMENDMENT: (Bowen/Tracey) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/1048/2010 for modification to approved development consent by relocating the rain water tank, replace front entry door, amend condition 5 relating to obscured glazing for bedroom windows at first floor level, extend the rear ground floor deck, changes to external shutters on side and new air conditioning unit on the southern side of the dwelling, at No. 52 Milroy Avenue, Kensington, subject to the following conditions:

 

Amend Condition No. 1 to read:

1.       The development must be implemented substantially in accordance with the plans numbered 1001/DA02, 1001/DA03, 1001/DA04, 1001/DA05, 1001/DA06, 1001/DA07, dated November 2010 and received by Council on the 26th November 2010, the application form and on any supporting information received with the application, as amended by the Section 96 plans numbered 1001/DA14/B, 1001/DA03/B, 1001/DA04/B, 1001/DA05/B, 1001/DA06/B, all dated 9 November 2011 and all received by Council on 10 November 2011, only in so far as they relate to the modifications highlighted on the Section 96 plans and detailed in the Section 96 application, except as may be amended  by the following conditions and as may be shown in red on the attached plans:

 

Amend Condition No. 5 to read:

5.       The first floor bedroom windows shall be treated as follows:

 

5.1     The shutters to the north-west facing master bedroom window (W18) shall be fixed and configured so that there is no direct overlooking into the private open space area of No. 50 Milroy Avenue.

 

5.2     The south-east facing first floor bedroom window (W24) shall be treated with fixed and obscured glazing up to 1.5m above the internal floor level.

 

Note: where necessary the BASIX certificate shall be amended to comply with the above conditions. Details of compliance shall be included in an amended construction certificate issued for the development.

 

Add the following Conditions:

 

Heritage condition

58.     The proposed new front door is to match as closely as possible the detail of the existing 5 panelled front door in terms of size, proportions and detailing of solid and glazed panels, in order to retain the stylistic integrity of the existing dwelling.  Amended drawings are to be submitted to and approved by Council’s Director City Planning, in accordance with Section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development. 

 

Protection of the Environment Operations Act 1997 – Air Conditioners

59.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Air Conditioning & Equipment

60.     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day. LOST.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Hughes

Councillor Belleli

Councillor Matson

Councillor Bowen

Councillor Matthews

Councillor Stevenson

Councillor Nash

Councillor Tracey

Councillor Seng

 

Councillor Smith

 

Councillor Woodsmith

Total (5)

Total (7)

 

AMENDMENT: (Matson/Seng) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/1048/2010 for modification to approved development consent by relocating the rain water tank, replace front entry door, amend condition 5 relating to obscured glazing for bedroom windows at first floor level, extend the rear ground floor deck, changes to external shutters on side and new air conditioning unit on the southern side of the dwelling, at No. 52 Milroy Avenue, Kensington, subject to the following conditions:

 

Amend Condition No. 1 to read:

1.       The development must be implemented substantially in accordance with the plans numbered 1001/DA02, 1001/DA03, 1001/DA04, 1001/DA05, 1001/DA06, 1001/DA07, dated November 2010 and received by Council on the 26th November 2010, the application form and on any supporting information received with the application, as amended by the Section 96 plans numbered 1001/DA14/B, 1001/DA03/B, 1001/DA04/B, 1001/DA05/B, 1001/DA06/B, all dated 9 November 2011 and all received by Council on 10 November 2011, only in so far as they relate to the modifications highlighted on the Section 96 plans and detailed in the Section 96 application, except as may be amended  by the following conditions and as may be shown in red on the attached plans:

 

Amend Condition No. 5 to read:

5.       The first floor bedroom windows shall be treated as follows:

 

5.1     The sill height of the windows (W16 & W17) to the first floor north western elevation must be increased to be a minimum height of 1.5m above floor level, or alternatively, these windows are to be fixed and provided with translucent, obscured, frosted or sandblasted glazing below 1.2m above floor level.

 

5.2     The shutters to the north-west facing master bedroom window (W18) shall be fixed and configured so that there is no direct overlooking into the private open space area of No. 50 Milroy Avenue.

 

5.3     The south-east facing first floor bedroom window (W24) shall be treated with fixed and obscured glazing up to 1.5m above the internal floor level.

 

Note: where necessary the BASIX certificate shall be amended to comply with the above conditions. Details of compliance shall be included in an amended construction certificate issued for the development.

 

Add the following Conditions:

 

Heritage condition

58.     The proposed new front door is to match as closely as possible the detail of the existing 5 panelled front door in terms of size, proportions and detailing of solid and glazed panels, in order to retain the stylistic integrity of the existing dwelling.  Amended drawings are to be submitted to and approved by Council’s Director City Planning, in accordance with Section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development. 

 

Protection of the Environment Operations Act 1997 – Air Conditioners

59.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Air Conditioning & Equipment

60.     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day. LOST.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Belleli

Councillor Andrews

Councillor Matson

Councillor Bowen

Councillor Matthews

Councillor Hughes

Councillor Nash

Councillor Smith

Councillor Seng

Councillor Stevenson

 

Councillor Tracey

 

Councillor Woodsmith

Total (5)

Total (7)

 

MOTION: (Hughes/Bowen) CARRIED – SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Woodsmith

Councillor Belleli

 

Councillor Bowen

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor Tracey

 

Total (11)

Total (1)

 

 

D8/12        Development Application Report - 16 Walenore Avenue, Kingsford (DA/641/2011)

PL9/12

RESOLUTION: (Andrews/Hughes) that the application be deferred in accordance with the applicant’s request, subject to it being referred back to the Council for determination.

 

MOTION: (Andrews/Hughes) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D9/12        Development Application Report - 18-20 Stanley Street, Randwick (DA/891/2008/D)

PL10/12

RESOLUTION: (Tracey/Andrews) that Council as the consent authority, grants its consent under Section 96 of the Environmental Planning and Assessment Act 1979, as amended, to modify Development Consent No. 891/2008 for the limited use of one (1) Chepstow Street pedestrian access gate (providing access to the basement car park) for maintenance and security staff only, at No. 18-20 Stanley Street, Randwick, in the following manner:

 

Amend Condition No. 6 to read:

6.       The two pedestrian access gates to the ground level entry forecourt and the basement car park on the Chepstow Street frontage shall be kept closed at all times, and shall not be used for general access purposes, except during emergency circumstances.The pedestrian gate providing direct access to the basement only, may only be used for a trial period of 12 months from the date of this determination and in the following circumstances:

 

a.     For security and maintenance staff and ancillary only to the performing of security checks and maintenance of the Chepstow Street school boundary. The pedestrian gate shall not become a general entry/exit point to the school for any personnel (including students and teaching staff).

b.    Use of the pedestrian gate shall be limited to security and maintenance staff between the hours of 6.00am and 6.30pm, except in the case of an emergency;

c.    Authorised staff using the pedestrian gate shall be clearly identifiable, through use of fluorescent vests;

d.    The pedestrian gate shall not be used for the purpose of waste collection or delivery services;

e.        A sign attached to the gate shall advise of the above restricted use.

 

An application must be made to Council prior to the expiry of the trial period in order for the use of the pedestrian gate providing direct access to the basement only to continue in the terms specified above.  Should an application not be made within the specified period this gate must not be used for general access purposes, except during emergency circumstances. 

 

MOTION: (Woodsmith/Matson) that Council as the consent authority, refuses its consent under Section 96 of the Environmental Planning and Assessment Act 1979, as amended, to modify Development Consent No. 891/2008 for the limited use of one (1) Chepstow Street pedestrian access gate (providing access to the basement car park) for maintenance and security staff only, at No. 18-20 Stanley Street, Randwick. LOST.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Hughes

Councillor Andrews

Councillor Matson

Councillor Belleli

Councillor Seng

Councillor Bowen

Councillor Smith

Councillor Matthews

Councillor Tracey

Councillor Nash

Councillor Woodsmith

Councillor Procopiadis

 

Councillor Stevenson

Total (6)

Total (7)

 

MOTION: (Tracey/Andrews) CARRIED – SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Woodsmith

Councillor Belleli

 

Councillor Bowen

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor Tracey

 

Total (12)

Total (1)

 

 

 

D10/12     Development Application Report - 87 St Marks Road, Randwick (DA/367/2008/C)

PL11/12

RESOLUTION: (Belleli/Andrews) that Council, as the consent authority, grants development consent under Section 96 of the Environmental Planning and Assessment Act 1979 to modify Development Consent No. DA/367/2008 for permission to modify the approved development by amending Condition 2 of the development consent relating to the sill height of windows for Building B and changes to the internal configuration and window openings of Building B at No. 87 St Marks Road, Randwick  in the following manner: 

 

A         Amend Condition 1 to read:

The development must be implemented substantially in accordance with the following plans

 

Title

No

Dated

Received by Council

Building A Floor Plans

DA 100 Rev. 02

20.9.08

1 October 2008

Building B Floor Plans

DA 101 Rev. 02

20.9.08

1 October 2008

Building A Elevations

DA 300 Rev. 01

20.9.08

1 October 2008

Building B Elevations

DA 301 Rev. 01

20.9.08

1 October 2008

Sections

DA 400 Rev. 01

20.9.08

1 October 2008

Landscape Plan

LO1 Rev. B

02.06.08

19 June 2008

 

the application form and on any supporting information received with the application, as amended by the following

 

·      Section 96’B’ plans: 

 

Title

No

Dated

Received by Council

Building A Floor Plans

DA 100 Rev. G

02.12.10

15 February 2011

Building A Elevations

DA 300 Rev. F

03.12.10

21 February 2011

 

·      Section 96 ‘C’ plans

 

Title

No

Dated

Received by Council

Building B Floor Plans

DA 101 Rev.06

08.08.11

10 August 2011

Building B Elevations

DA 301 Rev.03

08.08.11

10 August 2011

Sections Building A & B

DA 400 Rev.03

08.08.11

10 August 2011

 

only in so far as they relate to the modifications highlighted on the Section 96 plans and detailed in the Section 96 application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

B         Delete Condition No. 2 of the original consent

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

Note: Cr Procopiadis was not present in the Chamber during the vote on the above resolution.

 

 

 

D11/12     Development Application Report - 8-10 Wood Street, Randwick (DA/225/2004/B)

PL12/12

RESOLUTION: (Matson/Bowen) that Council, as the consent authority, grants development consent under Section 96(2) of the Environmental Planning and Assessment Act 1979 to modify Development Consent No DA/225/2004 permission to modify the approved development by amending conditions 6 and 7 relating to privacy screens, internal reconfiguration of units and common outdoor areas including new stairs to ground floor level, new garbage space area, bicycle parking, BBQ area above garage, increase the size of the rear first floor balconies, new boundary fence and changes to window openings at 8-10 Wood Street, Randwick in the following manner: 

 

A       Amend Condition No. 1 to read:

1.       The development must be implemented substantially in accordance with the plans drawn by the Architecture Company, numbered Issue H of DA02, DA05 dated 21/10/04 in the amendments box and stamped received by Council on 2 March 2006 and Issue D of DA03, DA04 and DA06 dated 20/02/04 in the amendments box and stapled received by Council on 2 March 2006 and the landscape plans prepared by Zenith Landscape Designs, Drawings Nos.04-1649A and 04-1649B dated Feb 04 and stamped received by Council on 2 March 2006 and sheets 1-4 of the strata plans, surveyor’s reference 19915 stamped received by Council on 2 March 2006, the application form and on any supporting information received with the application, as amended by the following: -

 

·    Section 96‘A’ application received by Council on the 6th December 2007, and

·    Section 96‘B’ plans numbered A100J, A101J, A102H, A103H, A104F, A200G, A201G, A202F, A203F, A300G, A301F, A302F, all dated 23.05.11 and received by Council on 25 May 2011

 

only in so far as they relate to the modifications detailed in the Section 96 applications, and highlighted on the Section 96 plans as amended by the following conditions and as may be shown in red on the attached plans.

 

B       Delete Conditions Nos 6 and 7

 

C       Add the following Conditions: 

89.     The inner edge of the southern side of the communal bbq area above the rear garages of the site shall be installed with a privacy screen to a height of 1.5m above the finished floor level of the terrace to maintain reasonable levels of privacy and amenity for adjacent residential properties along Rae Street to the south of the subject site. The screen is to be constructed in metal cladding to maintain visual consistency with the privacy screening along the western edges of the terrace. Details of compliance to be included in construction certificate plans/information.

 

90.     The planter box proposed for inclusion to the edges of the communal bbq area above the rear garages of the site shall be installed with suitable screen planting to a mature height of at least 1m (at the time of planting) above the height of the planter box (or 2m above the finished floor level of the rooftop terrace) to maintain reasonable levels of privacy and amenity for the surrounding residential properties. Details of compliance to be included in construction certificate plans/information.

 

91.     The units are to be fitted with L-shaped or linear wall kitchens in lieu of the proposed galley kitchens to improve the amenity of the internal living areas for future occupants. Details of compliance to be included in construction certificate plans.

 

92.     The design for the masonry sections of the fence at the front of the property shall be modified such that the heights of the solid (lower) sections of the fence do not exceed those of the masonry sections of the existing fence to maintain reasonable visual amenity with regard to potential obstruction of views of the facade from Wood Street. Details of compliance to be included in construction certificate plans/information.

 

93.     The dimensions and proportions of the proposed French doors to be introduced into the original façade of the building must reviewed. All new windows and external doors proposed to be introduced into the early building fabric shall be sympathetic to the architectural style and language of the building, details of proposed window and door joinery shall be to be submitted to and approved by Council’s Director City Planning, in accordance with Section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

94.     The existing gabled roof shall remain tiled (or re-clad using traditional roof slates) as per drawing No. A300 and not be replaced without metal sheeting or colourbond. Details of proposed materials and finishes shall be submitted to Council for approval prior to issue of a construction certificate.

 

95.     Existing chimneys on the residence must be retained. Details of compliance to be included in construction certificate plans/information.

 

96.     The dimensions and proportions of the proposed French doors, including fanlights, are to the sympathetic to the architectural style of the building, and are to match the adjacent building at no.6 Wood Street.  Details of proposed French doors shall be to be submitted to and approved by Council’s Director City Planning, in accordance with Section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

MOTION: (Matson/Bowen) CARRIED – SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Smith

Councillor Belleli

 

Councillor Bowen

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Stevenson

 

Councillor Tracey

 

Councillor Woodsmith

 

Total (12)

Total (1)

 

 

 

D12/12     Development Application Report - 1 Meagher Avenue, Maroubra (DA/29/1990/A)

PL13/12

RESOLUTION: (Matthews/Andrews) that Council, as the consent authority, refuse development consent under Section 96 of the Environmental Planning and Assessment Act 1979, as amended, to modify Development Consent No. DA/29/1990 by expending the approved trading hours for 7-Eleven service station and associated convenience store from 7:00am – 11:00pm to 5.00am to 12 midnight, 7 days, at 1 Meagher Avenue, Maroubra for the following reasons:

 

1.     The application has not undertaken a proper assessment of the potential amenity impacts as a result of the proposed extension to trading hours. Specifically, existing incidents of disturbance and anti social behaviour, as well as potential for these incidents to be exacerbated as a result of the extended trading hours has not been adequately addressed. The application has not provided any convincing argument to justify that the proposed trading hours will not result in detrimental impacts on the locality.

 

2.     The proposed modification to the original consent does not satisfy the matters for consideration under Section 96(a) of the Environmental Planning and Assessment Act, 1979 in that the proposal does not result in a development which minimises adverse social and environmental impacts.

 

3.     The proposal does not satisfy the objective for Zone No. 3B stipulated under Clause 14(d) of Randwick Local Environmental Plan 1998 (Consolidation) in that the submitted documents contain insufficient information relating to the degree of noise emission from the premises and details of appropriate mitigation measures. Consequently it cannot be justified that the proposal will not result in detrimental amenity impacts on the nearby residential zones.

 

4.     The site is located in close proximity to residential developments. The application is insufficient in addressing issues of potential noise emission, antisocial behaviour and details of appropriate mitigation measures. Therefore, the proposal is not considered to satisfy the provisions of Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended in that it cannot be demonstrated that approval of the proposed modification to the original consent will not result in detrimental environmental and social impacts on the locality.

 

5.     The proposal has been assessed has having the potential to result in detrimental noise and amenity impacts on the local residences and lead to a highly undesirable planning outcome. Accordingly, the proposal in its current form is not considered to have justified the suitability of the site for the proposed development. Therefore, the proposal is not considered to satisfy the provisions of Section 79C(1)(c) of the Environmental Planning and Assessment Act 1979, as amended.

 

6.     The proposal in its current form is not within the public interest and does not satisfy Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

MOTION: (Matthews/Andrews) CARRIED UNANIMOUSLY – SEE RESOLUTION.

 

 

 

D13/12     Development Application Report - 50 Milroy Avenue, Kensington (DA/783/2011)

 

 

 

 

PL14/12

Having declared a significant non pecuniary interest in this item earlier in the meeting Cr Procopiadis left the meeting during the debate and the vote on the matter.

 

RESOLUTION: (Belleli/Andrews) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/783/2011 for ground and first floor alterations and additions to the existing dwelling including the reconfiguration of the building into a single dwelling, at No. 50 Milroy Avenue, Kensington, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received:

1 of 5

John Spiteri

January 2011

16 December 2011

2 of 5

John Spiteri

January 2011

16 December 2011

3 of 5

John Spiteri

January 2011

16 December 2011

4 of 5

John Spiteri

January 2011

16 December 2011

5 of 5

John Spiteri

January 2011

16 December 2011

 

BASIX Certificate

No.

Dated

 

A125285

13 October 2011

 

Amendment of Plans & Documentation

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

2.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

3.       a)     The colours, materials and finishes of the external surfaces are to be compatible with the existing building and adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

External materials, finishes and colours of the building are required to match, as closely as possible, the existing building and any metal roof sheeting is to be pre-painted (e.g. Colourbond) to limit the level of reflection and glare.

 

b)     Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Manager Development Assessments prior to issuing a construction certificate for the development.

 

Section 94A Development Contributions

4.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $250,000, the following applicable monetary levy must be paid to Council: $2,500.00.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Long Service Levy Payments

5.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

Compliance with the Building Code of Australia

6.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Structural Adequacy

7.       A Certificate of Adequacy must be supplied by a professional engineer, to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development. The Certificate of Adequacy shall address the structural adequacy of the existing dwelling to support the additional upper floor part.

 

Smoke Alarms

8.       Smoke alarms are required to be installed in accordance with the relevant provisions of the Building Code of Australia (volume 2) smoke alarms must comply with AS3786.  Smoke alarms must be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

BASIX Requirements

9.       In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

10.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

Home Building Act 1989

11.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council.

 

Construction Noise & Vibration Management Plan

12.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works on site.

 

Temporary Site Fencing

13.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary site fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management Plan

14.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·            location and construction of protective fencing / hoardings to the perimeter of the site;

·            location of site storage areas/sheds/equipment;

·            location of building materials for construction;

·            provisions for public safety;

·            dust control measures;

·            site access location and construction

·            details of methods of disposal of demolition materials;

·            protective measures for tree preservation;

·            provisions for temporary sanitary facilities;

·            location and size of waste containers/bulk bins;

·            details of proposed sediment and erosion control measures;

·            provisions for temporary stormwater drainage;

·            construction noise and vibration management;

·            construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

15.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

 

·            The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·            Details of hazardous materials (including asbestos)

·            Method/s of demolition (including removal of any asbestos)

·            Measures and processes to be implemented to ensure the health & safety of workers and community

·            Measures to be implemented to minimise any airborne dust and asbestos

·            Methods and location of disposal of any hazardous materials (including asbestos)

·            Other relevant details, measures and requirements to be implemented

·            Details of re-use, recycling and disposal of waste demolition/building materials

·            Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Sydney Water

16.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

17.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Inspections During Construction

18.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Site Signage

19.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·           name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·           name, address and telephone number of the Principal Certifying Authority,

·           a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

20.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Demolition Work Requirements

21.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment, Climate Change & Water and Randwick City Council policies, including:

 

·            Occupational Health & Safety Act 2000 & Regulations

·            WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·            WorkCover NSW Guidelines and Codes of Practice

·            Australian Standard 2601 (2001) – Demolition of Structures

·            The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·            Relevant DECCW/EPA Guidelines

·            Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

22.     Work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·        Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·        Randwick City Council’s Asbestos Policy

 

·        A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·        On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·        Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·        A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Sediment & Erosion Control

23.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.  Details are to be included in the Construction Site Management Plan.

 

Public Safety & Site Management

24.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

·       Building materials, sand, soil, waste materials, construction equipment or other articles must not be placed upon the footpath, roadway or nature strip at any time.

 

·       The road, footpath, vehicular crossing and nature strip must be maintained in a good, safe, clean condition and free from any excavations, obstructions, trip hazards, goods, materials, soils or debris at all times.  Any damage caused to the road, footway, vehicular crossing, nature strip or any public place must be repaired immediately, to the satisfaction of Council.

 

·       Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

·       Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

·       Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

 

Occupation Certificate Requirements

25.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

BASIX Requirements

26.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

27.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·        The window having a minimum sill height of 1.5m above the internal floor level,

·        Providing a window locking device at least 1.5m above the internal floor level,

·        Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·        Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·        Other appropriate effective safety measures or barrier.

 

The relevant measures must be implemented prior to the issue of an occupation certificate.

 

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

Use of premises

28.     The premises must only be used as a single residential dwelling and must not be used for dual or multi-occupancy purposes.

 

29.     No cooking facilities or sanitary fittings other than those indicated on the approved plans are to be installed in the premises without the prior written consent of the Council.

 

External Lighting

30.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1      The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

A2      Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

A3      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A4      Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

A5      A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

A6      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A7      Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

A8      This consent does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the land owner or principal contractor must obtain:

 

§  the consent of the owners of such adjoining or supported land to trespass or encroach, or

§  an access order under the Access to Neighbouring Land Act 2000, or

§  an easement under section 88K of the Conveyancing Act 1919, or

§  an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

                     

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

Note: Cr Procopiadis was not present in the Chamber during the vote on the above resolution.

 

 

 

D14/12     Development Application Report - JRPP - 1408 Anzac Parade, Little Bay (DA/812/2011)

 

 

 

 

PL15/12

Having declared significant non pecuniary interests in this item earlier in the meeting Crs Matson, Nash and Hughes left the meeting during the debate and the vote on the matter.

 

RESOLUTION: (Andrews/Procopiadis) that Council receive and note the attached assessment report for the Joint Regional Planning Panel.

 

MOTION: (Andrews/Procopiadis) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D15/12     Development Application Report - JRPP - 330 Anzac Parade, Kensington - UNSW (DA/748/2011)

 

 

 

 

PL16/12

Having declared significant non pecuniary interests in this item earlier in the meeting Crs Matson, Nash and Hughes left the meeting during the debate and the vote on the matter.

 

RESOLUTION: (Andrews/Bowen) that the assessment report for the Joint Regional Planning Panel in relation to DA/748/2011 (330 Anzac Parade, Kensington – UNSW) be received and noted.

 

MOTION: (Andrews/Bowen) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

Miscellaneous Reports

 

M1/12       Miscellaneous Report - Recent Land & Environment Court Decisions (F2006/00383)

PL17/12

RESOLUTION: (Andrews/Woodsmith) that the report be received and noted.

 

MOTION: (Andrews/Woodsmith) CARRIED - SEE RESOLUTION.

  

Notice of Rescission Motions

Nil. 

 

 

The meeting closed at 9.48pm.

 

 

The minutes of this meeting were confirmed at the Planning Committee Meeting of the Council of the City of Randwick held on Tuesday, 13 March 2012.

 

 

 

 

...................................................

CHAIRPERSON