THESE MINUTES ARE DRAFT UNTIL CONFIRMED AT THE NEXT MONTHLY MEETING OF THIS COUNCIL AND/OR COMMITTEE

 

MINUTES OF Planning Committee Meeting of the

Council of the City of Randwick HELD ON

Tuesday, 8 November 2011 AT 6:18pm

 

Present:

 

The Mayor, Councillor S Nash (West Ward)

 

North Ward                                           -  Councillors K Smith (Chairperson),

                                                             P Tracey & M Woodsmith

 

South Ward                                          -  Councillors R Belleli, C Matthews & A White

 

East Ward                                            -  Councillors T Bowen, M Matson &

                                                             B Notley-Smith

                                                              

West Ward                                           - Councillors B Hughes (Deputy Chairperson) & J Procopiadis

 

Central Ward                                        - Councillors A Andrews, T Seng &

                                                            G Stevenson (arrived 7.08pm)

 

Officers present:

 

General Manager                                             Mr R Brownlee

Director City Services                                      Mr J  Frangoples

Director City Planning                                       Ms S Truuvert

Acting Director Governance & Financial Services   Mr G Banting

Manager Development Assessment                     Mr K Kyriacou

Senior Administrative Coordinator                       Ms J Hartshorn

Communications Manager                                  Mr J Hay

Manager Strategic Planning                               Ms K Armstrong

 

The meeting was adjourned at 6.18pm and was resumed at 6.44pm.

 

Minutes Silence

1 minutes silence was observed as a sign of respect for the three (3) Australian service men killed in Afghanistan last week.

 

Apologies/Granting of Leave of Absences 

 

Nil.

 


Confirmation of the Minutes

 

Confirmation of the Minutes of the Planning Committee Meeting held on Tuesday 11 October 2011

 

RESOLUTION: (Mayor, Cr  Nash/Procopiadis) that the Minutes of the Planning Committee Meeting held on Tuesday 11 October 2011 (copies of which were circulated to all Councillors) be and are hereby confirmed as a correct record of the proceedings of that meeting.

 

 Declarations of Pecuniary and Non-Pecuniary Interests

 

Cr Belleli declared a non significant non pecuniary interest in Item D148/11 as one of the objectors worked on his 2004 Council election campaign.

 

Procedural Motion

RESOLVED: (Mayor, Cr Nash/Andrews) that the General Manager’s answer to Councillor’s (below) question in relation to the Inglis Site be included in the minutes.

 

The Mayor, Cr Nash, asked the General Manager whether the Inglis Planning Proposal has any relationship with Item M22/11 (Randwick Education and Health Specialised Centre Discussion Paper - Feedback from Public Exhibition).

 

The General Manager responded that the Inglis Site has no relationship to the Discussion Paper (Item M22/11) that is before Council tonight and that the Inglis Site is the subject of a separate planning paper.

 

Address of Council by Members of the Public

Prior to consideration of the Agenda by the Committee, deputations were received in respect of the following matters:

D148/11    35 Midway Drive, Maroubra (DA/806/2010)

 

Against               Ying Morgan - objector

 

For                      Michael Khoury - applicant

 

D150/11    164-168 Marine Parade, Maroubra (DA/279/2011)

 

For                      Spiro Stavis -speaking on behalf of the applicant

 

D149/11    3 Bay Parade, Malabar (DA/231/2011)

 

Against               Anthony Betros – representing the objector

 

For                      Will Nitschke - applicant

 

Cr Stevenson arrived at the meeting (7.08pm)

 

D151/11    14 Govett Street, Randwick (DA/251/2011)

 

Against               Dan Pace - objector

 

For                      Matthew Stubbs – representing the applicant

 

D154/11    541A Malabar Road, Maroubra (DA/605/2011)

 

For                      John Maraz - applicant

 

D158/11    291 Malabar Road Maroubra (DA/179/2011)

 

Against               Anthony Betros – representing the objector

 

D159/11    6 Helena Street Randwick (DA/612/2011)

 

Against               Nick Shaloub - objector

 

For                      Matthew Stubbs - Architect for applicant

 

Having declared an interest in this matter Item M22/11, the Director City Planning (Sima Truuvert) left the meeting during the public address on the matter.

 

M22/11     Randwick Education and Health Specialised Centre Discussion Paper - Feedback from Public Exhibition

 

Against               Keiran Bowie – representing residents

 

For                      Lindsay Fletcher - Architect representing residents

 

The meeting was adjourned at 7.51pm and was resumed at 8.05pm.

 

Urgent Business

a)     Cr Notley-Smith tabled a petition, containing approximately 7,500 signatories, objecting to the “proposed over-development of the Randwick Education and Health Specialised Centre”. (F2008/00645)

 

b)     The Mayor, Cr Nash, tabled a petition, containing approximately 22 signatories, raising concerns in relation to the La Perouse loop road upgrade. (F2008/00616)

 

Procedural Motion

RESOLVED: (Andrews/Nash) that Item M22/11 (Randwick Education and Health Specialised Centre Discussion Paper – Feedback from Public Exhibition) be brought forward and dealt with immediately. CARRIED.

 

Development Application Reports

 

D143/11   Development Application Report - 165 Arden Street, Coogee (DA/139/2011)

PL164/11

RESOLUTION: (Andrews/Belleli) -

 

A.       That Council supports the objections under State Environmental Planning Policy No.1 – Development Standards in respect to non compliance with Clause 20F of Randwick Local Environmental Plan 1998, relating to floor space ratio on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.       That Council as the consent authority grant development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No.139/2011 to convert the existing subfloor area of the building into an additional dwelling at 165 Arden Street Coogee, subject to the following conditions:

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received

2.11.01

JMH Living Design

8.2.2011

4 March 2011

2.11.02

JMH Living Design

8.2.2011

4 March 2011

2.11.03

JMH Living Design

8.2.2011

4 March 2011

2.11.04

JMH Living Design

8.2.2011

4 March 2011

2.11.05

JMH Living Design

8.2.2011

4 March 2011

 

The development must also be implemented substantially in accordance with the response from Jason Storer of Blackett Maguire & Goldsmith Pty Ltd in correspondence dated 25th July 2011. The works are to be incorporated into a Construction Certificate for the development and be implemented prior to the issue of an Occupation Certificate.

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

2.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

3.       The colours, materials and finishes of the external surfaces are to be compatible with the existing building and adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

External materials, finishes and colours of the building are required to match, as closely as possible, the existing building and any metal roof sheeting is to be pre-painted (e.g. Colourbond) to limit the level of reflection and glare.

 

Compliance with the Building Code of Australia

4.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application. In relation to openings situated less than 3m from a side boundary the openings are to be protected by fire shutters or an alternative solution that will maintain the existing level of light and ventilation to those openings.

 

5.       In accordance with the provisions of clause 94 of the Environmental Planning and Assessment Regulation 2000, the existing levels of fire and safety within the premises are to be upgraded to achieve an adequate level of safety and the following requirements are to be satisfied:-

 

a)     A report prepared by a suitably qualified and accredited Building Surveyor must be submitted to and approved by the Principal Certifying Authority, prior to the issuing of a construction certificate, in accordance with section 80A(2) of the Environmental Planning & Assessment Act 1979.

 

b)     The report must include an assessment of the existing building and compliance with the relevant provisions of the Building Code of Australia. The report must also include details of the measures and works considered appropriate to achieve an adequate level of fire and safety for the building and the occupants.

 

c)     The upgrading works contained in the report as approved by the Principal Certifying Authority are to be included in the construction certificate and be implemented prior to issuing an occupation certificate for the new building or part and written confirmation is to be provided to Council accordingly.

 

6.       The proposal shall comply with the provisions of the BCA, Volume 1, ‘Section F – ‘Damp and Weatherproofing, Room Heights, Light and Ventilation, Sound Transmission and Insulation’.  Details of works required to achieve compliance are to be provided in the relevant plans/specifications for the construction certificate to the satisfaction of the Principal Certifying Authority.

 

7.       A Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to withstand and support the proposed works and proposed use of the existing basement. 

 

Long Service Levy Payments

8.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Energy & Water Efficiency

9.       The following energy efficiency and water saving measures are to be implemented in all new and upgraded building work and details included in the construction certificate:

 

a)    The consumption of water shall be minimised by the use of triple A rated water efficient plumbing fixtures (taps and shower roses) and water efficient dual flush toilets.

 

b)    New external timber or metal framed and brick veneer walls and roofs are to be provided with insulation (i.e. bulk insulation and a reflective building membrane/reflective sarking/foil insulation), having a minimum total thermal resistance R–value of 3.0 in roofs and 1.5 in external walls.  The insulation and reflective building membrane is to be installed in accordance with the relevant requirements of the Building Code of Australia and the manufacturers details.

 

c)    New hot water service pipes are to be provided with insulation and must also satisfy any relevant requirements of Building Code of Australia and AS 3500.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

10.     Prior to the commencement of any building works the following requirements must be complied with:

 

a)       a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)       a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)       a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)       the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)       at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

Home Building Act 1989

11.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing.

 

Construction Noise & Vibration Management Plan

12.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

Temporary Site Fencing

13.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary site fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management Plan

14.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·          location and construction of protective fencing / hoardings to the perimeter of the site;

·          location of site storage areas/sheds/equipment;

·          location of building materials for construction;

·          provisions for public safety;

·          dust control measures;

·          site access location and construction

·          details of methods of disposal of demolition materials;

·          protective measures for tree preservation;

·          provisions for temporary sanitary facilities;

·          location and size of waste containers/bulk bins;

·          details of proposed sediment and erosion control measures;

·          provisions for temporary stormwater drainage;

·          construction noise and vibration management;

·          construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

15.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

 

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

·          Recycling, reuse and waste disposal of remediation materials

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Sydney Water

16.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

17.     Design calculations prepared by a suitably qualified professional engineer, are to be submitted to and approved by the certifying authority for the stormwater drains and gutters prior to the commencement of works, detailing the adequacy of the stormwater disposal system and compliance with the provisions of the Building Code of Australia.

 

Public Utilities

18.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

19.     Public health, safety and convenience must be maintained at all times during demolition and building works and the following requirements must be complied with at all times (as applicable):

 

1)     Demolition work must be carried out in accordance with Australian Standard, AS2601 (2001) - The Demolition of Structures and a Demolition Work Plan is required to developed and implemented to the satisfaction of the Principal Certifying Authority prior to commencing any demolition works.

 

2)     The demolition, removal, storage and disposal of any materials containing asbestos must be carried out in accordance with the relevant requirements of WorkCover NSW, Council’s Asbestos Policy and the following requirements:

 

·         A licence must be obtained from WorkCover NSW for the removal of friable asbestos and or more than 10m2  of bonded asbestos (i.e. fibro)

 

·         Asbestos waste must be disposed of in accordance with the Protection of the Environment Operations Act 1997 & relevant Regulations

 

·         A sign must be provided to the site/building stating “Danger Asbestos Removal In Progress”

 

·         A Clearance Certificate or Statement must be obtained from a suitably qualified person (i.e. Occupational Hygienist) upon completion of the asbestos removal works, which is to be submitted to the Principal Certifying Authority and Council prior to issuing an Occupation Certificate.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

3)     A sign must be provided and maintained in a prominent position, which contains the following details:

 

·         name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·         name, address and telephone number of the Principal Certifying Authority,

·         a statement stating that “unauthorised entry to the work site is prohibited”.

 

4)     The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, trip hazards, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

5)     A Road / Asset Opening application must be submitted to and approved by Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council.  For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

6)     Building materials, sand, soil, waste materials, construction equipment or other materials or articles must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

7)     Bulk bins, waste containers or other articles must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container or other articles in a public place can be made to Council’s Building Services section.

 

8)     During demolition and construction, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council.

 

9)     Public safety must be maintained at all times and public access to any demolition and building works, materials and equipment on the site is to be restricted. If necessary, a temporary safety fence or hoarding is to be provided to protect the public. Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

If it is proposed to locate any site fencing, hoardings or items upon any part of the footpath, nature strip or any public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services department beforehand. Details and plans are to be submitted with the application, together with payment of the weekly charge in accordance with Council’s adopted Pricing Policy.

 

10)   Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents.

 

The requirements and practices contained in the Protection of the Environment Operations Act 1997 and relevant DECC Construction Noise and Vibration Guidelines are to be satisfied and a Construction Noise and Vibration Management Plan is to be developed and implemented throughout the works to the satisfaction of Council, prior to the commencement of works.

 

Excavations, Back-filling & Retaining Walls

20.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

21.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

Internal work only within a commercial or industrial development, located in a commercial or industrial zone, which is not audible within any residential dwelling or commercial or industrial premises

·   Monday to Saturday - No time limits (subject to column 1)

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Inspections During Construction

22.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:        For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

23.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation or use of the development encompassed in this development consent (including alterations, additions and ‘fit-out’ work to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

24.     Where applicable, a Fire Safety Certificate must be submitted to Council prior to the issuing of an Occupation Certificate, in accordance with the requirements of the Environmental Planning and Assessment Regulation 2000.

 

The Fire Safety Certificate must include details of all of the fire safety measures contained in the building and as detailed in the fire safety schedule attached to the Construction Certificate.

 

Prior to issuing any Occupation Certificate the Principal Certifying Authority must be satisfied that all of the relevant fire safety measures have been included and are sufficiently detailed within the Fire Safety Certificate. A copy of the fire safety certificate must be displayed in the building near the entrance and a copy must be forwarded to the NSW Fire Brigades.

 

An annual Fire Safety Statement is also required to be submitted to the Council and the NSW Fire Brigades, each year after the date of the Fire Safety Certificate, in accordance with the Environmental Planning & Assessment Regulation 2000.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

·          The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

·          Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

·          This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

·          A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

·          Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

·          Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

MOTION: (Andrews/Belleli) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D144/11   Development Application Report - 39 Waverley Street, Randwick (DA/432/2011)

PL165/11

RESOLUTION: (Andrews/Belleli) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20E(2), 20F(2), 20G(2) and 20G(4) of Randwick Local Environmental Plan 1998 (Consolidation), relating to landscaped areas, floor space ratio, building height and external wall height respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the adjoining premises and the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 432/2011 for modification of approved Strata subdivision and alterations and additions to an existing residential flat building under Development Consent 433/2007, including construction of a new loft level, reconfiguration of room layout, installation of balconies, provision of 2 tandem parking spaces, landscape works and amendment to approved Strata plan, at 39 Waverley Street, Randwick subject to the following conditions:

 

REFERENCED PLANS:

 

1.       The development must be implemented substantially in accordance with the following plans and BASIX Certificates:

 

Plan Number / Title

Dated

Received

Prepared By

02a

30/05/2011

9 June 2011

C M Hairis Architects

03a

30/05/2011

04a

30/05/2011

05a

30/05/2011

10-2371 LO1(A)

23.03.11

9 June 2011

Zenith Landscape Design

Draft Strata Plan 01a, 02a and 03a

Undated

9 June 2011

C M Hairis Architects

 

BASIX Cert. No.

Project Name

Dated

Received

A124418

Unit 1, 39 Waverley Street, Randwick

29 September 2011

30 September 2011

A124427

Unit 2, 39 Waverley Street, Randwick

A124428

Unit 3, 39 Waverley Street, Randwick

A124429

Unit 4, 39 Waverley Street, Randwick

A124431

Unit 5, 39 Waverley Street, Randwick

A124430

Unit 6, 39 Waverley Street, Randwick

 

the application form and any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

ENVIRONMENTAL AMENTITY:

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be consistent with the submitted “External Finishes Board”, prepared by C M Hairis Architects, and stamp-received by Council on 9 June 2011.

 

3.       Development Consent No. 433/2007 relating to the subject site at 39 Waverley Street, Randwick, as modified by Section 96 approval No. 433/2007/A, shall be surrendered in accordance with the provisions of the Environmental Planning and Assessment Act 1979 and Environmental Planning and Assessment Regulation 2000, prior to the issuing of any Construction Certificate.

 

4.       The north-facing windows adjacent to the Living / Dining areas of Units 1, 3 and 5 on the first, second and third levels respectively, shall be constructed with fixed and/or louvered glazing only.

 

Details demonstrating compliance shall be incorporated in the Construction Certificate drawings to the satisfaction of the Council / Accredited Certifier.

 

5.       The balustrades on the northern elevations of the eastern and western balconies at first, second and third levels shall be constructed with translucent / obscured glazing.

 

Details demonstrating compliance shall be incorporated in the Construction Certificate drawings to the satisfaction of the Council / Accredited Certifier.

 

6.       All proposed privacy screens on the northern elevations of the western balconies at the first, second and third levels shall be permanently fixed (not sliding). In addition, the individual louvre blades of the screens shall not be operable.

 

Details demonstrating compliance shall be incorporated in the Construction Certificate drawings to the satisfaction of the Council / Accredited Certifier.

 

7.       All bathroom windows on the northern elevation of the building shall be constructed with translucent / obscured glazing. Details demonstrating compliance are to be incorporated in the Construction Certificate documentation to the satisfaction of the Council / Accredited Certifier.

 

8.       The enclosing walls for the planter beds fronting or adjacent to the Sydney Street and Waverley Street alignments shall be finished with natural stone or similar materials. The above walling shall NOT be rendered and paint-finished. Details demonstrating compliance are to be incorporated in the Construction Certificate documentation to the satisfaction of the Council / Accredited Certifier.

 

9.       A minimum of two (2) bicycle parking spaces are to be provided within the proposed development. The design and construction of the bicycle parking facilities are to be compliant with Australian Standard 2890.3: Bicycle Parking Facilities. Details demonstrating compliance are to be incorporated in the Construction Certificate documentation to the satisfaction of the Council / Accredited Certifier.

 

10.     A wheel stop is to be installed for the rear tandem car space for Unit 5, to prevent damage to vehicles and the garden walls.

 

11.     All car parking spaces are to be line-marked. 

 

12.     Fences located on the side or rear boundaries of the site shall not exceed a maximum height of 1800mm, measured above the existing ground levels.

 

On sloping sites or at changes in ground levels, the maximum height of the fence may exceed the abovementioned specified height by up to 150mm maximum adjacent to any required ‘step-downs’ or changes in ground level.

 

The applicant and owner are advised that the relevant provisions of the Dividing Fences Act 1991 are to be satisfied accordingly and any necessary approvals or agreements should be obtained from the owner/s of the adjoining land beforehand.

 

13.     Street and unit numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the development.

         

In this regard, prior to occupation of the building, an application must be submitted to and approved by Council’s Director of City Planning, together with the required fee, for the allocation of an appropriate street number/s to the development.

 

14.     The reflectivity index of glazing used in the external facades of the proposed development must not exceed 20 per cent.

 

15.     A motion-triggered lighting device is to be installed near the bin storage area of the development, to ensure safety and security of the occupants. The device is to be appropriately positioned to minimize glare to the adjoining dwelling at No. 37 Waverley Street. Details demonstrating compliance are to be submitted to the satisfaction of the Principal Certifying Authority prior to the issuing of any Interim or Final Occupation Certificate. 

 

16.     Lighting to the premises shall be designed in accordance with Australian Standard AS 4282: Control of the Obtrusive Effects of Outdoor Lighting so as not to cause a nuisance to nearby residents or motorists and to ensure that light overspill does not affect the amenity of the area.

 

17.     Power supply and telecommunications cabling to the development shall be underground.

 

18.     A single common television aerial, and/or satellite dish (having a maximum diameter of 700mm and not located on the front or street elevation of the building) is to be installed to serve the development.

 

19.     The finished ground levels external to the building are to be consistent with the development consent and are not to be raised (other than for the provision of paving or the like on the ground) without the written consent of Council.

 

20.     Adequate letter box for each dwelling unit shall be installed at the main pedestrian entry on the Sydney Street elevation of the building.

 

21.     In accordance with the provisions of clauses 143A and 154A of the Environmental Planning & Assessment Regulation 2000, a ‘Design Verification Certificate’ must be provided to the Certifying Authority and the Council, prior to issuing a construction certificate and an occupation certificate, respectively.

 

The following condition is imposed to promote ecologically sustainable development and energy efficiency:

 

22.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, the approved BASIX Certificates and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificates are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

The following condition is applied to mitigate the loss of low rental accommodation:

 

23.     A monetary contribution of $298,950 is required for the purpose of mitigating the loss of low cost rental accommodation on the site caused by the development, pursuant to Clause 51 of the State Environmental Planning Policy (SEPP) Affordable Rental Housing 2009. The contribution must be paid in full to Council prior to the issuing of any Construction Certificate relating to the development.

 

The following condition is applied to meet additional demands for public facilities:

 

24.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $497,200, the following applicable monetary levy must be paid to Council: $4,972.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

25.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

26.     All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA), in accordance with Clause 98 of the Environmental Planning and Assessment Regulation 2000.

 

27.     Prior to the commencement of any building or fire safety works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

28.     Prior to the commencement of any building works, the person having the benefit of the development consent must:-

 

i)        appoint a Principal Certifying Authority for the building work, and

 

ii)       appoint a principal contractor for the building work and notify the Principal Certifying Authority and Council accordingly in writing, and

                                        

iii)       notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

 

iv)      give at least two days notice to the Council, in writing, of the persons intention to commence building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

29.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected in accordance with section 81A (2) (b1) (ii) of the Environmental Planning & Assessment Regulation 2000 and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Documentary evidence of the building inspections carried out and details of compliance with Council’s consent is to be maintained by the Principal Certifying Authority.  Details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council with the occupation certificate.

 

The principal contractor must ensure that the required critical stage and other inspections, as specified in the Principal Certifying Authority’s “Notice of Critical Stage Inspections”, are carried out to the satisfaction of the Principal Certifying Authority and at least 48 hours notice (excluding weekends and public holidays) is to be given to the Principal Certifying Authority, to carry out the required inspection, before carrying out any further works.

 

30.     A sign must be erected and maintained in a prominent position on the site, which contains the following details:

·       name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours,

·       name, address and telephone number of the Principal Certifying Authority,

·       a statement stating that “unauthorised entry to the work site is prohibited”.

 

31.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

32.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon and must also be provided to Council with the occupation certificate.

 

33.     In accordance with clause 98 of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition, that in the case of residential building work, a contract of insurance must be obtained and in force, in accordance with the provisions of the Home Building Act 1989.

 

Where the work is to be done by a licensed contractor, excavation or building work must not be carried out unless the Principal Certifying Authority (PCA):

 

·       has been informed in writing of the licensee’s name and contractor number; and

·       is satisfied that the licensee has complied with the insurance requirements of Part 6 of the Home Building Act 1989.

 

Details of the principal building contractor and compliance with the provisions of the Home Building Act 1989 (i.e. Details of the principal licensed building contractor and a copy of the Certificate of Insurance) are to be submitted to Council prior to the commencement of works, with the notice of appointment of the PCA / notice of intention to commence building work.

 

34.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

35.     A Certificate of Adequacy prepared by a professional engineer shall be submitted to the certifying authority prior to the issue of a construction certificate, certifying the structural adequacy of the building to support an additional storey.

 

36.     A Certificate of Adequacy prepared by a professional engineer, shall be submitted to the Council prior to the issue of an occupation certificate, certifying the structural adequacy of the building in general and internal and external balustrading.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

37.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Conservation (formerly the Environment Protection Authority) and Randwick City Council policies and conditions, including:

 

·      Occupational Health and Safety Act 2000

·      Occupational Health and Safety (Hazardous Substances) Regulation 2001

·      Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·      WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·      Australian Standard 2601 (2001) – Demolition of Structures

·      The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

·      Relevant Department of Environment & Conservation (DEC) / Environment Protection Authority (EPA) and WorkCover NSW Guidelines.

·      Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

38.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Additional requirements for all development (except for single residential dwellings)

·   Saturdays and Sundays where the preceding Friday and/or the following Monday is a public holiday - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

39.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents. 

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

40.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works.

 

The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

A Road Opening Permit must be obtained from the Council and other relevant Authorities prior to excavating or opening-up the road or footway for services or the like.

 

41.     Building materials, sand, soil, waste materials or construction equipment must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

42.     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council, unless the waste container is located upon the road in accordance with the Roads & Traffic Authority Guidelines and Requirements, and the container is exempt from an approval under Development Control Plan for Exempt & Complying Development and Council’s Local Approvals Policy.  Applications to place a waste container in a public place can be made to Council’s Building Services section.

 

43.     Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

44.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or any public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

45.     A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·       Install or erect any site fencing, hoardings or site structures

·       Operate a crane or hoist goods or materials over a footpath or road

·       Placement of a waste skip (grater than 3m in length) or any container or other article.

 

46.     All new building works must satisfy the relevant performance or deemed-to-satisfy provisions of the Building Code of Australia.

 

47.     All of the fire safety upgrading works and new building work must be detailed in the Construction Certificate for the development.

 

48.     The fire safety upgrading works must be carried out prior to issuing of an Occupation Certificate for the development and written confirmation must be provided to Council which verifies that all of the upgrading works have been carried out in accordance with the conditions of consent (together with a Fire Safety Certificate for the Essential Fire Safety Measures) prior to issuing an Occupation Certificate.

 

49.     The existing levels of fire safety and amenity within the building are to be upgraded, in accordance with the following requirements and the fire safety certificate provisions of Part 9 of the Environmental Planning and Assessment Regulation 2000 must be complied.  A Construction Certificate must be obtained for the subject works and the upgrading works are required to be implemented and completed prior to issue of an Occupation Certificate:-

 

a)     The balustrades along the side of the stairways and balconies are to be upgraded.

 

The balustrade height shall be not less than 1000mm above the floor of any access path, balcony, landing or the like and 865mm above the nosing of the stair treads or floor of a ramp and the balustrade is to be constructed in accordance with Clause D2.16 of the Building Code of Australia. Openings within balustrades shall not exceed 125mm, so as to not permit a 125mm sphere to pass through it and for stairs, the space is tested above the nosings, in accordance with Clause D2.16 of the Building Code of Australia.

 

Details of the proposed design of external balustrading shall be submitted to and approved by Council prior to construction.

 

b)     Handrails are to be provided to all stairs and must be continuous between stair flight landings and have no obstruction on or above them that will tend to break a hand-hold, in accordance with Clause D2.17 of the Building Code of Australia.

 

c)     The main entry/exit doors are to swing in the direction of egress or alternatively the main entry/exit doors are to be provided with an automatic hold open device, to assist persons seeking egress in the event of an emergency.

 

d)     Doors in a required exit, forming part of a required exit or in the path of travel to a required exit is required to be readily openable without a key from the side that faces a person seeking egress, by a single hand downward action or pushing action on a single device which is located between 900mm and 1200mm from the floor in accordance with Clause D2.21 of the Building Code of Australia.

 

e)     Provide emergency lighting to the stairways and corridors, in accordance with the provisions of Clauses E4.2 and E4.4 of the Building Code of Australia and AS/NZS 2293.1 (1998).

 

f)      Provide exit signs to the Building, to satisfy the provisions of Clause E4.5 and E4.7 of the Building Code of Australia and AS/NZS 2293.1 (1998).  Exit signs must be visible at all times to indicate the way to a position of egress from the building to the satisfaction of Council.

 

g)     Provide portable fire extinguishers to the building, to satisfy the provisions of Clause E1.6 of the Building Code of Australia and AS 2444 (1995).

 

h)     Provide a self-closing, -/60/30 fire door to the front entry doorway of each sole-occupancy unit, to the enclosure under the main stairway and to the laundry, in accordance with Clause C3.11 of the Building Code of Australia.

 

i)      Brick up or effectively seal the “milk boxes” in the walls of the main stairway with material having a fire resistance level of -/60/60.

 

j)      Upon completion of the fire safety upgrading works and prior to the issuing of the strata subdivision, a final fire safety certificate is to be submitted to Council and a copy of the fire safety certificate and fire safety schedule are to be displayed in a prominent position within the building (ie entrance area), in accordance with the provisions of the Environmental Planning and Assessment Act 1979.

 

50.     The demolition, removal, storage, handling and disposal of products and materials containing asbestos must be carried out in accordance with Randwick City Council’s Asbestos Policy and the relevant requirements of WorkCover NSW and the NSW Department of Environment & Conservation (formerly the Environment Protection Authority), including:

 

·      Occupational Health and Safety Act 2000

·      Occupational Health and Safety (Hazardous Substances) Regulation 2001

·      Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·      WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·      Australian Standard 2601 (2001) – Demolition of Structures

·      The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

·      Relevant Department of Environment & Conservation (DEC) / Environment Protection Authority (EPA) and WorkCover NSW Guidelines.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

51.     A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation). Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

52.     On demolition sites involving the removal of asbestos, a professionally manufactured sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS” and include details of the licensed contractor. The sign shall measure not less than 400mm x 300mm and the sign is to be installed prior to demolition work commencing and is to remain in place until such time as all asbestos has been safely removed from the site.

 

53.     Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 1996.

 

Asbestos waste must be disposed of at an approved waste disposal depot (refer to the DEC or Waste Service NSW for details of sites). Copies of all receipts detailing method and location of disposal must be maintained on site and be provided to Council officers upon request, as evidence of correct disposal.

 

54.     A Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council upon completion of the works (prior to an Occupation Certificate being issued), which confirms that the relevant requirements contained in the Asbestos Survey and conditions of consent, in relation to the safe removal and disposal of asbestos, have been satisfied.

 

Occupant Safety

55.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

i.     The window having a minimum sill height of 1.5m above the internal floor level,

ii.    Providing a window locking device at least 1.5m above the internal floor level,

iii.    Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

iv.   Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v.    Other appropriate effective safety measures or barrier.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

56.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

57.     The applicant shall note that all external work, carried out on Council property, shall be in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works". An application for the cost of the Council civil works is to be submitted to Council at the completion of the internal building works. An application fee shall be payable to Council for the quotation of the required works. The applicant may elect to use his contractor for the required works, subject to Council approval, however a design and supervision fee based on the lowest quotation from Council's nominated contractor will be required to be paid prior to the commencement of any works.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

58.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

59.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

60.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $121.00 (inclusive of GST). This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

61.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

62.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

The following additional conditions should be applied to provide adequate security against damage to Council’s infrastructure:

63.     The following damage / civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $1000.00   -      Damage / Civil Works Security Deposit

 

      The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

The following additional conditions are applied to provide adequate provisions for access, transport and infrastructure:

64.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)       Construct a new concrete vehicular crossing and layback at kerb opposite the new vehicular entrance to the site.

 

65.     All new walls adjacent to vehicular crossings must be lowered to a height of 600mm above the internal driveway level for a distance of 1.50m within the site or splayed 1.5 metre by 1.5 metre to provide satisfactory sight lines. Details are to be submitted to the Certifying Authority prior to the release of the construction certificate showing compliance with this condition.

 

66.     Any new wall constructed at the southwest corner of the site (Waverley St / Sydney St intersection) is to be constructed with a 3m x 3m splay should it exceed a height of 600mm above the Council footpath at this location. Details showing compliance with this condition are to be shown on the plans submitted for the Construction Certificate.

 

67.     Prior to the issuing of an occupation certificate the visitor car space is to be clearly signposted.

 

The following additional conditions are applied to provide adequate provisions for drainage and associated infrastructure:

68.     Prior to the issue of a construction certificate detailed drainage plans shall be prepared by a suitably qualified hydraulic engineer and submitted to and approved by the certifying authority. A copy of the plans shall be forwarded to Council, if Council is not the certifying authority. The drainage plans must demonstrate compliance with Australian Standard 3500.3:2003 (Plumbing and Drainage - Stormwater Drainage) except as varied by the conditions of this development approval.

 

69.     Generally all site stormwater shall be piped to a sediment/silt arrester pit that drains to Council's kerb and gutter.

 

Notes:

a.   The sediment/silt arrestor pit shall be constructed:-

 

i.        within the site at or near the street boundary.

ii.       with a child proof and corrosion resistant fastening system (e.g. spring loaded jay-bolt).

iii.       with a minimum of 4 x 90 mm diameter weep holes (preferably located in the walls of the pit at the floor level) and with a suitable geotextile material with a high filtration rating located around the weep holes.

iv.      with the pit floor being a minimum 300mm below the invert level of the outlet pipelines.

v.       with a galvanised heavy duty screen (Lysaght RH3030 Maximesh or similar) located over the outlet pipes draining to the infiltration pit and the kerb. (Similar to a Mascot GRC stormwater discharge control pit, product code DS3SDC).

 

70.     Prior to the issuing of an occupation certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer confirming that the design and construction of the stormwater drainage system complies with Australian Standard 3500.3:2003 (Plumbing & Drainage- Stormwater Drainage) and the conditions of this development approval. The certification must be provided following inspection/s of the site stormwater drainage system by the certifying engineers and shall be provided to the satisfaction of the PCA.

 

Strata Subdivision Conditions

The following conditions are applied to satisfy the provisions of Council’s environmental plans, policies and codes for subdivision works:

71.     All floors, external walls and ceilings depicted in the proposed strata plan must correspond to those of the building as constructed.

 

72.     A Section 73 Compliance Certificate under the Sydney Water Act 1994 must be obtained from Sydney Water Corporation.

 

Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the website www.sydneywater.com.au then refer to “Water Servicing Coordinator” under Developing Your Land” or telephone 13 20 92 for assistance.

 

Following application a “Notice of Requirements” will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to the release of the plan of subdivision.

 

73.     The applicant shall provide Council with a survey plan of the property prior to the release of any Subdivision Certificate.

 

74.     The applicant shall create suitable rights of carriageway, easements for services, support and stormwater lines, as required. The applicant shall be advised that the minimum easement width for any stormwater line is 0.9 metres.

 

75.     The registered proprietor of the land the subject of this consent shall enter into a restriction on the use of land that no right of exclusive use and enjoyment of the whole or any specified part of the area or areas designated as common area or similar in the approved plans will be conferred on any person or persons without the prior approval of Randwick City Council.

 

76.     A formal subdivision application is required to be submitted to and approved by the Council or an accredited certifier and all conditions of this development consent are required to be satisfied prior to the release of the subdivision plans. This includes restoration of all public roads and reserves.

 

Advisory

A1      The assessment of this development application does not include an assessment of the proposed building work under the Building Code of Australia (BCA).

 

All new building work must comply with the BCA and relevant Australian Standards and details of compliance must be provided in the Construction Certificate application.

 

A2      A separate Local Approval application must be submitted to and be approved by Council's Health, Building & Regulatory Services department prior to commencing any of the following activities:-

 

§  Install or erect any site fencing, hoardings or site structures on any part of the nature strip, road or footpath

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip, bin or any other container or article on the road, nature strip or footpath.

 

A3      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Andrews/Belleli) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D145/11   Development Application Report - 1420 Anzac Parade, Little Bay (DA/547/2011)

PL166/11

RESOLUTION: (Andrews/Belleli) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 547/2011 for alterations and additions to the existing aged care facility including construction of a new 3 storey addition to the northern side of the existing building, increase the total number of beds from 137 to 170, reconfiguration of the internal layout, new signage and associated landscape and site works at No. 1420 Anzac Parade, Little Bay, subject to the following conditions:

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

DA.01 Issue B,  DA.02 Issue B, DA.03 Issue B, DA.04 Issue B dated 11/7/11, DA.05 Issue C dated 18/7/11, DA.06 Issue B, DA.07 Issue B, DA.08 Issue B dated 18/7/11, DA.09 Issue A, DA.10 Issue A dated 15/7/11, DA.19 Issue B, DA.20 Issue B, DA.21 Issue B, DA.22 Issue B dated 15/7/11 dated 18/7/11, DA.25 Issue A dated 18/7/11 as amended by detail plan DA.23 Issue A dated 13/10/11.

Eeles Trelease Pty Ltd Architects

Various.

Refer to plan nos.

Landscape Drawing Nos. 11016-DA01 Rev A, 110016-DA02 Rev A, 11016-DA03 Rev A, 11016-DA07 Rev A, 11016-DA08 Rev A

Aspect Studios

All dated 15 July 2011

Equinox: Shadow study isometric, Shadow study in Plan; Winter Solstice; Shadow Study in Isometric; Winter solstice Shadow Study

in Plan; Summer Solstice Shadow Study in Isometric; Summer solstice shadow Study in Plan.

 

 

Statement of Heritage Impact (SHI)

prepared by Graham Brooks and Associates Pty Ltd

dated July 2011.

Statement of Environmental Effect (SEE) Planning

prepared by HMUP Urban

 

dated 18 July 2011.

Visual Impact Study: Setting of Henry’s Trading Post

 Eeles Trelease Pty Ltd.

 

Traffic and Parking Report

Halcrow.

dated 15/07/2011

Storm Water Concept Plan No. 16740 Issue 1 by

Wallis & Spratt.

 

BCA Compliance Report

Blackett Maguire +

Goldsmith.

dated 14/07/2011

 

 

Amendment of Plans & Documentation

2.       The approved plans and documents must be amended in accordance with the following requirements and details are to be included in the Construction Certificate:

 

A)  The colours, materials and finishes of the external surfaces to the new wing building are to be compatible with the existing building and heritage items in the vicinity of the site.  Details of the proposed colours, materials and textures (ie- a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director City Planning, in accordance with Section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

B)  An amended plan must be submitted of the porte cochere and the area surrounding it to ensure good visibility and definition of the trafficable areas, and the provision of a grassed verge so that the passengers can alight from parked vehicles where indicated. This is in response to the Design Review Panel’s comments with regard to the context of the proposal and the landscaping of the site.

 

C)  At least 30% of the new driveways and parking areas are to be constructed in porous building materials. Details are to be provided.

 

2A.      The following conditions are applied to meet the requirements of the   Heritage Council of NSW:

1)   All work shall comply with the following documentation:

 

a)     Drawings Nos: DA.01 Issue B; DA.02 Issue B; DA.03 Issue B, DA.04 Issue B dated 11/07/11; DA.05 Issue C dated 18/07/11; DA.06 Issue B; DA.07 Issue B; DA.08 Issue B dated 18/07/11; DA.09 Issue A; DA.10 Issue A dated 15/07/11; DA.19 Issue B; DA.20 Issue B; DA.21 Issue B; DA.22 Issue B dated 15/07/11; dated 18/07/11; DA.25 Issue A dated 18/07/11 by Eeles Trelease Pty. Ltd. Architects.

b)     Landscape Drawing Nos: 11016-DA01 Rev A; 11016-DA02 Rev A; 11016-DA03; Rev A; 11016-DA04 Rev A; 1106-DA05 Rev A11016-DA06 Rev A; 1106-DA07 Rev A; 11016-DA08 Rev A dated 15 July 2011 by Aspect Studios.

c)     Equinox: Shadow study isometric, Shadow study in Plan; WinterSolstice; Shadow Study in Isometric; Winter solstice Shadow Study in Plan; Summer Solstice Shadow Study in Isometric; Summer solstice shadow Study in Plan.

d)     Statement of Environmental Effect (SEE) prepared by HMUP Urban Planning dated 18 July 2011.

e)     Statement of Heritage Impact (SHI) prepared by Graham Brooks and Associates Pty Ltd dated July 2011.

f)     Visual Impact Study: Setting of Henry’s Trading Post by Eeles Trelease Pty Ltd.

g)     Response to Pre-DA Advice from Council by Helen Mulcahy Urban Planning.

h)     Landscape Traffic and Parking Report dated 15/07/2011 by Halcrow.

i)      Storm Water Concept Plan No. 16740 Issue 1 by Wallis & Spratt.

j)     BCA Compliance Report dated 14/07/2011 by Blackett Maguire + Goldsmith.

 

2)   A heritage consultant shall be nominated for the works. The consultant shall have appropriate qualifications and experience commensurate with the scope of the works. The name and experience of this consultant shall be submitted to the Heritage Branch for approval with the section 60 application.

 

3)   The consultant shall advise on the detail design resolution of new elements, undertake on site heritage inductions, inspect removal works, construction of new elements, design and installation of services (to minimise impacts on significant fabric and views) and manage the implementation of the conditions of approval.

 

4)   Information scheduling and describing the proposed conservation works is to be submitted to the Heritage Branch along with the S60 application:

 

a)   All works are to be implemented in accordance with the Conservation Management Plan for the Prince Henry Site at Little Bay dated May 2003 (Amended February 2003).

 

5)   Any site specific interpretation (proposed themes and media), proposed way signage and street furniture are to be in accordance with the Prince Henry site Interpretation Strategy dated October 2005 prepared by Musecape and submitted to Randwick City Council for approval prior to works commencing.

 

6)   Any ground disturbance and excavation undertaken as part of the proposed works is to be undertaken in consultation with the La Perouse Local Aboriginal Land Council (LPLALC) and, where requested, be subject to LPLALC and archaeological monitoring.

 

7)   Should Aboriginal objects be found, the Office of Environment and Heritage, Department of Premier and Cabinet is to be informed (as required by the provisions of the NSW National Parks and Wildlife Act 1974). Subject to an assessment of the extent, integrity and significance of any exposed objects, applications under either Section 87 or Section 90 of the National Parks and Wildlife Act may be required before work resumes.

 

8)   If any relics of state significance are uncovered, further excavation must stop and the Office of Environment and Heritage be notified immediately. Further approval may need to be obtained from the NSW Heritage Council as changes to the design and scope of the proposed works may be required depending upon the significance of the relics found.

 

9)   Suitable clauses are to be included in all contractor and subcontractor contracts to ensure that on-site personnel are aware of their obligations and requirements in relation to the relic’s provisions of the Heritage Act and the National Parks and Wildlife Act 1974. 10. Appropriate protective measures shall be included in the Master Program and Site Co-ordination Plan to ensure that significant built and landscape elements are not damaged during construction. Significant fabric (such as retaining walls, kerbs, gutters and significant paving) in the vicinity of the development and wherever construction vehicles are used should be protected during excavation and construction works. 11. An application under section 60 of the NSW Heritage Act is to be submitted and approved by the NSW Heritage Council prior to work commencing.

 

2B       The following conditions are applied to meet the requirements of the NSW Police Force

The applicant must take into consideration the recommendations contained in Safer by Design comments provided by the NSW Police dated 1/9/11.

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either an Accredited Certifier or Randwick City Council.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

3.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

4.       The colours, materials and surface finishes to the development must be consistent with the relevant plans, documentation and colour schedules provided with the development application.

 

Long Service Levy Payments

5.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

Security Deposit

6.       The following damage / civil works security deposit requirement must be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; and as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

·           $10000.00  -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash, cheque or credit card payment and is refundable upon a satisfactory inspection by Council upon the completion of the civil works which confirms that there has been no damage to Council's infrastructure.

 

The owner/builder is also requested to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

To obtain a refund of relevant deposits, a Security Deposit Refund Form is to be forwarded to Council’s Director of City Services upon issuing of an occupation certificate or completion of the civil works.

 

Sydney Water Requirements

7.       The relevant requirements of the Sydney Water Act 1994 must be complied with and a Section 73 Compliance Certificate under the Sydney Water Act 1994 must be obtained from Sydney Water. 

 

An Application for a Section 73 Certificate must be made through an authorised Water Servicing Co-ordinator. For details, please refer to the “Your Business” section of Sydney Water’s web site www.sydneywater.com.au then the “e-developer” icon or telephone 13 20 92.

 

Following the application, a “Notice of Requirements” will be provided, detailing water and sewer extensions to be built and charges to be paid.  Please make early contact with the Water Servicing Co-ordinator, as building of water/sewer extensions can be time consuming and may impact on other services and building, driveway or landscape design.

 

A copy of Sydney Water’s ‘Notice of Requirements’ must be submitted to the Certifying Authority prior to issuing a Construction Certificate.

The Section 73 Compliance Certificate is required to be obtained before an occupation certificate is issued.

 

Electricity Substation

8.       The applicant must liaise with Energy Australia prior to obtaining a construction certificate (for any above ground works), to determine whether or not an electricity substation is required for the development. Any electricity substation required for the site as a consequence of this development shall be located within the site and shall be screened from view. The proposed location and elevation shall be shown on relevant construction certificate and landscape plans.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

Compliance with the Building Code of Australia & Relevant Standards

9.       In accordance with section 80A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

10.     Access and facilities for people with disabilities must be provided in accordance with the relevant requirements of the Building Code of Australia, Disability (Access to Premises – Buildings) Standard 2010, relevant Australian Standards and conditions of consent, to the satisfaction of the Certifying Authority.  Details of the required access and facilities for people with disabilities are to be included in the plans/specifications for the construction certificate.

 

11.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council

 

12.     Prior to the commencement of any building or demolition work, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment

 

 

The following works are to be carried out to ensure minimum levels of fire safety are provided in existing buildings:

 

a)     Any new or replacement ceilings, walls and floor linings and doorways are required to satisfy the relevant requirements of the Building Code of Australia. 

 

Details of the abovementioned items and other building and fire safety works are to be provided in the construction certificate.

 

Site stability and construction work

13.     A report must be obtained from a suitably qualified and experienced professional engineer, which includes the following details, to the satisfaction of the Certifying Authority for the development:

 

a)     Geotechnical details which confirm the suitability and stability of the site for the development and relevant design and construction requirements to be implemented to ensure the stability and adequacy of the development and adjacent land.

 

b)     Details of the proposed methods of excavation and support for the adjoining land (including any public place) and buildings.

 

c)     Details to demonstrate that the proposed methods of excavation and construction are suitable for the site and should not result in any damage to the adjoining premises, buildings or any public place, as a result of the works and any associated vibration.

 

d)     The adjoining land and buildings located upon the adjoining land must be adequately supported at all times throughout demolition, excavation and building work, to the satisfaction of the Principal Certifying Authority.

 

e)     Written approval must be obtained from the owners of the land to install any ground or rock anchors underneath the adjoining premises (including any public roadway or public place) and details must be provided to the Certifying Authority.

 

Traffic conditions

14.     Adequate provisions are to be made to provide pedestrian visibility and safety.  All new walls (and/or landscaping) adjacent to vehicular crossings should not exceed a height of 600mm above the internal driveway level for a distance of 1.5m within the site or new walls (including landscaping) should splayed 1.5 metres by 1.5 metres. Details of compliance, to the satisfaction of the certifying authority, are to be included in the construction certificate documentation.

 

15.     The vehicular access driveways, internal circulation ramps and the carpark areas, (including, but not limited to, the ramp grades, carpark layout and height clearances) are to be in accordance with the requirements of AS2890.1:2004. The Construction Certificate plans must demonstrate compliance with these requirements.

 

16.     The Construction Certificate must reference the installation of either rising bollards or lockable fold-down bollards, so that access to the driveway is only available for ambulance vehicles. The details must be clearly shown on the Construction Certificate plans and no occupation certificate is to be issued until such time as these bollards are in place and operational.

 

Design Alignment levels

17.     The design alignment level (the finished level of concrete, paving or the like) at the Anzac Parade property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

The design alignment level/s at the property boundary as issued by Council and their relationship to the roadway/kerb/footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

      Any enquiries regarding this matter should be directed to Council’s Development Engineer on 9399 0924.

 

18.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the roadway/kerb/footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

19.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $5060 calculated at $44.00 (inclusive of GST) per metre of site frontage to Anzac Parade. This amount is to be paid prior to a construction certificate being issued for the development.

 

Stormwater Drainage

20.     Stormwater drainage plans have not been approved as part of this development consent. Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage shall be prepared by a suitably qualified Hydraulic Engineer and submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issued, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)       A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

b)       A layout of the proposed drainage system including pipe sizes, type, grade, length, invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system. 

c)       The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

i.        Roof areas

ii.       Paved areas

iii.       Grassed areas

iv.      Garden areas

e)       Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

f)       Proposed finished surface levels and grades of car parks, internal driveways and access aisles which are to be related to Council's design alignment levels.

g)  The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

21.     The site stormwater drainage system is to be provided in accordance with the following requirements;

 

a)     The stormwater drainage system must be provided in accordance with the relevant requirements of Building Code of Australia and the conditions of this consent, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate.

b)     The stormwater must be discharged (by gravity) directly into Council’s underground drainage system located in Brodie Street via a new or existing kerb inlet pit, such pit must be located in front of the Brodie Street site frontage.

c)     A reflux valve shall be provided (within the site) over the pipeline discharging from the site to ensure that stormwater from Council drainage system does not surcharge back into the site stormwater system.

d)     Any new kerb inlet pits (constructed within Council’s road reserve) are to be constructed generally in accordance with Council’s standard detail for the design of kerb inlet pits (drawing number SD6 which is available from Council).

e)     Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (i.e. above the 1 in 20 year storm) to the proposed drainage (detention/infiltration) system.

f)     A sediment/silt arrestor pit must be provided within the site near the street boundary prior to discharge of the stormwater to Council’s drainage system and prior to discharging the stormwater to any absorption/infiltration system.

 

Sediment/silt arrestor pits are to be constructed generally in accordance with the following requirements:

 

·         The base of the pit being located a minimum 300mm under the invert level of the outlet pipe.

·         The pit being constructed from cast in-situ concrete, precast concrete or double brick.

·         A minimum of 4 x 90 mm diameter weep holes (or equivalent) located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

·         A galvanised heavy-duty screen being provided over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

·         The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

·         A child proof and corrosion resistant fastening system being provided for the access grate (e.g. spring loaded j-bolts or similar).

·         Provision of a sign adjacent to the pit stating, “This sediment/silt arrester pit shall be regularly inspected and cleaned”.

 

Sketch details of a standard sediment/silt arrester pit may be obtained from Council’s Drainage Engineer.

g)     A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

h)     The site stormwater system must be regularly cleaned and maintained to ensure it operates as required by the design.

 

Site seepage & Dewatering

22.     Site seepage and sub-soil drainage (from planter boxes etc) must comply with the following requirements:

 

a)    Seepage/ground water and subsoil drainage (from planter boxes etc) must not be collected & discharged directly or indirectly to Council’s street gutter or underground drainage system

b)    Adequate provision is to be made for the ground water to drain around the basement carpark (to ensure the basement will not dam or slow the movement of the ground water through the development site).

c)    The walls of the basement level of the building are to be waterproofed to restrict the entry of any seepage water and subsoil drainage into the basement level of the building and the stormwater drainage system for the development.

d)    Details of the proposed stormwater drainage system including methods of waterproofing the basement level and any sub-soil drainage systems (as applicable) must be prepared or approved by a suitably qualified and experienced Professional Engineer to the satisfaction of the Certifying Authority and details are to be included in the construction certificate.

 

Waste Management

23.     Prior to the issuing of a construction certificate for the proposed building, a Waste Management Plan detailing the waste and recycling storage and removal strategy for all of the development, is required to be submitted to and approved by Council’s Director of City Services.

 

The Waste Management plan is required to be prepared in accordance with Council's Waste Management Guidelines for Proposed Development and must include the following details (as applicable):

 

·       The use of the premises and the number and size of occupancies.

·       The type and quantity of waste to be generated by the development.

·       Demolition and construction waste, including materials to be re-used or recycled.

·       Details of the proposed recycling and waste disposal contractors.

·       Waste storage facilities and equipment.

·       Access and traffic arrangements.

·       The procedures and arrangements for on-going waste management including collection, storage and removal of waste and recycling of materials (i.e. operational waste management plan).

 

Further details of Council's requirements and guidelines, including pro-forma Waste Management plan forms can be obtained from Council's Customer Service Centre.

 

24.     The applicant must comply with the operational waster management plan at all times.

 

Landscaping & Environmental amenity:

25.     Landscaping is to be provided to the site substantially in accordance with the Landscape Plans by Aspect Studios, dwg no 11016-DA01 – 08, revision A, dated 15 July 2011. The Construction Certificate must reference these details.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Certification and Building Inspection Requirements

26.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

27.     The works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

Home Building Act 1989

28.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council.

 

Dilapidation Reports

29.     A dilapidation report prepared by a professional engineer or suitably qualified and experienced building surveyor shall be submitted to the certifying authority prior to the commencement of demolition, excavation or building works detailing the current condition and status of all buildings and ancillary structures located upon all of the premises adjoining the subject site (e.g. dwellings, residential flat buildings, commercial/industrial building, garages, carports, verandah’s, fences, retaining walls, swimming pools and driveways etc).

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage and other structures located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report must be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

30.     A Construction Noise & Vibration Management Plan, prepared in accordance with the Department of Climate Change Guidelines for Construction Noise and Assessing Vibration, by a suitably qualified person, is to be developed and implemented prior to commencing site work and throughout the course of construction.

 

a)     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents. 

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

b)     The Construction Noise & Vibration Management Plan must include details of measurements, analysis and relevant criteria and demonstrate that the noise and vibration emissions from the work satisfy the relevant provisions of the Protection of the Environment Operations Act 1997, current DECC Guidelines for Construction Noise and Assessing Vibration and Councils conditions of consent.

 

c)     A further report/correspondence must be obtained from the consultant as soon as practicable upon the commencement of works, which reviews and confirms the implementation and suitability of the noise and vibration strategies in the Construction Noise & Vibration Management Plan and which demonstrates compliance with relevant criteria.

 

d)     Any recommendations and requirements contained in the Construction Noise & Vibration Management Plan and associated reports are to be implemented accordingly and should noise and vibration emissions not comply with the terms and conditions of consent, work must cease forthwith and is not to recommence until details of compliance are submitted to Council and the PCA.

 

A copy of the Construction Noise & Vibration Management Plan and associated acoustic/vibration report/s must be maintained on-site and a copy must be provided to Council and the Principal Certifying Authority accordingly.

 

Temporary Site Fencing

31.     Temporary site safety fencing must be provided to the perimeter of the site throughout demolition, excavation and construction works.

 

Temporary site fences must have a height of 1.8 metres and be a cyclone wire fence (with geotextile fabric attached to the inside of the fence to provide dust control), or heavy-duty plywood sheeting (painted white), or other material approved by Council.

 

A ‘B Class’ overhead type hoarding is required is be provided to protect the public, located adjacent to the development, prior to the commencement of any works on the site which comprise:

 

·       any works or hoisting of materials over a public footway or adjoining premises, or

·       any building or demolition works on buildings which are over 7.5m in height and located within 3.6 metres of the street alignment.

 

All site fencing and hoardings must be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

If it is proposed to locate any site fencing, hoardings, amenities or articles upon any part of the footpath, nature strip or public place at any time, a separate Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any fencing, hoarding or other article on the road, footpath or nature strip.

 

Construction Site Management

32.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·            location and construction of protective site fencing / hoardings;

·            location of site storage areas/sheds/equipment;

·            location of building materials for construction;

·            provisions for public safety;

·            dust control measures;

·            details of proposed sediment and erosion control measures;

·            site access location and construction

·            details of methods of disposal of demolition materials;

·            protective measures for tree preservation;

·            location and size of waste containers/bulk bins;

·            provisions for temporary stormwater drainage;

·            construction noise and vibration management;

·            construction traffic management details;

·            provisions for temporary sanitary facilities.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

33.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

 

·            The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·            Details of hazardous materials (including asbestos)

·            Method/s of demolition (including removal of any asbestos)

·            Measures and processes to be implemented to ensure the health & safety of workers and community

·            Measures to be implemented to minimise any airborne dust and asbestos

·            Methods and location of disposal of any hazardous materials (including asbestos)

·            Other relevant details, measures and requirements to be implemented

·            Details of re-use, recycling and disposal of waste materials

·            Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Public Liability

34.     The owner/builder is required to hold Public Liability Insurance, with a minimum liability of $10 million and a copy of the Insurance cover is to be provided to the Principal Certifying Authority and Council.

Demolition & Construction Waste

 

35.     A Demolition and Construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

Construction Traffic Management

36.     Prior to the commencement of any works on the site, an Application for a ‘Works Zone’ must be submitted to Councils Integrated Transport Department, and approved by the Randwick Traffic Committee. 

 

The ‘Works Zone’ must have a minimum length of 12m and extend for a minimum duration of three months.  The suitability of the proposed length and duration is to be demonstrated in the application for the Works Zone.  The application for the Works Zone must be submitted to Council at least six (6) weeks prior to the commencement of work on the site to allow for assessment and tabling of agenda for the Randwick Traffic Committee.

 

The requirement for a Works Zone may be varied or waived only if it can be demonstrated in the Construction Traffic Management Plan (to the satisfaction of Council’s Traffic Engineers) that all construction related activities (including all loading and unloading operations) can and will be undertaken wholly within the site.  The written approval of Council must be obtained to provide a Works Zone or to waive the requirement to provide a Works Zone prior to the commencement of any site work.

 

37.     A detailed Construction Traffic Management Plan must be submitted to and approved by Council, prior to a construction certificate being issued for the development.

 

The Construction Site Traffic Management Plan must be prepared by a suitably qualified person and must include the following details, to the satisfaction of Council:

·       A description of the demolition, excavation and construction works

·       A site plan/s showing the site, roads, footpaths, site access points and vehicular movements

·       Any proposed road and/or footpath closures

·       Proposed site access locations for personnel, deliveries and materials

·       Size, type and estimated number of vehicular movements (including removal of excavated materials, delivery of materials and concrete to the site)

·       Provision for loading and unloading of goods and materials

·       Impacts of the work and vehicular movements on the road network, traffic and pedestrians

·       Proposed hours of construction related activities and vehicular movements to and from the site

·       Current/proposed approvals from other Agencies and Authorities (including NSW Roads & Traffic Authority, Police and State Transit Authority)

·       Any activities proposed to be located or impact upon Council’s road, footways or any public place

·       Measures to maintain public safety and convenience

 

Sydney Water

38.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

39.     A public utility impact assessment must be carried out on all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.  The assessment should include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of services.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the principal certifying authority prior to the commencement of any demolition, excavation or building works.

 

40.     The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Inspections during Construction

41.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Building & Demolition Work Requirements

42.     All work and activities must be carried out in accordance with the relevant regulatory requirements, including:

 

·            Occupational Health & Safety Act 2000 & Regulations

·            WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·            WorkCover NSW Requirements, Guidelines and Codes of Practice

·            Australian Standard 2601 (2001) – Demolition of Structures

·            The Protection of the Environment Operations Act 1997

·            The Protection of the Environment Operations (Waste) Regulation 2005

·            DECC/EPA Waste Classification Guidelines

·            Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

43.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·        Occupational Health & Safety legislation and WorkCover NSW requirements

·        Randwick City Council’s Asbestos Policy

·        A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

·        On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

·        Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·        A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Sediment & Erosion Control

44.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details must be shown in a Sediment and Erosion Control Plan, including; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

A copy of the Sediment and Erosion Control Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Dust Control

45.     During demolition excavation and construction works, dust emissions must be minimised, so as not to result in a nuisance to nearby residents or result in a potential pollution incident.

 

Adequate dust control measures must be provided to the site prior to the works commencing and the measures and practices must be maintained throughout the demolition, excavation and construction process, to the satisfaction of Council.

 

Dust control measures and practices may include:-

·       Provision of geotextile fabric to all perimeter site fencing (attached on the prevailing wind side of the site fencing).

·       Covering of stockpiles of sand, soil and excavated material with adequately secured tarpaulins or plastic sheeting.

·       Installation of a water sprinkling system or provision hoses or the like.

·       Regular watering-down of all loose materials and stockpiles of sand, soil and excavated material.

·       Minimisation/relocation of stockpiles of materials, to minimise potential for disturbance by prevailing winds.

·       Landscaping and revegetation of disturbed areas.

 

Public Safety & Site Management

46.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

·      Building materials, sand, soil, waste materials, construction equipment or other articles must not be placed upon the footpath, roadway or nature strip at any time.

 

·      The road, footpath, vehicular crossing and nature strip must be maintained in a good, safe, clean condition and free from any excavations, obstructions, trip hazards, goods, materials, soils or debris at all times.  Any damage caused to the road, footway, vehicular crossing, nature strip or any public place must be repaired immediately, to the satisfaction of Council.

 

·      Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

·      Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

Excavations, Back-filling & Retaining Walls

47.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority prior to commencing such excavations or works.

 

Support of Adjoining Land

48.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

Site Signage

49.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·        name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·        name, address and telephone number of the Principal Certifying Authority,

·        a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

50.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

 

·   Monday to Friday - 8.00am to 1.00pm only

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

Additional requirements for all development

·   Saturdays and Sundays where the preceding Friday and/or the following Monday is a public holiday - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Survey Requirements

51.     A Registered Surveyor’s check survey certificate or other suitable documentation must be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority (PCA):

 

·           prior to construction (pouring of concrete) of footings and retaining structures,

·           prior to construction (pouring of concrete) of each floor slab,

·           upon completion of the building, prior to issuing an Occupation Certificate,

·           as otherwise may be required by the PCA.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the Principal Certifying Authority for the development.  

 

Building Encroachments

52.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Civil Works & Infrastructure

 

Road/Asset Opening Permit

53.     Any openings within or upon the road, footpath, nature strip or in any public place (i.e. for proposed drainage works or installation of services), must be carried out in accordance with the following requirements, to the satisfaction of Council:

 

a)   A Road / Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

b)   Council’s Road / Asset Opening Officer must be notified at least 48 hours in advance of commencing any excavation works and also immediately upon completing the works (on 9399 0691 or 0409 033 921 during business hours), to enable any necessary inspections or works to be carried out.

 

c)   Relevant Road / Asset Opening Permit fees, construction fees, inspection fees and security deposits, must be paid to Council prior to commencing any works within or upon the road, footpath, nature strip or other public place,

 

d)   The owner/developer must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate or occupation of the development (whichever is sooner).

 

e)   Excavations and trenches must be back-filled and compacted in accordance with AUSPEC standards 306U.

 

f)   Excavations or trenches located upon a road or footpath are required to be provided with 50mm depth of cold-mix bitumen finish, level with the existing road/ground surface, to enable Council to readily complete the finishing works at a future date.

 

g)   Excavations or trenches located upon turfed areas are required to be back-filled, compacted, top-soiled and re-turfed with Kikuyu turf.

 

h)   The work and area must be maintained in a clean, safe and tidy condition at all times and the area must be thoroughly cleaned at the end of each day’s activities and upon completion.

 

i)    The work can only be carried out in accordance with approved hours of building work as specified in the development consent, unless the express written approval of Council has been obtained beforehand.

 

j)    Sediment control measures must be implemented in accordance with the conditions of development consent and soil, sand or any other material must not be allowed to enter the stormwater drainage system or cause a pollution incident.

 

k)   The owner/developer must have a Public Liability Insurance Policy in force, with a minimum cover of $10 million and a copy of the insurance policy must be provided to Council prior to carrying out any works within or upon the road, footpath, nature strip or in any public place.

 

Stormwater Drainage

54.     Adequate provisions must be made to collect and discharge stormwater drainage during construction of the building to the satisfaction of the principal certifying authority.

 

The prior written approval of Council must be obtained to connect or discharge site stormwater to Council’s stormwater drainage system or street gutter.

 

55.     Any required dewatering must be monitored by the consulting Engineer/s to the satisfaction of the principal certifying authority and documentary evidence of compliance with the relevant conditions of consent and dewatering requirements must be provided to the principal certifying authority and the Council.

 

The site conditions and fluctuations in the water table are to be reviewed by the consulting Engineer prior to and during the excavation/construction process, to ensure the suitability of the excavation and dewatering process and compliance with Council's conditions of consent.

 

56.     A separate written approval from Council is required to be obtained in relation to any proposed discharge of groundwater into Council’s drainage system external to the site, in accordance with the requirements of Section 138 of the Roads Act 1993.

 

Landscaping & Environmental amenity:

Remnant Bushland

57.     The applicant must ensure that those areas of remnant native bushland adjacent the subject site are suitably protected and preserved in their current state as part of this application, with measures such as protective fencing, erosion control and similar to be put in place on-site, and the impact of over-shadowing and drainage patterns to be considered, with appropriately qualified professionals to be consulted in this regard to ensure compliance with best practice guidelines.

 

Street Trees

58.     Approval is granted for the applicant to remove those existing street trees on the Anzac Parade verge, only where necessary in order to accommodate the proposed vehicle drop off as shown, and must reimburse Council the appropriate fee, prior to the PCA issuing a Final Occupation Certificate.

 

59.     The planting of new trees on Council’s Anzac Parade verge must only be undertaken by Council, wholly at the applicant’s cost, and in accordance with the adopted Street Tree Masterplan.

 

In this regard, the applicant must contact Council’s Landscape Development Officer on 9399-0613 to obtain Council’s requirements for species, quantity, location and pot size, with the specified fee to be paid into Tree Amenity Income at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development.

 

The applicant must contact Council’s Landscape Development Officer on 9399-0613 (quoting the receipt number), and giving at least four working weeks notice to arrange for planting of the new street trees upon the completion of site works.

       

Tree Removals

60.     Approval is granted for removal of any of the small vegetation throughout the site where necessary in order to accommodate the proposed works as shown, subject to full implementation of the approved landscaping, but does not include those larger, more established canopy trees.

 

Protection of existing trees

61.     In order to ensure retention of the closely planted row of five Ficus macrocarpa var. Hillii (Hills Weeping Figs) towards the western boundary, amongst the heritage gate posts, within the proposed Courtyard 1 and the Children’s Playground in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the Construction Certificate application must show the retention of this group, with the position and diameter of their trunks and canopies to be clearly shown on all drawings.

 

b.       Any excavations associated with the installation of new services, pipes, stormwater systems or similar must be located outside the extent of their driplines, beneath the proposed circulation paths, which must be permeable/porous as shown.

 

c.       They are to be physically protected as one group by the installation of 1.8 metre high steel mesh/chainwire fencing, which shall be located a minimum distance of 2 metres, on all four sides (measured off the outside edge of their trunks at ground level), in order to completely enclose this group for the duration of works.

 

d.       This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until the proposed landscape works, being seating, paths, planting, children’s play area etc are being installed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

e.       Ground levels within the TPZ must not be altered by more than 200mm, with no other structures such as continuous strip footings for planter boxes or similar to be located in this area, and must remain as undisturbed, deep soil, with footings for the proposed timber seating to be located around any roots with a diameter of more than 75mm.

 

f.        In order to prevent soil/sediment being washed into the TPZ, over the root systems, suitable erosion control measures shall be provided at ground level, with all Site Management Plans needing to recognise the fact that material storage cannot be located within the TPZ.

 

g.       Within the TPZ, there is to be no storage of materials, machinery or site office/sheds, nor are cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble, with all Site Management Plans needing to acknowledge these requirements.

 

h.       Any roots encountered during the course of the approved works must be cut cleanly by hand, and the affected area backfilled with clean site soil as soon as practically possible.

 

62.     The owner/applicant is required to ensure the retention and long term health of all trees located on adjoining properties adjacent to the proposed development. As a general guide there shall be minimal excavation or root pruning within the dripline/s of the subject tree/s.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

 

Occupation Certificate Requirements

63.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

Fire Safety Certificate Requirements

64.     Prior to issuing an interim or final Occupation Certificate, a single and complete Fire Safety Certificate, which encompasses all of the essential fire safety measures contained in the fire safety schedule must be obtained and be submitted to Council, in accordance with the provisions of the Environmental Planning and Assessment Regulation 2000.  The Fire safety Certificate must be consistent with the Fire Safety Schedule which forms part of the Construction Certificate.

 

A Fire Safety Statement must be provided to the Council on an annual basis, each year following the issue of a Fire Safety Certificate, which confirms that all the fire safety measures are operating in accordance with the relevant standards of performance.

 

A copy of the Fire Safety Certificate/Fire Safety Statement must be displayed in the building entrance/foyer at all times and a copy must also be forwarded to Fire and Rescue NSW.

 

Structural Certification

65.     A Certificate must be obtained from a professional engineer, which certifies that the building works satisfy the relevant structural requirements of the Building Code of Australia and approved design documentation, to the satisfaction of the Principal Certifying Authority. A copy of which is to be provided to Council.

 

Sydney Water Certification

 

66.     The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to issuing an Occupation Certificate or Subdivision Certificate (whichever the sooner).

 

BASIX Requirements & Certification

67.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that any relevant BASIX commitments and requirements have been satisfied.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Principal Certifying Authority and Council upon issuing an Occupation Certificate.

 

Occupant Safety - Windows

68.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·        The window having a minimum sill height of 1.5m above the internal floor level,

·        Providing a window locking device at least 1.5m above the internal floor level,

·        Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·        Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·        Other appropriate effective safety measures or barrier.

 

The relevant safety measures must be implemented prior to the issue of an Occupation Certificate.

 

Noise Control Requirements & Certification

69.     The operation of plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Office of Environment and Heritage (EPA) Noise Control Guidelines.

 

70.     A report must be obtained from a suitably qualified and experienced consultant in acoustics, which demonstrates and certifies that noise and vibration from any plant and equipment (e.g. mechanical ventilation systems and air-conditioners) satisfies the relevant provisions of the Protection of the Environment Operations Act 1997, NSW Office of Environment and Heritage (EPA) Noise Control Manual, Industrial Noise Policy and Council’s development consent.

 

A copy of the report must be provided to the Principal Certifying Authority and Council prior to an occupation certificate being issued.

 

Swimming & Spa Pools

71.     Swimming pools and spa pools are to be provided with childproof fences and self-locking gates, in accordance with the Swimming Pools Act 1992 and regulations.

 

Swimming pools must be surrounded by a fence having a minimum height of 1.2m, that separates the pool from any residential building situated on the premises and from any place (whether public or private) adjoining the premises; and that is designed, constructed and installed in accordance with AS 1926.1 - 2007.

 

Gates to a swimming pool area shall be a maximum width of 1 metre, and be self-closing and latching; the gate is required to open outwards from the pool area and prevent a small child opening the gate or door when the gate or door is closed.

 

A ‘warning notice’ is also required to be erected in a prominent position in the immediate vicinity of a swimming pool or spa pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

72.     Swimming pools (and spa pools) are to be designed, installed and operated in accordance with the following general requirements:

 

a)  Backwash of the pool filter and other discharge of water is to be drained to the sewer in accordance with the requirements of the Sydney Water Corporation; and

 

b)  All pool overflow water is to be drained away from the building and adjoining premises, so as not to result in a nuisance or damage to premises; and

     

c)  Water recirculation and filtrations systems are required to comply with AS 1926.3 – 2010:  Swimming Pool Safety – Water Recirculation and Filtration Systems; and

 

d)  Pool plant and equipment is to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

Notification of Swimming Pools & Spa Pools

73.     Written notification must be provided to Council advising of the installation and completion of all Swimming Pools (or Spa Pools), to satisfy the requirements of the Swimming Pools Act 1992.

 

Council’s “Notification & Registration of a Swimming Pool” form must be completed and forwarded to Council prior to any Occupation Certificate being issued for all swimming and spa pools.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

74.     Prior to issuing a final occupation certificate for the development, the owner/developer must meet the full cost for Council or a Council approved contractor to construct three (3) full width concrete heavy duty vehicular crossings and laybacks at kerb in Anzac Parade opposite the vehicular entrances to the premises. Prior to construction of the vehicular crossings to serve the porte-cochere the applicant’s traffic consultant must certify that the internal drive through has been constructed strictly in accordance with the development consent and construction certificate. The vehicular crossings in Anzac Parade will be constructed at approximately 90 degrees to the Anzac Parade site frontage. The vehicular crossing to serve the additional carpark will be of a suitable width to accommodate 2 way traffic movements, (i.e. minimum of 5.5 metres).

 

75.     Prior to issuing a final occupation certificate for the development the applicant must meet the full cost fro alterations to sign posting along the Anzac Parade site frontage as required accommodating the additional vehicular crossings. The altered sign positing shall be to the satisfaction of the Technical Sub-Committee of the Randwick Traffic Committee.

 

76.     Prior to issuing a final occupation certificate or occupation of the development (whichever is sooner), the owner/developer must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

77.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)   All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)   Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)   If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)   The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

78.     The naturestrip upon Council's footway shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

Service Authorities

79.     The Section 73 Compliance Certificate must be submitted to the Principal Certifying Authority prior to issuing an Occupation Certificate.

 

Stormwater Drainage

80.     Prior to the issuing of an Occupation Certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer, which confirms that the design and construction of the stormwater drainage system complies with the Building Code of Australia, Australian Standard AS3500.3:2003 (Plumbing & Drainage- Stormwater Drainage) and conditions of this development consent. 

 

The certification must be provided following inspection/s of the site stormwater drainage system by the Hydraulic Engineers to the satisfaction of the PCA.

 

81.     Prior to the issuing of an Occupation Certificate certification must be obtained from a suitably qualified and experienced professional Engineer, to the satisfaction of the Principal Certifying Authority confirming that the basement tanking/waterproofing and any sub-soil drainage systems (as applicable) have been provided in accordance with the conditions of consent and relevant Standards. A copy of the certification must be provided to the Council with the Occupation Certificate.

 

Landscaping

82.     The landscaping shall be installed in accordance with the approved plans and specifications prior to occupation of the development and the landscaping must be maintained in accordance with the approved plans and specifications.

 

Certification is to be obtained from a suitably qualified Landscape Architect and submitted to the Principal Certifying Authority (PCA) (and Council, if Council is not the PCA) prior to the occupation of the development, which confirms that the landscaping works have been completed in accordance with the approved landscaping plans and relevant conditions of development consent, to the satisfaction of the PCA.

 

83.     The nature-strip upon Council's footway shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

Environmental Amenity

84.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

85.     Street numbering must be provided to the front of the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council.

 

In this regard, an Application must be submitted to and approved by Council’s Director of City Planning, together with the required fee, for the allocation of appropriate street and unit numbers for the development.

 

GENERAL ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and requirements.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1      The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

A2      Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from an Accredited Certifier or Council

§  An Accredited Certifier or Council has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

A3      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA), Disability (Access to Premises – Buildings) Standards 2010 and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards.  You are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A4      Any proposed amendments to the design and construction of the building may require a new development application or a section 96 amendment to the existing consent to be obtained from Council, before carrying out such works

 

A5      Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

A6      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A7      This consent does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the land owner or principal contractor must obtain:

 

§  the consent of the owners of such adjoining or supported land to trespass or encroach, or

§  an access order under the Access to Neighbouring Land Act 2000, or

§  an easement under section 88K of the Conveyancing Act 1919, or

§  an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

A8      External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to any adjoining land.

 

A9      Finished ground levels external to the building are to be consistent with the development consent and are not to be raised, other than for the provision of approved paving or the like on the ground.

 

A10     Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

A11     A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

A12     The necessary development consent and a construction certificate or a complying development certificate (as applicable) must be obtained for proposed external plant and equipment, if not included in this consent.

 

A13     An application must be submitted to an approved by Council prior to the installation and operation of any proposed greywater or wastewater treatment systems, in accordance with the Local Government Act 1993.

 

Greywater/Wastewater treatment systems must comply with the relevant requirements and guidelines produced by NSW Health, NSW Office of Environment and Heritage and other relevant regulatory requirements.

 

A14     Swimming/spa pool plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

§  before 8.00am or after 8.00pm on any Sunday or public holiday; or

§  before 7.00am or after 8.00pm on any other day.

 

A15     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

§  before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

§  before 7.00am or after 10.00pm on any other day.

 

·              Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

·              The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Andrews/Belleli) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D146/11   Development Application Report - 2-4 Beatty Street, Maroubra (DA/5/2011) 

PL167/11

RESOLUTION: (Andrews/Belleli) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20B(1) of the Randwick Local Environmental Plan 1998, relating to minimum allotment sizes, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/5/2011 for Demolition of the existing dwelling houses and construction of a 2 x double store dwelling houses and Torrens title boundary adjustment, at No. 2-4 Beatty Street, Maroubra, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan No.

Drawn by

Dated

Received on

A-01 through to A-07 inclusive

John Spiteri Design and Drafting

22/12/2010

5 January 2011

 

BASIX Certificate

No.

Date of issue

Received on

Single Dwelling

354850S

30 December 2010

5 January 2011

 

Amendment of Plans & Documentation

2.       The approved plans and documents must be amended in accordance with the following requirements:

 

a.     The privacy screen indicated for provision to the western edge of the ground floor patio at No. 4 Beatty Street shall be extended to wrap around entire length of the southern edge of the patio, at a height of 1500mm along the southern edge above the finished patio floor level.

 

The privacy screens must be constructed of metal or timber and the total area of any openings within the privacy screen must not exceed 25% of the area of the screen.  Alternatively, the privacy screen may be constructed with translucent, obscured, frosted or sandblasted glazing in a suitable frame. Details of compliance are to be included in relevant construction certificate plans and documentation.

 

b.     The fence attached to the garden areas of No. 2 Beatty Street fronting Byng Street shall be replaced with an open style palisade fence and be reduced to a height of. 1.6m from the footpath level. The palisade fence may be installed above a masonry base, which has a height of not more than 600mm as measured from the existing footpath level (consistent with the proposed masonry component for fencing fronting Beatty Street). Details of compliance are to be provided in the construction certificate plans.

 

Note: screen planting/hedging may be installed within the site as an additional privacy measure for the private open space of No. 2 Beatty Street. 

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

3.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

4.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Manager Development Assessments prior to issuing a construction certificate for the development.

 

Section 94A Development Contributions

5.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $800,543, the following applicable monetary levy must be paid to Council: $8005.45

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate [or subdivision certificate] being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Long Service Levy Payments

6.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

7.       The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $2000.00   -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

8.       Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)   Construct concrete vehicular crossings and laybacks at kerb opposite the vehicular entrances to the sites.

 

b)   Remove the redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

 

9.       The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

10.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)   All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)   Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)   If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)   The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

11.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level at the property boundary for driveways, access ramps and pathways or the like, must not exceed a grade of 1:10 (up or down) from the back of the existing Council footpath levels.

 

12.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

13.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $1283.00 calculated at $44.00 (inclusive of GST) per metre of site frontage. This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

14.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

15.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

16.     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any public utility service works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Councils Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

17.     Generally all site stormwater for each dwelling shall be piped to a sediment/silt arrester pit that drains to an infiltration area with a minimum 5 m2 base area. An overflow pipe shall be provided from each silt arrestor pit to drain to Council's kerb and gutter.

 

The location and details of the proposed internal stormwater pipelines, silt arrestor pit and the infiltration area shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the plans shall be forwarded to Council, prior to a construction certificate being issued, if Council is not the certifying authority.

 

Notes:

a.    The sediment/silt arrestor pit shall be constructed:-

 

i.    within the site at or near the street boundary.

i.    with a child proof and corrosion resistant fastening system (e.g. spring loaded jay-bolt).

ii.    with a minimum of 4 x 90 mm diameter weep holes (preferably located in the walls of the pit at the floor level) and with a suitable geotextile material with a high filtration rating located around the weep holes.

iii.   with the pit floor being a minimum 300mm below the invert level of the outlet pipelines.

iv.   with a galvanised heavy duty screen (Lysaght RH3030 Maximesh or similar) located over the outlet pipes draining to the infiltration pit and the kerb. (Similar to a Mascot GRC stormwater discharge control pit, product code DS3SDC).

 

b.    The infiltration/rubble pit shall:-

  

i.    have a minimum 300 mm of soil cover (600 mm where the pit is located under a garden/landscaping area).

ii.    be located a minimum of 3.0 metres from the dwelling or other structure (closer if a structural engineer certifies that the infiltration area will not adversely affect the structure) and 2.1 metres from the adjacent side or rear boundaries.

iii.   be constructed with a minimum 200 mm thick layer of 20 mm basalt/blue metal (or similar) that is wrapped in a suitable geotextile material covering with a high filtration rating (Geofabrics Bidim "A" range of filtration fabrics or equivalent). A suitable means of dispersing the stormwater over the area of infiltration is to be constructed.

 

Note:  other equivalent methods of infiltration may be adopted.

 

iv.   have a minimum base area of  5.0 square metres (m2).

 

The outlet from the silt arrestor pit to the infiltration area shall be located at least 50 mm below the outlet from the silt arrestor pit to the kerb and gutter.

 

c.  The requirement for an infiltration/rubble pit will not be enforced should the underground soil conditions preclude the construction of the infiltration pit (eg rock is located within 300 mm of the base of the infiltration area). If the infiltration/rubble pit is not constructed then all site stormwater shall be discharged to the kerb and gutter via a sediment/silt arrestor pit (as detailed in note a. above).

 

All works shall be to the satisfaction of the certifying authority.

 

d.  The overflow pipe/s from the rainwater tank/s shall be directed into the infiltration area.

 

18.     Any stormwater runoff which cannot be directed to the kerb and gutter at the front of the property (via the infiltration area as detailed above) shall be discharged either:

 

a)   Through private drainage easements to Council’s kerb and gutter (or underground drainage system); OR

 

b)   To a separate suitably sized infiltration area. As a guide, infiltration areas which do not have an overflow to the street shall be sized based on a minimum requirement of 1 m2 of infiltration area (together with 1 m3 of storage volume) for every 20 m2 of roof/impervious area draining to the infiltration area.

 

Prior to the use of infiltration in areas where there is no formal overland escape route to Council’s kerb and gutter/street drainage system, a geotechnical investigation will be required to determine whether the ground is suitable for infiltration. Should rock and/or a water table be encountered within two metres of the proposed base of the infiltration pit, or the ground conditions comprise low permeability soils such as clay, infiltration may not be appropriate.

 

The following conditions are applied to satisfy the provisions of Council’s environmental plans, policies and codes for subdivision works:

19.     A Section 73 Compliance Certificate under the Sydney Water Act 1994 must be obtained from Sydney Water Corporation.

 

Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the website www.sydneywater.com.au then refer to “Water Servicing Coordinator” under Developing Your Land” or telephone 13 20 92 for assistance.

 

Following application a “Notice of Requirements” will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to release of the plan of subdivision.

 

20.     The applicant shall provide Council with a survey plan of the property prior to receiving subdivision approval.

 

21.     The applicant shall create suitable rights of carriageway, easements for services, support and stormwater lines, as required. The applicant shall be advised that the minimum easement width for any stormwater line is 0.9 metres.

 

22.     A formal subdivision application is required to be submitted to and approved by the Council or an accredited certifier and all conditions of this development consent are required to be satisfied prior to the release of the subdivision plans.

 

23.     Details of critical stage inspections carried out by the principal certifying authority, together with any other certification relied upon, must be provided to Council or the accredited certifier prior to the issuing of a subdivision certificate.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

24.     The PCA must ensure that the landscaping at this site is installed in accordance with the Landscape Plan by Lisa Durland Landscapes, dwg no LS 23/10, sheet 1/1, dated December 2010, prior to the issue of a Final Occupation Certificate, with the owner/s to maintain it in a healthy and vigorous state until maturity, in accordance with this plan, for the life of the development.

 

25.     The nature-strip upon Council's Beatty Street footway shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf rolls or similar. Such works shall be installed at the applicant’s expense, prior to the issue of a Final Occupation Certificate.

 

Street Tree Removal

26.     The applicant must remove and dispose of (at their own cost) the existing Phoenix canariensis (Canary Island Date Palm, tree 10) seedling on the Beatty Street verge during excavations associated with the new vehicle crossing in this same area as shown, and must satisfy themselves as to the location of all site services prior to the commencement of any works on public property.

 

Tree Removals within site

27.     Approval is granted for removal of the following trees, subject to full implementation of the approved landscape plan:

 

c)  The Washingtonia robusta (Washington Palm, tree 4), around the southeast corner of the site, within the current front yard of no.4, then to its north, a Ficus macrophylla (Moreton Bay Fig, tree 3) both to accommodate the proposed works and due to poor health and condition respectively;

 

d)  Further to the north, around the existing free standing garage, the Brachychiton acerifolius (Illawarra Flame Tree, tree 2), the Trachycarpus fortunei (Chinese Fan Palm, tree 1) to its northwest, the Archontophoenix cunninghamiana (Bangalow Palm, tree 7) to its southwest and  the Syagrus romanzoffianum (Cocos Palm) in this same area.

 

Pruning of neighbours trees

28.     Permission is granted for the selective pruning of only the following overhanging branches from the eastern aspects of the two trees growing on the neighbouring property to the west, 51 Byng Street, against the common boundary, only where necessary in order to specifically avoid damage to the trees, or, interference with the works:

 

a)   The Lophostemon confertus (Brush Box, tree A):

i)    That 2nd order branch leading to the southeast, at a height of 3m;

 

ii)   One 3rd order, central leader, growing to the east-north-east, with the other leader to its west to remain;

 

iii)   Those four, 3rd order branches from the main 2nd order structural leader, growing to the northwest, between a height of approximately 3-6m.

 

b)   The Eucalyptus botryoides (Bangalay, tree B):

i)    That 3rd order branch growing to the east, 6-7m above ground level, with the vertical leader to its south to remain;

 

ii)   Those lower order, lowest growing branches. 

 

29.     Council’s Landscape Development Officer (9399-0613) must be present with the Arborist on site, prior to performing any pruning works, to confirm the exact location and extent of pruning that is permitted by these conditions.

       

The tying back of branches to avoid interference with scaffolding or similar, rather than pruning off, shall be undertaken wherever possible in order to minimise the loss of structure and photosynthetic area to both trees.

 

30.     This approval does not imply any right of entry onto a neighbouring property nor does it allow pruning beyond a common boundary; however, where such measures are desirable in the best interests of correct pruning procedures, and ultimately, the ongoing health of this tree, the applicant must negotiate with the neighbour/tree owner for access to perform this work.

 

31.     All pruning must be undertaken by an Arborist who holds a minimum of AQF Level V in Arboriculture, and to the requirements of Australian Standard AS 4373-2007 'Pruning of Amenity Trees,’ and NSW Work Cover Code of Practice for the Amenity Tree Industry (1998).

 

32.     Prior to the issue of a Final Occupation Certificate, the site Arborist must provide certification, to the satisfaction of the PCA, confirming compliance with the pruning related conditions in this consent.

 

Protection of street trees

33.     In order to ensure retention of the small Banksia serrata (Saw Toothed Banksia, tree 5) located on Council’s Beatty Street nature strip, just beyond the southern site boundary, as well as the two juvenile Eucalyptus species (Gum Trees, trees 8 & 9) located on the Byng Street verge in good health, the following measures are to be undertaken:

 

a.   All documentation submitted for the Construction Certificate application must show the retention of these street trees, with the position and diameter of their trunks and canopies to be clearly and accurately shown on all drawings.

 

b.   Any excavations associated with the installation of new services, pipes, stormwater systems or similar over public property must be setback a minimum distance of 3 metres off the outside edge of their trunks at ground level.

 

c.   Each of these three street trees must be physically protected by installing a total of four star pickets at a setback of 2 metres, measured off the outside edge of their trunks at ground level, matching up with the kerb or footpath as necessary, to which safety tape/para-webbing/shade cloth or similar shall be permanently attached so as to completely enclose each tree for the duration of works.

 

d.   This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

e.   The applicant is not authorised to perform any works to these street trees, and shall contact Council’s Landscape Development Officer on 9399-0613 should pruning or any similar such work appear necessary, with the applicant required to cover all associated costs with such work, to Council’s satisfaction, prior to the issue of a Final Occupation Certificate.

 

f.    Within the TPZ’s, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of, and no stockpiling of soil or rubble, with all Site Management Plans needing to acknowledge these requirements.

 

g.   A refundable deposit in the form of cash, credit card or cheque for an amount of $1,000.00 shall be paid at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development, in order to ensure compliance with the conditions listed in this consent, and ultimately, preservation of the street trees.

 

The refundable deposit will be eligible for refund following the issue of a Final Occupation Certificate, subject to completion and submission of Council’s ‘Security Deposit Refund Application Form’, and pending a satisfactory inspection by Council’s Landscape Development Officer (9399-0613).

 

Any contravention of Council's conditions relating to the tree at any time during the course of the works, or prior to the issue of a final occupation certificate, may result in Council claiming all or part of the lodged security in order to perform any rectification works necessary, as per the requirements of 80A (6) of the Environmental Planning and Assessment Act 1979.

 

Protection of palm tree

34.     In order to ensure that the Archontophoenix cunninghamiana (Bangalow Palm, tree 6) located within the current/proposed front yard of no.4, along the southern boundary is retained in good health as an existing site feature, as has been shown the Landscape Plan, the following measures are to be undertaken:

 

a.       All documentation submitted for the Construction Certificate application must show the retention of this palm, with the position and diameter of its trunk and crown to be clearly and accurately shown on all drawings.

 

b.       Any excavations associated with the installation of new services, pipes, stormwater systems or similar in this area of the site must be setback a minimum distance of 3 metres off the outside edge of its trunk at ground level, and shall be designed accordingly.

 

c.       This palm is to be physically protected by the installation of 1.8 metre high steel mesh/chainwire fencing, which shall be located a minimum distance of 2.5 metres to its east, north and west (measured off the outside edge of its trunk at ground level), matching up with the southern site boundary, in order to completely enclose this palm for the duration of works.

 

d.       This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

e.       Within the TPZ, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of, and no stockpiling of soil or rubble, with all Site Management Plans needing to acknowledge these requirements.

 

Protection of neighbours trees

35.     In order to also ensure retention of those two trees located within the neighbouring property to the west, 51 Byng Street, against the common boundary, being from north to south, a Lophostemon confertus (Brush Box, tree A) and a Eucalyptus botryiodes (Bangalay, tree B)  in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the Construction Certificate application must show the retention of these neighbouring trees, with the position and diameter of both of their trunks and canopies to be clearly and accurately shown on all drawings.

 

b.       Any excavations associated with the installation of new services, pipes, stormwater systems must either be re-directed to the south or east of dwelling no.4; or; if needing to be located in the western side setback, must be done so hard up against the western edge of the proposed building so as to minimise root damage.

 

c.       Ground levels within the 1500mm side setback, for a radius of 3.5 metres off both trees (measured off the common boundary adjacent the centreline of their trunks) must not be altered by more than 200mm, with no other structures such as continuous strip footings, planters boxes or similar to be located in this area, and must remain as undisturbed, deep soil with a permeable/porous treatment.

 

d.       All initial excavations for footings, structures or similar along the western edge of proposed dwelling no.4, to the south of the existing concrete slab, must be dug by hand, to a minimum depth of 600mm, with the Construction Certificate plans needing to show the use of a localised/cantilever footing system so as to minimise excavations and the extent of root damage.

 

e.       Approval is granted for the pruning of those two roots of 40mm in diameter opposite the trunk of the Brushbox, only by the site Arborist (refer also pruning condition), with any other roots encountered which are in direct conflict with the approved works and need to be cut are to be pruned cleanly by hand, with the affected area to be backfilled with clean site soil as soon as practically possible.

 

f.        Woodchip mulch to a depth of 75mm shall be provided in the western side setback, in the area between the proposed laundry and patio of no.4, prior to the commencement of demolition works, and must be maintained until completion.

 

g.       Ground protection comprising strapped together rumble boards, plywood or similar shall be provided on top of the mulched area described above, and must remain in place for the duration of works, until such time as the approved landscaping is being installed.

 

h.       Within the protection area described in point ‘e’ above, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble, with all Site Management Plans needing to acknowledge these requirements.

 

Further information and details on Council's requirements for trees on development sites can be obtained from the recently adopted Tree Technical Manual, which can be downloaded from Council’s website at the following link, http://www.randwick.nsw.gov.au - Looking after our environment – Trees – Tree Management Technical Manual; which aims to achieve consistency of approach and compliance with appropriate standards and best practice guidelines.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

Compliance with the Building Code of Australia

36.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Smoke Alarms

37.     Smoke alarms are required to be installed in accordance with the relevant provisions of the Building Code of Australia (volume 2) and smoke alarms must comply with AS3786.  Smoke alarms must be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

BASIX Requirements

38.     In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

39.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

Home Building Act 1989

40.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council.

 

Construction Noise & Vibration Management Plan

41.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works on site.

 

Temporary Site Fencing

42.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres). 

 

Temporary site fences are to have a height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings, amenities or articles upon any part of the footpath, nature strip or public place at any time, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management

43.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·            location and construction of protective fencing / hoardings to the perimeter of the site;

·            location of site storage areas/sheds/equipment;

·            location of building materials for construction;

·            provisions for public safety;

·            dust control measures;

·            site access location and construction

·            details of methods of disposal of demolition materials;

·            protective measures for tree preservation;

·            provisions for temporary sanitary facilities;

·            location and size of waste containers/bulk bins;

·            details of proposed sediment and erosion control measures;

·            provisions for temporary stormwater drainage;

·            construction noise and vibration management;

·            construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

44.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

·            The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·            Details of hazardous materials (including asbestos)

·            Method/s of demolition (including removal of any asbestos)

·            Measures and processes to be implemented to ensure the health & safety of workers and community

·            Measures to be implemented to minimise any airborne dust and asbestos

·            Methods and location of disposal of any hazardous materials (including asbestos)

·            Other relevant details, measures and requirements to be implemented

·            Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Demolition & Construction Waste

45.     A Demolition and Construction Waste Management Plan (WMP) must be development and implemented for the development.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

Sydney Water

46.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

47.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Inspections During Construction

48.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Site Signage

49.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·            name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·            name, address and telephone number of the Principal Certifying Authority,

·            a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

50.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Demolition Work Requirements

51.     All work and activities must be carried out in accordance with the relevant regulatory requirements and Randwick City Council policies, including:

 

·            Occupational Health & Safety Act 2000 & Regulations

·            WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·            WorkCover NSW Guidelines and Codes of Practice

·            Australian Standard 2601 (2001) – Demolition of Structures

·            The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·            Relevant DECCW/EPA Guidelines

·            Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 


Sediment & Erosion Control

52.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details must be shown in a Sediment and Erosion Control Plan, including; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

A copy of the Sediment and Erosion Control Plan must be provided to the Principal Certifying Authority and a copy must be maintained on site and be made available to Council officers upon request.

 

Public Safety & Site Management

53.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

·       Building materials, sand, soil, waste materials, construction equipment or other articles must not be placed upon the footpath, roadway or nature strip at any time.

 

·       The road, footpath, vehicular crossing and nature strip must be maintained in a good, safe, clean condition and free from any excavations, obstructions, trip hazards, goods, materials, soils or debris at all times.  Any damage caused to the road, footway, vehicular crossing, nature strip or any public place must be repaired immediately, to the satisfaction of Council.

 

·       Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

·       Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

·       Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Support of Adjoining Land, Excavations & Retaining Walls

54.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

55.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

Survey Requirements

56.     A Registered Surveyor’s check survey certificate or other suitable documentation must be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority (PCA):

 

·        prior to construction (pouring of concrete) of the footings or first completed floor slab,

·        upon completion of the building, prior to issuing an occupation certificate,

·        as otherwise may be required by the PCA.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the Principal Certifying Authority for the development.  

 

Building Encroachments

57.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Road/Asset Opening Permit

58.     A Road / Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

Site Amenities

59.     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Occupation Certificate Requirements

60.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

BASIX Requirements

61.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

62.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·        The window having a minimum sill height of 1.5m above the internal floor level,

·        Providing a window locking device at least 1.5m above the internal floor level,

·        Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·        Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·        Other appropriate effective safety measures or barrier.

 

The relevant measures must be implemented prior to issue of an occupation certificate.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

63.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)   All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)   Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)   If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)   The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

External Lighting

64.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

Use of premises

65.     The premises is to be used as a single residential dwelling only at all times and must not be used for dual or multi-occupancy purposes.

 

Street Numbering

66.     Street numbering must be provided to the front of the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council.

 

Waste Management

67.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council.

 

Protection of the Environment Operations Act 1997 – Air Conditioners

68.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Air Conditioning & Equipment

69.     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

Protection of the Environment Operations Act 1997 – Rainwater Tanks

70.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Rainwater Tank Requirements

71.     The installation of rainwater tanks shall comply with the following noise control requirements:-

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tanks are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with rainwater tanks are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

·       before 8.00am or after 8.00pm on weekends or public holiday; or

·       before 7.00am or after 8.00pm on weekdays.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1      The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

A2      Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

A3      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A4      Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

A5      A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

A6      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A7      This consent does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the land owner or principal contractor must obtain:

 

§  the consent of the owners of such adjoining or supported land to trespass or encroach, or

§  an access order under the Access to Neighbouring Land Act 2000, or

§  an easement under section 88K of the Conveyancing Act 1919, or

§  an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

A8      The finished ground levels external to the building must be consistent with the development consent and are not to be raised, other than for the provision of approved paving or the like on the ground.

 

A9      Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

A10     The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Andrews/Belleli) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D147/11   Development Application Report - 330 Anzac Parade, Kensington (DA/595/2011)

PL168/11

RESOLUTION: (Andrews/Belleli) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/595/2011 for alterations and additions to the existing New College building including construction of a floating roof above the central courtyard, new games room/lounge area within the courtyard, a bridge across the courtyard at the third floor level, reconfiguration of 12 bedrooms to create larger common rooms, reconfiguration of two existing ground floor apartments, new foyer on ground floor, new common kitchen, new windows on eastern façade, new sprinkler system and landscaping of the courtyard at No. 330 Anzac Parade, Kensington, subject to the following conditions:

 

Conditions of Consent

1.       The development must be implemented substantially in accordance with the following plans:

 

Plan Number

Revision

Dated

Received

Prepared By

DA010

E

03.08.2011

5 August 2011

HASSELL

DA110

F

04.08.2011

5 August 2011

HASSELL

DA111

F

04.08.2011

5 August 2011

HASSELL

DA112

F

04.08.2011

5 August 2011

HASSELL

DA113

F

04.08.2011

5 August 2011

HASSELL

DA114

E

03.08.2011

5 August 2011

HASSELL

DA161

E

04.08.2011

5 August 2011

HASSELL

DA162

F

04.08.2011

5 August 2011

HASSELL

DA115

1

20.09.2011

23 September 2011

HASSELL

DA160

1

20.09.2011

23 September 2011

HASSELL

Architectural Design Statement

n/a

Undated

5 August 2011

HASSELL

ESD Report

P3

Undated

5 August 2011

Erbas Building Services Consulting Engineers

Letter re. Daylight

n/a

20.09.2011

5 August 2011

Erbas Building Services Consulting Engineers

Natural Ventilation Study

n/a

12 July 2011

5 August 2011

Windtech

Acoustic Assessment

n/a

Undated

5 August 2011

Acoustic Logic

Hazardous Materials Report

n/a

July 2011

5 August 2011

CETEC Pty Ltd

 

Structural Statement

n/a

14 July 2011

5 August 2011

TLB Engineers

 

Fire Safety Engineering Assessment

n/a

27 July 2011

5 August 2011

Defire Pty Ltd

BCA Compliance Report

n/a

26 July 2011

5 August 2011

Vic Lilli & Partners

Section J Report

Rev P2

27 July 2011

5 August 2011

Erbas Building Services Consulting Engineers

Access Review

n/a

25 July 2011

5 August 2011

Godding Accessibility Consultants

 

the application form and any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

The following conditions are applied to ensure that the development satisfies   the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

2.       The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

3.       All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

4.       Prior to the commencement of any building works, a suitably qualified person (i.e. Accredited Crown Certifier) must be appointed for the development to monitor compliance with the relevant standards of construction, Council’s development consent and the approved construction plans.

 

The critical stages of construction are to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the appointed Certifier or other suitably qualified person, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Documentary evidence of the building inspections carried out and details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council upon finalisation of the development.

 

5.       A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·    name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours;

·    name, address and telephone number of the Project Manager,

·    a statement stating that “unauthorised entry to the work site is prohibited”.

 

6.       A statement confirming that the building is suitable for occupation must be obtained from a suitably qualified person (i.e. the certifier) prior to any occupation of the building work encompassed in this development consent.

 

The statement must not be issued if the development is inconsistent with the development consent and the relevant conditions of development consent must be satisfied prior to occupation.

 

Details of critical stage inspections carried out, together with any other certification relied upon must be provided to Council prior to occupation.

 

7.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to commencement of work, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

          At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

8.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved construction plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The Crown certifier is required to ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

The following group of conditions have been applied to ensure the structural adequacy and integrity of the proposed building and adjacent premises:

9.       Documentary evidence prepared by a suitably qualified professional geotechnical engineer shall be obtained prior to commencement of work, certifying the suitability and stability of the site for the proposed building and certifying the suitably and adequacy of the proposed design and construction of the building for the site.

 

A copy of the engineers report is to be submitted to the Council.

 

10.     New building work and fire safety works are to be carried out in accordance with the relevant provisions of the Building Code of Australia (BCA) and details are to be included in the construction plans, to the satisfaction of the appointed Certifier.

 

11.     In existing buildings, the following works are to be carried out to ensure minimum levels of fire safety:-

 

a)     Any new or replacement ceilings walls and floor linings and doorways are required to satisfy the relevant requirements of the Building Code of Australia.

 

b)     Any residential parts of the building must be provided with a smoke detection and alarm system, in accordance with the relevant provisions of the Building Code of Australia.

 

c)     Any residential part/s of the building are to be suitably fire-separated from the commercial area encompassed in the development application.

 

Details of the above works are to be detailed in the construction plans to the satisfaction of the appointed Certifier.

 

12.     A Certificate shall be obtained from a professional engineer and be submitted to the Council, prior to occupation of the building, which certifies that the building works satisfy the relevant structural design requirements of the Building Code of Australia.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

13.     A copy of the approved construction plans and development consent conditions must be provided to Council and a copy is to be kept on the site at all times and be made available to the Council officers and personnel for assessment.

 

14.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Certifier or other suitability qualified person prior to commencing such excavations or works.

 

15.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

Internal work only within a commercial or industrial development, located in a commercial or industrial zone, which is not audible within any residential dwelling or commercial or industrial premises

·   Monday to Saturday - No time limits (subject to column 1)

·   Sunday & public holidays - No work permitted

Additional requirements for all development (except for single residential dwellings)

·   Saturdays and Sundays where the preceding Friday and/or the following Monday is a public holiday - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

16.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant provisions of the Protection of the Environment Operations Act 1997 must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery and pile drivers (or the like) must be minimised by using appropriate plant and equipment and silencers and a construction noise and vibration minimisation strategy, prepared by a suitably qualified consultant is to be implemented during the works, to the satisfaction of the Certifier.

 

17.     A report must be obtained from a suitably qualified and experienced consultant upon commencement of works, certifying that noise and vibration emissions from the construction of the development satisfies the relevant provisions of the Protection of the Environment Operations Act 1997, Councils conditions of consent and relevant Standards relating to noise and vibration.  In support of the above, it is necessary to submit all relevant readings and calculations made and a copy of the report is to be forwarded to Council.

 

Any recommendations and requirements contained in the report are to be implemented accordingly and should noise and vibration emissions not comply with the terms and conditions of consent, work must cease forthwith and is not to recommence until details of compliance are submitted to the Council.

18.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

b)     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

c)     Building materials, sand, soil, waste materials or construction equipment must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.

 

Applications to place a waste container in a public place can be made to Council’s Building Services section.

 

d)     A temporary timber, asphalt or concrete crossing is to be provided to the site entrance across the kerb and footway area, with splayed edges, to the satisfaction of Council, unless access is via an existing concrete crossover.

 

e)     A Local Approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road or nature strip or in any public place:-

 

·           Install or erect any site fencing, hoardings or site structures

·           Operate a crane or hoist goods or materials over a footpath or road

·           Placement of a waste skip or any other container or article.

 

19.     A Construction Site Management Plan is to be prepared by a suitably qualified person (and a copy is to be forwarded to Council) prior to the commencement of demolition, excavation or building works. The site management plan must include the following measures, as applicable to the type of development:

 

·           location and construction of protective fencing / hoardings to the perimeter of the site;

·           location of site storage areas/sheds/equipment;

·           location of building materials for construction;

·           provisions for public safety;

·           dust control measures;

·           site access location and construction

·           details of methods of disposal of demolition materials;

·           protective measures for tree preservation;

·           provisions for temporary sanitary facilities;

·           location and size of waste containers/bulk bins;

·           details of proposed sediment and erosion control measures;

·           construction noise and vibration management,

·           construction traffic management.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and convenience to the satisfaction of Council.  A copy of the approved Construction Site Management Plan must be maintained on site and be made available to Council officers upon request.

 

20.     During demolition excavation and construction works, dust emissions must be minimised, so as not to result in a nuisance to nearby residents or result in a potential pollution incident.

 

Adequate dust control measures must be provided to the site prior to the works commencing and the measures and practices must be maintained throughout the demolition, excavation and construction process, to the satisfaction of Council.

 

Dust control measures and practices may include:-

·           Provision of geotextile fabric to all perimeter site fencing (attached on the prevailing wind side of the site fencing).

·           Covering of stockpiles of sand, soil and excavated material with adequately secured tarpaulins or plastic sheeting.

·           Installation of a water sprinkling system or provision hoses or the like.

·           Regular watering-down of all loose materials and stockpiles of sand, soil and excavated material.

·           Minimisation/relocation of stockpiles of materials, to minimise potential for disturbance by prevailing winds.

·           Revegetation of disturbed areas.

 

21.     During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing.

 

Details of the proposed sediment control measures are to be detailed in a site water management plan and must be prepared prior to the commencement of any site works.  The sediment and erosion control measures must be implemented prior to the commencement of any site works and be maintained throughout construction. A copy of the approved details must be forwarded to the Council and a copy is to be maintained on-site and be made available to Council officers upon request.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

22.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site. Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary fences and hoardings are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or any public place, the written approval from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

23.     If the work involved in the erection or demolition of a building is likely to cause pedestrian or vehicular traffic in a public place to be obstructed or rendered inconvenient or the building involves the enclosure of a public place, a hoarding or fence must be erected between the work site and the public place.

 

If necessary, an awning is to be erected sufficiently to prevent any substance from, or in connection with, the work from falling into the public place or adjoining premises.

 

The public place adjacent to the work site must be kept lit between sunset and sunrise if it is likely to be hazardous to persons in the public place and any such hoarding, fence or awning is to be removed upon completion of the work.

 

24.     The demolition, removal, storage, handling and disposal of  materials and all building work must be carried out in accordance with the following requirements (as applicable):

 

§   Australian Standard 2601 (2001) – Demolition of Structures

§   Occupational Health and Safety Act 2000

§   Occupational Health and Safety (Hazardous Substances) Regulation 2001

§   Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

§   WorkCover NSW – Guidelines and Codes of Practice

§   Randwick City Council’s Asbestos Policy

§   The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

 

25.     Any work involving the demolition, storage and disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

a)     Randwick City Council’s Asbestos Policy (adopted 13 September 2005).

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

b)     A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation). Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

c)     On sites involving the removal of asbestos, a  professionally manufactured sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS” and include details of the licensed contractor. The sign shall measure not less than 400mm x 300mm and the sign is to be installed prior to demolition work commencing and is to remain in place until such time as all asbestos has been safely removed from the site.

 

d)     Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 1996. Asbestos waste must be disposed of at an approved waste disposal depot (refer to the DEC or Waste Service NSW for details of sites). Copies of all receipts detailing method and location of disposal must be maintained on site and be provided to Council officers upon request, as evidence of correct disposal.

 

e)     A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council upon completion of the works prior to an occupation/use, which confirms that the asbestos material have been removed appropriately and the relevant requirements contained in the Asbestos Survey and conditions of consent in relation to the safe removal and disposal of asbestos, have been satisfied.

 

The following conditions are applied to provide access and facilities for people with disabilities:

26.     Access, facilities and car parking for people with disabilities must be provided to and within the building in accordance with the relevant provisions of the Building Code of Australia and AS1428.1 and relevant Council development control plans for the subject development.  Details of the proposed access, facilities and car parking for people with disabilities are to be included in the plans / specifications.

 

27.     A Fire Safety Certificate must be submitted to Council prior to occupation of the building, in accordance with any applicable requirements of the Environmental Planning and Assessment Regulation 2000.

 

The Fire Safety Certificate must include details of all of the fire safety measures contained in the building as detailed in the fire safety schedule.

 

Prior to occupation/use, the appointed certifier must be satisfied that all of the relevant fire safety measures have been included and are sufficiently detailed within the Fire safety Certificate. A copy of the fire safety certificate must be displayed in the building near the entrance and a copy must be forwarded to the NSW Fire Brigades.

 

An annual Fire Safety Statement is also required to be submitted to the Council and the NSW Fire Brigades, each year after the date of the Fire Safety Certificate, in accordance with the Environmental Planning & Assessment Regulation 2000.

 

28.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to commencement of work, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Occupant Safety

29.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i.     The window having a minimum sill height of 1.5m above the internal floor level,

ii.    Providing a window locking device at least 1.5m above the internal floor level,

iii.    Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

iv.   Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v.    Other appropriate effective safety measures or barrier.

 

Access & facilities

30.     Access and/or facilities for people with disabilities must be provided to new building work in accordance with any relevant provisions of the Building Code of Australia, to the satisfaction of the appointed Certifier or other suitably qualified person.

 

Environmental health & amenity

31.     The use and operation of the premises shall not give rise to an environmental health or public nuisance, cause a vibration nuisance or, result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

32.     The proposed use of the premises and the operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the premises and plant and equipment shall not give rise to a sound pressure level at any affected premises that exceeds the background (LA90), 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A).  The source noise level shall be assessed as an LAeq, 15 min and adjusted in accordance with the NSW DECC/EPA Industrial Noise Policy 2000 and Environmental Noise Control Manual (sleep disturbance).

 

33.     In relation to buildings provided with plant and equipment (e.g. air-conditioners, mechanical ventilation/exhaust systems or refrigeration motors etc), a report must be obtained from a suitably qualified and experienced consultant in acoustics, prior to an occupation/use, which demonstrates and certifies that noise and vibration from the development satisfies the relevant provisions of the Protection of the Environment Operations Act 1997, NSW EPA/DECC Noise Control Manual & Industrial Noise Policy, Council’s conditions of consent (including any relevant approved acoustic report and recommendations), to the satisfaction of Council.  The assessment and report must include all relevant fixed and operational noise sources and a copy of the report must be provided to Council.

 

Waste Management

34.     Adequate provisions are to be made within the premises for the storage, collection and disposal of trade/commercial waste and recyclable materials, to the satisfaction of Council.

 

Trade/commercial waste materials must not be disposed in or through Council’s domestic garbage service.  All trade/commercial waste materials must be collected by Council’s Trade Waste Service or a waste contractor authorised by the Waste Service of New South Wales and details of the proposed waste collection and disposal service are to be submitted to Council prior to occupation/use.

 

The operator of the business must also arrange for the recycling of appropriate materials and make the necessary arrangements with an authorised waste services contractor accordingly.

 

Public Utilities

35.     A Public Utility Impact Assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

36.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

Construction Traffic Management

37.     A detailed Construction Site Traffic Management Plan must be submitted to and approved by Council, prior to commencement of any site work.

 

The Construction Site Traffic Management Plan must be prepared by a suitably qualified person and must include the following details, to the satisfaction of Council:

 

·       A description of the demolition, excavation and construction works

·       A site plan/s showing the site, roads, footpaths, site access points and vehicular movements

·       Any proposed road and/or footpath closures

·       Proposed site access locations for personnel, deliveries and materials

·       Size, type and estimated number of vehicular movements (including removal of excavated materials, delivery of materials and concrete to the site)

·       Provision for loading and unloading of goods and materials

·       Impacts of the work and vehicular movements on the road network, traffic and pedestrians

·       Proposed hours of construction related activities and vehicular movements to and from the site

·       Current/proposed approvals from other Agencies and Authorities (including NSW Roads & Traffic Authority, Police and State Transit Authority)

·       Any activities proposed to be located or impact upon Council’s road, footways or any public place

·       Measures to maintain public safety and convenience

 

38.     A Traffic Control Plan must be submitted to and approved by Council and relevant Authorities, prior to carrying out any work which results in the closure or partial closure of a State or Regional Road , as identified by the NSW Roads & Traffic Authority.

 

Council’s Infrastructure, Vehicular Crossings, street verge

39.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

40.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)     All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)     Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing occupation/use, together with payment of the relevant fees.

 

c)     If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)     The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

41.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Climate Change Noise Control Guidelines.

 

42.     The use of the premises and the operation of plant and equipment shall not give rise to the transmission of a vibration nuisance or damage to other premises.

 

43.     A report/correspondence prepared by a suitably qualified and experienced consultant in acoustics shall be submitted to Council prior to occupation/use of the development, which demonstrates that noise and vibration emissions from the development satisfies the relevant provisions of the Protection of the Environment Operations Act 1997, Environmental Protection Authority Noise Control Manual & Industrial Noise Policy, relevant conditions of consent (including any relevant approved acoustic report and recommendations).  The assessment and report must include all relevant fixed and operational noise sources.

 

The following conditions are applied to satisfy the relevant pollution control criteria and to maintain reasonable levels of health, safety and amenity to the locality:

44.     The use and operation of the premises shall not give rise to an environmental health or public nuisance.

 

45.     There are to be no emissions or discharges from the premises which give rise to a public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

46.     The individual rooms, common areas, shared facilities and yard are to be maintained in a clean and tidy state and individual’s rubbish is to be placed in the appropriate receptacles.

 

47.     Adequate provisions are to be made within the premises for the storage, collection and disposal of waste and recyclable materials, to the satisfaction of Council.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1      The assessment of this development application does not include an assessment of the proposed building work under the Building Code of Australia (BCA).

 

All new building work must comply with the BCA and relevant Australian Standards and details of compliance must be provided in the construction details.

 

A2      In existing buildings, the levels of fire and occupant safety should be upgraded where necessary and details should be incorporated in the construction plans/documentation to the satisfaction of the appointed certifier.

 

Where the levels of accessibility to existing buildings do not meet current standards, if practicable, the level of accessibility should also be upgraded in conjunction with the proposed development (e.g. via the installation of a 1:8 access ramp within the building) and details included in the construction plans/documentation.

 

A3      A separate development application or a complying development certificate (as applicable) must be obtained if the premises is to be used for any of the purposes detailed below:

 

·            All food businesses (including premises used for the sale, storage, preparation and distribution of food and drinks)

·            Hairdressing salons, Beauty salons, Businesses involving Skin Penetration & Piercing, Massage businesses

·            Licensed premises, places of public entertainment and hotels

·            Places of Shared Accommodation (including Boarding / Lodging Houses, Bed & Breakfast businesses, Backpackers, Residential Hotels or the like

·            Cooling Towers or Warm Water Systems

·            Business providing any form of sexual service (i.e. brothel or the like).

 

Business premises which are used for these purposes must comply with relevant public health and safety legislation and requirements and they must be registered with Council prior to an occupation/use. The relevant registration and inspection fee is also required to be paid to Council in accordance with Council’s adopted Pricing Policy.

 

A4      Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

A5      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

A6      Further information and details on Council's requirements for trees on development sites can be obtained from the recently adopted Tree Technical Manual, which can be downloaded from Council’s website at the following link, http://www.randwick.nsw.gov.au - Looking after our environment – Trees – Tree Management Technical Manual; which aims to achieve consistency of approach and compliance with appropriate standards and best practice guidelines.

 

A7      The standard conditions may be modified or supplemented by additional non-standard site specific conditions to address any specific food safety, environmental & amenity considerations.

 

A8      Waste Services may impose site specific waste management conditions and applications for major commercial premises or sites with internal or external constraints should be referred to Waste Services for comment.

 

A9      Appropriate operating hours to be specified by Development Assessment officer having regard to standard condition No’s. 131 to 133, relevant Council Policies/Plans, potential community impacts and any relevant complaint history.

 

MOTION: (Andrews/Belleli) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D148/11   Development Application Report - 35 Midway Drive, Maroubra (DA/806/2010)

PL169/11

RESOLUTION: (Bowen/Mayor, Cr Nash) that the application be deferred for mediation.

 

MOTION: (Andrews/Seng)

 

A.     That Council does not support the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F(1) of Randwick Local Environmental Plan 1998 (Consolidation), relating to maximum floor space ratio, on the grounds that the proposed development does not comply with the objectives of the clause, and will adversely affect the amenity of the locality.

 

B.     That Council, as the consent authority, refuses development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/806/2010 for demolition of the existing structures and construction of two storey multi-unit building containing 4 town houses with basement car parking for 7 vehicles, fencing and associated site works at No. 35 Midway Drive, Maroubra, for the following reasons:

 

1.     The FSR does not comply with Clause 420(1) of the Randwick LEP.

 

2.     The proposal will result in a loss of natural sunlight to the adjoining property.

 

3.     Non compliance with the side setback requirements

 

4.     The proposal is against the public interest

 

5.     The proposal will cause traffic safety issues for the adjoining properties.

 

6.     The proposal will have an adverse impact on the amenity of adjoining dwellings and the character of the locality.

 

AMENDMENT: (Bowen/Mayor, Cr Nash) CARRIED AND BECAME THE MOTION. MOTION CARRIED – SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Matthews

Councillor Belleli

Councillor Smith

Councillor Bowen

Councillor Tracey

Councillor Hughes

Councillor White

Councillor Matson

 

Councillor Nash

 

Councillor Notley-Smith

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Stevenson

 

Councillor Woodsmith

 

Total (11)

Total (4)

 

 

 

D149/11   Development Application Report - 3 Bay Parade, Malabar (DA/231/2011)

PL170/11

RESOLUTION: (Belleli/White)

 

A.     The decision made on 15 August, 2011 to determine DA No. 231/2011 by granting consent to the application is rescinded.

 

B.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20 F of Randwick Local Environmental Plan 1998, relating to Floor Space Ratio respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

C.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to DA/231/2011 for the demolition of the existing buildings and erection of a new two storey attached dual occupancy at 3 Bay Parade, Malabar subject to the following conditions:

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received

Job RL 1710 Sheet 1 Revision B

Residential Logistics

4 July 2011

15 July 2011

Job RL 1717 Sheet 2 Revision B

Residential Logistics

4 July 2011

15 July 2011

 

BASIX Certificate

No.

Dated

Received

 

356052S

2 Feb 2011

1 April 2011

 

356073S

2 Feb 2011

1 April 2011

 

Amendment of Plans & Documentation

2.       The approved plans and documents must be amended in accordance with the following requirements:

 

To reduce the prominence of the fin wall between the two sun decks at the front of the dwellings the maximum height of the wall is to be reduced to a maximum height of 1800mm above the floor level of the decks. The plans accompanying the Construction Certificate application are to be amended accordingly.

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

3.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

4.       The colours, materials and finishes of the external surfaces to the building are to be consistent with the Schedule of external finishes dated 30th March 2011 and received with the application on the 1st April 2011.

 

Section 94A Development Contributions

5.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $ 642 443, the following applicable monetary levy must be paid to Council: $ 6 424.45.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate [or subdivision certificate] being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

BASIX Requirements

6.       In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Compliance with the Building Code of Australia

7.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Long Service Levy Payments

8.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Smoke Alarms

9.       Smoke alarms are required to be installed in each Class 1 building or dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

10.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

Home Building Act 1989

11.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing.

 

Construction Noise & Vibration Management Plan

12.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

Temporary Site Fencing

13.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres). 

 

Temporary site fences are to have a height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings, amenities or articles upon any part of the footpath, nature strip or public place at any time, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management

14.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·           location and construction of protective fencing / hoardings to the perimeter of the site;

·           location of site storage areas/sheds/equipment;

·           location of building materials for construction;

·           provisions for public safety;

·           dust control measures;

·           site access location and construction

·           details of methods of disposal of demolition materials;

·           protective measures for tree preservation;

·           provisions for temporary sanitary facilities;

·           location and size of waste containers/bulk bins;

·           details of proposed sediment and erosion control measures;

·           provisions for temporary stormwater drainage;

·           construction noise and vibration management;

·           construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

15.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

 

·           The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·           Details of hazardous materials (including asbestos)

·           Method/s of demolition (including removal of any asbestos)

·           Measures and processes to be implemented to ensure the health & safety of workers and community

·           Measures to be implemented to minimise any airborne dust and asbestos

·           Methods and location of disposal of any hazardous materials

·           Other relevant details, measures and requirements to be implemented

·           Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Demolition & Construction Waste

16.     A Demolition and Construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

Sydney Water

17.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

18.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Demolition Work Requirements

19.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment, Climate Change & Water and Randwick City Council policies, including:

 

·           Occupational Health & Safety Act 2000 & Regulations

·           WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·           WorkCover NSW Guidelines and Codes of Practice

·           Australian Standard 2601 (2001) – Demolition of Structures

·           The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·           Relevant DECCW/EPA Guidelines

·           Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

20.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·           Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

·           Randwick City Council’s Asbestos Policy

·           A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

·           On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

·           Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

·           A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Inspections During Construction

21.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Site Signage

22.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·           name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·           name, address and telephone number of the Principal Certifying Authority,

·           a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

23.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Sediment & Erosion Control

24.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details must be shown in a Sediment and Erosion Control Plan, including; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

A copy of the Sediment and Erosion Control Plan must be provided to the Principal Certifying Authority and a copy must be maintained on site and be made available to Council officers upon request.

 

Public Safety & Site Management

25.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

b)     Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

c)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

d)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

e)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

f)     Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Excavations, Back-filling & Retaining Walls

26.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

1.      Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

2.      Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

Support of Adjoining Land

27.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

 

b)     The condition referred to in subclause a) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

28.     Prior to undertaking any demolition, excavation or building work in the following circumstances, a report must be obtained from a professional engineer which details the methods of support for the dwelling or associated structure on the adjoining land, to the satisfaction of the Principal Certifying Authority:

 

·           when undertaking excavation or building work within the zone of influence of the footings of a dwelling or associated structure that is located on the adjoining land;

·           when undertaking demolition work to a wall of a dwelling that is built to a common or shared boundary (eg. semi-detached or terrace dwelling);

·           when constructing a wall to a dwelling or associated structure that is located within 900mm of a dwelling located on the adjoining land.

 

The demolition, excavation and building work and the provision of support to the dwelling or associated structure on the adjoining land, must also be carried out in accordance with the abovementioned report, to the satisfaction of the Principal Certifying Authority.

 

Survey Requirements

29.     A Registered Surveyor’s check survey certificate or other suitable documentation must be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority (PCA):

 

·           prior to construction (pouring of concrete) of the footings or first completed floor slab,

·           upon completion of the building, prior to issuing an occupation certificate,

·           as otherwise may be required by the PCA.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the Principal Certifying Authority for the development.  

 

Building Encroachments

30.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Finished Ground Levels

31.     The finished ground levels external to the building must be consistent with the development consent and are not to be raised, other than for the provision of approved paving or the like on the ground.

 

Site Amenities

32.     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Occupation Certificate Requirements

33.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

BASIX Requirements

34.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

35.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·           The window having a minimum sill height of 1.5m above the internal floor level,

·           Providing a window locking device at least 1.5m above the internal floor level,

·           Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·           Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·           Other appropriate effective safety measures or barrier.

 

Street Numbering

36.     Street numbering must be provided to the front of the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

External Lighting

37.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

Protection of the Environment Operations Act 1997 – Air Conditioners

38.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Air Conditioning & Equipment

39.     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

Protection of the Environment Operations Act 1997 – Rainwater Tanks

40.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Rainwater Tank Requirements

41.     The installation of rainwater tanks shall comply with the following noise control requirements:

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tanks are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with rainwater tanks are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

·       before 8.00am or after 8.00pm on weekends or public holiday; or

·       before 7.00am or after 8.00pm on weekdays.

 

Waste Management

42.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

43.     The following damage / civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $1000.00   -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

 

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

44.     Prior to the issuing of an Occupation Certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)  Construct concrete vehicular crossings and laybacsk at kerb opposite the vehicular entrances to the site, as required by Council.

 

b)  Remove any redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

 

45.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

46.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)    All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)    Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)    If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)    The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

47.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

48.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $947.00 calculated at $44.00 (inclusive of GST) per metre of site frontage. This amount is to be paid to Council prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

49.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

50.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

51.     A Section 73 Compliance Certificate under the Sydney water Act 1994 must be obtained from Sydney Water Corporation.

 

Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the website www.sydneywater.com.au then refer to “Water Servicing Coordinator” under Developing Your Land” or telephone 13 20 92 for assistance.

 

Following application a “Notice of Requirements” will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.

 

The Notice must be issued to the Principal Certifying Authority prior to the construction certificate being issued.

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to occupation of the development.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

52.     Generally all site stormwater shall be piped to a sediment/silt arrester pit that drains to Council's kerb and gutter.

 

53.     The location and details of the proposed internal stormwater pipeline and silt arrestor pit/s shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development.

 

Notes:

The sediment/silt arrestor pit shall be constructed:-

 

i.        within the site at or near the street boundary.

ii.       with a child proof and corrosion resistant fastening system (e.g. spring loaded jay-bolt).

iii.       with a minimum of 4 x 90 mm diameter weep holes (preferably located in the walls of the pit at the floor level) and with a suitable geotextile material with a high filtration rating located around the weep holes.

iv.      with the pit floor being a minimum 300mm below the invert level of the outlet pipelines.

v.       with a galvanised heavy duty screen (Lysaght RH3030 Maximesh or similar) located over the outlet pipes draining to the infiltration pit and the kerb. (Similar to a Mascot GRC stormwater discharge control pit, product code DS3SDC).

 

The following conditions are applied to provide adequate provisions for waste management:

54.     Prior to the credited certifier issuing an occupation certificate for the proposed development the applicant is to contact Council’s Manager of Waste in regards to meeting Council’s requirements for waste services to the dual occupancy.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

55.     Prior to the commencement of site works, the Landscape Plan by Conzept Landscape Architects, dwg no. LPDA 11 – 9964125/1B, issue B, dated 08.07.2011, must be amended to show the following changes:

 

a)   Deletion of the Tuckeroo proposed in the northwest corner of the site, and Corymbia ‘Summer Red’ halfway across the width of the front boundary, so as to minimise view loss from adjoining properties to the west.

 

56.     The PCA must ensure that landscaping at the site is installed in accordance with this amended plan, prior to issuing a Final (or any other type of Interim) Occupation Certificate, with the owner/s to ensure it is maintained in a healthy and vigorous condition until maturity.

 

57.     The nature-strip upon Council's footway shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

Tree Removals

58.     Approval is granted for removal of the following trees, subject to full implementation of the approved landscape plan:

 

a)   The Melaleuca quinquinervia (Broad Leafed Paperbark) in the front setback, towards the northeast corner of the site, in order to accommodate the proposed driveway as shown;

 

b)   The Agonis flexuosa (Willow Myrtle) to the southwest of the tree described above, in the side setback between the existing dwelling and boundary, both to accommodate the proposed works as shown as well as due to its poor condition from having all lower growing limbs pruned off for clearance reasons.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

·              The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

·              Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

·              This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

·              A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

·              Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

·              Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

●        The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Matthews/Andrews) that the application be deferred to enable amended plans to be submitted that provide for a flat, marine grade, colour bond roof for the proposed development. LOST.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Matthews

Councillor Andrews

 

Councillor Belleli

 

Councillor Bowen

 

Councillor Hughes

 

Councillor Matson

 

Councillor Nash

 

Councillor Notley-Smith

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor Tracey

 

Councillor White

 

Councillor Woodsmith

Total (1)

Total (14)

 

MOTION: (Belleli/White) CARRIED – SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Matthews

Councillor Belleli

 

Councillor Bowen

 

Councillor Hughes

 

Councillor Matson

 

Councillor Nash

 

Councillor Notley-Smith

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor Tracey

 

Councillor White

 

Councillor Woodsmith

 

Total (14)

Total (1)

 

 

 

D150/11   Development Application Report - 164-168 Marine Parade, Maroubra (DA/279/2011) 

PL171/11

RESOLUTION: (Andrews/Belleli) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20F(2), 20E(2) and 20G(4) of Randwick Local Environmental Plan 1998 Consolidation), relating to floor space ratio, landscaped area and maximum external wall height, respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/279/2011 for alterations and additions to the existing multi unit building at lower ground, ground, first and second floor levels, relocation of swimming pool, alterations to landscaping, widening driveway and strata subdivision at No. 164-168 Marine Parade, Maroubra, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received

A – 01 and A-05 through to A – 11

Alec Pappas Architects Pty Ltd

March 2011

20 April 2011

 

BASIX Certificate

No.

Dated

Received

Unit

A1105001

18 April 2011

20 April 2011

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

2.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

3.       The colours, materials and finishes of the external surfaces to the building are to be implemented substantially in accordance with the Schedule of External Materials and Colours numbered EF-01, dated March 2011 and received by Council on 20 April 2011 and be compatible with the surrounding development to maintain the integrity and amenity of the building, streetscape and surrounding foreshore scenic protection area.

 

Section 94A Development Contributions

4.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $486,200, the following applicable monetary levy must be paid to Council: $4862.00.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate [or subdivision certificate] being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

BASIX Requirements

5.       In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Compliance with the Building Code of Australia

6.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Long Service Levy Payments

7.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

8.       The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

9.       All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

10.     The Council’s Development Engineer has inspected the above site and have determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

11.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

12.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $135.00 (inclusive of GST). This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration ofor service authority assets:

13.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

14.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

The following condition is applied to provide adequate provisions for drainage and associated infrastructure:

15.     Stormwater runoff from the redeveloped portion of the site shall be discharged to the kerb and gutter along the site frontage by gravity (without the use of a charged system).

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

16.     That part of the nature-strip upon Council's footway which is damaged during the construction of the proposed works shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu turf or similar. Such works shall be completed at the applicant’s expense prior to the issue of a final Occupation Certificate.

 

17.     The PCA must ensure that landscaping at this site is installed substantially in accordance with the Landscape Planting Plan by Michael Siu Landscape Architects, dwg L01/1-R16112, dated 5 April 2011, prior to issuing a Final (or any other type of Interim) Occupation Certificate/s, with the owner/s to ensure it is maintained in a healthy and vigorous state until maturity.

 

The following conditions are applied to satisfy the provisions of Council’s environmental plans, policies and codes for subdivision works:

18.     All floors, external walls and ceilings depicted in the proposed strata plan must correspond to those of the building as constructed.

 

19.     All floors, external walls and ceilings depicted in the proposed strata plan must correspond to those depicted in the approved building plans for the site.

 

20.     A Section 73 Compliance Certificate under the Sydney Water Act 1994 must be obtained from Sydney Water Corporation.

 

Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the website www.sydneywater.com.au then refer to “Water Servicing Coordinator” under Developing Your Land” or telephone 13 20 92 for assistance.

 

Following application a “Notice of Requirements” will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to release of the plan of subdivision.

 

21.     The applicant shall provide Council with a copy of the survey ‘Plan of Redefinition’ of the property prior to receiving subdivision approval.

 

22.     The applicant shall create suitable rights of carriageway, easements for services, support and stormwater lines, as required. The applicant shall be advised that the minimum easement width for any stormwater line is 0.9 metres.

 

23.     A formal subdivision application is required to be submitted to and approved by the Council or an accredited certifier and all conditions of this development consent are required to be satisfied prior to the release of the subdivision plans.

 

24.     Details of critical stage inspections carried out by the principal certifying authority, together with any other certification relied upon, must be provided to Council or the accredited certifier prior to the issuing of a subdivision certificate.

 

Smoke Alarms

25.     Smoke alarms are required to be installed in each Class 1 building or dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

26.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

27.     All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA), in accordance with Clause 98 of the Environmental Planning and Assessment Regulation 2000.

 

28.     Prior to the commencement of any building or fire safety works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment

 

29.     Prior to the commencement of any building or fire safety works, the person having the benefit of the development consent must:

 

i)      appoint a Principal Certifying Authority for the building work, and

 

ii)     appoint a principal contractor for the building workand notify the Principal Certifying Authority and Council accordingly in writing, and

                                        

iii)    notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

 

iv)    give at least two days notice to the Council, in writing, of the persons intention to commence building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

30.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected in accordance with section 81A (2) (b1) (ii) of the Environmental Planning & Assessment Regulation 2000 and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Documentary evidence of the building inspections carried out and details of compliance with Council’s consent is to be maintained by the Principal Certifying Authority.  Details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council with the occupation certificate.

 

The principal contractor or owner-builder (as applicable) must ensure that the required critical stage and other inspections, as specified in the Principal Certifying Authority’s “Notice of Critical Stage Inspections”, are carried out to the satisfaction of the Principal Certifying Authority and at least 48 hours notice (excluding weekends and public holidays) is to be given to the Principal Certifying Authority, to carry out the required inspection, before carrying out any further works.

 

31.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·       name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours,

·       name, address and telephone number of the Principal Certifying Authority,

·       a statement stating that “unauthorised entry to the work site is prohibited”.

 

32.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

33.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Construction site management

34.     Demolition work and the removal, storage, handling and disposal of building materials must be carried out in accordance with the following requirements (as applicable):

 

·           Australian Standard 2601 (2001) – Demolition of Structures

·           Occupational Health and Safety Act 2000

·           Occupational Health and Safety (Hazardous Substances) Regulation 2001

·           Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·           Randwick City Council Asbestos Policy (adopted 13 September 2005)

·           WorkCover NSW Codes of Practice and Guidelines

·           The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

 

35.     In accordance with Council’s Asbestos Policy, the following requirements are to be satisfied if any materials containing asbestos are present in the building:

 

a)     Compliance with Randwick City Council’s Asbestos Policy (adopted 13 September 2005).

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

b)     A Demolition Work Plan must be developed and implemented in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

c)     A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation). Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

d)     Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 1996.

 

e)     Asbestos waste must be disposed of at an approved waste disposal depot (refer to the DEC or Waste Service NSW for details of sites). Copies of all receipts detailing method and location of disposal must be maintained on site and be provided to Council officers upon request, as evidence of correct disposal.

 

f)      On demolition sites involving the removal of asbestos, a  professionally manufactured sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS” and include details of the licensed contractor. The sign shall measure not less than 400mm x 300mm and the sign is to be installed prior to demolition work commencing and is to remain in place until such time as all asbestos has been safely removed from the site.

 

g)     A certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council upon completion of the works (prior to an Occupation Certificate being issued), which confirms that the relevant requirements contained in the Asbestos Survey and conditions of consent, in relation to the safe removal and disposal of asbestos, have been satisfied.

 

36.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

37.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

Additional requirements for all development (except for single residential dwellings)

·   Saturdays and Sundays where the preceding Friday and/or the following Monday is a public holiday - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

38.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant provisions of the Protection of the Environment Operations Act 1997 must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery and pile drivers (or the like) must be minimised by using appropriate plant and equipment and silencers and a construction noise and vibration minimisation strategy, prepared by a suitably qualified consultant is to be implemented during the works, to the satisfaction of the Principal Certifying Authority.

 

39.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works.

 

a)     The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

b)     A Road Opening Permit must be obtained from the Council and other relevant Authorities prior to excavating or opening-up the road or footway for services or the like.

 

c)     Building materials, sand, soil, waste materials or construction equipment must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

d)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council. Applications to place a waste container in a public place can be made to Council’s Health, Building & Regulatory Services department.

 

e)     During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing. Sediment and erosion control measures must be implemented prior to the commencement of any site works and be maintained throughout construction. 

 

f)      Public access to demolition/building works, materials and equipment on the site is to be restricted and a temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

g)     Temporary fences or hoardings or the like are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

h)     The public safety provisions and temporary fences or hoardings must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

i)      If it is proposed to locate any hoardings, site fencing or amenities upon any part of the footpath, nature strip or any public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

j)      Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

k)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

l)      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities upon any part of the footpath, road, nature strip or in any public place:

 

·       Install or erect any site fencing, hoardings or site structures

·       Operate a crane or hoist goods or materials over a footpath or road

·       Placement of a waste skip or any other container or article.

 

40.     Demolition work and the removal, storage, handling and disposal of building materials must be carried out in accordance with the following requirements (as applicable):

 

·           Australian Standard 2601 (2001) – Demolition of Structures

·           Occupational Health and Safety Act 2000

·           Occupational Health and Safety (Hazardous Substances) Regulation 2001

·           Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·           Randwick City Council Asbestos Policy (adopted 13 September 2005)

·           WorkCover NSW Codes of Practice and Guidelines

·           The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

 

41.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works.

 

a)     The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

b)     A Road Opening Permit must be obtained from the Council and other relevant Authorities prior to excavating or opening-up the road or footway for services or the like.

 

c)     Building materials, sand, soil, waste materials or construction equipment must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

d)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council. Applications to place a waste container in a public place can be made to Council’s Health, Building & Regulatory Services department.

 

e)     During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing. Sediment and erosion control measures must be implemented prior to the commencement of any site works and be maintained throughout construction. 

 

f)     Public access to demolition/building works, materials and equipment on the site is to be restricted and a temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

g)     Temporary fences or hoardings or the like are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

h)     The public safety provisions and temporary fences or hoardings must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

i)      If it is proposed to locate any hoardings, site fencing or amenities upon any part of the footpath, nature strip or any public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

j)     Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

k)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

l)      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities upon any part of the footpath, road, nature strip or in any public place:

 

·       Install or erect any site fencing, hoardings or site structures

·       Operate a crane or hoist goods or materials over a footpath or road

·       Placement of a waste skip or any other container or article.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

42.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

43.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon and must also be provided to Council with the occupation certificate.

 

44.     A Fire Safety Certificate must be submitted to Council prior to the issuing of an Occupation Certificate, in accordance with the requirements of the Environmental Planning and Assessment Regulation 2000.

 

A single and complete Fire Safety Certificate must be provided which includes details of all of the fire safety measures contained in the building and as detailed in the fire safety schedule attached to the Construction Certificate.

 

Prior to issuing any Occupation Certificate the Principal Certifying Authority must be satisfied that all of the relevant fire safety measures have been included and are sufficiently detailed within the Fire safety Certificate.

 

A copy of the fire safety certificate must be displayed in the building near the entrance and a copy must be forwarded to the NSW Fire Brigades.

 

45.     A Certificate prepared by a professional engineer shall be submitted to the certifying authority prior to issuing a construction certificate  which certifies that the structural adequacy of the existing building to support an additional storey.

 

46.     A Certificate prepared by a professional engineer shall be submitted to the certifying authority prior to issuing an occupation certificate or strata subdivision certificate, which certifies that the structural adequacy of the building, including balustrades to external balconies and the trafficable roof.

 

BASIX Requirements

47.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Swimming Pool Safety

48.     Swimming pools are to be provided with childproof fences and self-locking gates, in accordance with the Swimming Pools Act 1992 and regulations.

 

The swimming pool is to be surrounded by a fence having a minimum height of 1.2m, that separates the pool from any residential building situated on the premises and from any place (whether public or private) adjoining the premises; and that is designed, constructed and installed in accordance with AS 1926.1 - 2007.

 

Gates to pool area shall be a maximum width of 1 metre, and be self-closing and latching; the gate is required to open outwards from the pool area and prevent a small child opening the gate or door when the gate or door is closed.

 

A ‘warning notice’ must be erected in a prominent position in the immediate vicinity of the swimming pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

Notification of Swimming Pools & Spa Pools

49.     Written notification must be provided to Council advising of the installation and completion of the Swimming Pool (or Spa Pool), to satisfy the requirements of the Swimming Pools Act 1992.

 

Council’s “Notification & Registration of a Swimming Pool” form must be completed and forwarded to Council prior to any Occupation Certificate being issued for the pool.

 

Occupant Safety

50.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·                 The window having a minimum sill height of 1.5m above the internal floor level,

·                 Providing a window locking device at least 1.5m above the internal floor level,

·                 Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·                 Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·                 Other appropriate effective safety measures or barrier.

 

Street Numbering

51.     Street numbering must be provided to the front of the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council.

 

            Fire safety

52.     The existing levels of fire and safety within the building are to be upgraded in accordance with the following requirements and the fire safety certificate provisions of Part 9 of the Environmental Planning and Assessment Regulation 2000 must be complied with, prior to issuing an occupation certificate or strata subdivision certificate:

 

a)     The following works are to be undertaken in accordance with the specified provisions of the Building Code of Australia (BCA), as applicable:

 

1)     Provide a -/60/30 fire door set, with a self-closing device, to the front entry of each sole-occupancy unit in accordance with clause C3.11 of the Building Code of Australia (BCA).

2)     Install a smoke detection and alarm system throughout the building in accordance with specification E2.2a of the BCA,

3)     Provide emergency lighting system to the common stairway and corridor/s, in accordance with clause E4.2 & E4.4 of the BCA,

4)     Provide portable fire extinguisher within the building adjacent to the electrical switchboard, in accordance with clause E1.6 of the BCA,

5)     Provide a non-combustible enclosure (ie a metal cabinet) with seals to prevent the passage of smoke to electricity meters and switchboard located in corridors, exits and within stairways etc,

6)     Balustrades and handrails to stairway/s, balconies, decks or the like are to be designed and constructed to satisfy clause D2.16 & D2.17 of the BCA,

7)     The main entry/exit door is to be provided with a ‘hold-open’ device, or swing in the direction of egress, to facilitate people seeking egress from  the building in the event of an emergency,

8)     Prior to commencing  the abovementioned works, a Construction Certificate must be obtained from Council’s Building Certification Services or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

b)     All new building works (including the proposed alterations/additions) must satisfy the relevant performance or deemed-to-satisfy provisions of the Building Code of Australia.

 

c)     All of the fire safety upgrading works and new building work must be detailed in the Construction Certificate for the development.

 

53.     The fire safety upgrading works must be carried out prior to issuing of an Occupation Certificate for the development and written confirmation must be provided to Council which confirms that all of the upgrading works have been carried out in accordance with the conditions of consent.

 

Include additional conditions, as applicable to address the individual design features of buildings, including:

 

§ Buildings 3 or more storeys

§ Buildings having more than 2 SOU’s on the upper floor

§ Timber floors

§ Timber stairways

§ Sound transmission

§ Structural adequacy concerns

§ Glazing concerns

§ Weatherproofing

 

Refer to the standard conditions for fire safety upgrading works (contained in standard local approval conditions BDR-L1 - Local Approval Conditions - May 2006) for further details.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

External Lighting

54.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

Protection of the Environment Operations Act 1997Swimming Pools & Spa Pools

55.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

      In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

Pool Plant & Equipment

56.     The pool plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 8.00pm on any Sunday or public holiday; or

·       before 7.00am or after 8.00pm on any other day.

 

Protection of the Environment Operations Act 1997 – Air Conditioners

57.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

      In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Air Conditioning & Equipment

58.     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

Rainwater Tank Requirements

59.     The installation of rainwater tanks shall comply with the following noise control requirements:

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tanks are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with rainwater tanks are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

·       before 8.00am or after 8.00pm on weekends or public holiday; or

·       before 7.00am or after 8.00pm on weekdays.

 

Waste Management

60.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

·              The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

·              This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA), Disability (Access to Premises – Buildings) Standards 2010 and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards.  You are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

·              Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

·              This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

·              A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

·              Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

·              Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

·              The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Andrews/Belleli) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D151/11   Development Application Report - 14 Govett Street, Randwick (DA/251/2011) 

PL172/11

RESOLUTION: (Andrews/Belleli) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/251/2011 for the demolition of existing structures and construction of a two storey dwelling, three car garage with first floor bedroom at rear, swimming pool, awning over part of pool and associated works at No. 14 Govett Street, Randwick, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received by Council 

DA.02, Rev b

Matthew Stubbs Partners

July 2011

2 August 2011

DA.03, Rev b

DA.04, Rev b

DA.05, Rev b

DA.06, Rev b

DA.07, Rev b

BASIX Certificate

No.

Dated

Received by Council 

Single Dwelling

378664S

20 October 2011

20 October 2011

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

2.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

3.       A brief Digitally based archival recording of the existing property (internally and externally) shall be prepared and submitted to and approved by Council’s Director City Planning, in accordance with Section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development. This recording shall be in accordance with the NSW Heritage Office 2006 Guidelines for Photographic Recording of Heritage Items using Film or Digital Capture. Two copies of the endorsed archival recording shall be presented to Council, one of which shall be placed in the Local History Collection of Randwick City Library.

 

External Colours, Materials & Finishes

4.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Manager Development Assessments prior to issuing a construction certificate for the development.

 

Section 94A Development Contributions

5.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $2,039,565, the following applicable monetary levy must be paid to Council: $20395.65.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate [or subdivision certificate] being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Long Service Levy Payments

6.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

Compliance with the Building Code of Australia

7.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Smoke Alarms

8.       Smoke alarms are required to be installed in accordance with the relevant provisions of the Building Code of Australia (volume 2) and smoke alarms must comply with AS3786.  Smoke alarms must be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

BASIX Requirements

9.       In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Security Deposit

10.     The following damage / civil works security deposit requirement must be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; and as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

·           $1500.00    -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash, cheque or credit card payment and is refundable upon a satisfactory inspection by Council upon the completion of the civil works which confirms that there has been no damage to Council's infrastructure.

 

The owner/builder is also requested to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

To obtain a refund of relevant deposits, a Security Deposit Refund Form is to be forwarded to Council’s Director of City Services upon issuing of an occupation certificate or completion of the civil works.

 

Design Alignment levels

11.     The design alignment level (the finished level of concrete, paving or the like) at the property boundary for driveways, access ramps and pathways or the like, shall be:

 

           Govett Lane Frontage

·        60mm above the edge of the bitumen at all points opposite, along the full site frontage.

 

              Govett Street Frontage

·     Match back of the existing footpath, along the full site frontage.

       

The design alignment levels at the property boundary as issued by Council and their relationship to the roadway must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

      Any enquiries regarding this matter should be directed to Council’s Development Engineer on 9399 0881.

12.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $841 calculated at $46.00 (inclusive of GST) per metre of site frontage. This amount is to be paid prior to a construction certificate being issued for the development.

 

Garage Setback

13.     The garage shall be setback a minimum of 0.5m from Govett Lane to improve vehicle access and compliance with Australian Standard 2890.1. Plans submitted for the construction certificate shall demonstrate compliance with this requirement.

 

Driveway Design

14.     The gradient of the driveway and garage must be designed and constructed in accordance with AS 2890.1 (2004) – Off Street Car Parking and the levels of the driveway must match the alignment levels at the property boundary (as specified by Council). Details of compliance are to be included in the construction certificate.

 

Sydney Water

15.     Prior to the issuing of a construction certificate the approved plans must be submitted to a Sydney Water Quick Check agent or Customer Centre to determine whether the development will affect any Sydney Water asset’s sewer and water mains, stormwater drains and/or easement, and if further requirements need to be met. Plans will be appropriately stamped.

 

         Please refer to the web site www.sydneywater.com.au for Quick Check agent details and Guidelines for Building Over/Adjacent to Sydney Water Assets.

 

Stormwater Drainage

16.     Prior to the issue of a construction certificate, detailed drainage plans with levels reduced to Australian Height Datum (AHD), shall be prepared by a suitably qualified Hydraulic Engineer and be submitted to and approved by the certifying authority.  A copy of the plans shall be forwarded to Council, if Council is not the certifying authority.

 

The drainage plans must demonstrate compliance with the Building Code of Australia, Australian Standard AS3500.3:2003 (Plumbing and Drainage - Stormwater Drainage) and the relevant conditions of this development approval.

 

17.     Generally all site stormwater shall be piped to a sediment/silt arrester pit that drains to an infiltration area with a minimum 5 m2 base area. An overflow pipe shall be provided from the silt arrestor pit to drain to Council's kerb and gutter.

 

NOTES:

a.     The sediment/silt arrestor pit shall be constructed:-

(i)     within the site at or near the street boundary.

(ii)    with a child proof and corrosion resistant fastening system (e.g. spring loaded jay-bolt).

(iii)   with a minimum of 4 x 90 mm diameter weep holes (preferably located in the walls of the pit at the floor level) and with a suitable geotextile material with a high filtration rating located around the weep holes.

(iv)   with the pit floor being a minimum 300mm below the invert level of the outlet pipelines.

(v)    with a galvanised heavy duty screen (Lysaght RH3030 Maximesh or similar) located over the outlet pipes draining to the infiltration pit and the kerb. (Similar to a Mascot GRC stormwater discharge control pit, product code DS3SDC).

 

b.     The infiltration/rubble pit shall:-

i.      have a minimum 300 mm of soil cover (600 mm where the pit is located under a garden/landscaping area).

ii.     be located a minimum of 3.0 metres from the dwelling or other structure (closer if a structural engineer certifies that the infiltration area will not adversely affect the structure) and 2.1 metres from the adjacent side or rear boundaries.

iii.     be constructed with a minimum 200 mm thick layer of 20 mm basalt/blue metal (or similar) that is wrapped in a suitable geotextile material covering with a high filtration rating (Geofabrics Bidim "A" range of filtration fabrics or equivalent). A suitable means of dispersing the stormwater over the area of infiltration is to be constructed. Other equivalent methods of infiltration may be adopted.

iv.    have a minimum base area of  5.0 square metres (m2).

NOTE: The outlet from the silt arrestor pit to the infiltration area shall be located at least 50 mm below the outlet from the silt arrestor pit to the kerb and gutter.

 

c.     The requirement for an infiltration/rubble pit will not be enforced should the underground soil conditions preclude the construction of the infiltration pit (eg rock is located within 300 mm of the base of the infiltration area). If the infiltration/rubble pit is not constructed then all site stormwater shall be discharged to the kerb and gutter via a sediment/silt arrestor pit (as detailed in note a. above).

 

 All works shall be to the satisfaction of the certifying authority.

 

d.     The overflow pipe/s from the rainwater tank/s shall be directed into the infiltration area.

 

Tree Protection Measures

18.     In order to ensure the retention of the Eucalyptus haemastoma (Scribly Gum) on Council's Govett Street  verge, towards the eastern boundary, as well as the Corymbia maculata (Spotted Gum) in the middle of the site frontage in good health, the following measures are to be undertaken:

 

a.     All documentation submitted for the Construction Certificate application must show the retention of both street trees, with the position and diameter of both of their trunks and canopies to be clearly and accurately shown on all drawings.

 

b.     Any excavations associated with the installation of new services, pipes or similar over public property, must be located centrally between the street trees, so as to minimise root damage and future maintenance issues.

 

c.     Each tree must be physically protected by the installation of 1.8 metre high steel mesh/chainwire fencing, which shall be located a minimum distance of 2 metres to the east and west (measured off the outside edge of their trunks at ground level), matching up with the back of the kerb to its north, and pedestrian footpath to its south, in order to completely enclose each tree for the duration of works.

 

d.     This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

e.     The applicant is not authorised to perform any works to either of these street trees, and shall contact Council’s Landscape Development Officer on 9399-0613 should pruning or any similar such work appear necessary, with the applicant required to cover all associated costs with such work, to Council’s satisfaction, prior to the issue of a Final Occupation Certificate.

 

f.     Within the TPZ's, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble, with all Site Management Plans needing to acknowledge these requirements.

 

g.     A refundable deposit in the form of cash, credit card or cheque for an amount of $1,500.00 shall also be paid at the Cashier on the Ground Floor of the Administrative Centre, prior to a construction certificate being issued for the development, in order to ensure compliance with the conditions listed in this consent, and ultimately, preservation of the street trees.

 

The refundable deposit will be eligible for refund following the issue of a Final Occupation Certificate, subject to completion and submission of Council’s ‘Security Deposit Refund Application Form’, and pending a satisfactory inspection by Council’s Landscape Development Officer (9399-0613).

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

19.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

Dilapidation Reports

20.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

21.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works on site.

 

Temporary Site Fencing

22.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres). 

 

Temporary site fences are to have a height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings, amenities or articles upon any part of the footpath, nature strip or public place at any time, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management

23.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·           location and construction of protective fencing / hoardings to the perimeter of the site;

·           location of site storage areas/sheds/equipment;

·           location of building materials for construction;

·           provisions for public safety;

·           dust control measures;

·           site access location and construction

·           details of methods of disposal of demolition materials;

·           protective measures for tree preservation;

·           provisions for temporary sanitary facilities;

·           location and size of waste containers/bulk bins;

·           details of proposed sediment and erosion control measures;

·           provisions for temporary stormwater drainage;

·           construction noise and vibration management;

·           construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

24.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

·           The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·           Details of hazardous materials (including asbestos)

·           Method/s of demolition (including removal of any asbestos)

·           Measures and processes to be implemented to ensure the health & safety of workers and community

·           Measures to be implemented to minimise any airborne dust and asbestos

·           Methods and location of disposal of any hazardous materials (including asbestos)

·           Other relevant details, measures and requirements to be implemented

·           Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Demolition & Construction Waste

25.     A Demolition and Construction Waste Management Plan (WMP) must be development and implemented for the development.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

Sydney Water

26.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

27.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Inspections During Construction

28.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Site Signage

29.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·           name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·           name, address and telephone number of the Principal Certifying Authority,

·           a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

30.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Demolition Work Requirements

31.     All work and activities must be carried out in accordance with the relevant regulatory requirements and Randwick City Council policies, including:

 

·           Occupational Health & Safety Act 2000 & Regulations

·           WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·           WorkCover NSW Guidelines and Codes of Practice

·           Australian Standard 2601 (2001) – Demolition of Structures

·           The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·           Relevant DECCW/EPA Guidelines

·           Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

32.     Work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·           Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

·           Randwick City Council’s Asbestos Policy

·           A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

·           On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

·           Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

·           A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Sediment & Erosion Control

33.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details must be shown in a Sediment and Erosion Control Plan, including; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

A copy of the Sediment and Erosion Control Plan must be provided to the Principal Certifying Authority and a copy must be maintained on site and be made available to Council officers upon request.

 

Public Safety & Site Management

34.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

·       Building materials, sand, soil, waste materials, construction equipment or other articles must not be placed upon the footpath, roadway or nature strip at any time.

 

·       The road, footpath, vehicular crossing and nature strip must be maintained in a good, safe, clean condition and free from any excavations, obstructions, trip hazards, goods, materials, soils or debris at all times.  Any damage caused to the road, footway, vehicular crossing, nature strip or any public place must be repaired immediately, to the satisfaction of Council.

 

·       Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

·       Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

·       Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Support of Adjoining Land, Excavations & Retaining Walls

35.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

36.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

37.     Prior to undertaking any demolition, excavation or building work in the following circumstances, a report must be obtained from a professional engineer which details the methods of support for the dwelling or associated structure on the adjoining land, to the satisfaction of the Principal Certifying Authority:

 

·      when undertaking excavation or building work within the zone of influence of the footings of a dwelling or associated structure that is located on the adjoining land;

·      when undertaking demolition work to a wall of a dwelling that is built to a common or shared boundary (eg. semi-detached or terrace dwelling);

·      when constructing a wall to a dwelling or associated structure that is located within 900mm of a dwelling located on the adjoining land.

 

The demolition, excavation and building work and the provision of support to the dwelling or associated structure on the adjoining land, must also be carried out in accordance with the abovementioned report, to the satisfaction of the Principal Certifying Authority.

 

Survey Requirements

38.     A Registered Surveyor’s check survey certificate or other suitable documentation must be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority (PCA):

 

·           prior to construction (pouring of concrete) of the footings or first completed floor slab,

·           upon completion of the building, prior to issuing an occupation certificate,

·           as otherwise may be required by the PCA.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the Principal Certifying Authority for the development.  

 

Building Encroachments

39.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Road/Asset Opening Permit

40.     A Road / Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

Site Amenities

41.     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

Demolition & Construction Waste

42.     A Demolition and Construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

Public Utilities

43.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

Road/Asset Opening Permit

44.     A Road / Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

Tree Management

45.     Approval is granted for removal of all existing vegetation within the site due to their small size and insignificance, as well as to accommodate the proposed works as shown, subject to full implementation of the approved landscaping.

 

Geotechnical

46.     The basement storeroom is to be suitably waterproofed. A Structural Engineer\Geotechnical Engineer shall certify the waterproofing has been carried out to an acceptable standard, to the satisfaction of the certifying authority. A copy of the certification is to be forwarded to Council.

 

Notes:

a)  Any subsoil drainage is to be disposed of within the site and is not to be discharged to Council’s kerb & gutter and/or underground drainage system.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Occupation Certificate Requirements

47.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

BASIX Requirements

48.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

49.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·           The window having a minimum sill height of 1.5m above the internal floor level,

·           Providing a window locking device at least 1.5m above the internal floor level,

·           Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·           Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·           Other appropriate effective safety measures or barrier.

 

The relevant measures must be implemented prior to issue of an occupation certificate.

 

Swimming Pool Safety

50.     Swimming pools are to be provided with childproof fences and self-locking gates, in accordance with the Swimming Pools Act 1992 and regulations.

 

The swimming pool is to be surrounded by a fence having a minimum height of 1.2m, that separates the pool from any residential building situated on the premises and from any place (whether public or private) adjoining the premises; and that is designed, constructed and installed in accordance with AS 1926.1 - 2007.

 

Gates to pool area shall be a maximum width of 1 metre, and be self-closing and latching; the gate is required to open outwards from the pool area and prevent a small child opening the gate or door when the gate or door is closed.

 

A ‘warning notice’ must be erected in a prominent position in the immediate vicinity of the swimming pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

Swimming Pool & Spa Pool Requirements

51.     Swimming pools (and spa pools) are to be designed, installed and operated in accordance with the following general requirements:

 

a)     Backwash of the pool filter and other discharge of water is to be drained to the sewer in accordance with the requirements of the Sydney Water Corporation; and

 

b)     All pool overflow water is to be drained away from the building and adjoining premises, so as not to result in a nuisance or damage to premises; and

                 

c)     Water recirculation and filtrations systems are required to comply with AS 1926.3 – 2003:  Swimming Pool Safety – Water Recirculation and Filtration Systems; and

 

d)     Pool plant and equipment is to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

Notification of Swimming Pools & Spa Pools

52.     Written notification must be provided to Council advising of the installation and completion of the Swimming Pool (or Spa Pool), to satisfy the requirements of the Swimming Pools Act 1992.

 

Council’s “Notification & Registration of a Swimming Pool” form must be completed and forwarded to Council prior to any Occupation Certificate being issued for the pool.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

53.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)     All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)     Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)     If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)     The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

54.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

a)  Construct concrete vehicular crossing opposite the vehicular entrance to the site in Govett Lane.

b)  Reconstruct Council footpath along the Govett Street frontage, if required.

 

55.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

56.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)  All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)  Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)  If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)  The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

57.     The naturestrip upon Council's footway shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

Stormwater Drainage

58.     Prior to the issuing of an occupation certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer confirming that the design and construction of the stormwater drainage system complies with Australian Standard 3500.3:2003 (Plumbing & Drainage- Stormwater Drainage) and the conditions of this development approval. The certification must be provided following inspection/s of the site stormwater drainage system by the certifying engineers and shall be provided to the satisfaction of the PCA.

 

Landscaping

59.     The PCA must ensure that landscaping at this site is installed substantially in accordance with the plan by Mathew Stubbs, drawing number DA07, project number 3110, and stamped 2nd August 2011, prior to issuing a Final (or any other type of Interim) Occupation Certificate/s, with the owner/s to ensure it is maintained in a healthy and vigorous state until maturity.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

Waste Management

60.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council.

 

External Lighting

61.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

Use of premises

62.     The premises is to be used as a single residential dwelling only at all times and must not be used for dual or multi-occupancy purposes.

 

Street Numbering

63.     Street numbering must be provided to the front of the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council.

 

Protection of the Environment Operations Act 1997 – Swimming Pools & Spa Pools

64.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Pool Plant & Equipment

65.     The pool plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 8.00pm on any Sunday or public holiday; or

·       before 7.00am or after 8.00pm on any other day.

 

Protection of the Environment Operations Act 1997 – Air Conditioners

66.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Air Conditioning & Equipment

67.     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

Protection of the Environment Operations Act 1997 – Rainwater Tanks

68.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Rainwater Tank Requirements

69.     The installation of rainwater tanks shall comply with the following noise control requirements:

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

b)     Plant and equipment associated with rainwater tanks are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with rainwater tanks are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

·       before 8.00am or after 8.00pm on weekends or public holiday; or

·       before 7.00am or after 8.00pm on weekdays.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1      The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

A2      Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

A3      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A4      Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

A5      A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

A6      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A7      This consent does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the land owner or principal contractor must obtain:

 

§  the consent of the owners of such adjoining or supported land to trespass or encroach, or

§  an access order under the Access to Neighbouring Land Act 2000, or

§  an easement under section 88K of the Conveyancing Act 1919, or

§  an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

A8      The finished ground levels external to the building must be consistent with the development consent and are not to be raised, other than for the provision of approved paving or the like on the ground.

 

A9      Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development

 

A10     Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

A11     The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

A12     Further information and details on Council's requirements for trees on development sites can be obtained from the recently adopted Tree Technical Manual, which can be downloaded from Council’s website at the following link, http://www.randwick.nsw.gov.au - Looking after our environment – Trees – Tree Management Technical Manual; which aims to achieve consistency of approach and compliance with appropriate standards and best practice guidelines.

 

MOTION: (Andrews/Belleli) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D152/11   Development Application Report - 51 Knox Street, Clovelly (DA/834/2010/A)

PL173/11

RESOLUTION: (Andrews/Belleli) that Council, as the consent authority, grant its consent under Section 96 of the Environmental Planning and Assessment Act 1979 as amended to modify Development Consent No DA/834/2010 for permission to replace the skillion roof over first floor rear addition with pitched roof, amend windows at the ground level, delete rear external stairs & change lower ground floor plan and window positions for 51 Knox Street, Clovelly in the following manner:

 

A.     Amend Condition 1 to read:

1.     The development must be implemented substantially in accordance with the plans numbered Sheet 1 of 4 to sheet 4 of 4, dated 9 September 2010 and received by Council on 27 September 2010, the application form and on any supporting information received with the application, as amended by the Section 96 plans numbered 14/10 Sheet 1 of 4 to 4 of 4 (All Issue B), dated 10/08/2011 and received by Council on 18 August 2011, only in so far as they relate to the modifications highlighted on the Section 96 plans and detailed in the Section 96 application, except as may be amended  by the following conditions and as may be shown in red on the attached plans:

 

MOTION: (Andrews/Belleli) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

D153/11   Development Application Report - Shop 299/116-132 Maroubra Road, Maroubra (DA/433/2011)

PL174/11

RESOLUTION: (Andrews/Mayor, Cr Nash) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/433/2011 for retrospective approval for the use of the existing premises as a massage business, at No. Shop 299/116-132 Maroubra Road, Maroubra, subject to the following conditions:

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan reference

Received

Plan 1:50

10 June 2011

 

         Building regulation & construction conditions

2.       The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

3.       The works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent.

 

4.       The operation of the premises is to be restricted to remedial massage. The premises is not to be used for the purpose of a brothel and in this regard, no sexual services are to be offered in association with the massage usage.

 

5.       The maximum number of employees operating from the subject premises is restricted to (3) three, and their relevant remedial and therapeutic massage qualifications are to be provided to Council’s satisfaction. Council will keep a record of the employee and their relevant qualifications, and at no time are the employees to vary without first notifying Council.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations and to provide for reasonable levels of fire safety:

6.       Buildings in which there is a change of building use must comply with the category 1 fire safety provisions (as defined in the Environmental Planning & Assessment Regulation 2000) as applicable to the proposed new use, in accordance with clause 93 of the Environmental Planning and Assessment Regulation 2000, unless an exemption is in force under clause 187 or 188 of the Regulation.  Details of compliance are to be provided to the certifying authority and the Council, prior to issuing an occupation certificate.

 

7.       In accordance with clause 93 of the Environmental Planning and Assessment Regulation 2000, the levels of fire safety within the existing building are to be upgraded and the following measures are to be implemented prior to commencement of the change of use:

 

          Provide a suitable fire extinguisher and fire blanket to the kitchen area.

 

In accordance with clause 168 of the Environmental Planning and Assessment Regulation 2000, the fire safety measures contained in the attached ‘fire safety schedule’ must be implemented in the building premises and the fire safety schedule forms part of this consent.

 

The fire safety measures are to be implemented in accordance with the minimum standards of performance as specified in the schedule and the provisions of Part 9 of the Environmental Planning and Assessment Regulation 2000 are to be complied with.

 

A copy of the fire safety certificate, encompassing all the existing and new fire safety measures, is to be submitted to the Council with the occupation certificate prior to commencement of the change of use.

 

8.       A Principal Certifying Authority must be appointed to inspect the installation of the required fire extinguisher and fire blanket, to confirm that the requirements of condition 1 of this approval in relation to compliance with the category 1 fire safety provisions are complied and to issue the required Occupation Certificate.

 

9.       An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

10.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon must also be provided to Council with the occupation certificate.

 

The essential fire safety measures to be included in the fire safety certificate and annual fire safety statement (as a minimum) are detailed below:

 

FIRE SAFETY MEASURE

BUILDING CODE OF AUSTRALIA REFERENCE

MINIMUM STANDARD OF PERFORMANCE

(To be specified in the Fire Safety Certificate / Statement)

Portable fire extinguishers and fire blanket to Shop 299

BCA Clause E1.6

AS 2444 (1995, as amended)

 

The following conditions are applied to satisfy the relevant pollution control criteria and to maintain reasonable levels of health, safety and amenity to the locality:

11.     The use and operation of the premises shall not give rise to an environmental health or public nuisance.

 

12.     There are to be no emissions or discharges from the premises which will give rise to a public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

13.     Adequate provisions are to be made within the premises for the storage, collection and disposal of waste and recyclable materials, to the satisfaction of Council.

 

The following conditions have been applied to ensure compliance with Local Government Legislation and Policies of Council:

14.          The operation of the premises is to be restricted to massage.

 

15.     The premises are not to be used for the purpose of a brothel and in this regard, no sexual services are to be offered in association with the massage usage.

 

16.     Skin penetration activities as defined by the Public Health Regulation 2000, shall not be conducted on the premises without the prior approval of Council.

 

17.     Any other treatments/services other than massage will require a separate application to Council and relevant approval shall be obtained (as required) prior to commencement.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

18.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

19.     The hours of operation of the business is restricted to:

 

  Monday to Sunday, from:   10:00am- 8.00pm.

 

20.     The owner of the subject site must advise Council in writing of any change in the tenant that is operating the remedial massage centre and advise the new tenant that they must provide Council with the qualifications of all staff involved in providing remedial massage services prior to commencing the new operation.

 

MOTION: (Andrews/Mayor, Cr Nash) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Matthews

Councillor Belleli

Councillor Stevenson

Councillor Bowen

Councillor Tracey

Councillor Hughes

 

Councillor Matson

 

Councillor Nash

 

Councillor Notley-Smith

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor White

 

Councillor Woodsmith

 

Total (12)

Total (3)

 

 

 

D154/11   Development Application Report - 541A Malabar Road, Maroubra (DA/605/2011)

PL175/11

RESOLUTION: (Andrews/Belleli) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20F (1) of Randwick Local Environmental Plan (Consolidation) 1998, relating to floor area, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/605/2011 to carry out alterations and additions to a semi detached dwelling including construction of a first floor level, reconfiguration of ground floor layout and associated works at 541A Malabar Road, Maroubra, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received

DDC1011 – 00

DDC Architects

8 August 2011

9 August 2011

DDC1011 – 01

DDC Architects

8 August 2011

9 August 2011

DDC1011 – 02

DDC Architects

8 August 2011

9 August 2011

DDC1011 – 07

DDC Architects

8 August 2011

9 August 2011

DDC1011 – 08

DDC Architects

8 August 2011

9 August 2011

DDC1011 – 09

DDC Architects

8 August 2011

9 August 2011

DDC1011 – 10

DDC Architects

8 August 2011

9 August 2011

DDC1011 – 11

DDC Architects

8 August 2011

9 August 2011

DDC1011 – 12

DDC Architects

8 August 2011

9 August 2011

DDC1011 – 13

DDC Architects

8 August 2011

9 August 2011

DDC1011 – 17

DDC Architects

8 August 2011

9 August 2011

DDC1011 – 18

DDC Architects

8 August 2011

9 August 2011

DDC1011 – 19

DDC Architects

8 August 2011

9 August 2011

 

BASIX Certificate

No.

Dated

Received

 

A115883

27 July 2011

9 August 2011

 

Amendment of Plans & Documentation

2.       The approved plans and documents must be amended in accordance with the following requirements:

 

a.     A privacy screen having a height of 1.7m above the middle courtyard floor level must be provided to northern side.  The privacy screen must be constructed of metal or timber and the total area of any openings within the privacy screen must not exceed 25% of the area of the screen.  Alternatively, the privacy screen may be constructed with translucent, obscured, frosted or sandblasted glazing in a suitable frame.

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

3.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

Section 94A Development Contributions

4.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $172,788 the following applicable monetary levy must be paid to Council: $863.94.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Long Service Levy Payments

5.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Security Deposits

6.       The following security deposits requirement must be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to Council’s assets and infrastructure; and as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

·           $600.00     -      Damage / Civil Works Security Deposit

 

Security deposits may be provided by way of a cash, cheque or credit card payment and is refundable upon a satisfactory inspection by Council upon the completion of the civil works which confirms that there has been no damage to Council's infrastructure.

 

The owner/builder is also requested to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

To obtain a refund of relevant deposits, a Security Deposit Refund Form is to be forwarded to Council’s Director of City Services upon issuing of an occupation certificate or completion of the civil works.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

Compliance with the Building Code of Australia

7.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Structural Adequacy

8.       Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority), certifying the structural adequacy of the existing structure to support the additional storey/upper floor addition.

 

Smoke Alarms

9.       Smoke alarms are required to be installed in accordance with the relevant provisions of the Building Code of Australia (volume 2) smoke alarms must comply with AS3786.  Smoke alarms must be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

BASIX Requirements

10.     In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

11.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

Home Building Act 1989

12.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council.

 

Dilapidation Reports

13.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·              excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·              new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·              excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·              as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

14.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW D