THESE MINUTES ARE DRAFT UNTIL CONFIRMED AT THE NEXT MONTHLY MEETING OF THIS COUNCIL AND/OR COMMITTEE

 

MINUTES OF Ordinary Council Meeting of the

Council of the City of Randwick HELD ON

Tuesday, 20 September 2011 AT 6:10pm

 

Present:

 

The Mayor, Councillor M Matson (Chairperson) (East Ward)

 

Councillor K Smith (Deputy Mayor) (North Ward)

 

North Ward                                           -   Councillor M Woodsmith

 

South Ward                                          -   Councillors R Belleli, C Matthews & A White

 

East Ward                                            -   Councillors T Bowen & B Notley-Smith (from 6.25pm)

 

West Ward                                           -   Councillors B Hughes, J Procopiadis &

                                                              S Nash

 

Central Ward                                        -   Councillors A Andrews, T Seng (from 6.42pm) & G Stevenson

 

Officers Present:

 

General Manager                                             Mr R Brownlee

Director City Services                                      Mr J Frangoples

Director City Planning                                       Ms S Truuvert

Director Governance & Financial Services             Mr G Banting

Manager Administrative Services                        Mr D Kelly

Manager Development Assessment                     Mr K Kyriacou

Communications Manager                                  Mr J Hay

Manager Organisational Staff Services                 Ms F Calabrese

Manager Corporate & Financial Planning               Mr M Woods

 

 

Prayer & Acknowledgement of Local Indigenous People

 

The Council Prayer was read by Cr White. The Acknowledgement of Local Indigenous People was read by Cr Woodsmith.

 

Apologies/Granting of Leave of Absences 

 

An apology was received from Cr Tracey.

 

RESOLVED: (Andrews/Nash) that the apology received from Cr Tracey be accepted as leave of absence from the meeting has previously been granted.

Confirmation of the Minutes

 

Confirmation of the Minutes of the Ordinary Council Meeting held on Tuesday 23 August 2011

133/11

RESOLUTION: (Woodsmith/Hughes) that the Minutes of the Ordinary Council Meeting held on Tuesday 23 August 2011 (copies of which were circulated to all Councillors) be and are hereby confirmed as a correct record of the proceedings of that meeting.

 

Declarations of Pecuniary and Non-Pecuniary Interests

 

(a)    Cr Nash declared a significant non pecuniary interest in Items CP92/11, CP93/11         and CP94/11 as he is Council’s delegate on the Joint Regional Planning Panel. Cr         Nash will be taking no part in the debate or voting on these matters.

(b)    The Mayor, Cr Matson declared a significant non pecuniary interest in Items         CP92/11, CP93/11 and CP94/11 as he is Council’s delegate on the Joint Regional         Planning Panel. The Mayor will be taking no part in the debate or voting on these         matters.

(c)    Cr Hughes declared a significant non pecuniary interest in Items CP92/11,         CP93/11 and CP94/11 as he is Council’s alternate delegate on the Joint Regional         Planning Panel. Cr Hughes will be taking no part in the debate or voting on these         matters.

(d)    Cr Bowen declared a non significant non pecuniary interest in Item CP101/11 as         he knows one of the objectors.

(e)    Cr Andrews declared a non significant non pecuniary interest in Item CP101/11         as knows the applicant through a previous association with the ALP.

(f)    Cr Andrews declared a non significant non pecuniary interest in Item GM30/11         as he knows one of the objectors, George Houssos, through his previous         associations with the ALP and Coogee West Branch of the ALP. Cr Andrews also         declared a significant, non pecuniary interest in Item GM30/11 as he has a close         relationship with the applicant and previously used vehicles of the applicant’s         hotel during his election campaign. Cr Andrews will not be taking part in the         debate or voting on this matter unless it was simply to refer the matter to the         General Manager as per the recommendation in the Council report.

(g)    Cr Smith declared a pecuniary interest in Item GM30/11 as his employer has a         business relationship with the applicant. Cr Smith will not be taking part in the         debate or voting on these matters.

(h)    Cr White declared a non significant non pecuniary interest in Item CP88/11 as         he is a member of the Matraville RSL Club Sub Branch.

(i)     Cr White declared a non significant non pecuniary interest in Item CP94/11 as         he attended a ceremony at the site and received a token gift along with all other         attendees.

(j)    Cr Matthews declared a significant non pecuniary interest in Item GM30/11 as         he knows the applicant, who has made a donation to his political party. Cr         Matthews will not be taking part in the debate or voting on this matter unless it         was simply to refer the matter to the General Manager as per the         recommendation in the Council report.

(k)    Crs Seng, Nash and Belleli declared a significant non pecuniary interest in Item GM30/11 as they were of the belief that Cr Notley-Smith’s State election campaign received a donation from the applicant. All Liberal Councillors   indicated they would not be taking part in the debate or voting on the matter      unless it was simply to refer the matter to the General Manager as per the       recommendation in the Council report.

(l)     Cr Procopiadis declared a significant non pecuniary interest in Item GM30/11 as,         during his term as Mayor, the applicant supported the Mayor’s Relay For Life         team. Cr Procopiadis will not be taking part in the debate or voting on this         matter. unless it was simply to refer the matter to the General Manager as per         the recommendation in the Council report.

(m)   Cr Notley-Smith declared a pecuniary interest in Item GM30/11 as his State         election campaign received a donation from the applicant. Cr Notley-Smith         indicated he would not be taking part in the debate or voting on the matter.

(n)    Cr Notley-Smith declared a non significant non pecuniary interest in Item         CP101/11 as he knows one of the objectors.

(o)    Cr Notley-Smith declared a non significant non pecuniary interest in Items         CP93/11 and CP94/11 as he knows one of the objectors who attended a function         of his. Cr Notley-Smith indicated he would not be taking part in the debate or         voting on these matters.

 

Address of Council by Members of the Public

Prior to consideration of the Agenda by the Council, deputations were received in respect of the following matters:

GF42/11    Presentation of the 2010-11 Financial Statements

 

For                      Gary Mottau - representing Council's Auditors

 

CP89/11    11/98 Mount Street, Coogee (DA/542/2011)

 

Objector             Hector Lim

 

Applicant           Luke McDonald

 

CP91/11    19 Courland Street, Randwick (DA/133/2011)

 

Objector             Gail Tierney

 

Applicant           David Dix

 

Crs Matson, Nash and Hughes left the chamber during the addresses concerning matters which are to be determined by the Joint Regional Planning Panel.

 

CP92/11    JRPP - 330 Anzac Parade, Kensington - UNSW (DA/494/2011)

 

Applicant           Peter Strudwick - representing the applicant

 

CP93 & 94/11     JRPP - 1408 Anzac Parade, Little Bay (Lot 5) (DA/496/2011)

 

Applicant           Ian Cady representing the applicant

 

MM69/11   PORT BOTANY PRIVATISATION

 

For                      Peter Fagan

 

 

The meeting was adjourned at 7.06pm and was resumed at 7.28pm.

 

PROCEDURAL MOTION (Smith/Nash) that all the matters that were subject to addresses by members of the public be brought forward for immediate consideration. CARRIED.

 

 

Mayoral Minutes

 

 

MM67/11  Mayoral Minute - Wylies Baths - Council Contribution to Geotechnical Risk Assessment (F2010/00422)

134/11

RESOLUTION: (Mayor, Cr M Matson) that Council contribute $5,000.00 towards the geotechnical investigation and structural design for Wylies Baths from the 2011-12 Contingency Fund.

 

MOTION: (Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

 

MM68/11  Mayoral Minute - Malabar Headland Update (F2004/06759)

135/11

RESOLUTION: (Mayor, Cr M Matson) that Council note this update report.

 

MOTION: (Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

 

MM69/11  Mayoral Minute - Port Botany Privatisation (F2004/07460)

 

MOTION: (Mayor, Cr M Matson) that Council:-

 

a)     write to the Premier concerning the Government’s proposed offering to the         private sector of a 99 year lease on Port Botany to:

 

·       Advise of Council’s concern that a privatised or long-term leased facility may lead to increased pressures to expand operational levels, with impacts such as increased truck movements and noise impacts in residential areas around the facility;

 

·       Note Council’s concerns that the current planning framework for approvals in the Port is not suitable in a privatisation or long-term leased scenario;

 

·       Note Council's resolution of 23 August 2011 to write to the Government requesting that a detailed acoustic assessment be undertaken by it encompassing all Port related development, in consultation with OEH, Randwick and Botany Councils;

 

·       Request that this acoustic study is completed before any greater commitment is given to proceeding further with any long-term leasing initiatives; and

 

·       Seek clarification as to the measures the State Government will undertake to address Council’s concerns to Port operational, amenity impacts and planning regime.

 

b)     seek to raise with the relevant State Government Minister and Port Authority before the privatisation of the Port, the possible implementation of a broadband alert system for vehicles otherwise known as squawkers.

 

c)     advise the Premier that Council opposes the privatisation or long term leasing of Port Botany.

 

d)     ensure that the issue of noise abatement be actively pursued by Council representatives on the appropriate committee.

 

e)     request that the State Government take an all of government approach to planning with respect to NSW and national sea freight and ports planning, including an examination of expansion of port operations for container sea freight at Port Kembla. LOST.

 

The DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Bowen

Councillor Andrews

Councillor Hughes

Councillor Belleli

Councillor Matson

Councillor Matthews

Councillor Stevenson

Councillor Nash

Councillor White

Councillor Notley-Smith

Councillor Woodsmith

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

 

Total (6)

Total (8)

 

 

 

MM70/11  Mayoral Minute - Christening of the City of Randwick III Offshore Rescue Boat (F2004/07113)

136/11

RESOLUTION: (Andrews/Matthews) that:

 

a)     Council note its financial contribution towards the important addition to the         Randwick District Offshore Rescue Boat Association’s rescue fleet of a brand new         6.5 metre state of the art KevlaCat, aptly named City of Randwick III; and

 

b)     Council also write to all sponsors thanking them for their support towards the         ongoing operation of the Offshore Rescue Boat Association.

 

MOTION: (Mayor, Cr M Matson) that Council note its financial contribution towards the important addition to the Randwick District Offshore Rescue Boat Association’s rescue fleet of a brand new 6.5 metre state of the art KevlaCat, aptly named City of Randwick III .

 

AMENDMENT: (Andrews/Matthews) CARRIED AND BECAME THE MOTION. MOTION CARRIED – SEE RESOLUTION.

 

 

 

MM71/11  Mayoral Minute - The Prince Henry Hospital Trained Nurses' Association - Request for Use of Prince Henry Centre (F2004/06540)

137/11

RESOLUTION: (Mayor, Cr M Matson) that the request received from the Prince Henry Hospital Trained Nurses’ Association for Council to assist in the conduct of their annual reunion by waiving the fees for the hire of the Prince Henry Centre on Saturday 29 October 2011 (totalling $1,945.00) be granted, such funds to come from the 2011-12 Contingency Fund budget.

 

MOTION: (Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

 

MM72/11  Mayoral Minute - June Moore (1919-2011) (F2004/08382)

138/11

RESOLUTION: (Mayor, Cr M Matson) that Council:

 

a)     Liaise with the Randwick and District Historical Society to officially name a site in the city in honour of June Moore and her invaluable contribution to preserving Randwick’s local heritage; and

 

b)     invite members of June’s family and the Randwick and District Historical Society, to a dedication of the chosen site.

 

MOTION: (Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

 

MM73/11  Mayoral Minute - Update on the Randwick Light Rail Pre-Feasibility Study (F2004/08175)

139/11

RESOLUTION: (Mayor, Cr M Matson) that this update on the Randwick Light Rail Pre-Feasibility Study be received and noted.

 

MOTION: (Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

 

MM74/11  Mayoral Minute - E-Waste Collection Opportunity at Perry Street Recycling Centre (F2004/01045)

140/11

RESOLUTION: (Mayor, Cr M Matson) that Council endorses the proposal to investigate potential commercial opportunities to work with the industry on utilizing Perry Street Recycling Centre as a drop off point for electronic waste as per the Terms of Engagement distributed by the LGSA.

 

MOTION: (Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

 

MM75/11  Mayoral Minute - Supporting La Perouse Aboriginal Land Council with Solar PV Panel Installation at Yarra Bay House (F2005/00230)

141/11

RESOLUTION: (Mayor, Cr M Matson) that Council approves $4,000.00 from the Climate Change budget of the environmental levy program to install additional solar PV panels on Yarra Bay House in support of community activities by Lend Lease employees and the La Perouse Aboriginal Land Council.

 

MOTION: (Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

Director City Planning Reports

 

CP87/11   Director City Planning Report - 60 Avoca Street, Randwick (DA/186/2011/A) (DA/186/2011/A)

142/11

RESOLUTION: (Andrews/Nash) that Council, as the consent authority, grant its consent under Section 96 of the Environmental Planning and Assessment Act 1979 as amended to modify Development Consent No DA/186/2011 for permission to increase the footprint of the ground floor level of the dwelling, internal reconfiguration, relocation of the approved courtyard & carport, minor addition to the first floor level & changes to the window and door openings on all elevations for 60 Avoca Street, Randwick in the following manner:

 

A.         Amend Condition 1 to read:

The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received

A-01

John Spiteri Design and Drafting

9 March 2011

18 March 2011

A-02

John Spiteri Design and Drafting

16 March 2011

18 March 2011

A-03

John Spiteri Design and Drafting

16 March 2011

18 March 2011

A-04

John Spiteri Design and Drafting

16 March 2011

18 March 2011

Concept Strata Subdivision Plan

Anonymous

Undated

18 March 2011

 

BASIX Certificate

No.

Dated

Received

 

364985S

10 March 2011

18 March 2011

 

as amended by the following Section 96’A’ plans and documents, except as may be amended  by the following conditions and as may be shown in red on the attached plans:

 

Plan

Drawn by

Dated

Received

A-01 (Revision A)

John Spiteri Design and Drafting

7 July 2011

14 July 2011

A-02 (Revision A)

John Spiteri Design and Drafting

7 July 2011

14 July 2011

A-03 (Revision A)

John Spiteri Design and Drafting

7 July 2011

14 July 2011

A-04 (Revision A)

John Spiteri Design and Drafting

7 July 2011

14 July 2011

Concept Strata Subdivision Plan

Anonymous

Undated

14 July 2011

 

BASIX Certificate

No.

Dated

Received

 

364985S_02

11 July 2011

14 July 2011

 

B.         Delete Conditions Nos.  28 and 29.

 

C.         Amend Condition 31 to read as follows:

31.     In order to ensure retention of the three trees within Council’s Hodgson Street footpath, being from west to east, a Robinia pseudoacacia ‘Frisia’ (Golden Robinia), just beyond the western site boundary, a Tristaniopsis laurina (Watergum), adjacent the southeast corner of the existing garage, just west of the proposed vehicle crossing, and then another Tristaniopsis laurina (Watergum) just east of the power pole in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the Construction Certificate application must show the retention of these street trees, with the position and diameter of their trunks and canopies to be clearly and accurately shown.

 

b.       The western edge of the proposed vehicle crossing must be setback a minimum distance of 800mm to the east of the most western Watergum, measured off the outside edge of its trunk at ground level.

 

c.       The applicant is not authorised to perform any works to these street trees, and shall contact Council’s Landscape Development Officer on 9399-0613 should pruning or any similar such work appear necessary, with the applicant required to cover all costs associated with such works, to Council’s satisfaction, prior to the issue of a Final Occupation Certificate.

 

d.       There is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble on the footpath, within 2 metres of their trunks, with all Site Management Plans needing to acknowledge these requirements.

 

e.       A refundable deposit in the form of cash, credit card or cheque for an amount of $500.00 shall also be paid at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development, in order to ensure compliance with the conditions listed in this consent, and ultimately, preservation of these street trees.

 

The refundable deposit will be eligible for refund following the issue of a Final Occupation Certificate, subject to completion and submission of Council’s ‘Security Deposit Refund Application Form’, and pending a satisfactory inspection by Council’s Landscape Development Officer (9399-0613).

 

Any contravention of Council's conditions relating to the trees at any time during the course of the works, or prior to the issue of a final occupation certificate, may result in Council claiming all or part of the lodged security in order to perform any rectification works necessary, as per the requirements of 80A (6) of the Environmental Planning and Assessment Act 1979.

 

·      Further information and details on Council's requirements for trees on development sites can be obtained from the recently adopted Tree Technical Manual, which can be downloaded from Council’s website at the following link, http://www.randwick.nsw.gov.au - Looking after our environment – Trees – Tree Management Technical Manual; which aims to achieve consistency of approach and compliance with appropriate standards and best practice guidelines.

 

MOTION: (Andrews/Nash) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

CP88/11   Director City Planning Report - 523 Bunnerong Road, Matraville (DA/136/2011) (DA/136/2011)

143/11

RESOLUTION: (Belleli/Andrews) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 42DA 4(B) of Randwick Local Environmental Plan 1998, relating to building height on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/136/2011 for the construction of a new part 3/part 5 storey mixed use development comprising two retail tenancies fronting Bunnerong Road at ground floor level, 11 residential units, and two levels of parking, including one basement level, with provisions for 21 cars and bicycle storage at No. 523 Bunnerong Road, Matraville, subject to the following conditions:

 

1.       The development must be implemented substantially in accordance with the amended plans:

 

Drawing

Revision

Date

Received

DA01

DA04

August 2010

24/08/2011

DA02

DA02

August 2010

04/07/2011

DA03

DA02

August 2010

04/07/2011

DA04

DA04

August 2010

24/08/2011

DA05

DA04

August 2010

24/08/2011

 

and the application form, and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

2.       The colours, materials and finishes of the external surfaces to the proposed development are to be compatible with adjacent developments to maintain the integrity and amenity of the building and the streetscape.

 

3.       Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

4.       Design for sun-shading screens for units north facing units must be submitted to Council’s Director of City Planning for approval before a Construction Certificate is issued. The approved design must be shown on the Construction Certificate plans.

 

5.       Street and unit numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the development. In this regard, an application must be submitted to and approved by Council’s Director of City Planning, together with the required fee, for the allocation of appropriate street and unit numbers for the development, prior to issue of the Occupation Certificate.

 

6.       Lighting to the premises shall be designed so as not to cause a nuisance to nearby residents or motorists and to ensure that light overspill does not affect the amenity of the area.

 

7.       Non-glare street lighting shall be installed adjacent to the eastern façade of the building facing Norfolk Lane.

 

8.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

9.       The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

10.     If suitable, the plans will be appropriately stamped. For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

11.     The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

12.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificates for this development are fulfilled.

 

13.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, relevant BASIX Certificates and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

14.     The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

15.     The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

16.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue a final Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments has been fulfilled.

 

17.     Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing the final Occupation Certificate.

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either an Accredited Certifier or Randwick City Council.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

Security Deposit

18.     The following damage / civil works security deposit requirement must be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; and as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

·           $10,000.00 -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash, cheque or credit card payment and is refundable upon a satisfactory inspection by Council upon the completion of the civil works which confirms that there has been no damage to Council's infrastructure.

 

The owner/builder is also requested to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

To obtain a refund of relevant deposits, a Security Deposit Refund Form is to be forwarded to Council’s Director of City Services upon issuing of an occupation certificate or completion of the civil works.

 

Sydney Water Requirements

19.     The relevant requirements of the Sydney Water Act 1994 must be complied with and a Section 73 Compliance Certificate under the Sydney Water Act 1994 must be obtained from Sydney Water. 

 

An Application for a Section 73 Certificate must be made through an authorised Water Servicing Co-ordinator. For details, please refer to the “Your Business” section of Sydney Water’s web site www.sydneywater.com.au then the “e-developer” icon or telephone 13 20 92.

 

Following the application, a “Notice of Requirements” will be provided, detailing water and sewer extensions to be built and charges to be paid.  Please make early contact with the Water Servicing Co-ordinator, as building of water/sewer extensions can be time consuming and may impact on other services and building, driveway or landscape design.

 

A copy of Sydney Water’s ‘Notice of Requirements’ must be submitted to the Certifying Authority prior to issuing a Construction Certificate.

The Section 73 Compliance Certificate is required to be obtained before an occupation certificate or subdivision certificate is issued, whichever the sooner.

 

Electricity Substation

20.     The applicant must liaise with Energy Australia prior to obtaining a construction certificate (for any above ground works), to determine whether or not an electricity substation is required for the development. Any electricity substation required for the site as a consequence of this development shall be located within the site and shall be screened from view. The proposed location and elevation shall be shown on relevant construction certificate and landscape plans.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

Traffic Conditions

21.     The Roller Shutter door for the basement car park is to be setback a minimum of 5.00metres from the newly dedicated rear boundary in Norfolk Lane.

 

22.     Plans submitted for the construction certificate are to show a minimum of 2 visitor car spaces.

 

23.     Plans submitted for the construction certificate are to show a road dedication to Council, in Norfolk Lane. The road dedication width is to be a width of 0.60m.

 

24.     Plans submitted for the construction certificate shall demonstrate the proposed awnings complying with the following council requirements;

 

a)  The minimum clear distance from the existing footpath in Bunnerong Road to the underside of the proposed awning shall be 3.00 metres.

 

b)  All new awnings shall be set back a minimum of 600mm from the face of kerb.

 

c)  The plans are to be amended to show the awning design above the Council Street Tree area as following the square cut out area in Council’s footpath for the Council Street Tree.

 

Design Alignment levels

25.     The design alignment level (the finished level of concrete, paving or the like) at the new property boundary for driveways, access ramps and pathways or the like, must be as follows:

 

Bunnerong Road frontage - match the back of the existing footpath along the full Bunnerong Road site frontage.

 

Norfolk Lane Frontage at the New Dedicated Boundary - 30mm above the top of the existing Council kerb at all points opposite the kerb, along the full site frontage

 

Any enquiries regarding this matter should be directed to Council’s Development Engineer on 9399 0923.

 

26.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the kerb/footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

27.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $1,862.00 calculated at $46.00 (inclusive of GST) per metre of site frontage. This amount is to be paid prior to a construction certificate being issued for the development.

 

Stormwater Drainage & Flood Management

28.     Vents into the ground floor car park are to be located a minimum 600mm above the Council kerb level. Details demonstrating compliance with this condition are to be included in the construction certificate documentation.

 

29.     Plans submitted for the construction certificate are to show a internal driveway grades as shown of the Development Application plans marked “ Drwg No DA01 Issue DA-4 dated 22/8/2011 by Axil Architects “

 

30.     Stormwater drainage plans have not been approved as part of this development consent. Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage shall be prepared by a suitably qualified Hydraulic Engineer and submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issued, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)       A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

 

b)       A layout of the proposed drainage system including pipe sizes, type, grade, length, invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system. 

 

c)       The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

 

i.        Roof areas

ii.       Paved areas

iii.       Grassed areas

iv.      Garden areas

 

e)       Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

 

f)       Proposed finished surface levels and grades of car parks, internal driveways and access aisles which are to be related to Council's design alignment levels.

 

g)       The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

31.     The site stormwater drainage system is to be provided in accordance with the following requirements;

 

a)     The stormwater drainage system must be provided in accordance with the relevant requirements of Building Code of Australia and the conditions of this consent, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate.

 

b)     The stormwater must be discharged (by gravity) either:

 

i.     Directly into Council’s underground drainage system located in Bunnerong Road via a new kerb inlet pit; or

 

ii.    To a suitably designed infiltration system (subject to confirmation in a geotechnical investigation that the ground conditions are suitable for the infiltration system).

 

c)     Should stormwater be discharged to Council’s street drainage system, an on-site stormwater detention system must be provided to ensure that the maximum discharge from the site does not exceed that which would occur during a 1 in 5 year storm of one hour duration for existing site conditions. All other stormwater run-off from the site for all storms up to the 1 in 20 year storm is to be retained on the site for gradual release to the street drainage system, to the satisfaction of the certifying authority.

 

An overland escape route or overflow system (to Council’s street drainage system) must be provided for storms having an average recurrence interval of 100 years (1 in 100 year storm), or, alternatively the stormwater detention system is to be provided to accommodate the 1 in 100 year storm.

 

d)     Should stormwater be discharged to an infiltration system, the infiltration area shall be  sized for all storm events up to the 1 in 20 year storm event with provision for a formal overland flow path to Council’s Street drainage system.

 

Should no formal overland escape route be provided for storms greater than the 1 in 20 design storm, the infiltration system shall be sized for the 1 in 100 year storm event.

 

e)     Determination of the required cumulative storage (in the on-site detention and/or infiltration system) must be calculated by the mass curve technique as detailed in Technical Note 1, Chapter 14 of the Australian Rainfall and Run-off Volume 1, 1987 Edition.

 

Where possible any detention tanks should have an open base to infiltrate stormwater into the ground. Infiltration should not be used if ground water and/or any rock stratum is within 2.0 metres of the base of the tank.

 

f)     If connecting to Council’s underground drainage system, a reflux valve shall be provided (within the site) over the pipeline discharging from the site to ensure that stormwater from Council drainage system does not surcharge back into the site stormwater system.

 

g)     Any new kerb inlet pits (constructed within Council’s road reserve) are to be constructed generally in accordance with Council’s standard detail for the design of kerb inlet pits (drawing number SD6 which is available from Council).

 

h)     Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (i.e. above the 1 in 20 year storm) to the proposed drainage (detention/infiltration) system.

 

i)      A sediment/silt arrestor pit must be provided within the site near the street boundary prior to discharge of the stormwater to Council’s drainage system and prior to discharging the stormwater to any absorption/infiltration system.

 

Sediment/silt arrestor pits are to be constructed generally in accordance with the following requirements:

·         The base of the pit being located a minimum 300mm under the invert level of the outlet pipe.

·         The pit being constructed from cast in-situ concrete, precast concrete or double brick.

·         A minimum of 4 x 90 mm diameter weep holes (or equivalent) located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

·         A galvanised heavy-duty screen being provided over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

·         The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

·         A child proof and corrosion resistant fastening system being provided for the access grate (e.g. spring loaded j-bolts or similar).

·         Provision of a sign adjacent to the pit stating, “This sediment/silt arrester pit shall be regularly inspected and cleaned”.

 

Sketch details of a standard sediment/silt arrester pit may be obtained from Council’s Drainage Engineer.

 

j)      The floor level of all habitable, retail, commercial and storage areas located adjacent to any detention and/or infiltration systems with above ground storage must be a minimum of 300mm above the maximum water level for the design storm or alternately a permanent 300mm high water proof barrier is to be provided.

 

k)     Infiltration systems/Absorption Trenches must be designed and constructed generally in accordance with "Section 8.5 ABSORPTION TRENCHES" of Randwick City Council's Private Stormwater Code.

 

l)      A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

 

m)    The site stormwater system must be regularly cleaned and maintained to ensure it operates as required by the design.

 

n)     Site discharge pipelines shall cross the verge at an angle no less than 45 degrees to the kerb line.

 

o)     Any onsite detention/infiltration systems shall be located in areas accessible by residents of all units.

 

32.     Site seepage and sub-soil drainage (from planter boxes etc) must comply with the following requirements:

 

a)     Seepage/ground water and subsoil drainage (from planter boxes etc) must not be collected & discharged directly or indirectly to  Council’s street gutter or underground drainage system

 

b)     Adequate provision is to be made for the ground water to drain around the basement carpark (to ensure the basement will not dam or slow the movement of the ground water through the development site).

 

c)     The walls of the basement level/s of the building are to be waterproofed/tanked to restrict the entry of any seepage water and subsoil drainage into the basement level/s of the building and the stormwater drainage system for the development.

 

d)     Sub-soil drainage systems may discharge via infiltration subject to the hydraulic consultant/engineer being satisfied that the site and soil conditions are suitable and the seepage is able to be fully managed within the site, without causing a nuisance to any premises and ensuring that it does not drain or discharge (directly or indirectly) to the street gutter.

               

e)     Details of the proposed stormwater drainage system including methods of tanking/waterproofing the basement level/s and any sub-soil drainage systems (as applicable) must be prepared or approved by a suitably qualified and experienced Professional Engineer to the satisfaction of the Certifying Authority and details are to be included in the construction certificate.

 

33.     Where the site is affected by groundwater or fluctuating water table (including during the course of construction).  A report must be submitted to and approved by the Certifying Authority, with the Construction Certificate, detailing the proposed methods of excavation, managing groundwater and dewatering the site. 

 

The report is to be prepared by a suitably qualified and experienced Geotechnical and/or Hydrogeological Engineer and include:

·     Details of compliance with relevant approvals and licences (eg. Council’s conditions of consent and Water Licence from Department of Planning / Department of Water & Energy).

·     The proposed method of shoring/piling and dewatering.

·     Details of the proposed connection and or disposal of groundwater or construction site stormwater to Council’s drainage system.

·     The zone of influence of any possible settlement.

·     The location of any proposed re-injection points in relation to the property boundaries (where re-injection equipment is to be located on land other than the subject premises, the written consent of the owner must also be provided to Council).

·     The program to monitor fluctuations of the water table during dewatering/ construction to be undertaken by consulting engineers to ensure that the conditions of consent and other relevant requirements are satisfied.

·     The location of all proposed monitoring equipment in relation to the property boundaries (where monitoring equipment is to be located on land other than the subject premises, the written consent of the owner must also be provided to Council).

·     Details of any consultation and arrangements made with owners of any potentially affected nearby premises (i.e. in relation to access, monitoring and rectification of possible damage to other premises)

·     Details of groundwater quality and proposed disposal of any potentially contaminated groundwater in accordance with relevant requirements and approvals of the Department of Environment & Climate Change, Council and the Protection of the Environment Operations Act 1997, in an environmentally sensitive manner.

·     The location of all pumping equipment in relation to the property boundaries.

·     The proposed method of noise attenuation for all pumping equipment, so as not to be more than 5dB (A) greater than the A – weighted L90 background sound pressure level between the hours of 7am to 10pm within any residential premises and not to be audible at all between the hours of 10pm and 7am within any residential dwelling.

·     Confirmation that the proposed methods of dewatering and excavation are appropriate and in accordance with ‘best practice’ principles and should not result in any unacceptable levels of settlement or damage of the adjoining or nearby buildings within the zone of influence.

 

Any practices or recommendations made by the consulting Engineer/s must be implemented accordingly and the dewatering process must be monitored by the consulting Engineer/s to the satisfaction of the Principal Certifying Authority.

 

A copy of the reports, certification and details of compliance with the conditions of consent and dewatering requirements must be provided to the Principal Certifying Authority and a copy must be forwarded to the Council.

 

The site conditions and fluctuations in the water table are to be reviewed by the consulting Engineer prior to and during the excavation/construction process, to ensure the suitability of the excavation and dewatering process and compliance with Council's conditions of consent.  Details of compliance must be provided to the satisfaction of the Principal Certifying Authority and a copy must be forwarded to Council.

 

34.     Details of the proposed connection and or disposal of any site seepage, groundwater or construction site stormwater to Council’s stormwater drainage system must be submitted to and approved by Council’s Development Engineer, prior to commencing these works, in accordance with section 138 of the Roads Act 1993.

 

Details must include the following information:

 

·       Site plan

·       Hydraulic engineering details of the proposed disposal/connection of groundwater or site stormwater to Council/s drainage system

·       Volume of water to be discharged

·       Location and size of drainage pipes

·       Duration, dates and time/s for the proposed works and disposal

·       Details of water quality and compliance with the requirements of the Protection of the Environment Act 1997

·       Details of associated plant and equipment, including noise levels from the plant and equipment and compliance with the requirements of the Protection of the Environment Act 1997 and associated Regulations and Guidelines

·       Copy of any required approvals and licences from other Authorities (e.g.  A water licence from the Department of Planning/Department of Water & Energy).

·       Details of compliance with any relevant approvals and licences

 

Waste Management

35.     The residential garbage room shall be sized to contain a total of 12 x 240 litre bins (comprising 6 garbage bins & 6 recycle bins) and with adequate provisions for access to all bins.  Details showing compliance are to be included in the construction certificate.

 

36.     The commercial/retail garbage area shall be sized to contain a total of 6 x 240 litre bins and with adequate provisions for access to all of the bins. Details showing compliance are to be included in the construction certificate.

 

37.     The commercial garbage area must be separated from the residential bin storage area.

 

Landscaping & Environmental amenity:

38.     Detailed landscape drawings and specifications are to be submitted to and approved by the certifying authority with the construction certificate and the landscaping is required to be implemented in accordance with the approved plans and specifications. The landscape drawings and specifications are to be prepared by a qualified Landscape Architect who is eligible for membership with the Australian Institute of Landscape Architects (AILA). If Council is not the certifying authority for the development, a copy of the approved plans and specifications are to be forwarded to Council with the construction certificate.

 

The landscaping plans/specifications are required to include the following components:

 

a)     A site plan at an appropriate scale showing: existing site boundaries; existing trees within the property (clearly identified as being retained or removed); existing street trees (clearly identified as being retained or removed); features on adjoining sites within 6 metres of the common property boundary (buildings, trees, other structures etc); council’s footway; existing and proposed ground levels shown as spot heights and/or contours over the site, at site boundaries, and at the base of the tree/s to be retained; proposed building envelope; proposed areas of pavement; and proposed landscaped areas.

 

b)     The position, canopy spread (location of dripline), trunk diameter, height and names of all existing trees upon the site and adjoining sites within 6 metres of the common property boundary which are likely to be affected by the development.

 

c)     A planting plan at a scale of 1:100 or 1:200 indicating the location of all proposed planting and existing trees to be retained. All plants are to be drawn at their mature size with a dense planting of shrubs, accent plants and ground covers within all garden beds so that a continuous planted cover is achieved. Plant spacings are to be clearly indicated for all accent and groundcovers.

 

d)     A planting schedule listing all plants by botanic & common names, plant numbers, plant spacings for groundcovers and accent planting, pot sizes, the estimated size of the plant at maturity (height & spread) and proposed staking methods when applicable.

 

e)     Details of planter boxes, garden beds, soil and mulch, irrigation, landscape lighting, edging, paving, fencing, surface finishes, retaining walls, site composting, vehicle wheel-stops and any other landscape elements in sufficient detail to fully describe the proposed landscape works.

 

Planter boxes and garden beds constructed on slab must have a minimum soil depth of 600mm and all lawn areas must have a minimum soil depth of 300mm.

 

f)      Details of Tree Protection measures, including details of compliance with relevant conditions of consent.

 

g)     Position of existing and proposed site services including water, gas, electricity, sewer, stormwater and any easements etc.

 

Any required substation shall be suitably screened from view. Details of the proposed location of any substation/s including plans, elevations and proposed screening methods are to be submitted to and approved by Council prior to issuing a construction certificate.

 

h)     Elevations and sections through the site showing the existing and proposed groundlines, building elevations, and mature height of proposed planting.

 

i)      An automatic irrigation system throughout all planted areas to ensure satisfactory maintenance of the landscaping. The system shall provide full coverage to all the planted areas with no overspray onto driveways and pathways. The system shall comply with all Sydney Water requirements.

 

39.     All detention tanks and stormwater infiltration systems located within the landscaped areas shall have a minimum soil cover of 600mm to ensure sufficient soil depth to permit the establishment of landscaping on top of these services as required by these conditions of development consent. Details are to be included in the relevant construction certificate and landscape plans.

 

Site landscaping is required to contain a predominance of species that require minimal watering once established or species with water needs that match rainfall and drainage conditions.

 

Tree Management

40.     The applicant shall submit a total payment of $189.75 to Council,

 

a.       Being the cost for Council to supply and install 1 x 45 litre Tuckeroo street tree, to the Bunnerong Rd frontage, at the completion of all works

 

The contribution shall be paid into Tree Amenity Income account no 4001.768401 at the Cashier on the Ground Floor of the Administrative Centre prior to a construction certificate being issued for the development.

 

The applicant will be required to contact Council’s Landscape Development Officer on 9399-0613, giving at least two working weeks notice, to arrange for removal of the existing street tree/provision of a replacement street tree upon completion.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental

 

Demolition & Construction Waste

41.     A Demolition and Construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

Construction Traffic Management

42.     Prior to the commencement of any works on the site, an Application for a ‘Works Zone’ and Construction Traffic Management Plan must be submitted to Councils Integrated Transport Department, and approved by the Randwick Traffic Committee, for a ‘Works Zone’ to be provided in Bunnerong Road for the duration of the demolition & construction works. 

 

The ‘Works Zone’ must have a minimum length of 12m and extend for a minimum duration of three months.  The suitability of the proposed length and duration is to be demonstrated in the application for the Works Zone.  The application for the Works Zone must be submitted to Council at least six (6) weeks prior to the commencement of work on the site to allow for assessment and tabling of agenda for the Randwick Traffic Committee.

 

The requirement for a Works Zone may be varied or waived only if it can be demonstrated in the Construction Traffic Management Plan (to the satisfaction of Council’s Traffic Engineers) that all construction related activities (including all loading and unloading operations) can and will be undertaken wholly within the site.  The written approval of Council must be obtained to provide a Works Zone or to waive the requirement to provide a Works Zone prior to the commencement of any site work.

 

43.     A detailed Construction Site Traffic Management Plan must be submitted to and approved by Council, prior to:

 

a)     commencement of any site work [or]

 

b)     a construction certificate being issued for the development.

 

The Construction Site Traffic Management Plan must be prepared by a suitably qualified person and must include the following details, to the satisfaction of Council:

·       A description of the demolition, excavation and construction works

·       A site plan/s showing the site, roads, footpaths, site access points and vehicular movements

·       Any proposed road and/or footpath closures

·       Proposed site access locations for personnel, deliveries and materials

·       Size, type and estimated number of vehicular movements (including removal of excavated materials, delivery of materials and concrete to the site)

·       Provision for loading and unloading of goods and materials

·       Impacts of the work and vehicular movements on the road network, traffic and pedestrians

·       Proposed hours of construction related activities and vehicular movements to and from the site

·       Current/proposed approvals from other Agencies and Authorities (including NSW Roads & Traffic Authority, Police and State Transit Authority)

·       Any activities proposed to be located or impact upon Council’s road, footways or any public place

·       Measures to maintain public safety and convenience

 

44.     A Traffic Control Plan must be submitted to and approved by Council and relevant Authorities, prior to carrying out any work which results in the closure or partial closure of a State or Regional Road , as identified by the NSW Roads & Traffic Authority.

 

Sydney Water

45.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

46.     A public utility impact assessment must be carried out on all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.  The assessment should include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of services.

 

Documentary evidence from Sydney Water confirming that their requirements have been or are able to be satisfied, in regards to access to their infrastructure on the northern side of the site within the easement, must be submitted to the principal certifying authority prior to the commencement of any demolition, excavation or building works.

 

47.     The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Road/Asset Opening Permit

48.     Any openings within or upon the road, footpath, nature strip or in any public place (i.e. for proposed drainage works or installation of services), must be carried out in accordance with the following requirements, to the satisfaction of Council:

 

a)     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

b)     Council’s Road / Asset Opening Officer must be notified at least 48 hours in advance of commencing any excavation works and also immediately upon completing the works (on 9399 0691 or 0409 033 921 during business hours), to enable any necessary inspections or works to be carried out.

 

c)     Relevant Road / Asset Opening Permit fees, construction fees, inspection fees and security deposits, must be paid to Council prior to commencing any works within or upon the road, footpath, nature strip or other public place,

 

d)     The owner/developer must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate or occupation of the development (whichever is sooner).

 

e)     Excavations and trenches must be back-filled and compacted in accordance with AUSPEC standards 306U.

 

f)     Excavations or trenches located upon a road or footpath are required to be provided with 50mm depth of cold-mix bitumen finish, level with the existing road/ground surface, to enable Council to readily complete the finishing works at a future date.

 

g)     Excavations or trenches located upon turfed areas are required to be back-filled, compacted, top-soiled and re-turfed with Kikuyu turf.

 

h)     The work and area must be maintained in a clean, safe and tidy condition at all times and the area must be thoroughly cleaned at the end of each day’s activities and upon completion.

 

i)      The work can only be carried out in accordance with approved hours of building work as specified in the development consent, unless the express written approval of Council has been obtained beforehand.

 

j)     Sediment control measures must be implemented in accordance with the conditions of development consent and soil, sand or any other material must not be allowed to enter the stormwater drainage system or cause a pollution incident.

 

k)     The owner/developer must have a Public Liability Insurance Policy in force, with a minimum cover of $10 million and a copy of the insurance policy must be provided to Council prior to carrying out any works within or upon the road, footpath, nature strip or in any public place.

 

Stormwater Drainage

49.     Adequate provisions must be made to collect and discharge stormwater drainage during construction of the building to the satisfaction of the principal certifying authority.

 

The prior written approval of Council must be obtained to connect or discharge site stormwater to Council’s stormwater drainage system or street gutter.

 

50.     Any required dewatering must be monitored by the consulting Engineer/s to the satisfaction of the principal certifying authority and documentary evidence of compliance with the relevant conditions of consent and dewatering requirements must be provided to the principal certifying authority and the Council.

 

The site conditions and fluctuations in the water table are to be reviewed by the consulting Engineer prior to and during the excavation/construction process, to ensure the suitability of the excavation and dewatering process and compliance with Council's conditions of consent.

 

51.     A separate written approval from Council is required to be obtained in relation to any proposed discharge of groundwater into Council’s drainage system external to the site, in accordance with the requirements of Section 138 of the Roads Act 1993.

 

Street  Awning

52.     Upon completion of the construction of the awning, certification of the structural adequacy of the awning must be provided to the Council.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

 

53.     Prior to issuing a final occupation certificate for the development, the owner/developer must meet the full cost for Council or a Council approved contractor to:

a)     Construct a full width heavy duty concrete vehicular crossings and laybacks at kerb opposite the vehicular entrances to the site in Norfolk Lane.

b)     Remove any redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

c)     Construct a concrete footpath along the full site frontage in Norfolk Lane. 

d)     Reconstruct any damaged footpath along the Bunnerong Road site frontage, in accordance with Council’s Urban Design Elements Manual for the Matraville Commercial Centre.

 

54.     Prior to issuing a final occupation certificate or occupation of the development (whichever is sooner), the owner/developer must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

55.     Prior to issuing a final occupation certificate or occupation of the development (whichever is sooner), a Registered Surveyor is to submit a works as executed plan in relation to the levels and grades of the internal driveways, this is to ensure the internal driveways have been constructed in accordance with the approved plans marked “ Drwg No DA01 Issue DA-4 dated 22/8/2011 by Axil Architects “ . The works as executed plan must be forwarded to the Principal Certifying Authority and the Council. The works-as-executed plan must include the following details (as applicable):

 

·      Finished levels, grades, distances and transitions along both internal driveways at there outer edges and centreline.

 

56.     Prior to issuing a final occupation certificate or occupation of the development (whichever is sooner) the owner/developer is to have car space No 6 of the commercial car park clearly signposted & marked as a small car space as well as the Visitor car spaces in the residential carpark.

 

57.     Prior to issuing a final occupation certificate or occupation of the development (whichever is sooner) the owner/developer is to have the car park entrances clearly signposted at their entrances as “Residential Carpark” & “Commercial Carpark”.

 

58.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)  All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)  Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)  If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)  The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Service Authorities

59.     The Section 73 Compliance Certificate must be submitted to the Principal Certifying Authority prior to issuing an Occupation Certificate or Subdivision Certificate (whichever the sooner).

 

Stormwater Drainage

60.     Prior to occupation of the development, a "restriction on the use of land” and “positive covenant" (under section 88E of the Conveyancing Act 1919) shall be placed on the title of the subject property to ensure that the onsite detention/infiltration system is maintained and that no works which could affect the design function of the detention/infiltration system are undertaken without the prior consent (in writing) from Council. Such restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

Notes:

a.  The “restriction on the use of land” and “positive covenant” are to be to the satisfaction of Council. A copy of Council’s standard wording/layout for the restriction and positive covenant may be obtained from Council’s Development Engineer.

a.  The works as executed drainage plan and hydraulic certification must be submitted to Council prior to the “restriction on the use of land” and “positive covenant” being executed by Council.

 

61.     Upon completion of the works and prior to the issuing of an Occupation Certificate, a works-as-executed drainage plan prepared by a registered surveyor and approved by a suitably qualified and experienced hydraulic consultant/engineer must be forwarded to the Principal Certifying Authority and the Council. The works-as-executed plan must include the following details (as applicable):

 

·      The location of any detention basin/s with finished surface levels;

·      Finished site contours at 0.2 metre intervals;

·      Volume of storage available in any detention areas;

·      The location, diameter, gradient and material (i.e. PVC, RC etc) of all stormwater pipes;

·      The orifice size/s (if applicable);

·      Details of any infiltration/absorption systems; and

·      Details of any pumping systems installed (including wet well volumes).

 

62.     Prior to the issuing of an Occupation Certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer, which confirms that the design and construction of the stormwater drainage system complies with the Building Code of Australia, Australian Standard AS3500.3:2003 (Plumbing & Drainage- Stormwater Drainage) and conditions of this development consent. 

 

The certification must be provided following inspection/s of the site stormwater drainage system by the Hydraulic Engineers to the satisfaction of the PCA.

 

63.     Prior to the issuing of an Occupation Certificate certification must be obtained from a suitably qualified and experienced professional Engineer, to the satisfaction of the Principal Certifying Authority confirming that the basement tanking/waterproofing and any sub-soil drainage systems (as applicable) have been provided in accordance with the conditions of consent and relevant Standards. A copy of the certification must be provided to the Council with the Occupation Certificate.

 

Road Dedication

64.     Prior to the issue of an occupation certificate, the applicant shall, at no cost to Council, dedicate a 0.6 metre wide strip of land along the full Norfolk Lane site frontage for road widening purposes. The strip of land is required to facilitate provision of a concrete footpath along the site frontage in Norfolk Lane.

 

Landscaping

65.     The landscaping shall be installed in accordance with the approved plans and specifications prior to occupation of the development and the landscaping must be maintained in accordance with the approved plans and specifications.

 

Certification is to be obtained from a suitably qualified Landscape Architect and submitted to the Principal Certifying Authority (PCA) (and Council, if Council is not the PCA) prior to the occupation of the development, which confirms that the landscaping works have been completed in accordance with the approved landscaping plans and relevant conditions of development consent, to the satisfaction of the PCA.

 

Waste Management

66.     Prior to the occupation of the development, the owner or applicant is required to contact Council’s City Services Department, to make the necessary arrangements for the provision of waste services for the premises.

 

67.     The waste storage areas shall be clearly signposted.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

Stormwater Detention/Infiltration  System

68.     The detention area/infiltration system must be regularly cleaned and maintained to ensure it functions as required by the design.

 

Building Regulation & Construction Site Management

69.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

70.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance are to be provided in the construction certificate.

 

71.     Prior to the commencement of any excavation or building works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans & specifications and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

72.     Prior to the commencement of any excavation or building works, the person having the benefit of the development consent must:-

 

·            appoint a Principal Certifying Authority for the building work, and

·            appoint a principal contractor for the building work and notify the Principal Certifying Authority and Council accordingly in writing, and

·            notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

·            give at least two days notice to the Council, in writing, of the person’s intention to commence building works.

 

73.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

74.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon must also be provided to Council with the occupation certificate.

 

75.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority or other suitably qualified independent person, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

76.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of any relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council prior to commencement of works.

 

77.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

78.     Prior to issuing an interim or final Occupation Certificate, a single and complete Fire Safety Certificate, which encompasses all of the essential fire safety measures contained in the fire safety schedule must be obtained and be submitted to Council, in accordance with the provisions of the Environmental Planning and Assessment Regulation 2000. A copy of the Fire Safety Certificate must be displayed in the building entrance/foyer and a copy of the Fire Safety Certificate must also be forwarded to the NSW Fire Brigades.

 

An annual Fire Safety Statement is also required to be submitted to the Council and the NSW Fire Brigades, each year after the date of the Fire Safety Certificate, in accordance with the Environmental Planning & Assessment Regulation 2000.

 

79.     A report or written correspondence must be obtained from a suitably qualified professional geotechnical engineer shall be submitted to the certifying authority prior to the issuing of a construction certificate, confirming the suitability and stability of the site for the proposed building and certifying the suitably and adequacy of the proposed design and construction of the building for the site.

 

80.     A report shall be prepared by a professional engineer and submitted to the certifying authority prior to the issuing of a construction certificate, detailing the proposed methods of excavation, shoring or pile construction, including details of potential vibration emissions.  The report, must demonstrate the suitability of the proposed methods of construction to overcome any potential damage to nearby land/premises.

 

Driven type piles/shoring must not be provided unless a geotechnical engineer’s report is submitted to the certifying authority, prior to the issuing of a construction certificate, which demonstrates that damage should not occur to any adjoining premises and public place as a result of the works.

 

Any practices or recommendations specified in the engineer’s report in relation to the avoidance or minimisation of structural damage to nearby premises or land must be fully complied with and incorporated into the documentation for the construction certificate. A copy of the engineers report is to be submitted to the Council, if the Council is not the certifying authority.

 

81.     The installation of ground or rock anchors underneath any adjoining premises including (a public roadway or public place) must not be carried out without specific written consent of the owners of the affected adjoining premises and (where applicable) details of compliance must be provided to the certifying authority prior to the commencement of any excavation or building works.

 

82.     A dilapidation report prepared by a professional engineer or suitably qualified and experienced building surveyor shall be submitted to the certifying authority prior to the commencement of demolition, excavation or building works detailing the current condition and status of all buildings and ancillary structures located upon all of the premises adjoining the subject site (eg.  dwellings, residential flat buildings, commercial/industrial building, garages, carports, verandah’s, fences, retaining walls, swimming pools and driveways etc.).

 

The report is to be supported with photographic evidence of the status and condition of the buildings and a copy of the report must also be forwarded to the Council and to the owners of each of the abovementioned premises, prior to the commencement of any works.

 

83.     A Certificate prepared by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to an occupation certificate being issued, which certifies that the building works satisfy the relevant structural requirements of the Building Code of Australia and approved structural design documentation.

 

84.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

§   name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours,

§   name, address and telephone number of the Principal Certifying Authority,

§   a statement stating that “unauthorised entry to the work site is prohibited”.

 

85.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies and conditions, including:

 

·       Occupational Health and Safety Act 2000

·       Occupational Health and Safety (Hazardous Substances) Regulation 2001

·       Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·       WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·           Australian Standard 2601 (2001) – Demolition of Structures

·           The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005.

·           Relevant Department of Environment & Climate Change (DECC) / Environment Protection Authority (EPA) and WorkCover NSW Guidelines.

·           Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

86.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Work Plan must include the following information (as applicable):

 

·           The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor (where applicable)

·           Details of hazardous materials (including asbestos)

·           Method/s of demolition (including removal of any asbestos)

·           Measures and processes to be implemented to ensure the health & safety of workers and community

·           Measures to be implemented to minimise any airborne dust and asbestos

·           Methods and location of disposal of any hazardous materials

·           Other relevant details, measures and requirements to be implemented

·           Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must be provided to Council.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

87.     Any work involving the demolition, storage and disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

a)     A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation). Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

b)     On sites involving the removal of asbestos, a  professionally manufactured sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS” and include details of the licensed contractor. The sign shall measure not less than 400mm x 300mm and the sign is to be installed prior to demolition work commencing and is to remain in place until such time as all asbestos has been safely removed from the site.

 

c)     Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 1996. Asbestos waste must be disposed of at an approved waste disposal depot (refer to the DEC or Waste Service NSW for details of sites). Copies of all receipts detailing method and location of disposal must be maintained on site and be provided to Council officers upon request, as evidence of correct disposal.

 

d)     A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council upon completion of any asbestos related works prior to an Occupation Certificate being issued, which confirms that the asbestos material have been removed appropriately and the relevant requirements contained in the Asbestos Survey and conditions of consent in relation to the safe removal and disposal of asbestos, have been satisfied.

 

88.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

89.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

1)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

a)     protect and support the adjoining premises from possible damage from the excavation, and

b)     where necessary, underpin the adjoining premises to prevent any such damage.

 

2)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

90.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

Internal work only within a commercial or industrial development, located in a commercial or industrial zone, which is not audible within any residential dwelling or commercial or industrial premises

·   Monday to Saturday - No time limits (subject to column 1)

·   Sunday & public holidays - No work permitted

Additional requirements for all development (except for single residential dwellings)

·   Saturdays and Sundays where the preceding Friday and/or the following Monday is a public holiday - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

91.     A Construction Noise & Vibration Management Plan, prepared in accordance with the Department of Climate Change Guidelines for Construction Noise and Assessing Vibration, by a suitably qualified person, is to be developed and implemented prior to commencing site work and throughout the course of construction, to the satisfaction of the Council.

 

a)     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents. 

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

b)     The Construction Noise & Vibration Management Plan must include details of measurements, analysis and relevant criteria and demonstrate that the noise and vibration emissions from the work satisfy the relevant provisions of the Protection of the Environment Operations Act 1997, current DECC Guidelines for Construction Noise and Assessing Vibration and Councils conditions of consent.

 

c)     A further report/correspondence must be obtained from the consultant as soon as practicable upon the commencement of works, which reviews and confirms the implementation and suitability of the noise and vibration strategies in the Construction Noise & Vibration Management Plan and which demonstrates compliance with relevant criteria.

 

d)     Any recommendations and requirements contained in the Construction Noise & Vibration Management Plan and associated reports are to be implemented accordingly and should noise and vibration emissions not comply with the terms and conditions of consent, work must cease forthwith and is not to recommence until details of compliance are submitted to Council and the PCA.

 

A copy of the Construction Noise & Vibration Management Plan and associated acoustic/vibration report/s must be maintained on-site and a copy must be provided to Council and the Principal Certifying Authority accordingly.

 

92.     Public health, safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be satisfied:

 

a)     The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

b)     Building materials, sand, soil, waste materials or construction equipment must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council. Applications to place a waste container in a public place can be made to Council’s Health, Building & Regulatory Services department.

 

d)     Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

e)     A temporary timber, asphalt or concrete crossing is to be provided to the site entrance across the kerb and footway area, with splayed edges, to the satisfaction of Council, unless access is via an existing concrete crossover.

 

f)     Temporary toilet facilities are to be provided within the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and Council. The toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

g)     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

h)     If the work involved in the erection or demolition of a building is likely to cause pedestrian or vehicular traffic in a public place to be obstructed or rendered inconvenient or the building involves the enclosure of a public place, a hoarding or fence must be erected between the work site and the public place.

 

If necessary, an awning is to be erected sufficiently to prevent any substance from, or in connection with, the work from falling into the public place or adjoining premises.

 

The public place adjacent to the work site must be kept lit between sunset and sunrise if it is likely to be hazardous to persons in the public place and any such hoarding, fence or awning is to be removed upon completion of the work.

 

i)      A ‘B Class’ overhead type hoarding is required is be provided to protect the public, located adjacent to the development, prior to the commencement of any works on the site which comprise:-

 

·     any works or hoisting of materials over a public footway or adjoining premises, or

·     any building or demolition works on buildings which are over 7.5m in height and located within 3.6 metres of the street alignment.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

j)     If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or any public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

k)     The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

l)      A Road / Asset Opening application must be submitted to and be approved by Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of an occupation certificate for the development. For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

m)    The owner/builder is required to hold Public Liability Insurance, with a minimum liability of $10 million and a copy of the Insurance cover is to be provided to Council.

 

93.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any site works. The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing / hoardings to the perimeter of the site;

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction

·       details of methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·       construction noise and vibration management;

·       construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council.  A copy of the Construction Site Management Plan must be provided to Council and the Principal Certifying Authority.  A copy must also be maintained on site and be made available to Council officers upon request.

 

94.     During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council.

 

Details of the proposed sediment control measures are to be detailed in a site management plan and must be submitted to and approved by the principal certifying authority prior to the commencement of any site works.  The sediment and erosion control measures must be implemented prior to the commencement of any site works and be maintained throughout construction.  A copy of the approved details must be forwarded to the Council and a copy is to be maintained on-site and be made available to Council officers upon request.

 

95.     During demolition excavation and construction works, dust emissions must be minimised, so as not to result in a nuisance to nearby residents or result in a potential pollution incident.

 

Adequate dust control measures must be provided to the site prior to the works commencing and the measures and practices must be maintained throughout the demolition, excavation and construction process, to the satisfaction of Council.

 

Dust control measures and practices may include:-

·       Provision of geotextile fabric to all perimeter site fencing (attached on the prevailing wind side of the site fencing).

·       Covering of stockpiles of sand, soil and excavated material with adequately secured tarpaulins or plastic sheeting.

·       Installation of a water sprinkling system or provision hoses or the like.

·       Regular watering-down of all loose materials and stockpiles of sand, soil and excavated material.

·       Minimisation/relocation of stockpiles of materials, to minimise potential for disturbance by prevailing winds.

·       Landscaping and revegetation of disturbed areas.

 

96.     A Registered Surveyor’s check survey certificate or compliance certificate is to be obtained at the following stage/s of construction, to demonstrate compliance with the approved setbacks, levels, layout and height of the building, to the satisfaction of the Principal Certifying Authority:

 

§   prior to construction of the first constructed floor/floor slab (prior to pouring of concrete),

§   prior to construction of each additional new floor level,

§   upon completion of the building, prior to issuing an occupation certificate,

§   as may be required by the Principal Certifying Authority.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority.  

 

Occupant Safety

97.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i.     The window having a minimum sill height of 1.5m above the internal floor level,

ii.    Providing a window locking device at least 1.5m above the internal floor level,

iii.    Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

iv.   Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v.    Other appropriate effective safety measures or barrier.

 

Access & facilities

98.     Access, facilities and car parking for people with disabilities must be provided to new building work in accordance with the relevant provisions of the Building Code of Australia and AS1428.1, AS4299 and 2890.1 and conditions of consent, to the satisfaction of the Certifying Authority.  Details of the proposed access, facilities and car parking for people with disabilities are to be included in the plans / specifications for the construction certificate.

 

Environmental health & amenity

99.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment (excluding plant and equipment during the construction phase) shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB (A) in accordance with relevant NSW Department of Environment & Climate Change Noise Control Guidelines.

 

100.    A report, prepared by a suitably qualified and experienced consultant in acoustics, shall be submitted to the Council prior to an occupation certificate being issued for the development, which demonstrates and certifies that noise and vibration from the development satisfies the relevant provisions of the Protection of the Environment Operations Act 1997, NSW DECC/EPA Noise Control Manual & Industrial Noise Policy, Council’s conditions of consent (including any relevant approved acoustic report and recommendations).  The assessment and report must include all relevant fixed and operational noise sources.

 

101.    There are to be no emissions or discharges from the premises, which will give rise to an environmental or public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

102.    Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council and the location, collection, storage and removal of wastes generated within the premises must not result in a public health nuisance or cause pollution.

 

103.    A separate development application and construction certificate or a complying development certificate (as applicable) must be obtained if the premises is to be used at any time for any of the purposes detailed below:

 

·       All food businesses (including premises used for the sale, storage, preparation and distribution of food and drinks)

·       Hairdressing salons, Beauty salons, Businesses involving Skin Penetration & Piercing, Massage businesses

·       Licensed premises, places of public entertainment and hotels

·       Places of Shared Accommodation (including Boarding / Lodging Houses, Bed & Breakfast businesses, Backpackers, Residential Hotels or the like

·       Premises which have a Cooling Tower or Warm Water System

·       Business providing any form of sexual service (i.e. brothel or the like).

 

Business premises which are used for these purposes must comply with relevant public health and safety legislation and requirements and they must be registered with Council prior to an Occupation Certificate being issued for the development. The relevant registration and inspection fee is also required to be paid to Council in accordance with Council’s adopted Pricing Policy.

 

Services

104.    All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met.  If applicable, the Construction Certificate plans and Structural Engineering details must be amended to satisfy the requirements of Sydney Water.

 

If the proposal is acceptable to Sydney Water, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority is required to ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before the commencement of any works.

 

Advisory

A1      The assessment of this development application does not include an assessment of the proposed building work under the Building Code of Australia (BCA).

 

A2      The assessment of this development application does not include an assessment of the proposed building work under the Building Code of Australia (BCA).

 

All new building work must comply with the BCA and relevant Australian Standards and details of compliance must be provided in the Construction Certificate application.

 

A3      A separate Local Approval application must be submitted to and be approved by Council's Health, Building & Regulatory Services department prior to commencing any of the following activities:-

 

§  Install or erect any site fencing, hoardings or site structures on any part of the nature strip, road or footpath

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip, bin or any other container or article on the road, nature strip or footpath.

 

A4      All new building work must comply with the BCA and relevant Australian Standards and details of compliance must be provided in the Construction Certificate application.

 

A5      Access for persons with disabilities, suitable access ramp/s should be provided from the entry to the premises and to the building in accordance with the Disability Discrimination Act and relevant provisions of the Australian Standard to the satisfaction of the certifying authority and details should be included in the construction certificate.

 

A6      A separate Local Approval application must be submitted to and be approved by Council's Health, Building & Regulatory Services department prior to commencing any of the following activities:-

 

§  Install or erect any site fencing, hoardings or site structures on any part of the nature strip, road or footpath

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip, bin or any other container or article on the road, nature strip or footpath.

 

Sydney Airport Advisory Notes:

 

Notes:

·         The standard conditions may be modified or supplemented by additional non-standard site specific conditions to address any specific environmental, amenity, construction and safety considerations associated with the proposal.

 

·         The waste management, drainage and infrastructure standard conditions may be modified or replaced with site specific conditions as proposed by Council’s Development Engineer, City Services or Waste Services officers.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY – SEE RESOLUTION.

 

 

 

CP89/11   Director City Planning Report - 11/98 Mount Street, Coogee (DA/542/2011) (DA/542/2011)

144/11

RESOLUTION: (Hughes/Woodsmith) -

 

A.     That Council does not support the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 32 of the Randwick Local Environmental Plan 1998, relating to floor Space Ratio on the grounds that the proposed development is inconsistent with the objective of the clause and will adversely affect the amenity of the surrounding locality.

 

B.     That Council, as the consent authority, refuse consent under Section 80 and 80A of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No.DA/542/2011 for the enclosure of an existing balcony for unit 11 at 98 Mount Street, Coogee, for the following reasons:

 

1.   The additional floor area to the building resulting from the enclosure of the balcony will not comply with the maximum floor space ratio of 0.9:1, and purpose of Clause 32 of the Randwick LEP 1998.

 

2.   The proposed enclosure of the existing balcony does not meet the objectives of the DCP for Multi Unit Housing which discourages piecemeal enclosure of balconies as it will add to the perceived bulk of the building, it will also detract from the overall appearance of the building and compromise it’s existing architectural integrity.

 

MOTION: (Andrews/Matthews) that development consent be granted subject to standard conditions as the enclosure will not be detrimental to the overall appearance of the building and the applicant’s unit will still enjoy an outdoor terrace area. LOST.

 

The DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Belleli

Councillor Matthews

Councillor Bowen

Councillor Procopiadis

Councillor Hughes

 

Councillor Matson

 

Councillor Nash

 

Councillor Notley-Smith

 

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor White

 

Councillor Woodsmith

 

 

Total (3)

Total (11)

 

MOTION: (Hughes/Woodsmith) CARRIED – SEE RESOLUTION.

 

The DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Matthews

Councillor Belleli

Councillor Procopiadis

Councillor Bowen

 

Councillor Hughes

 

Councillor Matson

 

Councillor Nash

 

Councillor Notley-Smith

 

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor White

 

Councillor Woodsmith

 

 

 

Total (12)

Total (2)

 

 

 

CP90/11   Director City Planning Report - 281 Clovelly Road, Clovelly (DA/413/2011) (DA/413/2011)

145/11

RESOLUTION: (Andrews/Nash) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F(1) of Randwick Local Environmental Plan 1998 (Consolidation), relating to Floor Space Ratio, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/413/2011 for alterations and additions to the existing semi-detached dwelling including new first floor level and front and rear first floor balconies at No. 281 Clovelly Road, Clovelly, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received

7277/10 (Sheet  1 of 6)

Cape Cod Australia

02/06/2011

6 June 2011

7277/10 (Sheet  2 of 6)

Cape Cod Australia

-

6 June 2011

7277/10 (Sheet 3 of 6)

Cape Cod Australia

-

6 June 2011

7277/10 (Sheet 4 of 6)

Cape Cod Australia

-

6 June 2011

7277/10 (Sheet 5 of 6)

Cape Cod Australia

-

6 June 2011

7277/10 (Sheet 6 of 6)

Cape Cod Australia

-

6 June 2011

 

BASIX Certificate

No.

Dated

Received

 

A113483

1 June 2011

6 June 2011

 

Amendment of Plans & Documentation

2.       The approved plans and documents must be amended in accordance with the following requirements:

 

a.     The openings within the proposed privacy screens must not exceed 25% of the area of the screen to ensure reasonable levels of privacy are maintained to the neighbouring properties.

 

b.     Window No’s. W5 & W4 on the eastern elevation of the proposed first floor addition must be fixed to a height of at least 1.5m above floor level and be provided with translucent, obscured, frosted or sandblasted glazing below this specified height. Alternatively, external louvers angled in an upward direction to prevent overlooking to neighbouring properties shall be provided to these windows. The BASIX certificate is to be amended to reflect the above changes. Details of compliance are to be provided in the construction certificate plans.

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

3.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

4.       The external colours & finishes schedule shall be in general accordance with the documentation prepared by Cape Cod Australia and received by Council on 6 June 2011.

 

Section 94A Development Contributions

5.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $261,287, the following applicable monetary levy must be paid to Council: $2,612.87.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate [or subdivision certificate] being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Long Service Levy Payments

6.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

Compliance with the Building Code of Australia

7.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Structural Adequacy

8.       Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority), certifying the structural adequacy of the existing structure to support the additional storey.

 

Smoke Alarms

9.       Smoke alarms are required to be installed in accordance with the relevant provisions of the Building Code of Australia (volume 2) smoke alarms must comply with AS3786.  Smoke alarms must be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

BASIX Requirements

10.     In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Energy & Water Efficiency

11.     The following energy efficiency and water saving measures are to be implemented in all new and upgraded building work and details included in the construction certificate:

 

a)       The consumption of water shall be minimised by the use of triple A rated water efficient plumbing fixtures (taps and shower roses) and water efficient dual flush toilets.

 

b)       New external timber or metal framed and brick veneer walls and roofs are to be provided with insulation (i.e. bulk insulation and a reflective building membrane/reflective sarking/foil insulation), having a minimum total thermal resistance R–value of 3.0 in roofs and 1.5 in external walls.  The insulation and reflective building membrane is to be installed in accordance with the relevant requirements of the Building Code of Australia and the manufacturers details.

 

c)       New hot water service pipes are to be provided with insulation and must also satisfy any relevant requirements of Building Code of Australia and AS 3500.

 

Stormwater Drainage

12.     A surface water/stormwater drainage system must be provided in accordance with the following requirements, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate:-

 

a)     Surface water/stormwater drainage systems must be provided in accordance with the relevant requirements of the Building Code of Australia (Volume 2);

 

b)     The surface water/stormwater must be drained and discharged to the street gutter or, subject to site suitability, the stormwater may be drained to a suitably designed absorption pit;

 

c)     Any absorption pits or soaker wells should be located not less than 3m from any adjoining premises and the stormwater must not be directed to any adjoining premises or cause a nuisance;

 

d)     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises;

 

e)     Details of any proposed drainage systems or works to be carried out in the road, footpath or nature strip must be submitted to and approved by Council before commencing these works.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

13.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

Home Building Act 1989

14.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council.

 

Dilapidation Reports

15.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·        excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·        new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·        excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·        as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

16.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works on site.

 

Temporary Site Fencing

17.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary site fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management Plan

18.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·        location and construction of protective fencing / hoardings to the perimeter of the site;

·        location of site storage areas/sheds/equipment;

·        location of building materials for construction;

·        provisions for public safety;

·        dust control measures;

·        site access location and construction

·        details of methods of disposal of demolition materials;

·        protective measures for tree preservation;

·        provisions for temporary sanitary facilities;

·        location and size of waste containers/bulk bins;

·        details of proposed sediment and erosion control measures;

·        provisions for temporary stormwater drainage;

·        construction noise and vibration management;

·        construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

19.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

 

·        The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·        Details of hazardous materials (including asbestos)

·        Method/s of demolition (including removal of any asbestos)

·        Measures and processes to be implemented to ensure the health & safety of workers and community

·        Measures to be implemented to minimise any airborne dust and asbestos

·        Methods and location of disposal of any hazardous materials (including asbestos)

·        Other relevant details, measures and requirements to be implemented

·        Details of re-use, recycling and disposal of waste demolition/building materials

·        Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Sydney Water

20.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

21.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 


Inspections During Construction

22.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Site Signage

23.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·     name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·     name, address and telephone number of the Principal Certifying Authority,

·     a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

24.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Demolition Work Requirements

25.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment, Climate Change & Water and Randwick City Council policies, including:

 

·            Occupational Health & Safety Act 2000 & Regulations

·            WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·            WorkCover NSW Guidelines and Codes of Practice

·            Australian Standard 2601 (2001) – Demolition of Structures

·        The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·            Relevant DECCW/EPA Guidelines

·            Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

26.     Work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·           Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·           Randwick City Council’s Asbestos Policy

 

·           A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·           On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·           Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·           A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Sediment & Erosion Control

27.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.  Details are to be included in the Construction Site Management Plan.

 

Public Safety & Site Management

28.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

·       Building materials, sand, soil, waste materials, construction equipment or other articles must not be placed upon the footpath, roadway or nature strip at any time.

 

·       The road, footpath, vehicular crossing and nature strip must be maintained in a good, safe, clean condition and free from any excavations, obstructions, trip hazards, goods, materials, soils or debris at all times.  Any damage caused to the road, footway, vehicular crossing, nature strip or any public place must be repaired immediately, to the satisfaction of Council.

 

·       Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

·       Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

·       Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Support of Adjoining Land, Excavations & Retaining Walls

29.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

30.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

         Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

31.     Prior to undertaking any demolition, excavation or building work in the following circumstances, a report must be obtained from a professional engineer which details the methods of support for the dwelling or associated structure on the adjoining land, to the satisfaction of the Principal Certifying Authority:

 

·      when undertaking excavation or building work within the zone of influence of the footings of a dwelling or associated structure that is located on the adjoining land;

·      when undertaking demolition work to a wall of a dwelling that is built to a common or shared boundary (eg. semi-detached or terrace dwelling);

·      when constructing a wall to a dwelling or associated structure that is located within 900mm of a dwelling located on the adjoining land.

 

The demolition, excavation and building work and the provision of support to the dwelling or associated structure on the adjoining land, must also be carried out in accordance with the abovementioned report, to the satisfaction of the Principal Certifying Authority.

 

Building Encroachments

32.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Road/Asset Opening Permit

33.     A Road / Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Occupation Certificate Requirements

34.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

BASIX Requirements

35.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

36.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·        The window having a minimum sill height of 1.5m above the internal floor level,

·        Providing a window locking device at least 1.5m above the internal floor level,

·        Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·        Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·        Other appropriate effective safety measures or barrier.

 

The relevant measures must be implemented prior to the issue of an occupation certificate.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

37.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)     All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)     Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)     If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)     The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

Use of premises

38.     The premises must only be used as a single residential dwelling and must not be used for dual or multi-occupancy purposes.

 

External Lighting

39.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

Protection of the Environment Operations Act 1997 – Rainwater Tanks

40.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Rainwater Tank Requirements

41.     The installation of rainwater tanks shall comply with the following noise control requirements:-

 

a)   The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

      In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)   Plant and equipment associated with rainwater tanks are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)   The operation of plant and equipment associated with rainwater tanks are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

·      before 8.00am or after 8.00pm on weekends or public holiday; or

·      before 7.00am or after 8.00pm on weekdays.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1      The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

A2      Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

A3      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A4      Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

A5      A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

A6      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A7      Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

A8      This consent does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the land owner or principal contractor must obtain:

 

§  the consent of the owners of such adjoining or supported land to trespass or encroach, or

§  an access order under the Access to Neighbouring Land Act 2000, or

§  an easement under section 88K of the Conveyancing Act 1919, or

§  an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

MOTION: (Andrews/Nash) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

CP91/11   Director City Planning Report - 19 Courland Street, Randwick (DA/133/2011) (DA/133/2011)

146/11

RESOLUTION: (Andrews/Nash) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses Clause 20F(1) of Randwick Local Environmental Plan 1998 (Consolidation), relating to Floor Space Ratio, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/133/2011 for substantial alterations and additions to the existing dwelling including new first floor level, at No. at 19 Courland Street, Randwick, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received

13/11

Peter Banfield

24/06/2011

1 July 2011

 

BASIX Certificate

No.

Dated

Received

 

A106649

28 February 2011

3 March 2011

 

Amendment of Plans & Documentation

2.       The approved plans and documents must be amended in accordance with the following requirements:

 

a.   Window No’s. W2, W3 & W7 on the southern elevation of the proposed first floor addition must be fixed to a height of 1.5m and be provided with translucent, obscured, frosted or sandblasted glazing below this specified height.  Alternatively, external louvers angled in an upward direction to prevent overlooking to neighbouring properties shall be provided to these windows. The BASIX certificate is to be amended to reflect the above changes. Details of compliance are to be provided in the construction certificate plans.

 

b.   Window No. W9 on the ground floor level to the southern elevation must have a sill height of 1.5m above the ground floor level, to prevent overlooking to neighbouring properties’ rear yards. The BASIX certificate is to be amended to reflect the above changes. Details of compliance are to be provided in the construction certificate plans.

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

3.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

4.       a)    The colours, materials and finishes of the external surfaces are to be compatible with the existing building and adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

External materials, finishes and colours of the building are required to match, as closely as possible, the existing building and any metal roof sheeting is to be pre-painted (e.g. Colourbond) to limit the level of reflection and glare.

 

b)    Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Manager Development Assessments prior to issuing a construction certificate for the development.

 

Section 94A Development Contributions

5.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $220,000, the following applicable monetary levy must be paid to Council:   $2200.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate [or subdivision certificate] being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Compliance with the Building Code of Australia

6.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Structural Adequacy

7.       Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority), certifying the structural adequacy of the existing structure to support the additional storey.

 

Long Service Levy Payments

8.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Stormwater Drainage

9.       A surface water/stormwater drainage system must be provided in accordance with the following requirements, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate:-

 

a)    Surface water/stormwater drainage systems must be provided in accordance with Part 3.1.2 of the Building Code of Australia (Volume 2);

 

b)    The surface water/stormwater must be drained and discharged to the street gutter or, subject to site suitability, the stormwater may be drained to a suitably designed absorption pit;

 

c)    Any absorption pits or soaker wells should be located not less than 3m from any adjoining premises and the stormwater must not be directed to any adjoining premises or cause a nuisance;

 

d)    External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises;

 

e)    Details of any proposed drainage systems or works to be carried out in the road, footpath or nature strip must be submitted to and approved by Council before commencing these works.

 

BASIX Requirements

10.     In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Smoke Alarms

11.     Smoke alarms are required to be installed in each Class 1 building or dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

12.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)       a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)       a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)       a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)       the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)       at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

Home Building Act 1989

13.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing.

 

Dilapidation Reports

14.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·     excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·     new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·     excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·     as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

15.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

Temporary Site Fencing

16.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary site fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management Plan

17.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·          location and construction of protective fencing / hoardings to the perimeter of the site;

·          location of site storage areas/sheds/equipment;

·          location of building materials for construction;

·          provisions for public safety;

·          dust control measures;

·          site access location and construction

·          details of methods of disposal of demolition materials;

·          protective measures for tree preservation;

·          provisions for temporary sanitary facilities;

·          location and size of waste containers/bulk bins;

·          details of proposed sediment and erosion control measures;

·          provisions for temporary stormwater drainage;

·          construction noise and vibration management;

·          construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

18.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

 

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

·          Recycling, reuse and waste disposal of remediation materials

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Sydney Water

19.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

20.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Demolition Work Requirements

21.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment, Climate Change & Water and Randwick City Council policies, including:

 

·          Occupational Health & Safety Act 2000 & Regulations

·          WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·          WorkCover NSW Guidelines and Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECCW/EPA Guidelines

·          Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

22.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Site Signage

23.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·          name, address and telephone number of the Principal Certifying                  Authority,

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

Sediment & Erosion Control

24.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.  Details are to be included in the Construction Site Management Plan.

 

Public Safety & Site Management

25.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)    Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)    Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

c)    Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)    Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

e)    Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

f)     Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Excavations, Back-filling & Retaining Walls

26.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

Support of Adjoining Land

27.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)    If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)     protect and support the adjoining premises from possible damage from the excavation, and

ii)     where necessary, underpin the adjoining premises to prevent any such damage.

b)    The condition referred to in subclause a) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

28.     Prior to undertaking any demolition, excavation or building work in the following circumstances, a report must be obtained from a professional engineer which details the methods of support for the dwelling or associated structure on the adjoining land, to the satisfaction of the Principal Certifying Authority:

 

·          when undertaking excavation or building work within the zone of influence of the footings of a dwelling or associated structure that is located on the adjoining land;

·          when undertaking demolition work to a wall of a dwelling that is built to a common or shared boundary (eg. semi-detached or terrace dwelling);

·          when constructing a wall to a dwelling or associated structure that is located within 900mm of a dwelling located on the adjoining land.

 

The demolition, excavation and building work and the provision of support to the dwelling or associated structure on the adjoining land, must also be carried out in accordance with the abovementioned report, to the satisfaction of the Principal Certifying Authority.

 

Restriction on Working Hours

29.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Inspections During Construction

30.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Building Encroachments

31.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Road/Asset Opening Permit

32.     A Road / Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:        For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Occupation Certificate Requirements

33.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

BASIX Requirements

34.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

35.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·          The window having a minimum sill height of 1.5m above the internal floor level,

·          Providing a window locking device at least 1.5m above the internal floor level,

·          Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·          Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·          Other appropriate effective safety measures or barrier.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

36.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)   All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)   Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)   If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)   The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

Use of premises

37.     The premises must only be used as a single residential dwelling and must not be used for dual or multi-occupancy purposes.

 

External Lighting

38.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

·          The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

·          Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

·          This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

·          A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

·          Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

·          Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

MOTION: (Andrews/Nash) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

Note: Having previously declared interests, Councillors Matson, Nash and Hughes left the chamber at this point in the meeting and took no part in the debate or voting on items CP92/11, CP93/11 and CP94/11.

 

 

CP92/11   Director City Planning Report - JRPP - 330 Anzac Parade, Kensington - UNSW (DA/494/2011) (DA/494/2011)

147/11

RESOLUTION: (Procopiadis/Woodsmith) that:-

 

(a)    the assessment report from the Joint Regional Planning Panel in relation to         DA/494/2011 (330 Anzac Parade, Kensington - UNSW) be received and noted;         and

 

(b)    Council also make a submission to the JRPP in relation to the request by the         University of NSW for a waiver of the Section 94 contributions. The submission is to stress that Council disagrees with the request for waiver of the Section 94         contributions.

 

MOTION: (Procopiadis/Woodsmith) CARRIED UNANIMOUSLY – SEE RESOLUTION.

 

Note: Having previously declared an interest, Councillor Notley-Smith left the chamber at this point in the meeting and took no part in the debate or voting on items CP93/11 and CP94/11.

 

 

CP93/11   Director City Planning Report - JRPP - 1408 Anzac Parade, Little Bay (Lots 3 & 4) (DA/495/2011) (DA/495/2011)

148/11

RESOLUTION: (Andrews/Procopiadis) that Council receive and note the attached assessment report for the Joint Regional Planning Panel.

 

MOTION: (Belleli/Woodsmith) that Council make a submission to the JRPP recommending refusal of this application as it is not in the public interest, the proposal is to bulky, it will have a negative impact on the amenity of the streetscape and is of poor design. LOST.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Belleli

Councillor Andrews

Councillor Matthews

Councillor Bowen

Councillor Woodsmith

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor White

 

 

Total (3)

Total (7)

 

MOTION: (Andrews/Procopiadis) CARRIED – SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Belleli

Councillor Bowen

Councillor Matthews

Councillor Procopiadis

Councillor Woodsmith

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor White

 

Total (7)

Total (3)

 

Note: Crs Belleli and Matthews requested that their names be recorded as being opposed to the resolution.

 

 

 

CP94/11   Director City Planning Report - JRPP - 1408 Anzac Parade, Little Bay (Lot 5) (DA/496/2011) (DA/496/2011)

149/11

RESOLUTION: (Andrews/Procopiadis) that Council receive and note the attached assessment report for the Joint Regional Planning Panel.

 

MOTION: (Belleli/Woodsmith) that Council make a submission to the JRPP recommending refusal of this application as it is not in the public interest, the proposal is to bulky, it will have a negative impact on the amenity of the streetscape and is of poor design. LOST.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Belleli

Councillor Andrews

Councillor Matthews

Councillor Bowen

Councillor Woodsmith

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor White

 

 

Total (3)

Total (7)

 

MOTION: (Andrews/Procopiadis) CARRIED – SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Belleli

Councillor Bowen

Councillor Matthews

Councillor Procopiadis

Councillor Woodsmith

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor White

 

 

 

Total (7)

Total (3)

 

Note: Crs Belleli and Matthews requested that their names be recorded as being opposed to the resolution.

 

 

CP95/11   Director City Planning Report - Reporting Variation to Development Standard under State Environment Planning Policy No. 1 (SEPP 1) for the Month of August 2011 (F2008/00122)

150/11

RESOLUTION: (Andrews/Nash) that the report be received and noted.

 

MOTION: (Andrews/Nash) CARRIED - SEE RESOLUTION.

 

 

CP96/11   Director City Planning Report - Cultural Community Grant Program September 2011 Round - Recommended Allocations (F2009/00182)

151/11

RESOLUTION: (Andrews/Procopiadis) that Council:

 

a)     approve Cultural Community Program funds totalling $61,092.80 to be allocated to the recommended grant applicants listed in Attachment 1.

 

b)     endorse the amendments to the Cultural Community Grant Program outlined in this report.

 

c)     implement the amended Cultural Community Grants Program, Guidelines and Application Form (Attachment 2) for the March 2012 and subsequent rounds.

 

d)     place on its website the amended Cultural Community Grants Program Guidelines and Application Form immediately after the conclusion of the September 2011 Round.

 

MOTION: (Andrews/Procopiadis) CARRIED - SEE RESOLUTION.

 

 

 

CP101/11 Director City Planning Report - 5 Wisdom Street, Coogee (DA/837/2010) (DA/837/2010)

152/11

RESOLUTION: (Notley-Smith/Woodsmith)

 

That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. D/837/2010 for the demolition of an existing dwelling and construction of a three level dwelling with an in ground swimming pool to rear, garaging and associated site works, at No. 5 Wisdom Street, South Coogee, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Sheet No. D000

Site Analysis/Site Management Plan

Draftsmart Pty. Ltd.

18/07/11 Amendment D Roof Terrace Deleted

Sheet No. D01

Garage Plan

Draftsmart Pty. Ltd

18/07/11 Amendment D Roof Terrace Deleted

Sheet No. D02

Ground Floor Plan

Draftsmart Pty. Ltd

18/07/11 Amendment D Roof Terrace Deleted

Sheet No. D03

First Floor Plan

Draftsmart Pty. Ltd

18/07/11 Amendment D Roof Terrace Deleted

Sheet No. D05

Elevations

Draftsmart Pty. Ltd

18/07/11 Amendment D Roof Terrace Deleted

Sheet No. D06

Elevation, Section

Draftsmart Pty. Ltd

18/07/11 Amendment D Roof Terrace Deleted

Sheet No. D10

Floor Space Analysis

Draftsmart Pty. Ltd

18/07/11 Amendment D Roof Terrace Deleted

 

Amendment of Plans & Documentation

2.     The approved plans and documents must be amended in accordance with the         following requirements:

 

a.        The rooftop level must not be used as a trafficable area.

 

b.        The balustrading and infill panels to all balconies must consist of clear glass so as to ensure view lines are maintained and to reduce the visual bulk of the dwelling. The southern splay wall at ground floor level is also to be replaced by clear glass as a continuation of the glazing along the eastern terrace.

 

c.        A continuation of fence at a height of 1.8m above the ground level of the subject site must be installed along the side boundary between the subject site and No. 2 Crana Avenue.

 

d.        The eastern wall of the ground floor living area must be setback a minimum of 5550mm from the Crana Avenue street frontage as provided for in Plan Sheet No. D02 amendment E dated 19/9/11.

 

e.        The proposed dome skylight must be replaced with a flat glass skylight as provided for in Plan Sheet No. E00 amendment E dated 19/9/11.

 

f.         Prior to the issue of a Construction Certificate, a revised BASIX certificate is to be issued which reflects the current plans.

 

REQUIREMENTS BEFORE A CONSTRUCTION CERTIFICATE CAN BE ISSUED

The following conditions of consent must be complied with before a ‘Construction Certificate’ is issued by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be included in the documentation for the construction certificate.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

3.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

4.       The schedule of external colours and finishes shall be in general accordance with the documentation received by Council on 27 September 2010.

 

Section 94A Development Contributions

5.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $900,000 the following applicable monetary levy must be paid to Council: $ 9,000.00.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Long Service Levy Payments

6.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Security Deposits

7.       The following security deposits requirement must be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to Council’s assets and infrastructure; and as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

·           $600.00     -      Damage / Civil Works Security Deposit

 

Security deposits may be provided by way of a cash, cheque or credit card payment and is refundable upon a satisfactory inspection by Council upon the completion of the civil works which confirms that there has been no damage to Council's infrastructure.

 

The owner/builder is also requested to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

To obtain a refund of relevant deposits, a Security Deposit Refund Form is to be forwarded to Council’s Director of City Services upon issuing of an occupation certificate or completion of the civil works.

 

REQUIREMENTS TO BE INCLUDED IN THE CONSTRUCTION CERTIFICATE

The requirements contained in the following conditions of consent must be complied with and details of compliance must be included in the construction certificate for the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Councils development consent conditions and to achieve reasonable levels of environmental amenity.

 

Compliance with the Building Code of Australia

8.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Smoke Alarms

9.       Smoke alarms are required to be installed in accordance with the relevant provisions of the Building Code of Australia (volume 2) smoke alarms must comply with AS3786.  Smoke alarms must be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

Design Alignment levels

10.     The design alignment level (the finished level of concrete, paving or the like) at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

The design alignment level/s at the property boundary as issued by Council and their relationship to the roadway/kerb/footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

Any enquiries regarding this matter should be directed to Council’s Development Engineer on 9399 0923.

 

11.     The design alignment levels at the property boundary as issued by Council and their relationship to the roadway/kerb/footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

Any enquiries regarding this matter should be directed to Council’s Development Engineer on 9399 0923.

 

Driveway Design

12.     The gradient of the internal access driveway must be designed and constructed in accordance with AS 2890.1 (2004) – Off Street Car Parking and the levels of the driveway must match the alignment levels at the property boundary (as specified by Council). Details of compliance are to be included in the construction certificate.

 

BASIX Requirements

13.     In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Stormwater Drainage

14.     A surface water/stormwater drainage system must be provided in accordance with the following requirements, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate:-

 

a)     Surface water/stormwater drainage systems must be provided in accordance with the relevant requirements of the Building Code of Australia (Volume 2);

 

b)     The surface water/stormwater must be drained and discharged to the street gutter or, subject to site suitability, the stormwater may be drained to a suitably designed absorption pit;

 

c)     Any absorption pits or soaker wells should be located not less than 3m from any adjoining premises and the stormwater must not be directed to any adjoining premises or cause a nuisance;

 

d)     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises;

 

e)     Details of any proposed drainage systems or works to be carried out in the road, footpath or nature strip must be submitted to and approved by Council before commencing these works.

 

Building & Design

15.     Eaves, gutters, hoods and similar structures or attachments are required to be setback from the side boundaries of the allotment a minimum distance of 450mm.

 

Security Deposit

16.     The following damage / civil works security deposit requirement must be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; and as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

·           $3000.00    -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash, cheque or credit card payment and is refundable upon a satisfactory inspection by Council upon the completion of the civil works which confirms that there has been no damage to Council's infrastructure.

 

The owner/builder is also requested to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

To obtain a refund of relevant deposits, a Security Deposit Refund Form is to be forwarded to Council’s Director of City Services upon issuing of an occupation certificate or completion of the civil works.

 

Design Alignment levels

17.     The design alignment level (the finished level of concrete, paving or the like) at the property boundary for driveways, access ramps and pathways or the like, shall be:

 

For  Driveway (Crana Avenue)

·      50mm above the top of the kerb opposite at the southern edge of the driveway

·      100mm above the top of the kerb opposite at the property corner located on the driveway

·      200mm above the top of the kerb opposite at the northern edge of driveway.

·      Straight grade between these points

 

 For Pedestrian entrance (Wisdom Street)

·     RL 25.05 (AHD).

 

The design alignment levels at the property boundary as issued by Council must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

      Any enquiries regarding this matter should be directed to Council’s Development Engineer Jason Rider on 9399 0881.

18.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $526 calculated at $46.00 (inclusive of GST) per metre of Crana Avenue frontage. This amount is to be paid prior to a construction certificate being issued for the development.

 

Driveway Design

19.     The gradient of the internal access driveway must be designed and constructed in accordance with AS 2890.1 (2004) – Off Street Car Parking and the levels of the driveway must match the alignment levels at the property boundary (as specified by Council). Details of compliance are to be included in the construction certificate.

 

 

Sydney Water

20.     Prior to the issuing of a construction certificate the approved plans must be submitted to a Sydney Water Quick Check agent or Customer Centre to determine whether the development will affect any Sydney Water asset’s sewer and water mains, stormwater drains and/or easement, and if further requirements need to be met. Plans will be appropriately stamped.

 

         Please refer to the web site www.sydneywater.com.au for Quick Check agent details and Guidelines for Building Over/Adjacent to Sydney Water Assets.

 

Stormwater Drainage

21.     Prior to the issue of a construction certificate, detailed drainage plans with levels reduced to Australian Height Datum (AHD), shall be prepared by a suitably qualified Hydraulic Engineer and be submitted to and approved by the certifying authority.  A copy of the plans shall be forwarded to Council, if Council is not the certifying authority.

 

The drainage plans must demonstrate compliance with the Building Code of Australia, Australian Standard AS3500.3:2003 (Plumbing and Drainage - Stormwater Drainage) and the relevant conditions of this development approval.

 

22.     Generally all site stormwater shall be piped to a sediment/silt arrester pit that drains by gravity to Council’s kerb and gutter or underground drainage system in Canara Avenue or Wisdom Street.

 

NOTES:

a.       The sediment/silt arrestor pit shall be constructed:-

(i)  within the site at or near the street boundary.

(ii) with a child proof and corrosion resistant fastening system (e.g. spring loaded jay-bolt).

(iii) with a minimum of 4 x 90 mm diameter weep holes (preferably located in the walls of the pit at the floor level) and with a suitable geotextile material with a high filtration rating located around the weep holes.

(iv)  with the pit floor being a minimum 300mm below the invert level of the outlet pipelines.

(v) with a galvanised heavy duty screen (Lysaght RH3030 Maximesh or similar) located over the outlet pipes draining to the infiltration pit and the kerb. (Similar to a Mascot GRC stormwater discharge control pit, product code DS3SDC).

 

b.       The overflow pipe/s from the rainwater tank/s shall be directed into the sediment arrestor pit.

 

23.     Sub-soil drainage (from site seepage & planter boxes etc) must comply with the following requirements:

 

a)     Sub-soil drainage must not be connected or discharged directly or indirectly to Council’s street gutter.

 

b)     Sub-soil drainage systems (if provided) must comply with one or more of the following requirements:-

 

i.   The system may be connected directly to Council’s underground drainage system (but only with the prior written approval of Council, as required under the Roads Act 1993).

 

ii.   The basement areas of the building must be tanked and waterproofed to prevent seepage water and subsoil drainage from entering the building.

 

iii.  Sub-soil drainage systems may discharge via infiltration subject to the hydraulic consultant/engineer being satisfied that the site and soil conditions are suitable and the seepage is able to be fully managed within the site, without causing a nuisance to any premises and ensuring that it does not drain or discharge (directly or indirectly) to the street gutter.

 

c)     Details of the proposed stormwater drainage system including methods of sub-soil drainage, tanking/waterproofing (as applicable) must be prepared or approved by a suitably qualified and experienced Professional Engineer to the satisfaction of the Certifying Authority and details are to be included in the construction certificate.

 

24.     Details of the proposed connection and or disposal of any site seepage, groundwater or construction site stormwater to Council’s stormwater drainage system must be submitted to and approved by Council’s Development Engineer, prior to commencing these works, in accordance with section 138 of the Roads Act 1993.

 

Details must include the following information:

·       Site plan

·       Hydraulic engineering details of the proposed disposal/connection of groundwater or site stormwater to Council/s drainage system

·       Volume of water to be discharged

·       Location and size of drainage pipes

·       Duration, dates and time/s for the proposed works and disposal

·       Details of water quality and compliance with the requirements of the Protection of the Environment Act 1997

·       Details of associated plant and equipment, including noise levels from the plant and equipment and compliance with the requirements of the Protection of the Environment Act 1997 and associated Regulations and Guidelines

·       Copy of any required approvals and licences from other Authorities (e.g.  A water licence from the Department of Planning/Department of Water & Energy).

·       Details of compliance with any relevant approvals and licences

 

Street Tree

25.     The applicant shall submit a payment of $107.25 (including GST), being the cost for Council to supply and install 1 x 25 litre street tree, Banksia serrata (Saw Toothed Banskia) on the Wisdom Street verge, just east of the proposed pedestrian entry, at the completion of all works.

 

The contribution shall be paid into Tree Amenity Income at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development.

 

The applicant must contact Council’s Landscape Development Officer on 9399-0613 (quoting the receipt number), and giving at least four working weeks notice to arrange for planting of the tree.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

26.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

Home Building Act 1989

27.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council.

 

Dilapidation Reports

28.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

29.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works on site.

 

Temporary Site Fencing

30.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary site fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management Plan

31.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·           location and construction of protective fencing / hoardings to the perimeter of the site;

·           location of site storage areas/sheds/equipment;

·           location of building materials for construction;

·           provisions for public safety;

·           dust control measures;

·           site access location and construction

·           details of methods of disposal of demolition materials;

·           protective measures for tree preservation;

·           provisions for temporary sanitary facilities;

·           location and size of waste containers/bulk bins;

·           details of proposed sediment and erosion control measures;

·           provisions for temporary stormwater drainage;

·           construction noise and vibration management;

·           construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

32.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

·           The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·           Details of hazardous materials (including asbestos)

·           Method/s of demolition (including removal of any asbestos)

·           Measures and processes to be implemented to ensure the health & safety of workers and community

·           Measures to be implemented to minimise any airborne dust and asbestos

·           Methods and location of disposal of any hazardous materials (including asbestos)

·           Other relevant details, measures and requirements to be implemented

·           Details of re-use, recycling and disposal of waste demolition/building materials

·           Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

    Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Sydney Water

33.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

34.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

Demolition & Construction Waste

35.     A Demolition and Construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

Public Utilities

36.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

Landscaping

37.     Prior to the commencement of site works, the PCA must ensure that the Landscape Plan by GreenPlan, dwg no. 11.713-01, issue A, dated 27/07/11 has been amended to show the following requirements:

 

a)   Agapanthus praecox (African Lily) shall be replaced with a native coastal species of similar form and function, such as the Lomandra or Dianella genus or similar;

 

b)    The 2 x Magnolia ‘Little Gems’ (Dwarf Magnolia) shown on the Crana Avenue frontage shall be replaced with native coastal trees of similar size from the Banksia or Cupaniopsis genus or similar;

 

c)   Identification of ‘LE’ in the plant schedule, which is currently not listed, and must not be an invasive species in anyway that would have the capacity to escape cultivation and threaten the coastal corridor to the east of the site

 

d)   In order to ensure satisfactory maintenance of those garden areas proposed beneath the awning and vergola, which may be deprived of natural rainfall, an automatic drip irrigation system shall be installed within these areas, with details to be provided showing that the system will be connected to the sites rainwater tanks, with back-up connection to the mains supply, in accordance with all current Sydney Water requirements.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 


Inspections During Construction

38.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Site Signage

39.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·           name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·           name, address and telephone number of the Principal Certifying Authority,

·           a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

40.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Demolition Work Requirements

41.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment, Climate Change & Water and Randwick City Council policies, including:

 

·           Occupational Health & Safety Act 2000 & Regulations

·           WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·           WorkCover NSW Guidelines and Codes of Practice

·           Australian Standard 2601 (2001) – Demolition of Structures

·           The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·           Relevant DECCW/EPA Guidelines

·           Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

42.     Work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·           Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·           Randwick City Council’s Asbestos Policy

 

·           A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·           On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·           Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·           A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Sediment & Erosion Control

43.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.  Details are to be included in the Construction Site Management Plan.

 

Public Safety & Site Management

44.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

·           Building materials, sand, soil, waste materials, construction equipment or other articles must not be placed upon the footpath, roadway or nature strip at any time.

 

·           The road, footpath, vehicular crossing and nature strip must be maintained in a good, safe, clean condition and free from any excavations, obstructions, trip hazards, goods, materials, soils or debris at all times.  Any damage caused to the road, footway, vehicular crossing, nature strip or any public place must be repaired immediately, to the satisfaction of Council.

 

·           Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

·           Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

·           Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Support of Adjoining Land, Excavations & Retaining Walls

45.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

46.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

47.     Prior to undertaking any demolition, excavation or building work in the following circumstances, a report must be obtained from a professional engineer which details the methods of support for the dwelling or associated structure on the adjoining land, to the satisfaction of the Principal Certifying Authority:

 

·           when undertaking excavation or building work within the zone of influence of the footings of a dwelling or associated structure that is located on the adjoining land;

·           when undertaking demolition work to a wall of a dwelling that is built to a common or shared boundary (eg. semi-detached or terrace dwelling);

·           when constructing a wall to a dwelling or associated structure that is located within 900mm of a dwelling located on the adjoining land.

 

The demolition, excavation and building work and the provision of support to the dwelling or associated structure on the adjoining land, must also be carried out in accordance with the abovementioned report, to the satisfaction of the Principal Certifying Authority.

 

Building Encroachments

48.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Road/Asset Opening Permit

49.     A Road / Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

Road/Asset Opening Permit

50.     A Road / Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

Tree Management

51.     No objections are raised to removing any of the existing vegetation within the site where necessary in order to accommodate the proposed works as shown, subject to full implementation of the approved landscaping.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Occupation Certificate Requirements

52.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

BASIX Requirements

53.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

54.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·           The window having a minimum sill height of 1.5m above the internal floor level,

 

·           Providing a window locking device at least 1.5m above the internal floor level,

 

·           Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

 

·           Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

 

·           Other appropriate effective safety measures or barrier.

 

The relevant measures must be implemented prior to the issue of an occupation certificate.

 

Swimming Pool Safety

55.     Swimming pools are to be provided with childproof fences and self-locking gates, in accordance with the Swimming Pools Act 1992 and regulations.

 

The swimming pool is to be surrounded by a fence having a minimum height of 1.2m, that separates the pool from any residential building situated on the premises and from any place (whether public or private) adjoining the premises; and that is designed, constructed and installed in accordance with AS 1926.1 - 2007.

 

Gates to pool area shall be a maximum width of 1 metre, and be self-closing and latching; the gate is required to open outwards from the pool area and prevent a small child opening the gate or door when the gate or door is closed.

 

A ‘warning notice’ must be erected in a prominent position in the immediate vicinity of the swimming pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

Swimming Pool & Spa Pool Requirements

56.     Swimming pools (and spa pools) are to be designed, installed and operated in accordance with the following general requirements:

 

a)     Backwash of the pool filter and other discharge of water is to be drained to the sewer in accordance with the requirements of the Sydney Water Corporation; and

 

b)     All pool overflow water is to be drained away from the building and adjoining premises, so as not to result in a nuisance or damage to premises; and

            

c)     Water recirculation and filtrations systems are required to comply with AS 1926.3 – 2003:  Swimming Pool Safety – Water Recirculation and Filtration Systems; and

 

d)     Pool plant and equipment is to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

Notification of Swimming Pools & Spa Pools

57.     Written notification must be provided to Council advising of the installation and completion of the Swimming Pool (or Spa Pool), to satisfy the requirements of the Swimming Pools Act 1992.

 

Council’s “Notification & Registration of a Swimming Pool” form must be completed and forwarded to Council prior to any Occupation Certificate being issued for the pool.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

58.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)     All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)     Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)     If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)     The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

59.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

a)  Remove the redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

b)  Construct new concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site which will necessitate the removal of the existing stormwater lintel and replace with a new v-grate located above the existing pit to Council's specification.

c)  Construct new kerb inlet pit immediately to the south of the new vehicle crossing and connect to the existing pit via a new section of 375mm diameter reinforced concrete pipe to Council requirements.

d)  Remove the illegal steps on council street verge in Wisdom Street and replace with new council footpath and steps as required between kerb and the pedestrian entrance to the site to the satisfaction of Council. 

 

60.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

61.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)   All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)   Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)   If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)   The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

62.     The nature-strip upon both of Council's footways shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar, prior to the issue of a Final Occupation Certificate.

 

63.     The PCA must ensure that landscaping at this site is installed in accordance with the approved landscape plan and relevant conditions of consent, prior to issuing a Final (or any other type of Interim) Occupation Certificate/s, with the owner/s to ensure that the landscaping is maintained in a healthy and vigorous state until maturity, for the life of the development.

 

Stormwater Drainage

64.     Prior to the issuing of an occupation certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer confirming that the design and construction of the stormwater drainage system complies with Australian Standard 3500.3:2003 (Plumbing & Drainage- Stormwater Drainage) and the conditions of this development approval. The certification must be provided following inspection/s of the site stormwater drainage system by the certifying engineers and shall be provided to the satisfaction of the PCA.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

Use of premises

65.     The premises must only be used as a single residential dwelling and must not be used for dual or multi-occupancy purposes.

 

External Lighting

66.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

Protection of the Environment Operations Act 1997 – Swimming Pools & Spa Pools

67.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Pool Plant & Equipment

68.     The pool plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 8.00pm on any Sunday or public holiday; or

·       before 7.00am or after 8.00pm on any other day.

 

Protection of the Environment Operations Act 1997 – Air Conditioners

69.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Air Conditioning & Equipment

70.     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

Protection of the Environment Operations Act 1997 – Rainwater Tanks

71.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Rainwater Tank Requirements

72.     The installation of rainwater tanks shall comply with the following noise control requirements:

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tanks are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with rainwater tanks are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

·     before 8.00am or after 8.00pm on weekends or public holiday; or

·     before 7.00am or after 8.00pm on weekdays.

 

Waste Management

73.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1      The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

A2      Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

A3      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A4      Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

A5      A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

A6      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A7      Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

A8      This consent does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the land owner or principal contractor must obtain:

 

§  the consent of the owners of such adjoining or supported land to trespass or encroach, or

§  an access order under the Access to Neighbouring Land Act 2000, or

§  an easement under section 88K of the Conveyancing Act 1919, or

§  an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

·              Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Notley-Smith/Woodsmith) CARRIED UNANIMOUSLY – SEE RESOLUTION.

 

General Manager's Reports

 

GM26/11  General Manager's Report - Delegations of Authority (F2004/06895)

153/11

RESOLUTION: (Andrews/Procopiadis) that pursuant to section 377 of the Local Government Act, the Delegations of Authority be amended as follows;

 

Amended delegations;

 

RF007

Finance – Petty Cash

Current delegation

To authorise petty cash expenditure within the adopted budget for that delegates section as determined by the management structure.

Amended delegation

a)  To authorise petty cash expenditure in accordance with the ‘Petty Cash Limit’ policy, within the adopted budget for that delegates section as determined by the management structure

b)  To authorise petty cash expenditure over $200 and up to the value of $500, otherwise in accordance with the ‘Petty Cash Limit; policy, within the adopted budget (it is proposed that this function be sub-delegated to the Director Governance & Financial Services only)

c)   To authorise all petty cash expenditure claims by the Director Government & Financial Services up to the value of $500, otherwise in accordance with the ‘Petty Cash Limit’ policy, within the adopted budget (there will be no sub0-delegation of proposed part C of the delegation – ie. All claims by the DG&FS are to be authorised by the General Manager)

 


RF008

Finance – cheque signing

Current delegation

To sign cheques under the arrangements endorsed by the General Manager and the Commonwealth Bank.


RF008

Finance – cheque signing and electronic transfer of funds

Amended delegation

To sign cheques and authorise the electronic transfer of funds under the arrangements endorsed by the General Manager and the Commonwealth Bank.

 

 

MOTION: (Andrews/Procopiadis) CARRIED - SEE RESOLUTION.

 

 

 

GM27/11  General Manager's Report - Equal Employment Opportunity Policy and Plan 2011 -12 (F2004/06949)

154/11

RESOLUTION: (Stevenson/Andrews) that Council adopt the Council’s Equal Employment Opportunity Policy and note the EEO Performance Review for 2010-11.

 

MOTION: (Stevenson/Andrews) CARRIED - SEE RESOLUTION.

 

 

 

GM28/11  General Manager's Report - Staff Performance Reviews 2011 (F2006/00304)

155/11

RESOLUTION: (Andrews/Procopiadis) that the Council receive and note the completion of the 2010-11 performance review process.

 

MOTION: (Andrews/Procopiadis) CARRIED - SEE RESOLUTION.

 

Director City Services Reports

Nil.

Director Governance & Financial Services Reports

 

GF42/11   Director Governance & Financial Services Report - Presentation of the 2010-11 Financial Statements (F2010/00252)

156/11

RESOLUTION: (Andrews/Procopiadis) that the Financial Statements for the year ended 30 June 2011 be adopted.

 

MOTION: (Andrews/Procopiadis) CARRIED - SEE RESOLUTION.

 

 

 

GF43/11   Director Governance & Financial Services Report - Public Interests Disclosures Act - Internal Reporting Policy and Procedures (F2005/00303)

157/11

RESOLUTION: (Andrews/Woodsmith) that the amended Internal Reporting Policy – Public Interest Disclosures Act (which is based on the NSW Ombudsman’s Model Internal Reporting Policy – September 2011 and which incorporates the changes required by the enactment of the Public Interest Disclosures Amendment Act 2011) be adopted.

 

MOTION: (Andrews/Woodsmith) CARRIED - SEE RESOLUTION.

 

 

 

GF44/11   Director Governance & Financial Services Report - Lease to The Shack Youth Services - Suite 3, Ground Floor, Bowen Library, 669-677 Anzac Parade, Maroubra (F2011/07367)

158/11

RESOLUTION: (Andrews/Procopiadis) that the Council’s Seal be affixed to the signing of agreements between Council and The Shack Youth Services in relation to Suite 3, Ground Floor, Bowen Library, 669-677 Anzac Parade, Maroubra for a period of five (5) years.

 

MOTION: (Andrews/Procopiadis) CARRIED - SEE RESOLUTION.

 

 

 

GF45/11   Director Governance & Financial Services Report - Division of Local Government's Guidelines for the Appointment and Oversight of General Managers (F2005/00583)

159/11

RESOLUTION: (Andrews/Procopiadis) that the Division of Local Government’s “Guidelines for the Appointment and Oversight of General Managers” be received and noted.

 

MOTION: (Andrews/Procopiadis) CARRIED - SEE RESOLUTION.

 

 

 

GF46/11   Director Governance & Financial Services Report - Investment Performance Update (F2004/06527)

160/11

RESOLUTION: (Andrews/Procopiadis) that the Investment Update Report be received and noted.

 

MOTION: (Andrews/Procopiadis) CARRIED - SEE RESOLUTION.

 

 

 

GF47/11   Director Governance & Financial Services Report - Investment Policy (F2004/06527)

161/11

RESOLUTION: (Andrews/Procopiadis) that the attached updated Investment Policy be adopted.

 

MOTION: (Andrews/Procopiadis) CARRIED - SEE RESOLUTION.

 

 

 

GF48/11   Director Governance & Financial Services Report - Investment Report - August 2011 (F2004/06527)

162/11

RESOLUTION: (Andrews/Procopiadis) that the investment report for August 2011 be received and noted.

 

MOTION: (Andrews/Procopiadis) CARRIED - SEE RESOLUTION.

 

 

 

GF49/11   Director Governance & Financial Services Report - 2 Coast Hospital Road, Little Bay - Prince Henry Centre - Lease & Operation of Cafe (F2011/07367)

163/11

RESOLUTION: (Andrews/Procopiadis) that:

 

a)     Council notes that no submissions were received under Tender No. T07/10 and commits to the marketing and negotiation of a lease of the property through it’s contracted Leasing Agent, Preston Rowe Paterson, for the purpose of a café/restaurant.

 

b)     a report be bought to Council for determination of lease period and commercial arrangements prior to entering into any new lease.

 

MOTION: (Andrews/Procopiadis) CARRIED - SEE RESOLUTION.

 

Petitions

 

Nil.

 

Motion Pursuant to Notice

 

 

NM27/11  Motion Pursuant to Notice - Motion Pursuant to Notice from Cr Nash  - Review of the Environmental Planning & Assessment Act 1979  (F2004/07889)

164/11

RESOLUTION: (Nash/Procopiadis) that:

 

a)     Council note the NSW Government has appointed an independent panel to review the Environmental Planning and Assessment Act 1979 along with the broader planning system;

 

b)     Council prepare a submission in respect of the review, focusing on matters of particular concern to Randwick City Council; and

 

c)     the submission be reported to Council prior to it being delivered to the independent panel.

 

MOTION: (Nash/Procopiadis) CARRIED - SEE RESOLUTION.

 

 

 

NM28/11  Motion Pursuant to Notice - Motion Pursuant to Notice from Cr Notley-Smith - Reviewing the "Call Up" Procedure for Development Applications (F2004/06570)

165/11

RESOLUTION: (Notley-Smith/Andrews) that Council:

 

a)     notes that in order to constitute a valid “call-up” of a development application or notice of motion, a Councillor must sign the call-up or notice of motion (as the case may be) in accordance with existing Council policy;

 

b)     amend that policy to permit a Councillor to submit a valid call-up or notice of motion by emailing the public officer of the Council concerning the subject matter of the call-up or notice of motion (as the case may be) without the necessity for a signature; and

 

c)     set up a register of email addresses of councillors to ensure that emails are only accepted for this purpose from authorised email addresses.

 

MOTION: (Notley-Smith/Andrews) CARRIED - SEE RESOLUTION.

 

 


 

 

Confidential Reports

 

 

GM29/11  Confidential - 23 Adina Avenue, Phillip Bay - Expression of Interest - Sale or Lease (F2011/07367)

This matter is considered to be confidential under Section 10A(2) (d) Of the Local Government Act, as it deals with commercial information of a confidential nature that would, if disclosed (i) prejudice the commercial position of the person who supplied it; or (ii) confer a commercial advantage on a competitor of the Council; or (iii) reveal a trade secret.

166/11

RESOLUTION: (Andrews/Nash) that:

 

a)     the General Manager be given delegated authority to negotiate a lease for the over the property, and

 

b)     the outcome of the negotiations and proposed lease be reported back to Council at the earliest opportunity.

 

MOTION: (Andrews/Nash) CARRIED - SEE RESOLUTION.

 

Cr Stevenson sought permission to leave the chamber at this point in meeting, the time being 10.08pm, as there is a possibility he may have an interest in this matter.

 

 

GF50/11   Confidential - SSROC Tender for the Supply and Delivery of Ready Mix Concrete (F2010/00439)

This matter is considered to be confidential under Section 10A(2) (c) Of the Local Government Act, as it deals with information that would, if disclosed, confer a commercial advantage on a person with whom the Council is conducting (or proposes to conduct) business.

167/11

RESOLUTION: (Smith/Hughes) that:

 

a)    under Regulation 178(1)(a) of the Local Government (General) Regulation 2005, both Concrite Pty Ltd and Metromix Pty Ltd be accepted as the successful tenderers; with Concrite Pty Ltd as the primary provider, and Metromix Pty Ltd as a secondary provider, and

 

b)     the General Manager, or delegated representative, be authorised to enter into a         preferred supplier agreements with these suppliers for a period of three (3)         years, with two (2) optional twelve (12) month extensions.

 

MOTION: (Smith/Hughes) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

Cr Stevenson returned to the chamber at this point in the meeting, the time being 10.11pm.

 

Urgent Business

 

UB4/11     Cr Tony Bowen - NSW Government - Call for Expressions of Interests - Establishment of 8 new PCYCs (F2004/06290 )

168/11

RESOLUTION: (Bowen/Stevenson) that Council investigate the submission of an Expression of Interest in establishing a new PCYC in the Randwick local government area in response to the NSW Government’s current invitation to NSW Councils.

 

MOTION: (Bowen/Stevenson) CARRIED - SEE RESOLUTION.

 


Closed Session

The meeting moved into closed session in order to consider confidential item.

 

 

GM30/11  Confidential - Coach & Horses Appeal - Solicitors Instructions. (DA/182/2009/B) (DA/182/2009/B)

This matter is considered to be confidential under Section 10A(2) (e) Of the Local Government Act, as it deals with information that would, if disclosed, prejudice the maintenance of law.

169/11

RESOLUTION: (Hughes/Woodsmith) that the meeting proceed to the next item of business as no resolution can be reached in regard to this matter.

 

MOTION: (Woodsmith/Hughes) that Council delegate its decision-making role in relation to the conduct of the Coach and Horses appeal to the General Manager.

 

AMENDMENT: (Bowen/Stevenson) that this matter be deferred to an extraordinary council meeting to be held at 7.00am on 22 September 2011.

 

All Councillors who declared an interest in this matter left the chamber. The meeting then lapsed at 10.36pm due to the lack of a quorum.

 

The meeting was resumed at 7.16am on Thursday 22 September 2011 with the following Councillors and staff present:

 

Councillors Present:

The Mayor, Cr M Matson (Chairperson), Cr M Woodsmith, Cr R Belleli, Cr A White, Cr T Bowen, Cr B Hughes, Cr J Procopiadis, Cr S Nash and Cr G Stevenson

 

Officers Present:

General Manager                                             Mr R Brownlee

Director City Planning                                       Ms S Truuvert

Director Governance & Financial Services             Mr G Banting

Senior Administrative Coordinator                       Ms J Hartshorn

 

Crs Bowen and Stevenson indicated that they wished to WITHDRAW their AMENDMENT (moved prior to the meeting being adjourned).

 

AMENDMENT: (Bowen/Stevenson) that Council obtain legal advice in relation to the options available for a resident to represent the Council under S39A of the Land and Environment Court Act 1979 and that a report come back to Council in relation to the options.

 

Crs Belleli, Nash and Procopiadis left the meeting at this point. The meeting then lapsed at 7.38pm due to the lack of a quorum.

 

The following Councillors were present at the meeting when it lapsed: The Mayor, Cr M Matson (Chairperson), Cr M Woodsmith, Cr A White, Cr T Bowen, Cr B Hughes and Cr G Stevenson.

 

The meeting was resumed at 7.49am on Thursday 22 September 2011 with the following Councillors present: The Mayor, Cr M Matson (Chairperson), Cr M Woodsmith, Cr R Belleli, Cr A White, Cr T Bowen, Cr B Hughes, Cr J Procopiadis, Cr S Nash and Cr G Stevenson

 

PROCEDURAL MOTION (Hughes/Woodsmith). CARRIED – SEE RESOLUTION.

 

 

Open Session

 

The meeting moved back into open session.


Notice of Rescission Motions

Nil.

 

 

There being no further business, His Worship the Mayor, Cr M Matson, declared the meeting closed at 7.50am on Thursday 22 September 2011.

 

 

The minutes of this meeting were confirmed at the Ordinary Meeting of the Council of the City of Randwick held on Tuesday, 18 October 2011.

 

 

 

 

 

 

...................................................

CHAIRPERSON