MINUTES OF Planning Committee Meeting of the

Council of the City of Randwick HELD ON

Tuesday, 10 May 2011 AT 6:26pm

 

Present:

 

The Mayor, Councillor M Matson (East Ward)

 

North Ward                                           -  Councillors K Smith, P Tracey &

M Woodsmith

 

South Ward                                          -  Councillors R Belleli, C Matthews &

                                                             A White

 

West Ward                                           - Councillors B Hughes (Deputy Chairperson), J Procopiadis & S Nash

 

Central Ward                                        - Councillors A Andrews & T Seng (Chairperson)

 

Officers present:

 

General Manager                                             Mr R Brownlee

Director City Services                                      Mr J  Frangoples

Director City Planning                                       Ms S Truuvert

Director Governance & Financial Services             Mr G Banting

Manager Development Assessment                     Mr K Kyriacou

Senior Administrative Coordinator                       Ms J Hartshorn

Communications Manager                                  Mr J Hay

Manager Organisational Staff Services                 Ms F Calabrese

Manager Strategic Planning                               Ms K Armstrong

 

The meeting was adjourned at 6.26pm and was resumed at 6.35pm.

 

Apologies/Granting of Leave of Absences 

 

Apologies were received from Crs Bowen, Notley-Smith and Stevenson.

 

RESOLVED: (Procopiadis/Nash) that the apologies received from Crs Bowen, Notley-Smith and Stevenson be accepted and leave of absences from the meeting be granted.

 

Confirmation of the Minutes

 

Confirmation of the Minutes of the Planning Committee Meeting held on Tuesday 12 April 2011

PL51/11

RESOLUTION: (Belleli/White) that the Minutes of the Planning Committee Meeting held on Tuesday 12 April 2011 (copies of which were circulated to all Councillors) be and are hereby confirmed as a correct record of the proceedings of that meeting.

 


Declarations of Pecuniary and Non-Pecuniary Interests

 

a)            Cr White declared a non significant non pecuniary interest in Item D53/11 as he knows the applicants.

b)     Cr Tracey declared a non significant non pecuniary interest in Item D53/11 as he knows the applicants.

c)     Cr Smith declared a non significant non pecuniary interest in Item D54/11 as his parents are the sole directors of a company that owns a apartment building nearby.

d)     Cr Andrews declared a non significant non pecuniary interest in Item D53/11 as he knows the applicants.

e)     Cr Woodsmith declared a non significant non pecuniary interest in Item D54/11 as she knows the speaker.

f)     Cr Matthews declared a non significant non pecuniary interest in Item D54/11 as he knows the applicant. Cr Matthews indicated that he would not take part in the debate or the vote on the matter.

 

Address of Council by Members of the Public

Prior to consideration of the Agenda by the Committee, deputations were received in respect of the following matters:

D43/11      9 Tedwin Avenue, Kensington

 

Applicant           Mr Tone Wheeler

 

D44/11      77 Bream Street, Coogee

 

Applicant           Mr Payarm Escandari (Architect representing the applicant)

 

D46/11      11A Oswald Street, Randwick

 

Objector             Ms Lesley Bloomer

 

               Applicant         Mr Brad Inwood

 

D48/11      2 Gordon Street, Randwick

 

Applicant           Mr James Kevin

 

D49/11      2 Beaumond Avenue, Maroubra

 

Objector             Mr Franz Weiss

 

Applicant            Mr Anthony Betros (Town Planner representing the applicant)

 

D52/11      16/32 Perry Street, Matraville

 

Objector             Mrs Susan Parker

 

Applicant           Mr Mack McGeechan (representing the applicant)

 

D54/11      2 Wolseley Road, Coogee

Having declared an interest in this matter earlier in the meeting, Cr Matthews left the meeting during the public addresses on the matter.

 

Objector             Ms Carol Mock

 

Applicant           Mr Gary Shiels (Town Planner representing the applicant)

 

The meeting was adjourned at 7.36pm and was resumed at 7.58pm. Cr Matthews returned to the meeting when it was resumed at 7.58pm.

Urgent Business

Nil.

Development Application Reports

 

D42/11     Development Application Report - 142 Bundock Street, Randwick (DA/1051/2010)

PL52/11

RESOLUTION: (Andrews/Nash) -

 

A.       That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20F & 20G of Randwick Local Environmental Plan 1998, relating to floor space ratio and building height respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.       That Council grant development consent under Section 80 and 80A of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No. 1051/2010 for alterations and additions to the existing dwelling at 142 Bundock Street, Coogee subject to the following conditions;

 

GENERAL CONDITIONS

 

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

 

Approved Plans & Supporting Documentation

 

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received

DA01a

 

Chris Weeding

10th February 2011

16th February 2011

DA02a

10th February 2011

16th February 2011

DA03a

10th February 2011

16th February 2011

DA04a

10th February 2011

16th February 2011

DA05

4th November 2010

16th February 2011

 

BASIX Certificate

No.

Dated

Received

A98822

4th November 2010

29th November 2010

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

2.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

3.       The colours, materials and finishes of the external surfaces are to be compatible with the existing building and adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

         External materials, finishes and colours of the building are required to match, as closely as possible, the existing building and any metal roof sheeting is to be pre-painted (e.g. Colourbond) to limit the level of reflection and glare.

 

4.       The proposed installation of the car space to the front of the dwelling does not satisfy the objectives and performance requirements of the Development Control Plan for Dwellings and will detract from the appearance of the semi detached dwellings and the local streetscape. The car space is not approved and is to be deleted from the application and plans accompanying the Construction Certificate are to be amended accordingly.

 

Section 94A Development Contributions

5.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $150,000, the following applicable monetary levy must be paid to Council:   $750.00.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Compliance with the Building Code of Australia

6.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Structural Adequacy

7.       Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority), certifying the structural adequacy of the existing structure to support the upper level addition.

 

Long Service Levy Payments

8.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Stormwater Drainage

9.       A surface water/stormwater drainage system must be provided in accordance with the following requirements, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate:-

 

a)    Surface water/stormwater drainage systems must be provided in accordance with Part 3.1.2 of the Building Code of Australia (Volume 2);

 

b)    The surface water/stormwater must be drained and discharged to the street gutter or, subject to site suitability, the stormwater may be drained to a suitably designed absorption pit;

 

c)    Any absorption pits or soaker wells should be located not less than 3m from any adjoining premises and the stormwater must not be directed to any adjoining premises or cause a nuisance;

 

d)    External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises;

 

e)    Details of any proposed drainage systems or works to be carried out in the road, footpath or nature strip must be submitted to and approved by Council before commencing these works.

 

BASIX Requirements

10.     In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Energy & Water Efficiency

11.     The following energy efficiency and water saving measures are to be implemented in all new and upgraded building work and details included in the construction certificate:

 

a)    The consumption of water shall be minimised by the use of triple A rated water efficient plumbing fixtures (taps and shower roses) and water efficient dual flush toilets.

 

b)    New external timber or metal framed and brick veneer walls and roofs are to be provided with insulation (i.e. bulk insulation and a reflective building membrane/reflective sarking/foil insulation), having a minimum total thermal resistance R–value of 3.0 in roofs and 1.5 in external walls.  The insulation and reflective building membrane is to be installed in accordance with the relevant requirements of the Building Code of Australia and the manufacturer’s details.

 

c)    New hot water service pipes are to be provided with insulation and must also satisfy any relevant requirements of Building Code of Australia and AS 3500.

 

Smoke Alarms

12.     Smoke alarms are required to be installed in each Class 1 building or dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

 

13.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)       a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)       a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)       a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)       the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)       at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

Home Building Act 1989

14.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing.

 

Dilapidation Reports

15.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

16.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

Temporary Site Fencing

17.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary site fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management Plan

18.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·          location and construction of protective fencing/hoardings to the perimeter of the site;

·          location of site storage areas/sheds/equipment;

·          location of building materials for construction;

·          provisions for public safety;

·          dust control measures;

·          site access location and construction

·          details of methods of disposal of demolition materials;

·          protective measures for tree preservation;

·          provisions for temporary sanitary facilities;

·          location and size of waste containers/bulk bins;

·          details of proposed sediment and erosion control measures;

·          provisions for temporary stormwater drainage;

·          construction noise and vibration management;

·          construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

19.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher/Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

·          Recycling, reuse and waste disposal of remediation materials

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Sydney Water

20.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

21.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Demolition Work Requirements

22.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment, Climate Change & Water and Randwick City Council policies, including:

 

·          Occupational Health & Safety Act 2000 & Regulations

·          WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·          WorkCover NSW Guidelines and Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECCW/EPA Guidelines

·          Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

23.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Site Signage

24.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·          name, address and telephone number of the Principal Certifying Authority,

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

Sediment & Erosion Control

25.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.  Details are to be included in the Construction Site Management Plan.

 

Public Safety & Site Management

26.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)    Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)    Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

c)    Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)    Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

e)    Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

f)     Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Excavations, Back-filling & Retaining Walls

27.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

Support of Adjoining Land

28.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)    If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)     protect and support the adjoining premises from possible damage from the excavation, and

ii)     where necessary, underpin the adjoining premises to prevent any such damage.

 

b)    The condition referred to in subclause a) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

29.     Prior to undertaking any demolition, excavation or building work in the following circumstances, a report must be obtained from a professional engineer which details the methods of support for the dwelling or associated structure on the adjoining land, to the satisfaction of the Principal Certifying Authority:

 

·          when undertaking excavation or building work within the zone of influence of the footings of a dwelling or associated structure that is located on the adjoining land;

·          when undertaking demolition work to a wall of a dwelling that is built to a common or shared boundary (eg. semi-detached or terrace dwelling);

·          when constructing a wall to a dwelling or associated structure that is located within 900mm of a dwelling located on the adjoining land.

 

The demolition, excavation and building work and the provision of support to the dwelling or associated structure on the adjoining land, must also be carried out in accordance with the abovementioned report, to the satisfaction of the Principal Certifying Authority.

 

Restriction on Working Hours

30.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Inspections During Construction

31.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Building Encroachments

32.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Road/Asset Opening Permit

33.     A Road/Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road/Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road/Asset Opening Officer on 9399 0691 or 9399 0999.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:        For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Occupation Certificate Requirements

34.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

BASIX Requirements

35.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

36.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·          The window having a minimum sill height of 1.5m above the internal floor level,

·          Providing a window locking device at least 1.5m above the internal floor level,

·          Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·          Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·          Other appropriate effective safety measures or barrier.

 

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

External Lighting

37.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

·          The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

·          Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

·          This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

·          A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

·          Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

·          Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

MOTION: (Andrews/Nash) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Woodsmith

Councillor Belleli

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Tracey

 

Councillor White

 

Total (11)

Total (1)

 

 

 

D43/11     Development Application Report - 9 Tedwin Avenue, Kensington (DA/47/2001/A)

PL53/11

RESOLUTION: (Andrews/Nash) that Council, as the consent authority, grant its consent under Section 96 of the Environmental Planning and Assessment Act 1979 as amended to modify Development Consent No DA/47/2001 for permission to modify the approved development by increasing the size of garage, alteration to entry, reduction in size of living room, deletion of study and extension of master bedroom, alteration to roof, glazing and colours and materials for 9 Tedwin Avenue, Kensington in the following manner:

 

Amend Condition No 1 to read:

 

1.     The development must be implemented substantially in accordance with the plans numbered Job 169/01-09, dated December 2000 and received by Council on 16 January 2001 , the application form and on any supporting information received with the application, as amended by:

 

·        The additional plans numbered 102 to 109, dated 8 March 2003 and received by Council on 10 March 2005 only in so far as they relate to compliance with conditions 2 to 7 of the original determination and

 

·        The following Section 96 “A” plans:

 

Plan Number

Dated

Received by Council

01 Issue B

19 October 2010

25 February 2011

02 Issue B

19 October 2010

25 February 2011

03 Issue C

22 February 2011

25 February 2011

04 Issue C

22 February 2011

25 February 2011

05 Issue C

22 February 2011

25 February 2011

06 Issue C

22 February 2011

25 February 2011

07 Issue C

22 February 2011

25 February 2011

08 Issue C

22 February 2011

25 February 2011

09 Issue C

22 February 2011

25 February 2011

10 Issue C

22 February 2011

25 February 2011

11 Issue C

22 February 2011

25 February 2011

12 Issue C

22 February 2011

25 February 2011

 

only in so far as they relate to the modifications highlighted on the Section 96 plans and detailed in the Section 96 application, except as may be amended  by the following conditions and as may be shown in red on the attached plans:

 

Delete the following condition

 

3.       Condition No. 3 to be deleted

 

Add the following conditions:

 

The following group of conditions have been applied to ensure the structural adequacy and integrity of the proposed building and adjacent premises:

 

32.      Documentary evidence prepared by a suitably qualified professional engineer shall be submitted to the certifying authority prior to the issuing of an occupation certificate for the development, certifying the suitability and stability of the site for the existing building and certifying the adequacy of the design and construction of the building on the site taking into account the additionally excavated areas in level 1 and the structural adequacy of the lower level structures to support the additional levels above.

 

33.      A Certificate prepared by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to issuing an occupation certificate, which certifies the structural adequacy of the pergola and compliance with the relevant structural requirements of the Building Code of Australia.

 

The following condition is included to ensure the eastern side boundary fencing is installed in accordance with relevant design guidelines for fencing.

 

34.      The fence extension located along the eastern front side boundary shall be limited to a maximum extension of 500mm, be treated with neutral light colours on the eastern side elevation, located wholly within the subject site and the total area of any openings within the extension must not exceed 25% of the surface area. Details of compliance are to be provided in the construction certificate plans.

 

MOTION: (Andrews/Nash) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

 

FOR

AGAINST

Councillor Andrews

Councillor Woodsmith

Councillor Belleli

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Tracey

 

Councillor White

 

Total (11)

Total (1)

 

 

 

D44/11     Development Application Report - 77 Bream Street, Coogee (DA/1061/2010)

PL54/11

RESOLUTION: (Andrews/Nash) -

 

A.       That Council support objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F Randwick Local Environmental Plan 1998 (Consolidation), relating to Floor Space Ratio, on the grounds that the proposed development complies with the specified purpose of the clauses, and will not adversely affect the character and amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.       That Council grant development consent under Section 80 and 80A of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No. DA/1061/2010 for alterations and additions to the existing single storey semi-detached dwelling house including first and second storey additions, new front hardstand car space and a new front fence at 77 Bream Street, Coogee, subject to the following conditions:

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Received

DA02

Abstract Designs

22/3/11

DA03

Abstract Designs

22/3/11

DA04

Abstract Designs

22/3/11

DA05

Abstract Designs

22/3/11

DA06

Abstract Designs

22/3/11

DA07

Abstract Designs

22/3/11

DA08

Abstract Designs

22/3/11

 

BASIX Certificate

No.

Received

Alterations and additions

A107841

22/3/11

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

2.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

3.       a)    The colours, materials and finishes of the external surfaces are to be compatible with the existing building and adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

External materials, finishes and colours of the building are required to match, as closely as possible, the existing building and any metal roof sheeting is to be pre-painted (e.g. Colourbond) to limit the level of reflection and glare.

 

b)    Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Manager Development Assessments prior to issuing a construction certificate for the development.

 

Section 94A Development Contributions

4.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $495,000.00, the following applicable monetary levy must be paid to Council:   $4,950.00.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Compliance with the Building Code of Australia

5.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Structural Adequacy

6.       Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority), certifying the structural adequacy of the existing structure to support the addition.

 

Long Service Levy Payments

7.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

Security Deposits

 

8.       The following damage/civil works security deposit requirement must be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; and as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

·           $600.00     -      Damage/Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash, cheque or credit card payment and is refundable upon a satisfactory inspection by Council upon the completion of the civil works which confirms that there has been no damage to Council's infrastructure.

 

The owner/builder is also requested to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

To obtain a refund of relevant deposits, a Security Deposit Refund Form is to be forwarded to Council’s Director of City Services upon issuing of an occupation certificate or completion of the civil works.

 

9.       Any transitional grades required to satisfactorily grade from the footpath level to the carspace shall be contained within 1.5m of the front property alignment and shall not exceed 12.5%.  The remainder of the carspace shall not exceed a grade of 1 in 20 (5%). Plans submitted for the construction certificate shall demonstrate compliance with this requirement.

 

Alignment Level Conditions

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

10.     The Council’s Development Engineer has inspected the above site and have determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

11.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

12.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $135.00 (inclusive of GST). This amount is to be paid prior to a construction certificate being issued for the development.

 

Service Authority Conditions

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

13.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

14.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

Drainage Conditions

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

15.     Stormwater runoff from the site shall be discharged to the kerb and gutter along the site frontage by gravity (preferably without the use of a charged system).

 

16.     Should a pump system be required to drain any portion of the site the system must be designed with a minimum of two pumps being installed, connected in parallel (with each pump capable of discharging at the required discharge rate) and connected to a control board so that each pump will operate alternatively. The pump wet well shall be sized for the 1 in 100 year, 2 hour storm assuming both pumps are not working.

 

The pump system must also be designed and installed strictly in accordance with Randwick City Council's Stormwater Code.

 

17.     All pump out water must pass through a stilling pit prior to being discharged by gravity to the kerb and gutter.

 

Street Tree Removal

 

18.     The applicant shall submit a total payment of $592.00 (including GST) being to cover Council’s costs to remove the Hibiscus tiliaceus (Cottonwood) from the Bream Street verge, in order to accommodate the proposed vehicle crossing and internal hardstand as shown, and also includes a loss of amenity fee as this semi-established public tree cannot be replaced upon completion due to the presence of another vehicle crossing to the east, and a power pole to the west.

 

The contribution shall be paid into Tree Amenity Income at the Cashier on the Ground Floor of the Administrative Centre prior to a Construction Certificate being issued for the development.

 

The applicant must contact Council’s Landscape Development Officer on 9399-0613 (quoting the receipt number), and giving at least four working weeks notice to arrange for removal of the street tree prior to the commencement of site works.

 

BASIX Requirements

19.     In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Energy & Water Efficiency

20.     The following energy efficiency and water saving measures are to be implemented in all new and upgraded building work and details included in the construction certificate:

 

a)    The consumption of water shall be minimised by the use of triple A rated water efficient plumbing fixtures (taps and shower roses) and water efficient dual flush toilets.

 

b)    New external timber or metal framed and brick veneer walls and roofs are to be provided with insulation (i.e. bulk insulation and a reflective building membrane/reflective sarking/foil insulation), having a minimum total thermal resistance R–value of 3.0 in roofs and 1.5 in external walls.  The insulation and reflective building membrane is to be installed in accordance with the relevant requirements of the Building Code of Australia and the manufacturers details.

 

c)    New hot water service pipes are to be provided with insulation and must also satisfy any relevant requirements of Building Code of Australia and AS 3500.

 

Smoke Alarms

21.     Smoke alarms are required to be installed in each Class 1 building or dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

 

22.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)       a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)       a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)       a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)       the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)       at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

Home Building Act 1989

23.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing.

 

Dilapidation Reports

24.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

25.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

Temporary Site Fencing

26.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary site fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management Plan

27.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·          location and construction of protective fencing/hoardings to the perimeter of the site;

·          location of site storage areas/sheds/equipment;

·          location of building materials for construction;

·          provisions for public safety;

·          dust control measures;

·          site access location and construction

·          details of methods of disposal of demolition materials;

·          protective measures for tree preservation;

·          provisions for temporary sanitary facilities;

·          location and size of waste containers/bulk bins;

·          details of proposed sediment and erosion control measures;

·          provisions for temporary stormwater drainage;

·          construction noise and vibration management;

·          construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

28.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

 

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

·          Recycling, reuse and waste disposal of remediation materials

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

 

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Sydney Water

29.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

30.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Demolition Work Requirements

31.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment, Climate Change & Water and Randwick City Council policies, including:

 

·          Occupational Health & Safety Act 2000 & Regulations

·          WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·          WorkCover NSW Guidelines and Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECCW/EPA Guidelines

·          Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

32.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Site Signage

33.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·           name, address and telephone number of the Principal Certifying Authority,

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

Sediment & Erosion Control

34.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.  Details are to be included in the Construction Site Management Plan.

 

Public Safety & Site Management

35.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

c)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

e)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

f)     Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Excavations, Back-filling & Retaining Walls

36.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

Support of Adjoining Land

37.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)    If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)     protect and support the adjoining premises from possible damage from the excavation, and

ii)     where necessary, underpin the adjoining premises to prevent any such damage.

 

b)    The condition referred to in subclause a) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

38.     Prior to undertaking any demolition, excavation or building work in the following circumstances, a report must be obtained from a professional engineer which details the methods of support for the dwelling or associated structure on the adjoining land, to the satisfaction of the Principal Certifying Authority:

 

·          when undertaking excavation or building work within the zone of influence of the footings of a dwelling or associated structure that is located on the adjoining land;

·          when undertaking demolition work to a wall of a dwelling that is built to a common or shared boundary (eg. semi-detached or terrace dwelling);

·          when constructing a wall to a dwelling or associated structure that is located within 900mm of a dwelling located on the adjoining land.

 

The demolition, excavation and building work and the provision of support to the dwelling or associated structure on the adjoining land, must also be carried out in accordance with the abovementioned report, to the satisfaction of the Principal Certifying Authority.

 

Restriction on Working Hours

39.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·    Monday to Friday - 7.00am to 5.00pm

·    Saturday - 8.00am to 5.00pm

·    Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

 

·    Monday to Friday - 8.00am to 5.00pm

·    Saturday - No work permitted

·    Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Inspections During Construction

40.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Building Encroachments

41.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Road/Asset Opening Permit

42.     A Road / Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:        For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

 

Occupation Certificate Requirements

43.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

Civil Works Conditions

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

44.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)       Construct a concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site.

 

45.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

BASIX Requirements

46.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

47.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·          The window having a minimum sill height of 1.5m above the internal floor level,

·          Providing a window locking device at least 1.5m above the internal floor level,

·          Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·          Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·          Other appropriate effective safety measures or barrier.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

48.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)     All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)     Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)     If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)     The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Landscape Conditions

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

49.     That part of the nature-strip upon Council's footway which is damaged during the construction of the proposed works shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu turf or similar. Such works shall be completed at the applicant’s expense prior to the issue of a final Occupation Certificate.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

Use of premises

50.     The premises must only be used as a single residential dwelling and must not be used for dual or multi-occupancy purposes.

 

External Lighting

51.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

52.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Advisory Conditions

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

 

·          The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

·          Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

·          This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

·          A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

·          Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

·          Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

MOTION: (Andrews/Nash) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Woodsmith

Councillor Belleli

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Tracey

 

Councillor White

 

Total (11)

Total (1)

 

 

 

D45/11     Development Application Report - 22 Camira Street, Maroubra (DA/1112/2010)

PL55/11

RESOLUTION: (Andrews/Nash) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20G 20F of Randwick Local Environmental Plan 1998, relating to maximum floor space ratio and maximum external wall height respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 1112/2010 for alterations and additions to the dwelling at No. 22 Camira Street, Maroubra subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered S03-1/2010, 2/2010, 3/2010, 4/2010 dated 10.12.2010 and received by Council on the 17th December 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

3.       Metal roof sheeting is to be pre-painted (e.g. colourbond) and form part of the colour scheme and external finishes for the development.

 

4.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

5.       Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

6.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

7.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $ 150 000 the following applicable monetary levy must be paid to Council: $ 750.00.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

8.       In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

9.       In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

10.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

11.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

12.     Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

13.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

14.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

15.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

16.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

17.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

18.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·          name, address and telephone number of the Principal Certifying Authority; and

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

19.     The relevant requirements of the Home Building Act 1989 must be complied with, in accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000.

 

Details of the Licensed Building Contractor (and a copy of any relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council prior to commencement of works.

 

20.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

21.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

22.     Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

23.     Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the upper level addition.

 

24.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·          Occupational Health and Safety Act 2000 & Regulations

·          WorkCover NSW Guidelines & Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

25.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

26.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

 

b)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

27.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           new dwellings or additions to dwellings sited up to shared property boundaries (e.g. additions to a semi-detached dwelling or a terraced dwelling),

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

28.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

29.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, is required to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of site works.

 

The Construction Noise Management Plan is to be prepared in accordance with the relevant provisions of the DECC Construction Noise Guideline.

 

30.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

31.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing/hoardings to the perimeter of the site;

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction

·       details of methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·       construction noise and vibration management;

·       construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

32.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

33.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)       Construct a concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site.

 

34.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

35.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

36.     The Council’s Development Engineer has inspected the above site and have determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, shall be:

 

·              20mm above the back of the existing concrete footpath at all points opposite the path, along the full site frontage.

 

37.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the roadway/kerb/footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

38.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $135.00 (inclusive of GST). This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

39.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

40.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

41.     Stormwater runoff from the redeveloped portion of the site shall be discharged to the kerb and gutter along the site frontage by gravity (without the use of a charged system).

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

42.     That part of the nature-strip upon Council's footway which is damaged during the construction of the proposed works shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu turf or similar. Such works shall be completed at the applicant’s expense prior to the issue of a final Occupation Certificate.

 

43.     Suitable planting and landscape treatment incorporating the use of native coastal species shall be provided throughout the front and rear portions of the site, so as to both enhance and improve presentation of the dwelling to the street, as well as minimize any negative impacts on neighbouring properties in regards to overlooking and privacy from the proposed first floor as shown, and must include at least 1 x 25 litre/300mm (pot size at the time of planting) NATIVE coastal tree in the rear yard, selecting a species that will achieve a minimum height of between 4-7 metres at maturity.

 

44.     The PCA must ensure that the site landscaping has been completed, prior to issuing a Final Occupation Certificate, with the property owner required to maintain it in a healthy and vigorous state until maturity.

 

ADVISORY MATTERS:

 

A1    Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A4      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A5      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Andrews/Nash) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Woodsmith

Councillor Belleli

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Tracey

 

Councillor White

 

Total (11)

Total (1)

 

 

 

D46/11     Development Application Report - 11A Oswald Street, Randwick (DA/1078/2010)

PL56/11

RESOLUTION: (Andrews/Nash) -

 

A.     That Council support the objections under State Environmental Planning No. 1 (SEPP No.1) in respect to non-compliance with Clause of the Randwick Local Environmental Plan 1988, relating to Clauses 20E – Landscaped area, 20F – Floor space ratios and 20G Building Heights, on the grounds that the proposed development is consistent with the objective of the clauses and will not adversely affect the amenity of the surrounding locality and that the Department of Planning be advised accordingly; and

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/1078/2010 for alterations and additions to the existing dwelling including attic roof conversion into bedroom, bathroom with terrace at No. 11A Oswald Street, Randwick, subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received

0941-3a

Brad Inwood Architects

July 10

12 April 2011

0941-4a

Brad Inwood Architects

July 10

12 April 2011

0941-5a

Brad Inwood Architects

July 10

12 April 2011

0941-6a

Brad Inwood Architects

July 10

12 April 2011

0941-7a

Brad Inwood Architects

July 10

12 April 2011

0941-8a

Brad Inwood Architects

July 10

12 April 2011

 

BASIX Certificate

No.

Dated

Received

 

A108961

27 March 2011

11 April 2011

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

2.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

3.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the existing building and surrounding buildings in the heritage conservation area.  Details of the proposed colours, materials and textures (i.e. - a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director City Planning, in accordance with Section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

Section 94A Development Contributions

4.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $180,000, the following applicable monetary levy must be paid to Council:   $900.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate [or subdivision certificate] being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Compliance with the Building Code of Australia

5.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Structural Adequacy

6.       Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority), certifying the structural adequacy of the existing structure to support the proposed additions.

 

Long Service Levy Payments

7.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Stormwater Drainage

8.       A surface water/stormwater drainage system must be provided in accordance with the following requirements, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate:-

 

a)    Surface water/stormwater drainage systems must be provided in accordance with Part 3.1.2 of the Building Code of Australia (Volume 2);

 

b)    The surface water/stormwater must be drained and discharged to the street gutter or, subject to site suitability, the stormwater may be drained to a suitably designed absorption pit;

 

c)    Any absorption pits or soaker wells should be located not less than 3m from any adjoining premises and the stormwater must not be directed to any adjoining premises or cause a nuisance;

 

d)    External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises;

 

e)    Details of any proposed drainage systems or works to be carried out in the road, footpath or nature strip must be submitted to and approved by Council before commencing these works.

 

BASIX Requirements

9.       In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Energy & Water Efficiency

10.     The following energy efficiency and water saving measures are to be implemented in all new and upgraded building work and details included in the construction certificate:

 

a)    The consumption of water shall be minimised by the use of triple A rated water efficient plumbing fixtures (taps and shower roses) and water efficient dual flush toilets.

 

b)    New external timber or metal framed and brick veneer walls and roofs are to be provided with insulation (i.e. bulk insulation and a reflective building membrane/reflective sarking/foil insulation), having a minimum total thermal resistance R–value of 3.0 in roofs and 1.5 in external walls.  The insulation and reflective building membrane is to be installed in accordance with the relevant requirements of the Building Code of Australia and the manufacturers details.

 

c)    New hot water service pipes are to be provided with insulation and must also satisfy any relevant requirements of Building Code of Australia and AS 3500.

 

Smoke Alarms

11.     Smoke alarms are required to be installed in each Class 1 building or dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

12.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)       a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)       a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)       a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)       the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)       at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

  In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

Home Building Act 1989

13.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing.

 

Dilapidation Reports

14.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

15.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

Temporary Site Fencing

16.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary site fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management Plan

17.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·          location and construction of protective fencing/hoardings to the perimeter of the site;

·          location of site storage areas/sheds/equipment;

·          location of building materials for construction;

·          provisions for public safety;

·          dust control measures;

·          site access location and construction

·          details of methods of disposal of demolition materials;

·          protective measures for tree preservation;

·          provisions for temporary sanitary facilities;

·          location and size of waste containers/bulk bins;

·          details of proposed sediment and erosion control measures;

·          provisions for temporary stormwater drainage;

·          construction noise and vibration management;

·          construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

18.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

·          Recycling, reuse and waste disposal of remediation materials

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Sydney Water

19.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

20.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

 

Demolition Work Requirements

21.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment, Climate Change & Water and Randwick City Council policies, including:

 

·          Occupational Health & Safety Act 2000 & Regulations

·          WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·          WorkCover NSW Guidelines and Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECCW/EPA Guidelines

·          Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

22.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Site Signage

23.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·          name, address and telephone number of the Principal Certifying                  Authority,

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

Sediment & Erosion Control

24.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.  Details are to be included in the Construction Site Management Plan.

 

Public Safety & Site Management

25.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)          Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

a)    Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

b)    Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)    Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

d)    Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

e)    Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Excavations, Back-filling & Retaining Walls

26.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

Support of Adjoining Land

27.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)    If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

i)     protect and support the adjoining premises from possible damage from the excavation, and

ii)     where necessary, underpin the adjoining premises to prevent any such damage.

b)    The condition referred to in subclause a) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

28.     Prior to undertaking any demolition, excavation or building work in the following circumstances, a report must be obtained from a professional engineer which details the methods of support for the dwelling or associated structure on the adjoining land, to the satisfaction of the Principal Certifying Authority:

 

·          when undertaking excavation or building work within the zone of influence of the footings of a dwelling or associated structure that is located on the adjoining land;

·          when undertaking demolition work to a wall of a dwelling that is built to a common or shared boundary (eg. semi-detached or terrace dwelling);

·          when constructing a wall to a dwelling or associated structure that is located within 900mm of a dwelling located on the adjoining land.

 

The demolition, excavation and building work and the provision of support to the dwelling or associated structure on the adjoining land, must also be carried out in accordance with the abovementioned report, to the satisfaction of the Principal Certifying Authority.

 

Restriction on Working Hours

29.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·        Monday to Friday - 7.00am to 5.00pm

·        Saturday - 8.00am to 5.00pm

·        Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

 

·        Monday to Friday - 8.00am to 5.00pm

·        Saturday - No work permitted

·        Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Inspections During Construction

30.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Building Encroachments

31.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Road/Asset Opening Permit

32.     A Road/Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:        For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

 

Occupation Certificate Requirements

33.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

BASIX Requirements

34.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

35.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·          The window having a minimum sill height of 1.5m above the internal floor level,

·          Providing a window locking device at least 1.5m above the internal floor level,

·          Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·          Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·          Other appropriate effective safety measures or barrier.

 

Council’s Infrastructure, Vehicular Crossings & Road Openings

36.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)    All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)    Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)    If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)    The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

External Lighting

37.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

38.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

39.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific  written approval has been obtained from Council to use non-Council contractors.

 

a)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

b)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

c)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Service Authority Conditions

 

            The following conditions are applied to provide adequate consideration for service authority assets:

 

40.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

41.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

Landscape Conditions

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

42.     Suitable landscape treatment incorporating both accent/feature species and native plants that have low water dependency shall be provided within the rear courtyard of the site so as to improve both its visual appeal and the usability of this primary area of private open space.

 

Pruning of neighbouring palms

43.     Permission is granted for the selective pruning of only those lower growing fronds from the western aspects of the Archontophoenix cunninghamiana (Bangalow Palm) and Washingtonia robusta (Washingtonia Palm), which are located in the rear yard of the adjoining property to the east, 11 Oswald Street, against the common boundary, close to the house, as well as the Howea fosteriana (Kentia Palm), towards the Right of Way, only where they overhang into the subject site and need to be pruned in order to avoid damage to the palms; or; for clearance reasons.

 

44.     This approval does not imply any right of entry onto a neighbouring property nor does it allow pruning beyond a common boundary; however, where such measures are desirable in the best interests of correct pruning procedures, and ultimately, the ongoing health of this tree, the applicant must negotiate with the neighbour/tree owner for access to perform this work.

 

45.     All pruning must be undertaken by an Arborist who holds a minimum of AQF Level V in Arboriculture, and to the requirements of Australian Standard AS 4373-2007 'Pruning of Amenity Trees,’ and NSW Work Cover Code of Practice for the Amenity Tree Industry (1998).

 

Protection of Street Tree

46.     In order to ensure retention of the Eucalyptus scoparia (White Gum) located on Council’s Oswald Street footpath in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the Construction Certificate application must show the retention of this street tree, with the position and diameter of both its trunk and canopy to be clearly shown on all drawings.

 

b.       There is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble around its trunk, or, in a position where these types of materials may runoff towards its trunk, with all Site Management Plans needing to acknowledge these requirements.

 

c.       Any excavations associated with the installation of new services, pipes, stormwater systems or similar over public property must be done so in line with either of the sites side so as to avoid root damage and future maintenance issues.

 

d.       The applicant is not authorised to perform any works to this tree or any of the adjoining street trees along this frontage, and shall contact Council’s Landscape Development Officer on 9399-0613 should pruning or any similar such work appear necessary, with the applicant required to cover all associated costs with such work, to Council’s satisfaction, prior to the issue of a final occupation certificate.

 

e.       A refundable deposit in the form of cash, credit card or cheque for an amount of $750.00 shall be paid at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development, in order to ensure compliance with the conditions listed in this consent, and ultimately, preservation of this street tree.

 

The refundable deposit will be eligible for refund following the issue of a Final Occupation Certificate, subject to completion and submission of Council’s ‘Security Deposit Refund Application Form’, and pending a satisfactory inspection by Council’s Landscape Development Officer (9399-0613).

 

Any contravention of Council's conditions relating to the tree at any time during the course of the works, or prior to the issue of a final occupation certificate, may result in Council claiming all or part of the lodged security in order to perform any rectification works necessary, as per the requirements of 80A (6) of the Environmental Planning and Assessment Act 1979.

 

Protection of Palms in rear yard & within no.11

47.     In order to also ensure retention of the mature Archontophoenix cunninghamiana (Bangalow Palm) located in the rear yard of the subject site, along the western boundary, as well as those palms within the neighbouring property at 11 Oswald Street, against the common boundary, being a Bangalow Palm and Washingtonia robusta (Washingtonia Palm) near the neighbouring dwelling, and a Howea fosteriana (Kentia Palm) towards the rear boundary/Right of Way in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the Construction Certificate application must show the retention of these palms, with the position and diameter of their trunks and crowns to be clearly shown on all drawings.

 

b.       The paving in the rear courtyard, around the trunk of the Bangalow Palm, must be porous/permeable.

 

c.       Any roots encountered during construction of the proposed paving, party wall and Store/WC must be cut cleanly by hand, and the affected area backfilled with clean site soil as soon as practically possible.

 

d.       The Bangalow Palm in the rear yard of the subject site must be physically protected by installing a total of four star pickets at a setback of 1.5 metres to its south, east and north (measured off the outside edge of its trunk at ground level), matching up with the western site boundary, to which safety tape/para-webbing/shade cloth or similar shall be permanently attached so as to completely enclose this palm for the duration of works.

 

e.       This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

f.        Within the TPZ, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble, with all Site Management Plans needing to acknowledge this requirement.

 

·      Further information and details on Council's requirements for trees on development sites can be obtained from the recently adopted Tree Technical Manual, which can be downloaded from Council’s website at the following link, http://www.randwick.nsw.gov.au - Looking after our environment – Trees – Tree Management Technical Manual; which aims to achieve consistency of approach and compliance with appropriate standards and best practice guidelines.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

 

·          The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

·          Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

·          This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

·          A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

·          Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

·          Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

·          The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Andrews/Nash) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Woodsmith

Councillor Belleli

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Tracey

 

Councillor White

 

Total (11)

Total (1)

 

 

 

D47/11     Development Application Report - 66 Coogee Bay Road, Coogee (DA/1101/2010)

PL57/11

RESOLUTION: (Andrews/Nash) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20F(1), 20G(1) and 20G(3) of Randwick Local Environmental Plan 1998 (consolidation), relating to floor apace ratio overall building height and external wall height respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No DA/1101/2010 for permission to carry out alterations and additions to existing multi-unit residential building including new upper level containing a bedroom with en-suite bathroom at 66 Coogee Bay Road, Randwick subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

 

1.       The development must be implemented substantially in accordance with the plans numbered 10.181A sheet No. 1 of 5 to sheet No. 5 of 5, dated 7 March 2011, and received by Council on 8 March 2011, the application form and on any supporting information received with the application, except as may be amended  by the following conditions and as may be shown in red on the attached plans:

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

3.       A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·      excavations for new buildings, additions to existing buildings which are proposed to be located within the zone of influence of the footings of a building located upon an adjoining  premises,

·      buildings sited up to shared boundaries (eg terraced or attached buildings),

·      excavations for new buildings, additions to existing buildings which are within rock and may result in vibration and or potential damage to any building located upon an adjoining  premises,

·      as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of the relevant building/s located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

4.       A Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the additional storey

 

The following conditions are applied to satisfy relevant legislative requirements and to provide reasonable levels of health, safety and amenity:

 

5.       The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

6.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance are to be provided in the construction certificate.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

 

7.       Prior to the commencement of any building or ‘fit-out’ works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment

 

8.       Prior to the commencement of any building or ‘fit-out’ works, the person having the benefit of the development consent must:

 

·       appoint a Principal Certifying Authority for the building work, and

·       appoint a principal contractor for the building work, or in relation to residential building work, obtain an owner-builder permit in accordance with the requirements of the Home Building Act 1989, and notify the Principal Certifying Authority and Council accordingly in writing, and

·       unless the person having the benefit of the consent is the principal contractor (i.e. owner-builder), notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

·       Give at least two days notice to the Council, in writing, of the person’s intention to commence building works.

 

9.       The works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

10.     Any required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

Services

 

11.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If the proposed works are suitable, the plans will be appropriately stamped by Sydney Water or their Agent.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority is required to ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans prior to the commencement of any building works.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

 

12.     In existing buildings, the following works are to be carried out to ensure minimum levels of fire safety (as applicable):-

 

1)     Any new or replacement ceilings walls and floor linings and doorways are required to satisfy the relevant requirements of the Building Code of Australia. 

 

2)     Any residential parts of the building must be provided with a smoke detection and alarm system, in accordance with the relevant provisions of the Building Code of Australia.

 

3)     Any residential part/s of the building are to be suitably fire-separated from the commercial area encompassed in this development application.

 

Details of the abovementioned items and other building and fire safety works are to be provided in the construction certificate.

 

13.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

1)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

a)     protect and support the adjoining premises from possible damage from the excavation, and

b)     where necessary, underpin the adjoining premises to prevent any such damage.

2)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

14.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

15.     Public health, safety and convenience must be maintained at all times during demolition and building works and the following requirements must be complied with at all times (as applicable):

 

a)     Demolition work must be carried out in accordance with Australian Standard, AS2601 (2001) - The Demolition of Structures and a Demolition Work Plan is required to developed and implemented to the satisfaction of the Principal Certifying Authority prior to commencing any demolition works.

 

b)     The demolition, removal, storage and disposal of any materials containing asbestos must be carried out in accordance with the relevant requirements of WorkCover NSW, Council’s Asbestos Policy and the following requirements:

 

·         A licence must be obtained from WorkCover NSW for the removal of friable asbestos and or more than 10m2  of bonded asbestos (i.e. fibro)

·         Asbestos waste must be disposed of in accordance with the Protection of the Environment Operations Act 1997 & relevant Regulations

·         A sign must be provided to the site/building stating “Danger Asbestos Removal In Progress”

·         A Clearance Certificate or Statement must be obtained from a suitably qualified person (i.e. Occupational Hygienist) upon completion of the asbestos removal works, which is to be submitted to the Principal Certifying Authority and Council prior to issuing an Occupation Certificate.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

c)     A sign must be provided and maintained in a prominent position, which contains the following details:

·         name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·         name, address and telephone number of the Principal Certifying Authority,

·         a statement stating that “unauthorised entry to the work site is prohibited”.

 

d)     The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, trip hazards, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

e)     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council.  For further information, please contact Council’s Road/Asset Opening Officer on 9399 0691 or 9399 0999.

 

f)      Building materials, sand, soil, waste materials, construction equipment or other materials or articles must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

g)     Bulk bins, waste containers or other articles must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container or other articles in a public place can be made to Council’s Building Services section.

 

h)     During demolition and construction, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council.

 

i)      Public safety must be maintained at all times and public access to any demolition and building works, materials and equipment on the site is to be restricted. If necessary, a temporary safety fence or hoarding is to be provided to protect the public. Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

If it is proposed to locate any site fencing, hoardings or items upon any part of the footpath, nature strip or any public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services department beforehand. Details and plans are to be submitted with the application, together with payment of the weekly charge in accordance with Council’s adopted Pricing Policy.

 

j)      Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents.

 

The requirements and practices contained in the Protection of the Environment Operations Act 1997 and relevant DECC Construction Noise and Vibration Guidelines are to be satisfied and a Construction Noise and Vibration Management Plan is to be developed and implemented throughout the works to the satisfaction of Council.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

 

16.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation or use of the development encompassed in this development consent (including alterations, additions and ‘fit-out’ work to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

17.     Where applicable, a Fire Safety Certificate must be submitted to Council prior to the issuing of an Occupation Certificate, in accordance with the requirements of the Environmental Planning and Assessment Regulation 2000.

 

The Fire Safety Certificate must include details of all of the fire safety measures contained in the building and as detailed in the fire safety schedule attached to the Construction Certificate.

 

Prior to issuing any Occupation Certificate the Principal Certifying Authority must be satisfied that all of the relevant fire safety measures have been included and are sufficiently detailed within the Fire Safety Certificate. A copy of the fire safety certificate must be displayed in the building near the entrance and a copy must be forwarded to the NSW Fire Brigades.

 

An annual Fire Safety Statement is also required to be submitted to the Council and the NSW Fire Brigades, each year after the date of the Fire Safety Certificate, in accordance with the Environmental Planning & Assessment Regulation 2000.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

 

A1      The assessment of this development application does not include an assessment of the proposed building work under the Building Code of Australia (BCA).

 

All new building work must comply with the BCA and relevant Australian Standards and details of compliance must be provided in the Construction Certificate application.

 

A2      In existing buildings, the levels of fire and occupant safety should be upgraded where necessary and details should be incorporated in the Construction Certificate to the satisfaction of the Certifying authority.

 

Where the levels of accessibility to existing buildings do not meet current standards, if practicable, the level of accessibility should also be upgraded in conjunction with the proposed development (e.g. via the installation of a 1:8 access ramp within the building) and details included in the construction certificate application.

 

Building owners, applicants and builders are advised to speak to the appointed Certifying Authority prior to lodgement of the Construction Certificate.

 

A3      The applicant/owner is advised to engage the services of a suitably qualified and experienced Acoustic consultant, prior to finalising the design and construction of the development, to ensure that the relevant noise criteria and conditions of consent can be fully satisfied.

 

MOTION: (Andrews/Nash) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Woodsmith

Councillor Belleli

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Tracey

 

Councillor White

 

Total (11)

Total (1)

 

 

 

D48/11     Development Application Report - 2 Gordon Street, Randwick (DA/1138/2010)

PL58/11

RESOLUTION: (Andrews/Nash) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F(2) of Randwick Local Environmental Plan 1998 (Consolidation), relating to floor space ratio, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/1138/2010 for alterations and additions to the existing dwelling house including two storey extension to the rear of the dwelling, at No. 2 Gordon Street, Randwick subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

 

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received

DA101B

Studio3design 

30 March 2011

31 March 2011

DA201A

25 March 2011

31 March 2011

DA202A

25 March 2011

31 March 2011

 

BASIX Certificate

No.

Dated

Received

Single Dwelling

A102536

22 December 2010

23 December 2010

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

 

2.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

3.       Details are to be provided in the Construction Certificate to demonstrate that the proposed works will not encroach onto the adjoining properties, Council’s road reserve or any public place.

 

External Colours, Materials & Finishes

 

4.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

5.       The external materials, colours and finishes of the building are required to match, as closely as possible, the existing building.

 

6.       The design, materials and colour of the roofing to the proposed building/s are required to match, as closely as possible, the existing roof.

 

7.       Metal roof sheeting is to be pre-painted (e.g. colourbond) and form part of the colour scheme and external finishes for the development.

 

Section 94A Development Contributions

 

8.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $139,700 the following applicable monetary levy must be paid to Council: $698.50

 

The levy must be paid in cash, bank cheque or by credit card prior to

 

a)   a construction certificate being issued

 

for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

BASIX Requirements

 

9.       In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

10.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

11.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

12.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Compliance with the Building Code of Australia

 

13.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

14.     Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

Long Service Levy Payments

 

15.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

16.     The Council’s Development Engineer has inspected the above site and have determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

17.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $135.00 (inclusive of GST). This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

18.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

19.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

20.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

21.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)  All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)  Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)  If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

d)  The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Smoke Alarms

22.     Smoke alarms are required to be installed in each Class 1 building or dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

23.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

Home Building Act 1989

24.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing.

 

Dilapidation Reports

25.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

26.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

Temporary Site Fencing

27.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres). 

 

Temporary site fences are to have a height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings, amenities or articles upon any part of the footpath, nature strip or public place at any time, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management

28.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·           location and construction of protective fencing/hoardings to the perimeter of the site;

·           location of site storage areas/sheds/equipment;

·           location of building materials for construction;

·           provisions for public safety;

·           dust control measures;

·           site access location and construction

·           details of methods of disposal of demolition materials;

·           protective measures for tree preservation;

·           provisions for temporary sanitary facilities;

·           location and size of waste containers/bulk bins;

·           details of proposed sediment and erosion control measures;

·           provisions for temporary stormwater drainage;

·           construction noise and vibration management;

·           construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition & Construction Waste

29.     A Demolition and Construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

Sydney Water

30.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

Demolition Work Requirements

31.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council, not less than 2 days before commencing such works.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

32.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment, Climate Change & Water and Randwick City Council policies, including:

 

·           Occupational Health & Safety Act 2000 & Regulations

·           WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·           WorkCover NSW Guidelines and Codes of Practice

·           Australian Standard 2601 (2001) – Demolition of Structures

·           The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·           Relevant DECCW/EPA Guidelines

·           Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

33.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·           Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·           Randwick City Council’s Asbestos Policy

 

·           A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·           On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·           Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·           A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Inspections During Construction

34.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Site Signage

35.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·           name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·           name, address and telephone number of the Principal Certifying Authority,

·           a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

36.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Sediment & Erosion Control

37.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details must be shown in a Sediment and Erosion Control Plan, including; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

A copy of the Sediment and Erosion Control Plan must be provided to the Principal Certifying Authority and a copy must be maintained on site and be made available to Council officers upon request.

 

Public Safety & Site Management

38.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)       Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)       Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

c)       Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)       Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

e)       Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

f)       Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Excavations, Back-filling & Retaining Walls

39.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

      Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

Support of Adjoining Land

40.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)      protect and support the adjoining premises from possible damage from the excavation, and

 

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

 

b)     The condition referred to in subclause a) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

41.     Prior to undertaking any demolition, excavation or building work in the following circumstances, a report must be obtained from a professional engineer which details the methods of support for the dwelling or associated structure on the adjoining land, to the satisfaction of the Principal Certifying Authority:

 

·           when undertaking excavation or building work within the zone of influence of the footings of a dwelling or associated structure that is located on the adjoining land;

·           when undertaking demolition work to a wall of a dwelling that is built to a common or shared boundary (eg. semi-detached or terrace dwelling);

·           when constructing a wall to a dwelling or associated structure that is located within 900mm of a dwelling located on the adjoining land.

 

The demolition, excavation and building work and the provision of support to the dwelling or associated structure on the adjoining land, must also be carried out in accordance with the abovementioned report, to the satisfaction of the Principal Certifying Authority.

 

Survey Requirements

42.     A Registered Surveyor’s check survey certificate or other suitable documentation must be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority (PCA):

 

·           prior to construction (pouring of concrete) of the footings or first completed floor slab,

·           upon completion of the building, prior to issuing an occupation certificate,

·           as otherwise may be required by the PCA.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the Principal Certifying Authority for the development.  

 

Building Encroachments

43.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Finished Ground Levels

44.     The finished ground levels external to the building must be consistent with the development consent and are not to be raised, other than for the provision of approved paving or the like on the ground.

 

Road/Asset Opening Permit

45.     A Road/Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

Occupation Certificate Requirements

46.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

Occupant Safety

47.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·           The window having a minimum sill height of 1.5m above the internal floor level,

·           Providing a window locking device at least 1.5m above the internal floor level,

·           Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·           Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·           Other appropriate effective safety measures or barrier.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

A1    Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A4      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards. All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your    architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A5      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Andrews/Nash) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Woodsmith

Councillor Belleli

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Tracey

 

Councillor White

 

Total (11)

Total (1)

 

 

 

D49/11     Development Application Report - 2 Beaumond Avenue, Maroubra (DA/507/2010)

PL59/11

RESOLUTION: (Andrews/Nash) -

 

A.     That Council support the objection under State Environmental Planning No. 1 (SEPP No.1) in respect to non-compliance with Clause 20F of the Randwick Local Environmental Plan 1998 (as amended), relating to maximum floor space ratio, on the grounds that the proposed development is consistent with the relevant objectives of the clauses and will not adversely affect the amenity of the surrounding locality and that the Department of Planning be advised accordingly.

 

B.     That Council as the responsible authority grant its development consent under Section 80 and 80A of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No DA/507/2010 for the demolition of existing structures and construction of 2 x 3 level residential units with garaging and associated works at 2 Beaumond Avenue, Maroubra, subject to the following conditions:

 

1.       The development must be implemented substantially in accordance with the plans numbered DA1000, DA 1001, DA 2000, all Revision B, 11/02/2011 and stamped received by Council on 24 February 2011, and the application form, and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

2.       The colours, materials and finishes of the external surfaces to the proposed development are to be compatible with adjacent developments to maintain the integrity and amenity of the building and the streetscape. Specifically, the use of natural materials rather than the proposed predominantly painted surface shall be provided.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

3.       Details of bicycle storage as required in the Development Control Plan – Parking shall be submitted to and approved by Council’s Director City Planning Council prior to a Construction Certificate being issued for the development in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

4.       Details of the front fence as required in the Development Control Plan – Multi-unit Housing shall be submitted to and approved by Council’s Director City Planning Council prior to a Construction Certificate being issued for the development in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

5.       Details of the following amendments:

 

·      Each kitchen has a waste cupboard for separation of recycling materials, with adequate storage for one day’s waste; and

 

·      Waste storage facilities shall not to be located between the front building alignment and the road but shall be provided in a centralised position behind the proposed building alignment that has easy access for moving bins to the street for collection

 

shall be submitted to and approved by Council’s Director City Planning Council prior to a Construction Certificate being issued for the development in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

6.       Street numbering must be provided to the premises in a prominent position, to the satisfaction of Council.

 

7.       The reflectivity index of glass used in the external façade of the development must not exceed 20 percent. 

 

8.       Lighting to the premises shall be designed in accordance with AS4282 – 1997 Control of the Obtrusive Effects of  Outdoor Lighting" so as not to cause a nuisance to nearby residents or motorists and to ensure that light overspill does not affect the amenity of the area

 

9.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

10.     All plumbing and drainage pipes, other than rainwater heads, gutters and downpipes, must be concealed within the building.

 

11.     The enclosure of balconies is prohibited by this consent.

 

12.     No cooking facilities or sanitary fittings other than those indicated on the approved plans are to be installed in the premises without the prior written consent of the Council.

 

13.     A single common television aerial, and/or satellite dish (having a maximum diameter of 700mm and not located on the front or street elevation of the building) is to be installed to serve the development.

 

14.     Internal or external clothes drying facilities are to be provided in accordance with the provisions of the Building Code of Australia.

 

Should external clothes drying facilities be provided, the facilities must be adequately screened by vegetation and details are to be incorporated into the landscaping plans, to the satisfaction of the certifying authority.

 

15.     In accordance with the provisions of clauses 143A and 154A of the Environmental Planning & Assessment Regulation 2000, a ‘Design Verification Certificate’ must be provided to the Certifying Authority and the Council, prior to issuing a construction certificate and an occupation certificate, respectively.

 

16.     Public access to the visitor’s carparking spaces is to be maintained at all times and an intercom system is to be provided adjacent to the vehicular entrance to the carpark, together with appropriate signage providing instructions for use.

 

17.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

18.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

19.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue a final Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments has been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing the final Occupation Certificate.

 

The following condition is applied to meet additional demands for public facilities:

 

20.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, the following monetary levy must be paid to Council.

 

Category

Cost

Applicable Levy

S94A Levy

Development Cost more than $200,000

$ 497,530

1%

$4,975.30

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions have been applied to maintain reasonable levels of amenity to the area:

 

21.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment (excluding plant and equipment during the construction phase) shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

22.     A report, prepared by a suitably qualified and experienced consultant in acoustics, shall be submitted to the Council prior to an occupation certificate being issued for the development, which demonstrates and certifies that noise and vibration emissions from the development comply with the relevant provisions of the Protection of the Environment Operations Act 1997, NSW Environmental Protection Authority Noise Control Manual & Industrial Noise Policy and conditions of Council’s approval, to the satisfaction of Council’s Manager Health, Building & Regulatory Services.

 

23.     There are to be no emissions or discharges from the premises, which will give rise to a public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

24.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

25.     All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA), in accordance with Clause 98 of the Environmental Planning and Assessment Regulation 2000.

 

26.     Prior to the commencement of any building works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans & specifications and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

27.     Prior to the commencement of any building works, the person having the benefit of the development consent must:

 

i)    appoint a Principal Certifying Authority for the building work, and

 

ii)       appoint a principal contractor for the building work and notify the Principal Certifying Authority and Council accordingly in writing, and

 

iii)       notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

 

iv)      give at least two days notice to the Council, in writing, of the person’s intention to commence building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

28.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected in accordance with section 81A (2) (b1) (ii) of the Environmental Planning & Assessment Regulation 2000 and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Documentary evidence of the building inspections carried out and details of compliance with Council’s consent is to be maintained by the Principal Certifying Authority.  Details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council with the occupation certificate.

 

The principal contractor must ensure that the required critical stage and other inspections, as specified in the Principal Certifying Authority’s “Notice of Critical Stage Inspections”, are carried out to the satisfaction of the Principal Certifying Authority and at least 48 hours notice (excluding weekends and public holidays) is to be given to the Principal Certifying Authority, to carry out the required inspection, before carrying out any further works.

 

29.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·       name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours,

·       name, address and telephone number of the Principal Certifying Authority,

·       a statement stating that “unauthorised entry to the work site is prohibited”.

 

30.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

31.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon must also be provided to Council with the occupation certificate.

 

32.     In accordance with clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition, that in the case of residential building work, a contract of insurance must be obtained and in force, in accordance with the provisions of the Home Building Act 1989.

 

Where the work is to be done by a licensed contractor, excavation or building work must not be carried out unless the Principal Certifying Authority (PCA):

 

·       has been informed in writing of the licensee’s name and contractor number; and

·       is satisfied that the licensee has complied with the insurance requirements of Part 6 of the Home Building Act 1989, or

 

Details of the principal building contractor and compliance with the provisions of the Home Building Act 1989 (i.e. Details of the principal licensed building contractor and a copy of the Certificate of Insurance) are to be submitted to Council prior to the commencement of works, with the notice of appointment of the PCA/notice of intention to commence building work.

 

33.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

34.     A Fire Safety Certificate must be submitted to Council prior to the issuing of an Occupation Certificate, in accordance with the requirements of the Environmental Planning and Assessment Regulation 2000.

 

A single and complete Fire Safety Certificate must be provided which includes details of all of the fire safety measures contained in the building and as detailed in the fire safety schedule attached to the Construction Certificate.

 

Prior to issuing any Occupation Certificate the Principal Certifying Authority must be satisfied that all of the relevant fire safety measures have been included and are sufficiently detailed within the Fire safety Certificate.

 

A copy of the fire safety certificate must be displayed in the building near the entrance and a copy must be forwarded to the NSW Fire Brigades.

 

35.     As a minimum, the building is required to be provided with a smoke alarm system complying with Clause 3 of Specification E2.2a of the Building Code of Australia or a smoke detection system complying with Clause 4 of Specification E2.2a of the Building Code of Australia or a combination of a smoke alarm system within the sole-occupancy units and a smoke detection system in areas not within the sole-occupancy units.  The smoke detectors located within the stairway, corridors or the like must be interconnected.

 

Additional requirements regarding the design and installation of the smoke detection and alarm system may be specified in the construction certificate for the development.

 

36.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following group of conditions have been applied to ensure the structural adequacy and integrity of the proposed building and adjacent premises:

 

37.     Documentary evidence prepared by a suitably qualified professional geotechnical engineer shall be submitted to the certifying authority prior to the issuing of a construction certificate, certifying the suitability and stability of the site for the proposed building and certifying the suitably and adequacy of the proposed design and construction of the building for the site.

 

38.     A report shall be prepared by a professional engineer and submitted to the certifying authority prior to the issuing of a construction certificate, detailing the proposed methods of excavation, shoring or pile construction, including details of potential vibration emissions.  The report, must demonstrate the suitability of the proposed methods of construction to overcome any potential damage to nearby land/premises.

 

Any practices or procedures specified in the engineer’s report in relation to the avoidance or minimisation of structural damage to nearby premises, must be fully complied with and incorporated into the documentation for the construction certificate.

 

A copy of the engineers report is to be submitted to the Council, if the Council is not the certifying authority.

 

39.     Driven type piles/shoring must not be provided unless a geotechnical engineer’s report is submitted to the certifying authority, prior to the issuing of a construction certificate, which demonstrates that damage should not occur to any adjoining premises and public place as a result of the works.

 

Any practices or recommendations specified in the engineer’s report in relation to the avoidance or minimisation of structural damage to nearby premises or land must be fully complied with and incorporated into the documentation for the construction certificate.

 

40.     A dilapidation report prepared by a professional engineer or suitably qualified and experienced building surveyor shall be submitted to the certifying authority prior to the commencement of demolition, excavation or building works detailing the current condition and status of all buildings, including ancillary structures (i.e. including dwellings, residential flat buildings, commercial/industrial building, garages, carports, verandah’s, fences, retaining walls, swimming pools and driveways etc.) located upon      all of the premises adjoining the subject site.

 

The report is to be supported with photographic evidence of the status and condition of the buildings and a copy of the report must also be forwarded to the Council and to the owners of each of the abovementioned premises, prior to the commencement of any works.

 

41.     The installation of ground or rock anchors underneath any adjoining premises must not be carried out without specific written consent of the owners of the affected adjoining premises (including the Council if bounding a public roadway or public place) and where applicable, details of compliance must be provided to the certifying authority prior to the commencement of any excavation or building works.

 

42.     A Certificate prepared by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to occupation of the building, which certifies that the building works satisfy the relevant structural design requirements of the Building Code of Australia.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

43.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

44.     The adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

If an excavation associated with the erection or demolition of a building extends below the level of the base of the footings of any building located on an adjoining allotment of land, the person causing the excavation must:

 

·       preserve and protect the building /s on the adjoining land from damage; and

·       effectively support  the excavation and building; and

·       at least seven (7) days before excavating below the level of the base of the footings of a building on an adjoining allotment of land (including a public road or public place), give notice of the intention and particulars of the works to the owner of the adjoining land.

 

Notes

·     This consent and condition does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the principal contractor or owner-builder must obtain:

a)       the consent of the owners of such adjoining or supported land to trespass or encroach, or

b)       an access order under the Access to Neighbouring Land Act 2000, or

c)       an easement under section 88K of the Conveyancing Act 1919, or

d)       an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

·     Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

45.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and (except as detailed below) between 8.00am to 5.00pm on Saturdays.

 

All building, demolition and associated site works are strictly prohibited on Sundays, Public Holidays and also on Saturdays adjacent to a Public Holiday.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

46.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant provisions of the Protection of the Environment Operations Act 1997 must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery and pile drivers (or the like) must be minimised by using appropriate plant and equipment and silencers and a construction noise and vibration minimisation strategy, prepared by a suitably qualified consultant is to be implemented during the works, to the satisfaction of the Principal Certifying Authority.

 

47.     A report prepared by a suitably qualified and experienced person shall be submitted to the Principal Certifying Authority (PCA) and a copy is to be provided to Council upon commencement of works or as otherwise specified by the PCA or Council, certifying that noise and vibration emissions from the construction of the development satisfies the relevant provisions of the Protection of the Environment Operations Act 1997, Councils conditions of consent and relevant Standards relating to noise and vibration.  In support of the above, it is necessary to submit all relevant readings and calculations made.

 

Any recommendations and requirements contained in the report are to be implemented accordingly and should noise and vibration emissions not comply with the terms and conditions of consent, work must cease forthwith and is not to recommence until details of compliance are submitted to the PCA and Council.

 

48.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

b)     Building materials, sand, soil, waste materials, construction equipment or other materials or articles must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

c)     Bulk bins, waste containers or other articles must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container or other articles in a public place can be made to Council’s Health, Building & Regulatory Services department.

 

d)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

e)     A temporary timber, asphalt or concrete crossing is to be provided to the site entrance across the kerb and footway area, with splayed edges, to the satisfaction of Council, unless access is via an existing concrete crossover.

 

f)      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road or nature strip or in any public place:-

 

·       Install or erect any site fencing, hoardings or site structures

·       Operate a crane or hoist goods or materials over a footpath or road

·       Placement of a waste skip or any other container or article on the road, nature strip or footpath.

 

g)     The applicant/builder is required to hold Public Liability Insurance, with a minimum liability of $10 million and a copy of the Insurance cover is to be provided to Council.

 

h)     A Road/Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road/ Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Council’s Road/Asset Opening Officer on 9399 0691 or 9399 0999.

 

i)      Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

49.     A Registered Surveyor’s check survey certificate or compliance certificate is to be forwarded to the principal certifying authority (and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority), detailing compliance with Council’s approval at the following stage/s of construction:

 

a)     Prior to construction of the first completed floor/floor slab (prior to pouring of concrete), showing the area of land, building and boundary setbacks and verifying that the building is being construction at the approved levels.

 

b)     On completion of the erection of the building showing the area of the land, the position of the building and boundary setbacks and verifying the building has been constructed at the approved levels.

 

50.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of demolition, excavation or building works. The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing/hoardings to the perimeter of the site;

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction

·       details and methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·           construction noise and vibration management;

·           construction traffic management provisions.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and convenience to the satisfaction of Council.  A copy of the approved Construction Site Management Plan must be maintained on site and be made available to Council officers upon request.

 

51.     During demolition excavation and construction works, dust emissions must be minimised, so as not to result in a nuisance to nearby residents or result in a potential pollution incident.

 

Adequate dust control measures must be provided to the site prior to the works commencing and the measures and practices must be maintained throughout the demolition, excavation and construction process, to the satisfaction of Council.

 

Dust control measures and practices may include:-

 

·       Provision of geotextile fabric to all perimeter site fencing (attached on the prevailing wind side of the site fencing).

·       Covering of stockpiles of sand, soil and excavated material with adequately secured tarpaulins or plastic sheeting.

·       Installation of a water sprinkling system or provision of hoses or the like.

·       Regular watering-down of all loose materials and stockpiles of sand, soil and excavated material.

·       Minimisation/relocation of stockpiles of materials, to minimise potential for disturbance by prevailing winds.

·       Revegetation of disturbed areas.

 

52.     During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing.

 

Details of the proposed sediment control measures are to be detailed in the Site Management Plan and must be submitted to and approved by the principal certifying authority prior to the commencement of any site works.  The sediment and erosion control measures must be implemented prior to the commencement of any site works and be maintained throughout construction.  A copy of the approved details must be forwarded to the Council and a copy is to be maintained on-site and be made available to Council officers upon request.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

A warning sign for soil and water management must be displayed in a prominent position on the building site, visible to both the public and site workers.  The sign must be displayed throughout the construction period.  Copies of a suitable warning sign are available at Council’s Customer Service Centre for a nominal fee.

 

53.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If the work involved in the erection or demolition of a building is likely to cause pedestrian or vehicular traffic in a public place to be obstructed or rendered inconvenient or the building involves the enclosure of a public place, a hoarding or fence must be erected between the work site and the public place.

 

If necessary, an awning is to be erected sufficiently to prevent any substance from, or in connection with, the work from falling into the public place or adjoining premises.

 

Temporary fences or hoardings are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or any public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

54.     The demolition, removal, storage, handling and disposal of  materials and all building work must be carried out in accordance with the following requirements (as applicable):

 

§   Australian Standard 2601 (2001) – Demolition of Structures

§   Occupational Health and Safety Act 2000

§   Occupational Health and Safety (Hazardous Substances) Regulation 2001

§   Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

§   WorkCover NSW – Guidelines and Codes of Practice

§   Randwick City Council’s Asbestos Policy

§   The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

 

55.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Work Plan must include the following information (as applicable):

 

§   The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

§   Details of hazardous materials, including asbestos

§   Method/s of demolition and removal of asbestos

§   Measures and processes to be implemented to ensure the health & safety of workers and community

§   Measures to be implemented to minimise any airborne asbestos and dust

§   Methods and location of disposal of any asbestos or other hazardous materials

§   Other relevant details, measures and requirements to be implemented as identified in the Asbestos Survey

§   Date the demolition and removal of asbestos will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition works.  A copy of the Demolition Work Plan must be forwarded to Council and a copy must also be maintained on site and be made available to Council officers upon request.

 

56.     Any work involving the demolition, storage and disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

a)     Randwick City Council’s Asbestos Policy (adopted 13 September 2005).

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

a)     A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

b)     On sites involving the removal of asbestos, a  professionally manufactured sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS” and include details of the licensed contractor.  The sign shall measure not less than 400mm x 300mm and the sign is to be installed prior to demolition work commencing and is to remain in place until such time as all asbestos has been safely removed from the site.

 

c)     Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 1996. Asbestos waste must be disposed of at an approved waste disposal depot (refer to the DEC or Waste Service NSW for details of sites). Copies of all receipts detailing method and location of disposal must be maintained on site and be provided to Council officers upon request, as evidence of correct disposal.

 

d)     A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council upon completion of the works prior to an Occupation Certificate being issued, which confirms that the asbestos material have been removed appropriately and the relevant requirements contained in the Asbestos Survey and conditions of consent in relation to the safe removal and disposal of asbestos, have been satisfied.

 

The following conditions are applied to promote occupant safety in the building:

 

57.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i.     The window having a minimum sill height of 1.5m above the internal floor level,

ii.    Providing a window locking device at least 1.5m above the internal floor level,

iii.    Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

iv.   Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v.    Other appropriate effective safety measures or barrier.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

58.     The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $2000.00   -      Damage/Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

59.     Prior to the issuing of an Occupation Certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)  Construct new concrete vehicular crossings and laybacks (if required) at kerb opposite the vehicular entrances to the site.

 

b)  Remove any redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

 

c)  Re/construct any damaged concrete footpath along the full site frontage.  Any unpaved areas on the nature strip must be turfed and landscaped to Council’s specification.

 

60.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

61.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

62.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

63.     The design alignment levels issued by Council and their relationship to the footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

64.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $901.00 calculated at $44.00 (inclusive of GST) per metre of site frontage. This amount is to be paid to Council prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

65.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

66.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

67.     A Road/Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Councils Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

68.     A Section 73 Compliance Certificate under the Sydney water Act 1994 must be obtained from Sydney Water Corporation.

 

Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the website www.sydneywater.com.au then refer to “Water Servicing Coordinator” under Developing Your Land” or telephone 13 20 92 for assistance.

 

Following application a “Notice of Requirements” will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.

The Notice must be issued to the Principal Certifying Authority prior to the construction certificate being issued.

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to occupation of the development.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

69.     Generally all site stormwater shall be piped to a sediment/silt arrester pit that drains to an infiltration area with a minimum 5 m2 base area. An overflow pipe shall be provided from the silt arrestor pit that drains to Council's kerb and gutter.

 

The location and details of the proposed internal stormwater pipelines, silt arrestor pit and the infiltration area shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the plans shall be forwarded to Council, prior to a construction certificate being issued, if Council is not the certifying authority.

 

Notes:

 

a.     The sediment/silt arrestor pit shall be constructed:

i.     within the site at or near the street boundary.

i.     with a child proof and corrosion resistant fastening system (e.g. spring loaded jay-bolt).

ii.     with a minimum of 4 x 90 mm diameter weep holes (preferably located in the walls of the pit at the floor level) and with a suitable geotextile material with a high filtration rating located around the weep holes.

iii.    with the pit floor being a minimum 300mm below the invert level of the outlet pipelines.

iv.    with a galvanised heavy duty screen (Lysaght RH3030 Maximesh or similar) located over the outlet pipes draining to the infiltration pit and the kerb. (Similar to a Mascot GRC stormwater discharge control pit, product code DS3SDC).

 

b.     The infiltration/rubble pit shall:

  

i.      have a minimum 300 mm of soil cover (600 mm where the pit is located under a garden/landscaping area).

i.     be located a minimum of 3.0 metres from the dwelling or other structure (closer if a structural engineer certifies that the infiltration area will not adversely affect the structure) and 2.1 metres from the adjacent side or rear boundaries.

ii.    be constructed with a minimum 200 mm thick layer of 20 mm basalt/blue metal (or similar) that is wrapped in a suitable geotextile material covering with a high filtration rating (Geofabrics Bidim "A" range of filtration fabrics or equivalent). A suitable means of dispersing the stormwater over the area of infiltration is to be constructed.

 

Note:  other equivalent methods of infiltration may be adopted.

 

iii.     have a minimum base area of  5.0 square metres (m2).

 

The outlet from the silt arrestor pit to the infiltration area shall be located at least 50 mm below the outlet from the silt arrestor pit to the kerb and gutter.

 

c.     The requirement for an infiltration/rubble pit will not be enforced should the underground soil conditions preclude the construction of the infiltration pit (eg rock is located within 300 mm of the base of the infiltration area). If the infiltration/rubble pit is not constructed then all site stormwater shall be discharged to the kerb and gutter via a sediment/silt arrestor pit (as detailed in note a. above).

 

All works shall be to the satisfaction of the certifying authority.

 

d.     The overflow pipe/s from any rainwater tank/s shall be directed into the infiltration area.

 

70.     The infiltration areas/Absorption Trenches must be designed in accordance with "Section 8.5 ABSORPTION TRENCHES" as stipulated in Randwick City Council's Private Stormwater Code.

 

71.     Any seepage water must not be collected and discharged from the site.

 

The following conditions are applied to provide adequate provisions for waste management:

 

72.     Prior to the Principal Certifying Authority issuing an occupation certificate for the proposed development the applicant is to contact Council’s Manager of Waste in regards to meeting Council’s requirements for waste services to the development site.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

73.     Landscaping at this site shall be installed substantially in accordance with the Landscape Plans by Taylor Brammer Landscape Architects, drawing no’s LA01 – 02, job number 10-066S, revision C, dated 29.06.10, prior to the PCA issuing a Final Occupation Certificate, with the owner/s to ensure that the landscape works are maintained in a healthy and vigorous state until maturity, for the life of the development.

 

74.     The nature-strip upon Council's footway shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

Planting of new street trees

 

75.     The applicant shall submit a total payment of $107.25 (including GST) being the cost for Council to supply and install 1 x 25 litre street tree, Hibiscus tiliaceus (Cottonwood) centrally across the width of the site, in between both vehicle crossings, at the completion of all works.

 

The contribution shall be paid into Tree Amenity Income at the Cashier on the Ground Floor of the Administrative Centre prior to a Construction Certificate being issued for the development.

 

The applicant must contact Council’s Landscape Development Officer on 9399-0613 (quoting the receipt number) and giving at least four working weeks notice to arrange for planting of the new street tree.

 

Removal of trees within the site

 

76.     Approval is granted for removal of the following trees in order to accommodate the proposed works as shown, subject to full implementation of the approved landscape plan:

 

a)  The Lagunaria patersonii (Norfolk Island Hibiscus, shown as Tree 3 on the Existing Tree Schedule) in the rear yard, about halfway along the length of the northern boundary, beyond the northeast corner of the existing house, and hard up against the existing timber fence, as following flowering, this species seed pods release fibres that are highly irritable to both humans and animals, and for this reason are not suitable for retention in residential situations;

 

b)  To the west of the tree described above, near the northwest corner of the site, a Jacaranda mimosifolia (Jacaranda, Tree 1) in order to accommodate the proposed works, landscaping and replacement tree planting as shown.

 

Protection of trees within the site

 

77.     In order to ensure retention of the two Howea fosteriana (Kentia Palms, shown as trees 3 & 4 on the Existing Tree Schedule) located in the rear yard, around the northeast corner of the site (future courtyard of proposed Unit 1) in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the construction certificate application must show their retention, with the position and diameter of both of their trunks and crowns to be clearly shown on all drawings.

 

b.       Any excavations associated with the installation of new services, pipes, stormwater systems or similar in the rear yard of proposed Unit 1, must be setback a minimum distance of 2 metres (measured off the outside edge of both of their trunks at ground level), so as to minimise root damage.

 

c.       Both palms are to be physically protected as one group by installing 1.8 metre high steel mesh/chainwire fencing, a minimum distance of 1.5 metres to the south of Tree 4, matching up with the eastern site boundary, then extending to the west, finishing a distance of 1.5 metres to the west of Tree 3 (measured off the outside edge of their trunks at ground level), where it will then match up with the northern site boundary, so as to completely exclude both palms as one group from the works.

 

d.       This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

e.       Within the zone specified in point ‘c’ above, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble, with all Site Management Plans to note these requirements.

 

f.        Any roots encountered during the course of the approved works must be cut cleanly by hand, and the affected area backfilled with clean site soil as soon as practically possible.

 

ADVISORY MATTERS:

 

A1.     The applicant is advised that the Construction Certificate plans and specification must comply with the provisions of the Building Code of Australia (BCA).

 

In this regard, the development consent plans do not show compliance with the deemed-to-satisfy provisions of the BCA, including:

 

a)     Part B1                  -       Structural provisions

b)     Part C1                 -       Fire resistance and stability

c)     Part C3                 -       Protection of openings

d)     Clause C3.2&C3.4    -       Protection of openings in external walls

e)     Part E1                  -       Fire fighting equipment

f)      Part E2                  -       Smoke Hazard Management

g)     Part E3                  -       Lift Installations

h)     Part E4                  -       Emergency lighting, exit signs & warning systems

i)      Part F1                  -       Damp and weatherproofing

k)     Part F4                  -       Light and ventilation

l)      Part F5                  -       Sound Transmission and Insulation

m)     Section J               -       Energy efficiency

 

Details of compliance with the relevant provisions of the Building Code of Australia and conditions of development consent are to be provided in the plans and specifications for the construction certificate.

 

The applicant/developer is advised to ensure that the development is not inconsistent with Council's consent and if necessary consult with Council’s Building Certification Services or your accredited certifier (as applicable) prior to submitting your construction certificate application to enable these matters to be addressed accordingly.

 

A2.     The applicant/owner is advised that this approval does not guarantee compliance with the provisions of the Disability Discrimination Act 1992 and the applicant should therefore consider their liability under the Act.  In this regard, the applicant is advised that compliance with the requirements of the Building Code of Australia and Australian Standard 1428.1 - Design for Access and Mobility does not necessarily satisfy the objectives of the Disability Discrimination Act 1992.

 

The applicant/owner is requested to give consideration to providing access and facilities for people with disabilities in accordance with Australian Standard 1428 Parts 1, 2, 3 and 4 - Design for Access and Mobility, which may be necessary to satisfy the objectives of the Disability Discrimination Act 1992.

 

A3.     The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

The consent is not to operate until the following documentation has been submitted to the satisfaction of Council’s Director, City Planning.

 

MOTION: (Andrews/Nash) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Woodsmith

Councillor Belleli

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Tracey

 

Councillor White

 

Total (11)

Total (1)

 

 

 

D50/11     Development Application Report - 60 Avoca Street, Randwick (DA/186/2011)

PL60/11

RESOLUTION: (Andrews/Nash) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F of the Randwick Local Environmental Plan 1998 (Consolidation), relating to Floor Space Ratio, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/186/2011 for the demolition of the existing dwelling and construction of a new two storey detached dwelling at the rear of the site fronting Hodgson Street with a new carport and strata subdivision (SEPP1 Objection - floor space ratio) at 60 Avoca Street, Randwick subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received

A-01

John Spiteri Design and Drafting

9 March 2011

18 March 2011

A-02

John Spiteri Design and Drafting

16 March 2011

18 March 2011

A-03

John Spiteri Design and Drafting

16 March 2011

18 March 2011

A-04

John Spiteri Design and Drafting

16 March 2011

18 March 2011

Concept Strata Subdivision Plan

Anonymous

Undated

18 March 2011

 

BASIX Certificate

No.

Dated

Received

 

364985S

10 March 2011

18 March 2011

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

2.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

3.       a)    The colours, materials and finishes of the external surfaces are to be compatible with the existing building and adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

External materials, finishes and colours of the building are required to match, as closely as possible, the existing building and any metal roof sheeting is to be pre-painted (e.g. Colourbond) to limit the level of reflection and glare.

 

b)    Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Manager Development Assessments prior to issuing a construction certificate for the development.

 

Section 94A Development Contributions

4.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $250,000, the following applicable monetary levy must be paid to Council:   $2,500.00.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate [or subdivision certificate] being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

Compliance with the Building Code of Australia

5.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Long Service Levy Payments

6.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

7.       The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $1000.00   -      Damage/Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a    cash or cheque with the Council and is refundable upon:

 

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all    building works and/or obtaining an occupation certificate, if required.

 

The applicant is to advise Council in writing and/or photographs of any   signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

8.       Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)  Construct concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site.

b)  Remove the redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

 

9.       The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

10.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

11.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level at the property boundary for driveways, access ramps and pathways or the like, shall be;

 

·              50mm above the top of the kerb at all points opposite the kerb, along the full site frontage.

 

12.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

13.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $135.00 (inclusive of GST). This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

14.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

15.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

16.     A Road/Asset Opening Permit must be obtained from Council prior to carrying out any public utility service works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Councils Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

17.     Generally all site stormwater from the redeveloped portion of the site shall be piped to a sediment/silt arrester pit that drains to an infiltration area with a minimum 5 m2 base area. An overflow pipe shall be provided from the silt arrestor pit to drain to Council's kerb and gutter.

 

The location and details of the proposed internal stormwater pipelines, silt arrestor pit and the infiltration area shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the plans shall be forwarded to Council, prior to a construction certificate being issued, if Council is not the certifying authority.

 

Notes:

 

a.   The sediment/silt arrestor pit shall be constructed:

 

i.     within the site at or near the street boundary.

ii.     with a child proof and corrosion resistant fastening system (e.g. spring loaded jay-bolt).

iii.    with a minimum of 4 x 90 mm diameter weep holes (preferably located in the walls of the pit at the floor level) and with a suitable geotextile material with a high filtration rating located around the weep holes.

iv.    with the pit floor being a minimum 300mm below the invert level of the outlet pipelines.

v.    with a galvanised heavy duty screen (Lysaght RH3030 Maximesh or similar) located over the outlet pipes draining to the infiltration pit and the kerb. (Similar to a Mascot GRC stormwater discharge control pit, product code DS3SDC).

 

b.            The infiltration/rubble pit shall:-

 

have a minimum 300 mm of soil cover (600 mm where the pit is located under a garden/landscaping area).

 

i.     be located a minimum of 3.0 metres from the dwelling or other structure (closer if a structural engineer certifies that the infiltration area will not adversely affect the structure) and 2.1 metres from the adjacent side or rear boundaries.

ii.     be constructed with a minimum 200 mm thick layer of 20 mm basalt/blue metal (or similar) that is wrapped in a suitable geotextile material covering with a high filtration rating (Geofabrics Bidim "A" range of filtration fabrics or equivalent). A suitable means of dispersing the stormwater over the area of infiltration is to be constructed.

 

Note:  other equivalent methods of infiltration may be adopted.

 

iii.    have a minimum base area of  5.0 square metres (m2).

 

The outlet from the silt arrestor pit to the infiltration area shall be located at least 50 mm below the outlet from the silt arrestor pit to the kerb and gutter.

 

c.            The requirement for an infiltration/rubble pit will not be enforced should the underground soil conditions preclude the construction of the infiltration pit (eg rock is located within 300 mm of the base of the infiltration area). If the infiltration/rubble pit is not constructed then all site stormwater shall be discharged to the kerb and gutter via a sediment/silt arrestor pit (as detailed in note a. above).

 

All works shall be to the satisfaction of the certifying authority.

 

18.     The overflow pipe from the rainwater tank shall be directed into the infiltration area.

 

The following conditions are applied to satisfy the provisions of Council’s environmental plans, policies and codes for subdivision works:

 

19.     All floors, external walls and ceilings depicted in the proposed strata plan must be constructed prior to the issue of a strata subdivision certificate.

 

20.     All floors, external walls and ceilings depicted in the proposed strata plan must correspond to those depicted in this development consent and construction certificate for the building.

 

21.     Prior to endorsement of the strata plans, all facilities required under this development consent (such as parking spaces, terraces and courtyards) must be provided in accordance with the relevant requirements.

 

22.     A Section 73 Compliance Certificate under the Sydney Water Act 1994 must be obtained from Sydney Water Corporation.

 

Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the website www.sydneywater.com.au then refer to “Water Servicing Coordinator” under Developing Your Land” or telephone 13 20 92 for assistance.

 

Following application a “Notice of Requirements” will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to release of the plan of subdivision.

 

23.     The applicant shall provide Council with a survey plan of the property prior to receiving subdivision approval.

 

24.     The applicant shall create suitable rights of carriageway, easements for services, support and stormwater lines, as required. The applicant shall be advised that the minimum easement width for any stormwater line is 0.9 metres.

 

25.     A formal subdivision application is required to be submitted to and approved by the Council or an accredited certifier and all conditions of this development consent are required to be satisfied prior to the release of the subdivision plans.

 

26.     Details of critical stage inspections carried out by the principal certifying authority, together with any other certification relied upon, must be provided to Council or the accredited certifier prior to the issuing of a subdivision certificate.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

27.     That part of the nature-strip upon Council's footway which is damaged during the construction of the proposed works shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu turf or similar. Such works shall be completed at the applicant’s expense prior to the issue of a final Occupation Certificate.

 

Street Tree Removal

28.     Approval is granted for the applicant to remove and dispose of (at their own cost) the existing Tristaniopsis laurina (Watergum), on Council’s Hodgson Street footpath, located beyond the southeast corner of the existing garage, during excavations associated with the proposed vehicle crossing as shown, and must satisfy themselves as to the location of all site services, prior to the commencement of any works on public property.

 

29.     This approval is subject to the applicant submitting a payment of $450.00 (no GST) to cover the cost of originally planting this semi-established public tree which is only now being removed to accommodate the development of private property, and also reflects a loss of amenity fee as a replacement cannot be provided due to the presence of other street trees to the east and west.

 

The contribution shall be paid into Tree Amenity Income at the Cashier on the Ground Floor of the Administrative Centre prior to a Construction Certificate being issued for the development.

 

Tree Removals within site       

30.     Approval is also granted for removal of the Schinus areira (Peppercorn Tree) located centrally in the rear yard, due both to its poor condition, inappropriate position close to the eastern wall of the existing garage, as well as to accommodate the proposed building as shown, with the same also applying to those small shrubs in this same area of the site.

 

Protection of street trees

31.     In order to ensure retention of both the Robinia pseudoacacia ‘Frisia’ (Golden Robinia) located within the Hodgson Street footpath, just beyond the western site boundary, as well as the Tristaniopsis laurina (Watergum), just east of the power pole, in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the Construction Certificate application must show the retention of both street trees, with the position and diameter of both its trunk and canopy to be clearly shown.

b.       The applicant is not authorised to perform any works to either of these street trees, and shall contact Council’s Landscape Development Officer on 9399-0613 should pruning or any similar such work appear necessary, with the applicant required to cover all costs associated with such works, to Council’s satisfaction, prior to the issue of a Final Occupation Certificate.

 

c.       There is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble on the footpath, within 2 metres of their trunks, with all Site Management Plans needing to acknowledge these requirements.

 

d.       A refundable deposit in the form of cash, credit card or cheque for an amount of $500.00 shall also be paid at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development, in order to ensure compliance with the conditions listed in this consent, and ultimately, preservation of these street trees.

 

The refundable deposit will be eligible for refund following the issue of a Final Occupation Certificate, subject to completion and submission of Council’s ‘Security Deposit Refund Application Form’, and pending a satisfactory inspection by Council’s Landscape Development Officer (9399-0613).

 

Any contravention of Council's conditions relating to the trees at any time during the course of the works, or prior to the issue of a final occupation certificate, may result in Council claiming all or part of the lodged security in order to perform any rectification works necessary, as per the requirements of 80A (6) of the Environmental Planning and Assessment Act 1979.

 

·      Further information and details on Council's requirements for trees on development sites can be obtained from the recently adopted Tree Technical Manual, which can be downloaded from Council’s website at the following link, http://www.randwick.nsw.gov.au - Looking after our environment – Trees – Tree Management Technical Manual; which aims to achieve consistency of approach and compliance with appropriate standards and best practice guidelines.

 

BASIX Requirements

32.     In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Smoke Alarms

33.     Smoke alarms are required to be installed in each Class 1 building or dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

34.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)       a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)       a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)       a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)       the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)       at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

Home Building Act 1989

35.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing.

 

Dilapidation Reports

36.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

37.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

Temporary Site Fencing

38.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary site fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management Plan

39.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·          location and construction of protective fencing/hoardings to the perimeter of the site;

·          location of site storage areas/sheds/equipment;

·          location of building materials for construction;

·          provisions for public safety;

·          dust control measures;

·          site access location and construction

·          details of methods of disposal of demolition materials;

·          protective measures for tree preservation;

·          provisions for temporary sanitary facilities;

·          location and size of waste containers/bulk bins;

·          details of proposed sediment and erosion control measures;

·          provisions for temporary stormwater drainage;

·          construction noise and vibration management;

·          construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

40.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

 

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

·          Recycling, reuse and waste disposal of remediation materials

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Sydney Water

41.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

 

Demolition Work Requirements

42.     The proposed works and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment, Climate Change & Water and Randwick City Council policies, including:

 

·          Occupational Health & Safety Act 2000 & Regulations

·          WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·          WorkCover NSW Guidelines and Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECCW/EPA Guidelines

·          Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

43.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Site Signage

44.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·          name, address and telephone number of the Principal Certifying Authority,

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

Sediment & Erosion Control

45.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.  Details are to be included in the Construction Site Management Plan.

 

Public Safety & Site Management

46.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

c)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

e)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

f)     Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Excavations, Back-filling & Retaining Walls

47.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

Support of Adjoining Land

48.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)    If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)     protect and support the adjoining premises from possible damage from the excavation, and

ii)     where necessary, underpin the adjoining premises to prevent any such damage.

 

b)    The condition referred to in subclause a) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

49.     Prior to undertaking any demolition, excavation or building work in the following circumstances, a report must be obtained from a professional engineer which details the methods of support for the dwelling or associated structure on the adjoining land, to the satisfaction of the Principal Certifying Authority:

 

·          when undertaking excavation or building work within the zone of influence of the footings of a dwelling or associated structure that is located on the adjoining land;

·          when undertaking demolition work to a wall of a dwelling that is built to a common or shared boundary (eg. semi-detached or terrace dwelling);

·          when constructing a wall to a dwelling or associated structure that is located within 900mm of a dwelling located on the adjoining land.

 

The demolition, excavation and building work and the provision of support to the dwelling or associated structure on the adjoining land, must also be carried out in accordance with the abovementioned report, to the satisfaction of the Principal Certifying Authority.

 

Restriction on Working Hours

50.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Inspections During Construction

51.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Building Encroachments

52.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Road/Asset Opening Permit

53.     A Road/Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:        For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

 

Occupation Certificate Requirements

54.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

BASIX Requirements

55.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

56.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·          The window having a minimum sill height of 1.5m above the internal floor level,

·          Providing a window locking device at least 1.5m above the internal floor level,

·          Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·          Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·          Other appropriate effective safety measures or barrier.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

Use of premises

57.     The premises must only be used as a single residential dwelling and must not be used for dual or multi-occupancy purposes.

 

External Lighting

58.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

Protection of the Environment Operations Act 1997 – Air Conditioners

59.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Air Conditioning & Equipment

60.     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·      before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·      before 7.00am or after 10.00pm on any other day.

 

Protection of the Environment Operations Act 1997 – Rainwater Tanks

61.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Rainwater Tank Requirements

62.     The installation of rainwater tanks shall comply with the following noise control requirements:-

 

a)    The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)    Plant and equipment associated with rainwater tanks are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)    The operation of plant and equipment associated with rainwater tanks are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

·      before 8.00am or after 8.00pm on weekends or public holiday; or

·      before 7.00am or after 8.00pm on weekdays.

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

 

·          The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

·          Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

·          This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

·          A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

·          Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

·          Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

·          The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Andrews/Nash) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Woodsmith

Councillor Belleli

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Tracey

 

Councillor White

 

Total (11)

Total (1)

 

 

 

D51/11     Development Application Report - 11 Torrens Street Matraville (DA/72/2011)

PL61/11

RESOLUTION: (Andrews/Nash) -

 

A.       That Council supports the objection under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20G of Randwick Local Environmental Plan 1998, relating to external wall height on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.       That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No.72/2011 for the demolition of the existing buildings and erection of a new two storey attached dual occupancy at No. 11 Torrens Street, Matraville subject to the following conditions:

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received

A-02

J Spiteri

28/1/2011

10th February 2011

A-03

J Spiteri

28/1/2011

10th February 2011

A-04

J Spiteri

28/1/2011

10th February 2011

A-05

J Spiteri

28/1/2011

10th February 2011

A-06

J Spiteri

28/1/2011

10th February 2011

 

BASIX Certificate

No.

Dated

Received

 

358718M

3rd February 2011

10th February 2011

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

2.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

3.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Manager Development Assessments prior to issuing a construction certificate for the development.

 

Section 94A Development Contributions

4.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $763 000, the following applicable monetary levy must be paid to Council: $ 7 630.00.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate [or subdivision certificate] being issued for the proposed development.  The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

BASIX Requirements

5.       In accordance with section 80A(11) of the Environmental Planning & Assessment Act 1979 and clause 97A of the Environmental Planning & Assessment Regulation 2000, the requirements and commitments contained in the relevant BASIX Certificate must be complied with.

 

The required commitments listed and identified in the BASIX Certificate must be included on the construction certificate plans, specifications and associated documentation, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

Compliance with the Building Code of Australia

6.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Long Service Levy Payments

7.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Smoke Alarms

8.       Smoke alarms are required to be installed in each Class 1 building or dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

9.       Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

Home Building Act 1989

10.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing.

 

Construction Noise & Vibration Management Plan

11.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

Temporary Site Fencing

12.     Temporary site safety fencing must be provided to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres). 

 

Temporary site fences are to have a height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

Temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings, amenities or articles upon any part of the footpath, nature strip or public place at any time, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services before placing any item or article on the road, footpath or nature strip.

 

Construction Site Management

13.     A Construction Site Management Plan must be developed and implemented prior to the commencement of any works. The construction site management plan must include the following measures, as applicable to the type of development:

 

·            location and construction of protective fencing/hoardings to the perimeter of the site;

·            location of site storage areas/sheds/equipment;

·            location of building materials for construction;

·            provisions for public safety;

·            dust control measures;

·            site access location and construction

·            details of methods of disposal of demolition materials;

·            protective measures for tree preservation;

·            provisions for temporary sanitary facilities;

·            location and size of waste containers/bulk bins;

·            details of proposed sediment and erosion control measures;

·            provisions for temporary stormwater drainage;

·            construction noise and vibration management;

·            construction traffic management details.

 

The site management measures must be implemented prior to the commencement of any site works and be maintained throughout the works, to the satisfaction of Council.

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council prior to commencing site works.  A copy must also be maintained on site and be made available to Council officers upon request.

 

Demolition Work Plan

14.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures and relevant environmental/occupational health and safety requirements.

 

The Demolition Work Plan must include the following information (as applicable):

·            The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·            Details of hazardous materials (including asbestos)

·            Method/s of demolition (including removal of any asbestos)

·            Measures and processes to be implemented to ensure the health & safety of workers and community

·            Measures to be implemented to minimise any airborne dust and asbestos

·            Methods and location of disposal of any hazardous materials

·            Other relevant details, measures and requirements to be implemented

·            Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Notes

§  It is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

§  Refer to the conditions within the “Requirements During Construction & Site Work”, for further details and requirements relating to demolition work, removal of any asbestos and public safety.

 

Demolition & Construction Waste

15.     A Demolition and Construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

Sydney Water

16.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

Prior to the commencement of excavation or building works, the approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing works.

 

Public Utilities

17.     A Public Utility Impact Assessment must be carried out to identify all public utility services located on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the building works.

 

Documentary evidence from the relevant public utility authorities confirming that their requirements have been or are able to be satisfied, must be submitted to the Principal Certifying Authority prior to the commencement of any works.

 

The owner/builder must make the necessary arrangements and meet the full cost for telecommunication companies, gas providers, Energy Australia, Sydney Water and other authorities to adjust, repair or relocate their services as required.

 

REQUIREMENTS DURING CONSTRUCTION & SITE WORK

The following conditions of consent must be complied with during the demolition, excavation and construction of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity during construction.

 

 

Demolition Work Requirements

18.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment, Climate Change & Water and Randwick City Council policies, including:

 

·           Occupational Health & Safety Act 2000 & Regulations

·           WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·           WorkCover NSW Guidelines and Codes of Practice

·           Australian Standard 2601 (2001) – Demolition of Structures

·           The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·           Relevant DECCW/EPA Guidelines

·           Randwick City Council Asbestos Policy

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

Removal of Asbestos Materials

19.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·           Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·           Randwick City Council’s Asbestos Policy

 

·           A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.  A copy of the relevant licence must be provided to the Principal Certifying Authority.

 

·           On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·           Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.  Details of the landfill site (which must be lawfully able to receive asbestos materials) must be provided to the Principal Certifying Authority.

 

·           A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

Inspections During Construction

20.     The building works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Site Signage

21.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·           name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·           name, address and telephone number of the Principal Certifying Authority,

·           a statement stating that “unauthorised entry to the work site is prohibited”.

 

Restriction on Working Hours

22.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers, vibratory rollers/compactors or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

Sediment & Erosion Control

23.     Sediment and erosion control measures, must be implemented throughout the site works in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details must be shown in a Sediment and Erosion Control Plan, including; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

A copy of the Sediment and Erosion Control Plan must be provided to the Principal Certifying Authority and a copy must be maintained on site and be made available to Council officers upon request.

 

Public Safety & Site Management

24.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

a)     Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health, Building and Regulatory Services department.

 

d)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

e)     Temporary safety fencing is to be provided to any swimming pools under construction, pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

Excavations, Back-filling & Retaining Walls

25.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations must be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

      Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

      Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

Support of Adjoining Land

26.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

 

b)     The condition referred to in subclause a) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

27.     Prior to undertaking any demolition, excavation or building work in the following circumstances, a report must be obtained from a professional engineer which details the methods of support for the dwelling or associated structure on the adjoining land, to the satisfaction of the Principal Certifying Authority:

 

·            when undertaking excavation or building work within the zone of influence of the footings of a dwelling or associated structure that is located on the adjoining land;

·            when undertaking demolition work to a wall of a dwelling that is built to a common or shared boundary (eg. semi-detached or terrace dwelling);

·            when constructing a wall to a dwelling or associated structure that is located within 900mm of a dwelling located on the adjoining land.

 

The demolition, excavation and building work and the provision of support to the dwelling or associated structure on the adjoining land, must also be carried out in accordance with the abovementioned report, to the satisfaction of the Principal Certifying Authority.

 

Survey Requirements

28.     A Registered Surveyor’s check survey certificate or other suitable documentation must be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority (PCA):

 

·            prior to construction (pouring of concrete) of the footings or first completed floor slab,

·            upon completion of the building, prior to issuing an occupation certificate,

·            as otherwise may be required by the PCA.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the Principal Certifying Authority for the development.  

 

Building Encroachments

29.     There must be no encroachment of any structures or building work onto Council’s road reserve, footway, nature strip or public place.

 

Finished Ground Levels

30.     The finished ground levels external to the building must be consistent with the development consent and are not to be raised, other than for the provision of approved paving or the like on the ground.

 

Road/Asset Opening Permit

31.     A Road/Asset Opening Permit must be obtained from Council prior to commencing any excavations or works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

Site Amenities

32.     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

REQUIREMENTS PRIOR TO THE ISSUE OF AN OCCUPATION CERTIFICATE

The following conditions of consent must be complied with prior to the ‘Principal Certifying Authority’ issuing an ‘Occupation Certificate’.

 

Note:  For the purpose of this consent, any reference to ‘occupation certificate’ shall also be taken to mean ‘interim occupation certificate’ unless otherwise stated.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health, safety and amenity.

 

 

Occupation Certificate Requirements

33.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

BASIX Requirements

34.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

Occupant Safety

35.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

·            The window having a minimum sill height of 1.5m above the internal floor level,

·            Providing a window locking device at least 1.5m above the internal floor level,

·            Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

·            Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

·            Other appropriate effective safety measures or barrier.

 

Street Numbering

36.     Street numbering must be provided to the front of the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council.

 

OPERATIONAL CONDITIONS

The following operational conditions must be complied with at all times, throughout the use and operation of the development.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent and to maintain reasonable levels of public health and environmental amenity.

 

 

External Lighting

37.     External lighting to the premises must be designed and located so as to minimise light-spill beyond the property boundary or cause a public nuisance.

 

Air Conditioning & Equipment

38.     Air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

Protection of the Environment Operations Act 1997 – Rainwater Tanks

39.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

Rainwater Tank Requirements

40.     The installation of rainwater tanks shall comply with the following noise control requirements:-

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tanks are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with rainwater tanks are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

·       before 8.00am or after 8.00pm on weekends or public holiday; or

·       before 7.00am or after 8.00pm on weekdays.

 

Waste Management

41.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

42.     The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $1000.00   -      Damage/Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

43.     Prior to the issuing of an Occupation Certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)     Construct concrete vehicular crossings and laybacks at kerb opposite the vehicular entrances to the site.

 

b)     Remove any redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

 

c)     Remove Council’s  Banksia serrata street tree located on the Torrens street verge.

 

d)     Construct a 1.3m wide concrete footpath along the full site frontage. Any unpaved areas on the nature strip must be turfed and landscaped to Council’s specification.

 

44.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

45.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

46.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level at the property boundary for driveways, access ramps and pathways or the like, shall be;

 

For Proposed Dwelling No .11A (eastern)

 

Driveway Access

 

§  Graded in a straight line from RL 32.60 (AHD) on eastern edge of driveway to RL 32.50 (AHD) on western edge of driveway.

 

Pedestrian  Access

 

§  RL 32.25 (AHD).

 

For Proposed Dwelling No .11 (western)

 

Pedestrian  Access

 

§  RL 32.15 (AHD).

 

Driveway Access

 

§  Graded in a straight line from RL 31.90 (AHD) on eastern edge of driveway to RL 31.80 (AHD) on western edge of driveway.

 

47.     The design alignment levels issued by Council and their relationship to the kerb must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

48.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $678 calculated at $44.00 (inclusive of GST) per metre of site frontage. This amount is to be paid to Council prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

49.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

50.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

51.     A Road/Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Councils Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

52.     A Section 73 Compliance Certificate under the Sydney water Act 1994 must be obtained from Sydney Water Corporation.

 

Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the website www.sydneywater.com.au then refer to “Water Servicing Coordinator” under Developing Your Land” or telephone 13 20 92 for assistance.

 

Following application a “Notice of Requirements” will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.

 

The Notice must be issued to the Principal Certifying Authority prior to the construction certificate being issued.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to occupation of the development.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

53.     Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issue, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)       A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

 

b)       A layout of the proposed drainage system including pipe sizes, type, grade, length, invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system.  This may involve either connection to the Council's street gutter, or into a Council stormwater pit.  Note:  All proposals should indicate the location of the closest Council stormwater pit and line regardless of the point of discharge.  This information can be obtained by a visual inspection of the area and perusing Council's drainage plans.

 

c)       Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (ie. above the 1 in 20 year storm) to the proposed drainage system.

 

d)       The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

 

i.        Roof areas

ii.       Paved areas

iii.       Grassed areas

iv.      Garden areas

 

e)       Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

 

f)       Proposed finished surface levels and grades of car parks, internal driveways and access aisles which are to be related to Council's design alignment levels.

 

g)       The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

54.     All stormwater run-off naturally draining to the site must be collected and discharged through this property's stormwater system.  Such drainage must, if necessary, be constructed prior to the commencement of building work.

 

55.     All site stormwater must be discharged either:

 

a.     To council’s kerb and gutter in Torrens Street by gravity.; OR

 

b.     To council’s kerb and gutter or street drainage system in Franklin Street by gravity via a private drainage easement through an adjoining private property (or properties); OR

 

c.     To a suitably sized infiltration area. As a guide the infiltration area shall be sized based on a minimum requirement of 1 m2 of infiltration area (together with 1 m3 of storage volume) for every 20 m2 of roof/impervious area on the site.

 

Prior to the use of infiltration in rear draining lots (where there is no formal overland escape route to Council’s kerb and gutter/street drainage system),  a geotechnical investigation will be required to determine whether the ground is suitable for infiltration. Should rock and/or a water table be encountered within two metres of the proposed base of the infiltration pit, or the ground conditions comprise low permeability soils such as clay, infiltration may not be appropriate.

 

NOTE: Should the applicant be unable to obtain a private drainage easement over properties to the rear of the development site (to facilitate stormwater discharge in accordance with option b)); and ground conditions preclude the use of infiltration (Option c), consideration may be given to the use of a charged system or a pump out system to drain that portion of the site that cannot be drained by gravity to the kerb and gutter at the front of the property.

 

56.     Should a charged system be required to drain any portion of the site, the charged system must be designed with suitable clear-outs/inspection points at pipe bends and junctions.

 

57.     Should a pump system be required to drain any portion of the site the system must be designed with a minimum of two pumps being installed, connected in parallel (with each pump capable of discharging at the required discharge rate) and connected to a control board so that each pump will operate alternatively. The pump wet well shall be sized for the 1 in 100 year, 2 hour storm assuming both pumps are not working.

 

The pump system must also be designed and installed strictly in accordance with Randwick City Council's Stormwater Code.

 

58.     All pump out water must pass through a stilling pit prior to being discharged by gravity to the kerb and gutter.

 

59.     Should stormwater be discharged to Council’s street drainage system, on-site detention must be provided to ensure that the maximum discharge from the above site is not to exceed that which would occur during a 1 in 10 year storm of 1 hour duration for the existing site conditions. All other stormwater run-off from the above site for all storms up to the 1 in 20 year storm is to be retained on the site for gradual release to the kerb and gutter or drainage system as required by the Director of City Planning.  Provision is to be made for satisfactory overland flow should a storm in excess of the above parameters occur.

 

Should no formal overland escape route be provided for storms greater than the design storm, the on-site detention system shall be sized for the 1 in 100 year storm event.

 

For small areas up to 0.5 hectares, determination of the required cumulative storage must be calculated by the mass curve technique as detailed in Technical Note 1, Chapter 14 of the Australian Rainfall and Run-off Volume 1, 1987 Edition.

 

Where possible the detention tank must have an open base to infiltrate stormwater to the groundwater. Note that the ground water and any rock stratum has to be a minimum of 2.0 metres below the base of the tank.

 

60.     Should stormwater be discharged to an infiltration system, the infiltration area shall be  sized for all storm events up to the 1 in 20 year storm event with provision for a formal overland flow path to Council’s Street drainage system.

 

Should no formal overland escape route be provided for storms greater than the design storm, the infiltration system shall be sized for the 1 in 100 year storm event.

 

61.     Any Infiltration systems/Absorption Trenches must be designed in accordance with "Section 8.5 ABSORPTION TRENCHES" as stipulated in Randwick City Council's Private Stormwater Code.

 

62.     The detention area/infiltration system must be regularly cleaned and maintained to ensure it functions as required by the design.

 

63.     The maximum depth of ponding in above ground detention areas (and/or infiltration systems with above ground storage) shall be as follows:

 

a.     150mm in uncovered carparking areas (with an isolated maximum depth of 200mm permissible at the low point pit within the detention area).

b.     300mm in landscaped areas (where child proof fencing is not provided around the outside of the detention area and sides slopes are steeper than 1 in 10)

c.     600mm in landscaped areas where the side slopes of the detention area have a maximum grade of 1 in 10.

d.     1200mm in landscaped areas where a childproof fence is provided around the outside of the detention area.

 

Notes:

§  Above ground storage will not be permitted in any area which may be used for storage of goods.

§  Mulch/bark must not be used in onsite detention areas.

 

64.     The stormwater detention area (and/or infiltration systems with above ground storage) must be suitably signposted where required, warning people of the maximum flood level.

 

65.     The floor level of all habitable and storage areas adjacent to the detention area (and/or infiltration systems with above ground storage) must be a minimum of 300mm above the maximum water level for the design storm or alternately a permanent 300mm high water proof barrier is to be constructed.

 

(In this regard, it must be noted that this condition must not result in any increase in the heights or levels of the building.  Any variations to the heights or levels of the building will require a new or amended development consent from the Council prior to a construction certificate being issued for the development).

 

66.     A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

 

67.     A `V' drain is to be constructed along the perimeter of the property, where required, to direct all stormwater to the detention/infiltration area.

 

 

68.     A sediment/silt arrester pit must be provided:-

 

a.     within the site at or near the street boundary prior to the site stormwater discharging by gravity to the kerb/street drainage system; and

b.     prior to stormwater discharging into any absorption/infiltration system.

 

The sediment/silt arrester pit shall be constructed in accordance with the following requirements:

·      The base of the pit located a minimum 300mm under the invert level of the outlet pipe.

·      The pit constructed from cast in-situ concrete, precast concrete, double brick or equivalent.

·      A minimum of 4 x 90 mm diameter weep holes located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

·      A galvanised heavy-duty screen located over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

·      The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

·      A child proof and corrosion resistant fastening system provided for the access grate.

·      A sign adjacent to the pit stating:

 

“This sediment/silt arrester pit shall be regularly inspected and cleaned.”

 

Note: Sketch details of a standard sediment/silt arrester pit may be obtained from Council’s Drainage Engineer.

 

69.     Prior to the issue of an occupation certificate, a "restriction on the use of land” and “positive covenant" (under section 88E of the Conveyancing Act 1919) shall be placed on the title of the subject property to ensure that the onsite detention system and/or infiltration system is maintained and that no works which could affect the design function of the detention system are undertaken without the prior consent (in writing) from Council. Such restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

 

Notes:

a.      The "restriction as to user” and “positive covenant" are to be to the satisfaction of Council. A copy of Council’s standard wording/layout for the restriction and positive covenant may be obtained from Council’s Development Engineer.

b.      The works as executed drainage plan and hydraulic certification must be submitted to Council prior to the “restriction on the use of land” and “positive covenant” being executed by Council.

 

70.     Prior to the issuing of an occupation certificate, the applicant shall submit to Council, a works-as-executed drainage plan prepared by a registered surveyor and approved by a suitably qualified and experienced Hydraulic Engineer. The works-as-executed drainage plan shall be to the satisfaction of the Principal Certifying Authority (PCA) and shall include the following details:

 

a)     The location of the detention basin with finished surface levels;

b)     Finished site contours at 0.2 metre intervals;

c)     Volume of storage available in the detention areas;

d)     The location, diameter, gradient and material (i.e PVC, RC etc) of all stormwater pipes;

e)     The orifice size(s) (if applicable);

f)     Details of any infiltration/absorption systems; and

g)     Details of any pumping systems installed (including wet well volumes).

 

71.     Prior to the issuing of an occupation certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer confirming that the design and construction of the stormwater drainage system complies with the conditions of development consent. The certification must be provided to the satisfaction of the PCA.

 

The following conditions are applied to provide adequate provisions for waste management:

 

72.     Prior to the Principal Certifying Authority issuing an occupation certificate for the proposed development the applicant is to contact Council’s Manager of Waste in regards to meeting Council’s requirements for waste services to the additional residence/dual occupancy.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

73.     Landscaping shall be provided to the site to enhance its amenity and reduce the impact of the development upon neighbouring properties. A landscape plan shall be submitted to and approved by the Director of City Planning, in accordance with section 80A(2) of the Environmental Planning and Assessment Act 1979, prior to a construction certificate being issued.

 

74.     Landscaped areas must contain a predominance of species that require minimal watering once established or species with water needs that match rainfall and drainage conditions.

 

75.     The landscaping shall be installed in accordance with the approved documentation prior to the issue of a final occupation certificate and shall be maintained in accordance with those plans.

 

76.     The naturestrip upon Council's footway shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

Tree Management

77.     The applicant shall submit a total payment of  $107.25 to Council,

Being the cost for Council to supply and install 1 x 25 litre street tree at the completion of all works ($97.50 + GST) midway between the new vehicle crossings on the Torrens Street verge.

 

The contribution shall be paid into Tree Amenity Income account no 4001.768401 at the Cashier on the Ground Floor of the Administrative Centre prior to a construction certificate being issued for the development.

 

The applicant will be required to contact Councils Landscape Development Officer on 9399-0613, giving at least two working weeks notice, to arrange for removal of the existing street tree/provision of a replacement street tree upon completion.

 

78.     Permission is granted for the removal of only those trees on the site falling within 2m of the area occupied by the approved works. Removal of the remaining trees on the site are subject to separate application under the Tree Preservation Order.

 

79.     The applicant shall be required to ensure the retention and long term health of all trees located on adjoining properties adjacent to the proposed development. As a general guide there shall be minimal excavation or root pruning within the dripline/s of the subject tree/s.

 

Tree Protection Measures

80.     In order to ensure the retention of the Agonis Flexuosa (Willow Myrtle) tree located in the south east corner of subject property and the large Harpephyllum kaffrum located near the south west corner of the property in good health, the following measures are to be undertaken:

 

a.       All detailed architectural, building, demolition, engineering (structural, stormwater & drainage, services), and landscape documentation submitted for the construction certificate application shall show the retention of the existing tree specimens with the position of the tree trunks and full diameter of the tree canopies clearly shown on all drawings.

 

b.       Detailed architectural, building, demolition, engineering (structural, stormwater & drainage, services), and landscape documentation submitted for the construction certificate application shall show no alteration in the existing soil levels or the location of any structures, services, footings, paving, detention tanks, stormwater infiltration systems, pipes, cutting or battering of the existing soil profile, or any excavations within a radius of  3 metres from the outside edge of the tree trunk/s.

 

b.       The trees are to be physically protected by the installation of protective  fencing around the trees using 1.8 metre high steel mesh/chainwire fencing. This fencing shall be located to a minimum radius of 3 metres from the outside edge of the tree trunk.

 

This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed.

 

c.       Within this zone there is to be no storage of materials or machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of in the area, no stockpiling of soil or rubble, or any works listed in Point b.

 

Any works required within this zone (only as approved on the construction certificate) shall be under the direction of, and to the satisfaction of, a suitably qualified Arborist.

 

d.       Any excavations required for footings, structures, retaining walls, services, pipes, detention tanks, stormwater infiltration systems, paving etc within 4 metres of the tree trunk shall be undertaken by hand and under the direction of, and to the satisfaction of, a suitably qualified Arborist with all roots being cleanly cut.

 

e.       The installation of woodchip mulch to a depth of 75mm within the fenced off protection area as described in Point c.

 

f.        The erection of signage on the fence with the following words clearly displayed: “TREE PROTECTION ZONE", "DO NOT ENTER".

 

ADVISORY NOTES

The following information is provided for your assistance to ensure compliance with the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, or other relevant legislation and Council’s policies.  This information does not form part of the conditions of development consent pursuant to Section 80A of the Act.

 

 

·              The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.  Council may also issue notices and orders to demolish unauthorised or non-complying building work, or to comply with the requirements of Council’s development consent.

 

·              Demolition, building or excavation work must not be commenced until;

 

§  A Construction Certificate has been obtained from Council or an Accredited Certifier

§  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

§  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Council’s Building Approvals & Certification team can issue Construction Certificates and be your Principal Certifying Authority for the development, to undertake inspections and ensure compliance with the development consent, relevant building regulations and standards of construction.  For further details contact Council’s Building Approvals & Certification team on 9399 0944.

 

·              This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

·              A Local Approval application must be submitted to and be approved by Council's Building Approvals & Certification team prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

§  Install or erect any site fencing, hoardings or site structures

§  Operate a crane or hoist goods or materials over a footpath or road

§  Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Approvals & Certification team on 9399 0944.

 

·              Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

·              Prior to commencing any works, the owner/builder should contact Dial Before You Dig on 1100 or www.dialbeforeyoudig.com.au and relevant Service Authorities, for information on potential underground pipes and cables within the vicinity of the development site.

 

·              The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works

 

MOTION: (Andrews/Nash) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Woodsmith

Councillor Belleli

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Tracey

 

Councillor White

 

Total (11)

Total (1)

 

 

 

D52/11     Development Application Report - 16/32 Perry Street, Matraville (DA/289/2000/A)

PL62/11

RESOLUTION: (Woodsmith/Mayor, Cr Matson) that:

 

A.     the application be deferred for mediation between the applicant and the objector to consider the following matters:

 

1.             the installation of an acoustic louver to the openings in the plant room or external ductwork lined with 50mm thick insulation.

2.             internal lining of the discharge ductwork/sleeves of air cooled chillers with insulation or installation of unpadded silencers to the discharge side of the fans.

3.             internal lining of the ceiling of the plant room with foil-faced 32kg/m3 density glasswool or equal.

4.             relocation of the rooftop fans and installation of a 1.8m high acoustic barrier to the south of the fans at a distance of 1m.

5.             details of the works required by proposed consent conditions 1-4.

6.             timeframe for the completion of the works required by proposed consent conditions 1-4.

7.             the certification required for the works required by proposed consent conditions 1-4.

 

B.     the acoustic consultant be invited to participate in the mediation.

 

MOTION: (Matthews/Andrews) that Council as the consent authority, refuse its consent under Section 96 of the Environmental Planning and Assessment Act 1979 as amended to modify Development Consent No DA/289/2000/A for permission to extend the operating hours for 16/32 Perry Street, Matraville for the following reasons:

 

1.     the proposal will adversely impact the amenity of nearby residential properties.

 

2.     the proposal is not in the public interest. LOST.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Hughes

Councillor Belleli

Councillor Matson

Councillor Matthews

Councillor Nash

Councillor Seng

Councillor Procopiadis

 

Councillor Smith

 

Councillor Tracey

 

Councillor White

 

Councillor Woodsmith

Total (4)

Total (8)

 

MOTION: (Woodsmith/Mayor, Cr Matson) CARRIED – SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Procopiadis

Councillor Belleli

Councillor Smith

Councillor Hughes

Councillor White

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Seng

 

Councillor Tracey

 

Councillor Woodsmith

 

Total (9)

Total (3)

 

 

 

D53/11     Development Application Report - 408 Malabar Road, Maroubra (DA/1053/2010)

PL63/11

RESOLUTION: (Andrews/Nash) -

 

A.       That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20F of Randwick Local Environmental Plan 1998, relating to floor space ratios, on the grounds that the proposed development complies with the objectives of the above clause, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.       That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/1053/2010 for demolition of the existing garage and construction of a new garage with rumpus room at lower ground floor level, at No. 408 Malabar Road, Maroubra subject to the following conditions:

 

DEVELOPMENT CONSENT CONDITIONS

 

GENERAL CONDITIONS

The development must be carried out in accordance with the following conditions of consent.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of environmental amenity.

 

Approved Plans & Supporting Documentation

1.       The development must be implemented substantially in accordance with the plans and supporting documentation listed below and endorsed with Council’s approved stamp, except where amended by Council in red and/or by other conditions of this consent:

 

Plan

Drawn by

Dated

Received

1 of 7 (Issue B)

-

10/03/2011

11 March 2011

2 of 7 (Issue B)

-

10/03/2011

11 March 2011

3 of 7 (Issue B)

-

10/03/2011

11 March 2011

4 of 7 (Issue B)

-

10/03/2011

11 March 2011

5 of 7 (Issue B)

-

10/03/2011

11 March 2011

6 of 7 (Issue B)

-

10/03/2011

11 March 2011

7 of 7 (Issue B)

-

10/03/2011

11 March 2011

 

REQUIREMENTS PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE

The following conditions of consent must be complied with prior to the issue of a ‘Construction Certificate’ by either Randwick City Council or an Accredited Certifier.  All necessary information to demonstrate compliance with the following conditions of consent must be submitted with the construction certificate application.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000, Council’s development consent conditions and to achieve reasonable levels of environmental amenity.

 

Consent Requirements

2.       The requirements and amendments detailed in the ‘General Conditions’ must be complied with and be included in the construction certificate plans and associated documentation.

 

External Colours, Materials & Finishes

3.       a)    The colours, materials and finishes of the external surfaces are to be compatible with the existing building and adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

External materials, finishes and colours of the building are required to match, as closely as possible, the existing building and any metal roof sheeting is to be pre-painted (e.g. Colourbond) to limit the level of reflection and glare.

 

Compliance with the Building Code of Australia

4.       In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance with the BCA are to be included in the construction certificate application.

 

Long Service Levy Payments

5.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, must be forwarded to the Long Service Levy Corporation or the Council, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

Security Deposit Conditions

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

6.       The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $2000.00   -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a      cash or cheque with the Council and is refundable upon:

 

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

          Civil Works Conditions

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

7.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)       Construct new drainage pit immediately to the south of proposed vehicle vehicular crossing and layback with same sized lintel as the existing pit and with a new section of 375mm reinforced concrete pipe to connect to the existing drainage pit.

 

b)       Remove the existing lintel and construct a concrete vehicular crossing and layback incorporating a new v-grate inlet over the existing drainage pit.

 

c)       Remove any redundant concrete vehicular crossing and layback and to reinstate the area with concrete, turf and integral kerb and gutter to Council's specification.

 

d)       Construct full depth minimum 0.8m wide road construction in front of the kerb and gutter along the full site frontage in Nicol Lane.

 

8.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

9.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Alignment Level Conditions

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

10.     The Council’s Development Engineer has inspected the above site and have determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, shall be:

 

·              170mm above the gutter level at all points opposite the gutter, along the full site frontage in Nicol Lane.

 

11.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the gutter must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

12.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $135.00 (inclusive of GST). This amount is to be paid prior to a construction certificate being issued for the development.

 

Service Authority Conditions

 

The following conditions are applied to provide adequate consideration for service authority assets:

13.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

14.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

Stormwater Drainage

 

            The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

15.     Stormwater runoff from the site shall be discharged either:

 

a)       To the kerb and gutter along the site frontage in Nicol Lane by gravity (without the use of a charged system); OR

 

b)       To the kerb and gutter along the site frontage in Malabar Road by gravity (without the use of a charged system).

 

The following conditions are applied to provide adequate protection against major flooding:

16.     The floor level of the garage must be a minimum of RL 35.00 to provide suitable flood protection from the 1 in 100yr storm event.

 

NOTE: The first 1.5m internal of the garage may be used to suitably transition to Council’s issued alignment levels but grades shall not exceed 1 in 8 (12.5%).

 

17.     The walls of the proposed rumpus room and garage are to be suitably waterproofed as per the following requirements;

 

§        The western wall up to RL 35.00 (AHD).

§        The northern and southern walls up to 300mm above adjacent       finished ground   level.

§        The eastern wall is not required to be waterproofed

 

A Structural Engineer\Geotechnical Engineer shall certify the waterproofing has been carried out to an acceptable standard, to the satisfaction of the certifying authority. A copy of the certification is to be forwarded to Council.

 

Landscape Conditions

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

Tree Management

18.   Permission is granted for the removal of only those trees falling within the area occupied by the approved works. Removal of any remaining trees on the site are subject to separate application under the Tree Preservation Order.

 

19.    The applicant shall be required to ensure the retention and long term health of all trees located on adjoining properties adjacent to the proposed development. As a general guide there shall be minimal excavation or root pruning within the dripline/s of the subject tree/s.

 

20.    Permission is granted for the selective pruning of overhanging branches from trees located on adjoining properties as required. This approval does not imply any right of entry onto a neighbouring property nor does it allow pruning beyond a common boundary. However, where such measures are desirable in the best interests of correct pruning procedures, it shall be necessary for the applicant to negotiate with the tree owner. All pruning must be undertaken by a qualified Arborist, with suitable qualifications in Arboriculture and to Australian Standard AS 4373-1996 'Pruning of Amenity Trees.’

 

Energy & Water Efficiency

21.     The following energy efficiency and water saving measures are to be implemented in all new and upgraded building work and details included in the construction certificate:

 

a)    The consumption of water shall be minimised by the use of triple A rated water efficient plumbing fixtures (taps and shower roses) and water efficient dual flush toilets.

 

b)    New external timber or metal framed and brick veneer walls and roofs are to be provided with insulation (i.e. bulk insulation and a reflective building membrane/reflective sarking/foil insulation), having a minimum total thermal resistance R–value of 3.0 in roofs and 1.5 in external walls.  The insulation and reflective building membrane is to be installed in accordance with the relevant requirements of the Building Code of Australia and the manufacturers details.

 

c)    New hot water service pipes are to be provided with insulation and must also satisfy any relevant requirements of Building Code of Australia and AS 3500.

 

Smoke Alarms

22.     Smoke alarms are required to be installed in each Class 1 building or dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance are to be included in the construction certificate.

 

REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY WORKS

The following conditions of consent must be complied with prior to the commencement of any works on the site.  The necessary documentation and information must be provided to the Council or the ‘Principal Certifying Authority’, as applicable.

 

These conditions have been applied to satisfy the relevant requirements of the Environmental Planning & Assessment Act 1979, Environmental Planning & Assessment Regulation 2000 and to provide reasonable levels of public health, safety and environmental amenity.

 

 

Construction Certificate, Principal Certifying Authority & Commencement of Works

23.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)       a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)       a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)       a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)       the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)       at least two days notice must be given to the Council, in writing, prior to commencing any works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

Home Building Act 1989

24.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing.

 

Dilapidation Reports

25.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

Construction Noise & Vibration Management Plan

26.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared in accordance with the NSW DECC Construction Noise Guideline by a suitably qualified person, is to be implemented throughout the works.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

Temporary Site Fencing