MINUTES OF Planning Committee Meeting of the

Council of the City of Randwick HELD ON

Tuesday, 9 November 2010 AT 6:23pm

 

Present:

 

The Mayor, Councillor M Matson (East Ward)

 

North Ward                                           -  Councillors K Smith, P Tracey &

M Woodsmith

 

South Ward                                          -  Councillors R Belleli, C Matthews &

                                                             A White

 

East Ward                                            -  Councillors T Bowen & B Notley-Smith

                                                              

West Ward                                           - Councillors B Hughes (Deputy Chairperson), J Procopiadis & S Nash

 

Central Ward                                        - Councillors A Andrews & G Stevenson

 

Officers present:

 

General Manager                                             Mr R Brownlee

Director City Services                                      Mr J  Frangoples

Acting Director City Planning                             Mr K Kyriacou

Director Governance & Financial Services             Mr G Banting

Senior Administrative Coordinator                       Ms J Hartshorn

 

Apologies/Granting of Leave of Absences 

 

An apology was received from Cr Seng.

 

RESOLVED: (Smith/Andrews) that the apology received from Cr Seng be accepted and leave of absence from the meeting be granted.

 

Confirmation of the Minutes

 

Confirmation of the Minutes of the Planning Committee Meeting held on Tuesday 12 October 2010

PL111/10

RESOLUTION: (Belleli/White) that the Minutes of the Planning Committee Meeting held on Tuesday 12 October 2010 (copies of which were circulated to all Councillors) be and are hereby confirmed as a correct record of the proceedings of that meeting.

 

Declarations of Pecuniary and Non-Pecuniary Interests

 

a)     All the Liberal Party Councillors present at the meeting (Crs Belleli, Nash, Notley-Smith and Smith) declared a non significant non pecuniary interest in       Item D81/10 as     the applicant has made donations to the NSW Division of the   Liberal Party.    

b)     Cr Smith declared an non significant non pecuniary in Item D85/10 as he is an         acquaintance of the applicant’s son.

c)     Cr Smith declared a non significant non pecuniary interest in Item D91/10 as a         colleague resides in a neighbouring property.

d)     Cr Smith declared a non significant non pecuniary interest in Item D92/10 as he         resides in a neighbouring property.

e)     Cr Notley-Smith declared a significant non pecuniary interest in Item D93/10 as the applicant had donated to a past election campaign. Cr Notley-Smith indicated that he would not participate in the debate or the vote on the matter.

 

Address of Council by Members of the Public

Prior to consideration of the Agenda by the Committee, deputations were received in respect of the following matters:

 

D80/10      39 Dacre Street, Malabar

 

Against               Mark Swaine – on behalf of objector

 

D81/10      88-102 Moverly Road, South Coogee

 

Against               Tony Moody – on behalf of objectors

 

For                      Leanne Boyle – on behalf of the Applicant

 

D83/10      2 Araluen Street, Kingsford

 

Against               Barry Wood - on behalf of objector

 

D85/10      1 Moira Crescent, Coogee

 

For                      Kathy Merrick - on behalf of objectors

 

Against               Richard Battley - Applicant

 

D87/10      390 Maroubra Road, Maroubra

 

For                      Damien Jasczyk - Applicant

 

D91/10      72 Doncaster Avenue, Kensington

 

Against               Ben Bayot - Applicant

 

D93/10      175 Avoca Street, Randwick

 

For                      Peter Lonergan – on behalf of the Applicant

 

The meeting was adjourned at 7.18pm and was resumed at 7.40pm.

 

Cr Woodsmith did not return to the meeting until 7.45pm.

 

Urgent Business

Nil.

 


Development Application Reports

 

D80/10     Development Application Report - 39 Dacre Street, Malabar (DA/233/2010)

PL112/10

RESOLUTION: (Andrews/Procopiadis) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20G and 20F of Randwick Local Environmental Plan 1998, relating to floor space ratio and external wall height respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/233/2010 for alterations and additions to existing dual occupancy including new upper level, swimming pool to rear and construction of 3-car garage fronting laneway with lower level storage, at 39 Dacre Street, Malabar, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.     The development must be implemented substantially in accordance with the plans numbered A01, A02, dated March 2010 and received by Council on 8 April 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.     The colours, materials and finishes of the external surfaces to the building are to be consistent with the external finishes schedule submitted with the development application and stamped received by Council 8 April 2010.

 

Any changes to the colours, materials and textures must be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979.

 

3.     Metal roof sheeting is to be pre-painted (e.g. colourbond) and form part of the colour scheme and external finishes for the development.

 

4.     There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

5.     Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

a.     The window having a minimum sill height of 1.5m above the internal floor level,

b.     Providing a window locking device at least 1.5m above the internal floor level,

c.     Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

d.     Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

e.     Other appropriate effective safety measures or barrier.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

6.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

7.     The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

8.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $496,100.00 the following applicable monetary levy must be paid to Council: $4,961.00.

 

The levy must be paid in cash, bank cheque or by credit card prior to construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

9.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

10.   In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

11.   The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

12.   The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

13.   The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

a.     Stormwater management (i.e. rainwater tanks)

b.     Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

c.     Landscaping provisions

d.     Thermal comfort (i.e. construction materials, glazing and insulation)

e.     Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

14.   In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

15.   Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

16.   Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

17.   Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

18.   Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

19.   External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

20.   The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

21.   In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

22.   Prior to the commencement of any building works, the following requirements must be complied with:

 

a.   A Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

b.   A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

c.   A Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

d.   A principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

e.   The principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

f.    At least two days notice must be given to the Council, in writing, prior to commencing building works.

 

23.   The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

24.   The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

25.   A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

26.   name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

 

a.     name, address and telephone number of the Principal Certifying Authority; and

b.     a statement stating that “unauthorised entry to the work site is prohibited”.

 

27.   In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

28.   Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

29.   The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

30.   An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

31.   An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

32.   Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

33.   Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

34.   Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the additional storey/upper floor addition.

 

35.   The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

a.     Occupational Health and Safety Act 2000 & Regulations

b.     WorkCover NSW Guidelines & Codes of Practice

c.     Australian Standard 2601 (2001) – Demolition of Structures

d.     The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

e.     Relevant DECC/EPA Guidelines

f.      Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

36.   A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

a.     The Demolition Work Plan must include the following information (as applicable):

b.     The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

c.     Details of hazardous materials (including asbestos)

d.     Method/s of demolition (including removal of any asbestos)

e.     Measures and processes to be implemented to ensure the health & safety of workers and community

f.      Measures to be implemented to minimise any airborne dust and asbestos

g.     Methods and location of disposal of any hazardous materials

h.     Other relevant details, measures and requirements to be implemented

i.      Date the demolition works will commence

 

37.   The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

38.   If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council, not less than 2 days before commencing such works.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

39.   Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

a.     Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

b.     Randwick City Council’s Asbestos Policy (adopted 13 September 2005)

 

c.     A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

d.     On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

e.     Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.

 

f.      A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the principal certifying authority immediately upon completion of the asbestos related works, which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

40.   All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

41.   Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

42.   Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

43.   In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

44.   If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

a. protect and support the adjoining premises from possible damage from the excavation, and

b. where necessary, underpin the adjoining premises to prevent any such damage.

 

45.   A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

a.     excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

 

b.     new dwellings or additions to dwellings sited up to shared property boundaries (e.g. additions to a semi-detached dwelling or a terraced dwelling),

 

c.     excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

 

d.     as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

46.   Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

47.   Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

48.   Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

49.   A Construction Noise Management Plan, is required to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of site works.

 

50.   The Construction Noise Management Plan is to be prepared in accordance with the relevant provisions of the DECC Construction Noise Guideline.

 

51.   Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

52.   A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

53.   If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

54.   A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

a.     location and construction of protective fencing/hoardings to the perimeter of the site;

b.     location of site storage areas/sheds/equipment;

c.     location of building materials for construction;

d.     provisions for public safety;

e.     dust control measures;

f.      site access location and construction

g.     details of methods of disposal of demolition materials;

h.     protective measures for tree preservation;

i.      provisions for temporary sanitary facilities;

j.      location and size of waste containers/bulk bins;

k.     details of proposed sediment and erosion control measures;

l.      construction noise and vibration management;

m.    construction traffic management details.

 

55.   The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

56.   A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

57.   The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

58.   Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a.     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b.     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c.     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d.     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following conditions are applied to ensure compliance with the Swimming Pools Act 1992 and to maintain public safety and amenity:

 

59.   Swimming pools are to be provided with childproof fences and self-locking gates, in accordance with the Swimming Pools Act 1992 and regulations.

 

60.   The swimming pool is to be surrounded by a fence having a minimum height of 1.2m, that separates the pool from any residential building situated on the premises and from any place (whether public or private) adjoining the premises; and that is designed, constructed and installed in accordance with AS 1926.1 - 2007.

 

61.   Gates to pool area shall be a maximum width of 1 metre, and be self-closing and latching; the gate is required to open outwards from the pool area and prevent a small child opening the gate or door when the gate or door is closed.

 

62.   Temporary pool safety fencing is to be provided pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

63.   A ‘warning notice’ must be erected in a prominent position in the immediate vicinity of the swimming pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

64.   Spa pools are to be provided with a child resistant barrier, in accordance with the provisions of the Swimming Pools Act 1992 and regulations.

 

65.   A ‘warning notice’ must be erected  in a prominent position in the immediate vicinity of the swimming pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

66.   Swimming pools are to be designed, installed and operated in accordance with the following general requirements: -

 

a.     Backwash of the pool filter and other discharge of water is to be drained to the sewer in accordance with the requirements of the Sydney Water Corporation; and

 

b.     All pool overflow water is to be drained away from the building and adjoining premises, so as not to result in a nuisance or damage to premises; and

 

c.     Water recirculation and filtrations systems are required to comply with AS 1926.3 – 2003:  Swimming Pool Safety – Water Recirculation and Filtration Systems; and

 

d.     Pool plant and equipment is to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents; and

 

e.     The pool plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

i.    before 8.00am or after 8.00pm on any Sunday or public holiday; or

ii.   before 7.00am or after 8.00pm on any other day.

 

67.   Written notification must be provided to Council advising of the installation and completion of the Swimming Pool (or Spa Pool), to satisfy the requirements of the Swimming Pools Act 1992, prior to issuing an Occupation Certificate.

 

68.   Council’s “Notification & Registration of a Swimming Pool” form must be completed and forwarded to Council prior to any Occupation Certificate being issued for the pool.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

69.   The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a. $3000.00 - Damage/Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

i.  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

 

ii.  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

70.   The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

71.   Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a.     Construct new concrete layback at kerb opposite the new vehicular entrance to the site in Dacre Lane.

 

        Note: this will require the reconstruction of the Double Grated Gully Pit and removal of the drainage lintel so as to provide satisfactory vehicular access to the new garage opening.

 

b.     Construct a new Double Grated Gully Pit with lintel to Council's specification, as required by Council’s Drainage Assets Engineer either side of the new driveway entrance.

 

c.     Remove/relocate the “No Parking” sign in Dacre Lane, if required, to the requirements of Council’s Integrated Transport Department.

 

72.   The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

73.   Prior to the issuing of a Construction Certificate the applicant is to amend the submitted plans to show any new/reconstructed awning on the Dacre Street frontage is to be located wholly within the subject site.

 

74.   All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a.     All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b.     Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

75.   If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

76.   The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

77.   The Council’s Development Engineer has inspected the above site and have determined that the design alignment level (concrete/paved/tiled level) at the property boundary for the driveway shall be:

 

a.     50mm below the top of the kerb at all points opposite the kerb, along the Dacre Lane site frontage.

 

78.   The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the kerb must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

79.   The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $121.00 (inclusive of GST). This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

80.   A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

81.   The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

82.   The PCA must ensure that landscaping at this site is installed substantially in accordance with the Landscape Plan by Suzanne Thompson (RLA#001197), stamped 8th April 2010 (subject to amendments being made in order to comply with the Tree Preservation conditions later in this report), prior to the issue of a Final Occupation Certificate, with the applicant/owner to maintain this landscaping in a healthy and vigorous state for the life of the development.

 

Removal of trees within rear yard

 

83.   Approval is granted for removal of the row of four trees running in an northeast-southwest arrangement, centrally in the rear yard, along the southern edge of the existing driveway strips, comprising three Cupressus species (Cypress Pines), due to their poor condition, as well as the Archontophoenix cunninghamiana (Bangalow Palm), as all are in direct conflict with the proposed garage and storage area as shown.

 

Preservation of palms in rear yard

 

84.   In order to ensure retention of the two mature Archontophoenix cunninghamiana (Bangalow Palms) located in the rear yard, along the eastern site boundary in good health (as has been shown on all submitted plans), the following measures are to be undertaken:

 

a.     All documentation must show their retention, with the position and diameter of both of their trunks and canopies to be clearly shown on all drawings.

 

b.     All plans submitted for the Construction Certificate application must show that an area measuring 2.5 metres to the west of the most western palm, as well as the same distance to their north, and the same distance again to the east of the most eastern palm (measured off the outside edge of their trunks at ground level), and matching up with the southern site boundary, will be maintained at existing ground levels.

 

c.     Temporary shoring of the soil profile to ensure the stability of both palms must be provided in the time between excavations and construction of this new masonry walls/raised planter, with the applicant/ PCA to ensure that professional advice is sought in this regard.

 

d.     Any new services, pipes, stormwater systems or similar that need to be installed in this rear yard are to be located outside the area described in point ‘b’ above, so as to minimise root damage.

 

e.     Both palms are to be physically protected as one group by the installation of 1.8 metre high steel mesh/chainwire fencing at the setbacks described in point ‘b’ above, in order to completely enclose both palms for the duration of works.

 

f.      This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE, DO NOT REMOVE".

 

g.     Within the zone specified in point ‘b’ above, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble.

 

h.     Any roots encountered during the course of the approved works must be cut cleanly by hand, and the affected area backfilled with clean site soil as soon as practically possible, with roots not to be left exposed to the atmosphere for prolonged periods of time.

 

i.      Any new common fencing along the southern site boundary must be a system/material that requires the use of localised pad footings only.

 

ADVISORY MATTERS:

 

A1.     The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

A2.     Demolition, building or excavation work must not be commenced until;

 

a.  A Construction Certificate has been obtained from Council or an Accredited Certifier

b.  Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

c.  Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A3.     A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

a.   Install or erect any site fencing, hoardings or site structures

b.   Operate a crane or hoist goods or materials over a footpath or road

c.   Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A4.     Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A5.     This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

MOTION: (Andrews/Procopiadis) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

Note: Cr Woodsmith was not present at the meeting during the vote on the above resolution.

 

 

D81/10     Development Application Report - 88-102 Moverly Road, South Coogee  (DA/407/2010)

PL113/10

RESOLUTION: (Andrews/Matthews) that Council as the consent authority grant its development consent under of Section 80 and 80A of the Environmental Planning and Assessment Act 1979 to Development Application No. DA/407/2010 for the construction of 28 new dwelling houses with associated landscape treatment within each allotment, utility service installation and Torrens title subdivision to create 28 residential allotments and landscape design treatment associated with the public domain Stage 4 at 88-102 Moverly Road, South Coogee, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the following plans:

 

Plan No.

Revision

Revision Date

Received on 

001

B

16-08-10

18-08-10

003

B

16-08-10

18-08-10

004

B

16-08-10

18-08-10

005

B

16-08-10

18-08-10

006

B

16-08-10

18-08-10

007

B

16-08-10

18-08-10

4-DA-008

B

16-08-10

18-08-10

4-DA-009

B

16-08-10

18-08-10

4-DA-010

A

31-05-10

18-08-10

4-DA-011

A

31-05-10

18-08-10

4-DA-012

B

16-08-10

18-08-10

4-DA-013

A

31-05-10

18-08-10

4-DA-014

B

16-08-10

18-08-10

4-DA-015

A

31-05-10

18-08-10

4-DA-016

B

16-08-10

18-08-10

4-DA-017

B

16-08-10

18-08-10

4-DA-018

B

16-08-10

18-08-10

4-DA-019

B

16-08-10

18-08-10

4-DA-020

B

16-08-10

18-08-10

4-DA-021

B

16-08-10

18-08-10

4-DA-022

B

16-08-10

18-08-10

4-DA-023

B

16-08-10

18-08-10

4-DA-024

B

16-08-10

18-08-10

4-DA-025

B

16-08-10

18-08-10

4-DA-026

B

16-08-10

18-08-10

4-DA-027

B

16-08-10

18-08-10

4-DA-028

B

16-08-10

18-08-10

4-DA-029

B

16-08-10

18-08-10

4-DA-030

B

16-08-10

18-08-10

4-DA-031

B

16-08-10

18-08-10

4-DA-032

B

16-08-10

18-08-10

4-DA-033

C

03-09-10

18-08-10

4-DA-034

B

09-08-10

18-08-10

4-DA-035

B

09-08-10

18-08-10

046

B

16-08-10

18-08-10

049

B

16-08-10

18-08-10

050

B

16-08-10

18-08-10

051

B

16-08-10

18-08-10

052

A

16-08-10

18-08-10

053

A

16-08-10

18-08-10

 

and draft subdivision plans dated 10/08/2010 and received by Council on 18 August 2010, the application form and any supporting information received with the application, except as may be amended by the following conditions:

 

2.       The design amendments indicated in Section 3 of the Endeavour Stage 4 Houses – Supplementary Report prepared by Helen Mulcahy Urban Planning and listed also in Table from Mirvac entitled Stage 4 Endeavour: Summary to amendments to DA 407/2010 received by Council on 9 September 2010 shall be shown on amended plans subject of this approval. Details of the amendments shall be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development

 

3.       The colours, materials and finishes of the external surfaces of the dwelling hours are to be consistent with that indicated in the sample board accompanying the subject development application and received by Council on 1 June 2010.

 

4.       Prior to the issue of any occupation certificate for any dwelling erected within the Stage 4 site, the developer must have completed the construction of the following public pedestrian access ways from the internal roads of the development:

 

(a) to the east to Moverly Road, South Coogee through No. 132 Moverly Road as per Development Consent No. 555/2009; and

 

(b) to the west to Grevillea Place, South Coogee through No. 11 Grevillea Place as per Development Consent No. 554/2009.

 

5.       Fences located on the side or rear boundaries of the premises shall not exceed a maximum height of 1800mm, measured above the finished ground level within the individual site.

 

On sloping sites or at changes in ground levels, the maximum height of the fence may exceed the abovementioned specified height by up to 150mm maximum adjacent to any required ‘step-downs’ or changes in ground level.

 

The applicant and owner is advised that the relevant provisions of the Dividing Fences Act 1991 are to be satisfied accordingly and any necessary approvals or agreements should be obtained from the owner/s of the adjoining land beforehand.

 

6.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

7.       Street numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the development.

 

In this regard, an Application must be submitted to and approved by Council’s Director of City Planning, together with the required fee, for the allocation of appropriate street and unit numbers for the development, prior to issuing an occupation certificate.

 

8.       The finished ground levels external to the building are to be consistent with the development consent and are not to be raised (other than for the provision of approved paving or the like on the ground) without the written consent of Council.

 

9.       External lighting to the premises shall be designed so as not to cause a nuisance to nearby residents.

 

The following condition is imposed to satisfy the requirements of the Sydney Water Corporation.

 

10.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities:

 

11.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, the following monetary levy must be paid to Council.

 

Category

Cost

Applicable Levy

S94A Levy

Development Cost more than $200,000

$9,078,327

1%

$90,783.27

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

12.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

13.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

14.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

15.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments has been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

16.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

17.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

18.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

19.     The building works must be inspected by the Principal Certifying Authority (or other certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

20.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

·        name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·        name, address and telephone number of the Principal Certifying Authority,

·        a statement stating that “unauthorised entry to the work site is prohibited”.

 

21.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

22.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

23.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

24.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority or other suitably qualified person, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

25.     Smoke alarms must be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance with the provisions of the Building Code of Australia must be included in the plans / specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

26.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

27.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

28.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

b)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

29.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

30.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared by a suitably qualified person is to be implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

The Construction Noise Management Plan is to be prepared in accordance with the NSW DECC Construction Noise Guideline.

 

31.     A Registered Surveyor’s check survey certificate or compliance certificate is to be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority:

 

·   prior to construction of the footings or first completed floor slab (prior to the pouring of concrete),

 

·   upon completion of the building, prior to issuing an occupation certificate.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority.  

 

32.     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

33.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

34.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works. The site management plan must include the following measures, as applicable to the type of development:

 

·      location and construction of protective fencing / hoardings to the perimeter of the site;

·      location of site storage areas/sheds/equipment;

·      location of building materials for construction;

·      provisions for public safety;

·      dust control measures;

·      site access location and construction

·      details of methods of disposal of demolition materials;

·      protective measures for tree preservation;

·      provisions for temporary sanitary facilities;

·      location and size of waste containers/bulk bins;

·      details of proposed sediment and erosion control measures;

·      construction noise and vibration management;

·      construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council.  A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

35.     Sediment and erosion control measures must be provided in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

36.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)       Building materials, sand, soil, waste materials, construction equipment or5 other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)       Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

c)       Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)       Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

e)       Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

37.     A Registered Surveyor’s check survey certificate or compliance certificate is to be forwarded to the principal certifying authority (and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority), detailing compliance with Council’s approval at the following stage/s of construction:

 

       

a)     Prior to construction of the first completed floor/floor slab of all proposed dwellings in Stage 4 (prior to pouring of concrete), showing the area of land, building and boundary setbacks and verifying that the building is being constructed at the approved levels.

 

b)     Prior to construction of the roof of all proposed dwellings in Stage 4, showing the area of land, building and boundary setbacks and verifying that the building is being constructed at the approved levels.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

38.     The air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

39.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min  sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

40.     The installation of rainwater tanks shall comply with the following noise control requirements:-

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tank(s) are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with the rainwater tank(s)  are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

●        before 8.00am or after 8.00pm on weekends or public holiday; or

●        before 7.00am or after 8.00pm on weekdays.

 

The following conditions are applied to ensure that adequate provisions are made for the management of waste from the development:

 

41.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council and details are to be included in the construction certificate documentation.

 

42.     A construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council, prior to the commencement of works.

 

The Waste Management Plan must provide details of the type and quantities of construction waste materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

The following conditions are applied to maintain reasonable levels of environmental health, safety and amenity:

 

43.     The land must be remediated to meet the relevant criteria in the National Environment Protection (Assessment of Site Contamination) Measure (NEPM) 1999 and the following requirements must be complied with:

 

a)     Prior to the commencement of any works, a Remediation Action Plan (RAP) is required to be prepared and be submitted to Council.  The RAP is also required to be reviewed by an independent NSW Department of Environment & Climate Change (DECC) Accredited Site Auditor and a written statement is to be provided to the Council with the RAP from the Site Auditor, which confirms that the RAP satisfies the relevant legislative guidelines and requirements and that the land is able to be remediated to the required level and will be suitable for the intended development and use.

 

b)     The RAP is to be prepared in accordance with the relevant Guidelines made or approved by the NSW Department of Environment & Climate Change, including the Guidelines for Consultants Reporting on Contaminated Sites.

 

This RAP is to include procedures for the following:

 

·           Excavation, removal and disposal of contaminated soil,

·           Site management planning,

·           Validation sampling and analysis,

·           Prevention of cross contamination and migration or release of contaminants,

·           Ground water remediation, dewatering, drainage, monitoring and validation,

·           Unexpected finds.

 

c)     A NSW Department of Environment & Climate Change (formerly EPA) Accredited Site Auditor, accredited under the Contaminated Land Management Act 1997, must be appointed to assess the suitability of the site for its intended development and use. 

 

d)     A Statutory Site Audit Statement and Summary Site Audit Report is to be submitted to Council which verifies that the land has been remediated and the site is suitable for the intended development and satisfies the relevant criteria in the NEPM 1999.

 

Any requirements contained within an Environmental Management Plan (EMP) which forms part of the Site Audit Statement and Site Audit Report, form part of this consent and must be implemented accordingly.  Council is required to be consulted with prior to the development of the EMP and any comments made by Council are required to be taken into consideration prior to finalising the EMP.

 

e)     The site remediation must be carried out to the satisfaction of the Accredited Site Auditor and a Site Audit Statement and Summary Site Audit Report must be submitted to Council prior to:

 

i)      a construction certificate being issued for the development or

ii)      a subdivision certificate being issued for the development, which ever comes first

 

f)      Remediation works shall be carried out in accordance with the requirements of the Contaminated Land Management Act 1997, environmental planning instruments applying to the site, guidelines made by the NSW Department of Environment & Climate Change and Department of Infrastructure Planning & Natural Resources, Randwick City Council’s Contaminated Land Policy 1999 and the Protection of the Environment Operations Act 1997.

 

g)     Should the approved remediation strategy including the ‘capping’ or ‘containment’ of any contaminated land, details are to be included in the Site Audit Statement (SAS) and Environmental Management Plan (EMP) to the satisfaction of the Site Auditor.

 

Details of the SAS and EMP (including capping and containment of contaminated land) are also required to be included on the Certificate of Title for the subject land under the provisions of section 88 of the Conveyancing Act 1919.

 

h)     The Site Audit Statement must, where no guideline made or approved under the NSW Contaminated Land Management Act is available (as with asbestos), clearly state the source of the standard adopted in determining the suitability of the land for the intended development and use and must also demonstrate its suitability to Council.

 

In relation to any asbestos contamination, a comprehensive remediation strategy and remedial action plan must be developed, to the satisfaction of the Site Auditor and NSW Department of Health or other suitably qualified and experienced specialist to the satisfaction of the Site Auditor. 

 

The remediation strategy and remedial action plan must demonstrate that the land will be remediated in accordance with relevant guidelines (if any) and to a level or standard where no unacceptable health risk remains from asbestos exposure, which shall be verified upon completion of the remediation works to the satisfaction of the Site Auditor.

 

i)      A Site Remediation Management Plan must be prepared prior to the commencement of remediation works by a suitably qualified environmental consultant and be implemented throughout remediation works. The Site Remediation Management Plan shall include measures to address the following matters:

·       general site management, site security, barriers, traffic management and signage

·           hazard identification and control

·       worker health & safety, work zones and decontamination procedures

·       prevention of cross contamination

·           site drainage and dewatering

·       air and water quality monitoring

·           disposable of hazardous wastes

·           contingency plans and incident reporting

·           details of provisions for monitoring implementation of remediation works and persons/consultants responsible.

 

A copy of the Site Remediation Management Plan is to be forwarded to Council prior to commencing remediation works.

 

j)      Any fill importation to the site is to be monitored and classified by the Site Auditor appointed for remediation of the site or a person with his qualifications. Only ‘Virgin Excavated Natural Material’ (VENM) is to be imported to the site, as detailed in the NSW DECC Waste Classification Guidelines (2008).

 

k)     Hazardous or intractable wastes arising from the demolition, excavation and remediation process being removed and disposed of in accordance with the requirements of WorkCover NSW and the Environment Protection Authority, and with the provisions of:

 

·       New South Wales Occupational Health and Safety Act, 2000;

·       The Occupational Health and Safety (Hazardous Substances) Regulation 2001;

·       The Occupational Health and Safety (Asbestos Removal Work) Regulation 2001;

·       Protection Of the Environment Operations Act 1997 (NSW) and

·       NSW DECC Waste Classification Guidelines (2008).

 

l)      The works must not cause any environmental pollution, public nuisance or, result in an offence under the Protection of the Environment Operations Act 1997 or NSW Occupational Health & Safety Act (2000) & Regulations (2001).

 

m)     Any new information which is identified during remediation, demolition or construction works that has the potential to alter previous conclusions about site contamination or the remediation strategy shall be notified to the Site Auditor and Council immediately in writing.

 

The written concurrence of Council must be obtained prior to implementing any changes to the remediation action plan or strategies.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

44.     The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $5000.00   -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

45.     Prior to the issuing of an Occupation Certificate for any of the residential dwellings the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)  Construct full width concrete vehicular crossings and laybacks at kerb opposite the vehicular entrances to the proposed dwellings.

 

46.     All civil infrastructure works within the proposed development site including, but not limited to, construction of the drainage system within the proposed road reserve, construction of the drainage system from the proposed road reserve to the downstream end of the development site, construction of the private interallotment drainage system/s, construction of the road pavement, construction of kerb and gutter, construction of footpaths within the road reserve and construction of vehicular crossings must be undertaken in accordance with the development consent for Stage 1 and the construction certificates for Stage 2, 3 and 4 civil infrastructure works. Construction certificate applications for the proposed dwellings must demonstrate compliance with this requirement.

 

47.     All private interallotment drainage systems and future Council controlled drainage systems within the proposed Stage 4 must be completed prior to the issuing of an occupation certificate for any dwelling within Stage 4. 

 

48.     All new walls adjacent to vehicular crossings must be lowered to a height of 600mm above the internal driveway level for a distance of 1.50m within the site or splayed 1.5 metre by 1.5 metre to provide satisfactory sight lines. Details are to be submitted to the Certifying Authority prior to the release of the construction certificate showing compliance with this condition.

 

49.     All internal driveways must be designed in compliance with the relevant sections of AS 2890.1-2004. The construction certificate plans must demonstrate compliance with this requirement and design certification from a suitably qualified consultant must be submitted to the Certifying Authority prior to the issuing of the Construction Certificate.

 

50.     Prior to the issue of a construction certificate for the proposed dwellings, the applicant shall submit for approval and have approved by Council's Traffic Engineer a detailed construction traffic management plan. The plan shall demonstrate how construction and delivery vehicles will access the development site during the construction phase of the development.

 

All traffic associated with the subject development shall comply with the terms of the approved construction traffic management plan.

 

Proposed Public Access way Conditions

 

51.     Lighting along the proposed pedestrian access way shall be designed so as not to cause a nuisance to nearby residents or motorists and to ensure that light overspill does not affect the amenity of the area. Full details of the proposed lighting along the proposed pedestrian access way shall be submitted to and approved by Council’s Director City Planning prior to a Construction Certificate being issued for construction of the public access way.

 

52.     Details of fencing along the side boundaries of the proposed public pedestrian access way shall be submitted to and approved by Council’s Director City Planning prior to a Construction Certificate being issued for construction of the public access way.

 

53.     The proposed 1.5m wide concrete footpath/public pedestrian access way shall be constructed in accordance with Council’s specifications. The applicant must obtain Council’s requirements and specifications for the construction of the concrete footpath/public pedestrian access way prior to lodging the construction certificate for Stage 4 works. The construction certificate for Stage 4 works must demonstrate compliance with Council’s requirements and specification. The applicant must meet the full cost for Council or a Council approved contractor to construct the footpath. Construction of the public pedestrian access way shall be completed prior to the issue of any occupation certificate for any dwelling erected upon the land the subject of Development Applications Nos. DA/407/2010.

 

54.     Prior to the issuing of a Construction Certificate for Stage 4 works the applicant must demonstrate to Council that, in the design of the public access way, all options have been explored and found to be unsuitable for eliminating the need for steps. The applicant must liaise with Council’s Development Engineer Coordinator regarding this condition.

 

55.     Landscaping for the proposed public pedestrian access way shall be carried out in general accordance with the plan prepared by AECOM, drawing number L-DA-842B and dated 28/05/2010.

 

Alignment Level Conditions

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

56.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

·      2.5% above the design top of kerb opposite at all points within the proposed Stage 4 development site. 

 

The design alignment level at the property boundary must be strictly adhered to.

 

57.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the roadway/kerb/footpath must be indicated on the building plans for the construction certificate.

 

Service Authority Conditions

The following conditions are applied to provide adequate consideration for service authority assets:

 

58.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

59.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

60.     Documentary evidence from the relevant public utility authorities confirming that their requirements have been satisfied, must be submitted to the certifying authority prior to a construction certificate being issued for the development.

 

61.     Any electricity substation required for the site as a consequence of this development shall be located within the site and shall be screened from view. The proposed location and elevation shall be shown on all detailed landscape drawings and specifications. The applicant must liaise with Energy Australia prior to lodging the construction certificate to determine whether or not an electricity substation is required for the development.

 

62.     All services must be located underground.

 

63.     A Section 73 Compliance Certificate under the Sydney water Act 1994 must be obtained. Application must be made through an authorised Water Servicing Coordinator. Please refer to “Your Business” section of Sydney Water’s web site at www.sydneywater.com.au then the “e-developer” icon or telephone 13 20 92.

 

Following application a “Notice of Requirements” will detail water and sewer extensions to be built and charges paid. Please make early contact with the Coordinator, since building of water/sewer extensions can be time consuming and may impact on other services and building, driveway or landscape design.

 

The Notice must be issued to the Principal Certifying Authority prior to the construction certificate being issued.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to occupation of the development.

 

Drainage Conditions

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

64.     The floor level of all habitable areas, storage areas and garages in the proposed dwellings must be a minimum of 300mm above the critical 1 in 100 year ARI flood level. The applicant’s hydraulic consultant, (i.e. the consultant engaged to prepare the drainage system design for the Stage 4 construction certificate), must provide to the certifying authority certification of compliance with this requirement prior to the issuing of a construction certificate for any dwelling.

 

65.     The proposed internal driveways must be designed with a high point at least 150 mm above the critical 1 in 100 year ARI flood level. The applicant’s hydraulic consultant, (i.e. the consultant engaged to prepare the drainage system design for the Stage 4 construction certificate), must provide to the certifying authority certification of compliance with this requirement prior to the issuing of a construction certificate for any dwelling.

 

66.     All stormwater discharge from the proposed dwellings shall be directed to either the proposed street drainage system and/or private interallotment drainage located towards the street frontage, (for houses on the high side of the proposed road) or to the street drainage system and/or private interallotment drainage system/s for houses that drain away from the road reserve.

 

67.     Detailed drainage plans for each dwelling shall be submitted to and approved by the certifying authority prior to the issue of a construction certificate for that dwelling. The drainage plans shall demonstrate compliance with the conditions of this development approval. All drainage details shall be prepared by a suitably qualified hydraulic consultant who shall, at the completion of the works, certify that the drainage works have been constructed in accordance with the approved drainage plans and relevant standards.

 

68.     The applicant must either create a suitable private drainage easement (s) over the stormwater drainage system associated with / located behind the retaining wall at the rear of the Stage 4 dwellings, (i.e. retaining wall located adjacent to the common boundary with Stage 4 dwellings and the existing Moverly Road dwellings), or alternatively demonstrate to the Principal Certifying Authority that no easement (s) is required. The private drainage easement (s), (should easements be required), must be created prior to the issuing of an Occupation Certificate for any Stage 4 dwelling. The applicant must liaise with Council’s Development Engineer Coordinator regarding the need for an easement prior to lodgement of a Construction Certificate for Stage 4 dwellings.

 

69.     The applicant’s hydraulic consultant, (i.e. the consultant engaged to prepare the drainage system design for the Stage 4 construction certificate), must certify that the interallotment drainage system proposed along the front of the eastern Stage 4 dwellings, has been suitably designed to ensure that water from the drainage pipeline cannot surcharge back into the individual site stormwater drainage systems. 

 

Waste Management Conditions

The following conditions are applied to provide adequate provisions for waste management:

 

70.     A waste storage area shall be provided within each dwelling, screened from view and sized to contain a total of 3 waste bins (1 x 120L garbage bin, 1 x 240L recycling bin & 1 x 240L green waste bin) whilst providing satisfactory access to these bins. The plans submitted for the construction certificate shall demonstrate compliance with this requirement.

 

71.     Prior to the issuing of a construction certificate for the proposed development the applicant is to submit to Council and have approved by Council’s Manager of Waste Services, a Waste Management Plan detailing waste and recycling storage and disposal for the development site.

 

The plan shall detail the type and quantity of waste to be generated by the development; demolition waste; construction waste; materials to be re-used or recycled; facilities/procedures for the storage, collection recycling & disposal of waste and the on-going management of waste.

 

Landscape Conditions

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

72.     Landscaping for each individual lot within Stage 4 must be installed substantially in accordance with the Stage 4 Private Lot Principles & Planting Schedule and Stage 4 Typical House Layouts by EDAW/AECOM, drawing numbers L-DA-948B, 949B and 950B, revision B, dated 28.05.10; however, Council requires that the following changes be shown on amended plans, which must be submitted to, and be approved by the PCA for each lot, prior to the issue of Construction Certificates for each dwelling:

 

a)  Deletion of the following species, which are to be replaced with alternative species of similar form and function:

 

i)   Coprosma repens (Looking Glass Plant) as it is recognised as an environmental weed which invades areas of native bushland;

ii)  Pennisetum alopecuroides (Fountain Grass) as this species has also demonstrated a capacity to escape cultivation and spread by wind blow seed;

iii)  Poa labillardieri (Poa) as it does not remain evergreen which gives a poor appearance.  

 

b)  Plant schedules must nominate the quantity, location and spacing for all planting proposed within each lot, and must be shown at their full size at maturity in order to avoid future maintenance issues for both the landscaping and dwellings;

 

c)  Any tree plantings that will achieve a height of 6 metres, and/or, a canopy spread of 4 metres upon maturity, must be setback a minimum distance of 2.5 metres from any physical part of a proposed dwelling;

 

d)  Additional notation or details for soil, mulch, edging, paving, fencing, surface finishes, retaining walls or any other landscape elements in order to fully describe the proposed landscape works;

 

e)  Any hydraulic/stormwater systems must attempt to reduce the placement of detention tanks and pits within areas of private open space so as to maximise the useability of these areas by future occupants.

 

73.  The landscaping must be installed in accordance with the approved documentation, prior to the issue of a Final Occupation Certificate, and must be maintained in accordance with these plans.

 

ADVISORY MATTERS:

 

A1      Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Certification Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Certification Services on 9399 0944.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A4      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A5      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Bowen/Tracey) that the recommendation be adopted, subject to the following amendments:

 

1.        Amendments to proposed plans as follows;

                   Reduce the heights of Lots 91, 92, 93, 99, 100, 101 and 102 by one (1) metre.

                   Reduce Lots 106, 107 and 108 by 300mm.

 

2.        A Survey Certificate from a qualified Surveyor to be provided to Randwick City Council confirming compliance to the approved plans immediately upon completion of each of the following stages of development;

                   Ground floor

                   First floor

                   Roof level.

       

3.        All plant species of the development are to be, at maturity, no higher than the eaves of the dwellings. A Landscape Plan be submitted to Randwick City Council for its approval confirming that the species of plants chosen will have a maturity height no greater than the eaves of the approved dwellings.

 

4.        Non-reflective surfaces be provided on all walls and roofs and any other external finishes and details of the non-reflective surfaces shall be provided at the Construction Certificate stage for the approval of Council. LOST.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Bowen

Councillor Andrews

Councillor Hughes

Councillor Belleli

Councillor Matson

Councillor Matthews

Councillor Notley-Smith

Councillor Nash

Councillor Tracey

Councillor Procopiadis

Councillor Woodsmith

Councillor Smith

 

Councillor Stevenson

 

Councillor White

Total (6)

Total (8)

 

MOTION: (Andrews/Matthews) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Bowen

Councillor Belleli

Councillor Notley-Smith

Councillor Hughes

Councillor Tracey

Councillor Matson

Councillor Woodsmith

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Smith

 

Councillor Stevenson

 

Councillor White

 

Total (10)

Total (4)

 

 

D82/10     Development Application Report - 23 Hargraves Place, Maroubra (DA/771/2010)

PL114/10

RESOLUTION: (Andrews/Procopiadis) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 771/2010 for alterations and additions to an existing dwelling including a new first floor level, at No. 23 Hargraves Place, Maroubra, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered Job No. 7239/10 Sheets 1 to 6, dated 7 September 2010 and received by Council on 9 September 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the finishes and colour schedule submitted with the application, to maintain the integrity and amenity of the building and the streetscape.

 

3.       The external walls of the dwelling must be located not less than 900mm from the boundary.

 

4.       Eaves, gutters, hoods and similar structures or attachments to the first floor level are required to be setback from the side boundaries of the allotment a minimum distance of 500mm and details of compliance are to be included in the construction certificate details.

 

5.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

6.       Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

7.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

1.       

2.      The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

3.       

4.      If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

5.       

6.      The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

Section 94A Development Contributions applicable to all applications lodged from 2 July 2007:

 

The following condition is applied to meet additional demands for public facilities;

 

8.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of 175,700 the following applicable monetary levy must be paid to Council: $878.50.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

Development subject to BASIX provisions

 

9.       In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

10.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

11.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

12.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

13.     Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

14.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

15.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

16.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

17.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

18.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

19.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·          name, address and telephone number of the Principal Certifying Authority; and

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

20.     The relevant requirements of the Home Building Act 1989 must be complied with, in accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000.

 

Details of the Licensed Building Contractor (and a copy of any relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council prior to commencement of works.

 

21.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

22.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

23.     Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

24.     Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the additional storey/upper floor addition.

 

25.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·          Occupational Health and Safety Act 2000 & Regulations

·          WorkCover NSW Guidelines & Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

26.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

   The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

 

   The Demolition Work Plan must be submitted to the Principal Certifying    Authority (PCA), not less than two (2) working days before commencing any    demolition work.  A copy of the Demolition Work Plan must be maintained on    site and be made available to Council officers upon request.

 

   If the work involves asbestos products or materials, a copy of the Demolition    Work Plan must also be provided to Council, not less than 2 days before    commencing such works.

 

    Note it is the responsibility of the persons undertaking demolition work to    obtain the relevant WorkCover licences and permits.

 

27.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy (adopted 13 September 2005)

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the principal certifying authority immediately upon completion of the asbestos related works, which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

28.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

29.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, is required to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of site works.

 

The Construction Noise Management Plan is to be prepared in accordance with the relevant provisions of the DECC Construction Noise Guideline.

 

30.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s       Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

31.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·     location and construction of protective fencing/hoardings to the perimeter of the site;

·     location of site storage areas/sheds/equipment;

·     location of building materials for construction;

·     provisions for public safety;

·     dust control measures;

·     site access location and construction

·     details of methods of disposal of demolition materials;

·     protective measures for tree preservation;

·     provisions for temporary sanitary facilities;

·     location and size of waste containers/bulk bins;

·     details of proposed sediment and erosion control measures;

·     construction noise and vibration management;

·     construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

32.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)   Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)   Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)   Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)   Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following conditions have been applied to ensure that adequate security provisions are made for vehicular access, parking and public infrastructure:

 

33.     The applicant must meet the full cost for Council or a Council approved contractor to install vehicular crossings and to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway. 

 

34.     A Road/Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

ADVISORY MATTERS:

 

A1    Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A4      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

MOTION: (Andrews/Procopiadis) CARRIED UNANIMOUSLY- SEE RESOLUTION.

 

Note: Cr Woodsmith was not present at the meeting during the vote on the above resolution.  

 

 

D83/10     Development Application Report - 2 Araluen Street, Kingsford (DA/493/2010)

PL115/10

RESOLUTION: (Andrews/Procopiadis) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20F of Randwick Local Environmental Plan 1998, relating to floor space ratio on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 493/2010 for alterations and additions to the dwelling at 2 Araluen Street, Kingsford, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered DA-A, 01-07, dated 6/10 and received by Council on 21 September 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be consistent with the colour board submitted with the application dated 29 June 2010.

 

3.       Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

4.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

5.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $ 271 689 the following applicable monetary levy must be paid to Council: $ 2 716.90.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

6.       In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

7.       In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

8.       The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

9.       In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

10.     Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

11.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

12.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

13.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

14.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

15.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

16.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·          name, address and telephone number of the Principal Certifying Authority; and

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

17.     The relevant requirements of the Home Building Act 1989 must be complied with, in accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000.

 

Details of the Licensed Building Contractor (and a copy of any relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council prior to commencement of works.

 

18.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

19.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

20.     Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

21.     Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the new upper level.

 

22.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·          Occupational Health and Safety Act 2000 & Regulations

·          WorkCover NSW Guidelines & Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

23.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

24.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

 

b)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

25.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           new dwellings or additions to dwellings sited up to shared property boundaries (e.g. additions to a semi-detached dwelling or a terraced dwelling),

·           excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·           as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

26.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

27.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

28.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

29.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing/hoardings to the perimeter of the site;

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction

·       details of methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·       construction noise and vibration management;

·       construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

30.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

31.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)       Construct a new concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site.

 

b)       Remove the redundant concrete vehicular crossing and to reinstate the area with turf and integral kerb and gutter to Council's specification.

 

32.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

33.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

34.     The Council’s Development Engineer has inspected the above site and have determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

35.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $135.00 (inclusive of GST). This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

36.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

37.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

Advisory Conditions

 

A1    The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works

 

A2    Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A3      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A4      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A5      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

MOTION: (Andrews/Procopiadis) CARRIED UNANIMOUSLY- SEE RESOLUTION.

 

Note: Cr Woodsmith was not present at the meeting during the vote on the above resolution.

 

 

D84/10     Development Application Report - 74 Carrington Road, Randwick (DA/759/2010)

PL116/10

RESOLUTION: (Andrews/Procopiadis) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F of Randwick Local Environmental Plan 1998, relating to floor space ratio on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 759/2010 for alterations and additions to the dwelling at  74 Carrington Road, Randwick subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered 7238/10, sheets 1-6, dated 03-09-10 and received by Council on the 7 September 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be consistent with the External Finishes and Colour Schedule submitted with the application on the 7th September 2010.

 

3.       To maintain a reasonable degree of privacy to the adjoining properties a fixed privacy screen 1800mm above floor level is to be installed to both sides of the rear upper level balcony. The privacy screen is to be of lattice, fixed louvres or obscured glazing, with any openings not exceeding 25mm and the total area of openings no more than 25% of the area of the screen. Details are to be provided with the Construction Certificate application.

 

4.       Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

5.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

6.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $173 602 the following applicable monetary levy must be paid to Council: $ 868.00

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

7.       In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

8.       In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

9.       The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

10.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

11.     Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

12.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

13.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

14.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

15.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

16.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·      name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·      name, address and telephone number of the Principal Certifying Authority; and

·      a statement stating that “unauthorised entry to the work site is prohibited”.

 

17.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

18.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

19.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

20.     Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

21.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·      Occupational Health and Safety Act 2000 & Regulations

·      WorkCover NSW Guidelines & Codes of Practice

·      Australian Standard 2601 (2001) – Demolition of Structures

·      The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·      Relevant DECC/EPA Guidelines

·      Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

22.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)   If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)    protect and support the adjoining premises from possible damage from the excavation, and

ii)    where necessary, underpin the adjoining premises to prevent any such damage.

 

b)   The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

23.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·      excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·      new dwellings or additions to dwellings sited up to shared property boundaries (e.g. additions to a semi-detached dwelling or a terraced dwelling),

·      excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·      as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

24.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

25.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

26.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

27.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·    location and construction of protective fencing/hoardings to the perimeter of the site;

·    location of site storage areas/sheds/equipment;

·    location of building materials for construction;

·    provisions for public safety;

·    dust control measures;

·    site access location and construction

·    details of methods of disposal of demolition materials;

·    protective measures for tree preservation;

·    provisions for temporary sanitary facilities;

·    location and size of waste containers/bulk bins;

·    details of proposed sediment and erosion control measures;

·    construction noise and vibration management;

·    construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

28.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

ADVISORY MATTERS:

 

A1     Demolition, building or excavation work must not be commenced until;

 

·      A Construction Certificate has been obtained from Council or an Accredited Certifier

·      Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·      Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2    A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·      Install or erect any site fencing, hoardings or site structures

·      Operate a crane or hoist goods or materials over a footpath or road

·      Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3    Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A4    This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A5    The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works

 

MOTION: (Andrews/Procopiadis) CARRIED UNANIMOUSLY- SEE RESOLUTION.

 

Note: Cr Woodsmith was not present at the meeting during the vote on the above resolution.

 

 

D85/10     Development Application Report - 1 Moira Crescent, Coogee (DA/39/2010)

PL117/10

RESOLUTION: (Andrews/Matson) that Council refuse development consent under Section 80 of the Environmental Planning and Assessment Act 1979 to Development Application No. DA/39/2010 for alterations and additions to existing building including addition of an attic with alterations to roof, addition of unit at lower ground level, extension of terrace to ground level unit, alteration to entry stair and creation of two additional carpark spaces in existing garage and a new landscaped roof at 1 Moira Crescent, Coogee for the following reasons:

 

1.       The proposal has an external wall height of up to 10m and exceeds the maximum development standard of 7m specified in Clause 20G of Randwick Local Environmental Plan 1998. The accompanying objection to the development standard is not well founded as required by clause 7 of State Environmental Planning Policy No 1 – Development Standards.

 

2.       The proposal has an overall building height of up to 10.2m and exceeds the maximum development standard of 9.5m specified in Clause 20G of Randwick Local Environmental Plan 1998. The accompanying objection to the development standard is not well founded as required by clause 7 of State Environmental Planning Policy No 1 – Development Standards.

 

3.       The proposal has a landscaped area comprising 38% of the site area and does not achieve the minimum development standard of 50% specified in Clause 20E of Randwick Local Environmental Plan 1998. The accompanying objection to the development standard is not well founded as required by clause 7 of State Environmental Planning Policy No 1 – Development Standards.

 

4.       The proposed increase in height of the garage wall adjacent to the northern boundary impacts on the neighbour’s outlook in an unacceptable manner. The proposal does not comply with the preferred solution and objective for Building Setbacks specified in Clause 3.3 of Development Control Plan – Multi-unit Housing.

 

5.       The driveway is 2.3m wide at its narrowest point between the existing building and the northern boundary. The driveway width does not comply with the minimum driveway width of 3m specified in Clause 3.3 of Development Control Plan – Parking and Clause 5.2.4 of Development Control Plan- Multi-unit Housing.

 

6.       The fire safety installation that is likely to be necessary to protect the garage opening is likely to obstruct the right of way servicing the car park at 17 Marcel Ave.

 

AMENDMENT: (Woodsmith/Bowen) that the application be deferred to enable a properly constructed SEPP1 application and amended plans to be submitted. LOST.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Belleli

Councillor Andrews

Councillor Bowen

Councillor Hughes

Councillor Nash

Councillor Matson

Councillor Smith

Councillor Matthews

Councillor Stevenson

Councillor Notley-Smith

Councillor Woodsmith

Councillor Procopiadis

 

Councillor Tracey

 

Councillor White

Total (6)

Total (8)

 

MOTION: (Andrews/Matson) CARRIED UNANIMOUSLY – SEE RESOLUTION.

 

 

 

D86/10     Development Application Report - 3/107 Arden Street, Coogee (DA/124/2009/A)

PL118/10

RESOLUTION: (Andrews/Procopiadis) that Council, as the consent authority, grant its consent under Section 96 of the Environmental Planning and Assessment Act 1979 as amended to modify Development Consent No DA/124/2009 by replacing the approved rear addition to Unit 3 with a vergola at 3/107 Arden Street, Coogee,  in the following manner:

 

Amend Condition No. 1 to read:

 

The development must be implemented substantially in accordance with the plans numbered DA01 – DA03, Issue A, dated 08.09.2008, received by Council on 2 March 2009, and DA04 – DA07, Issue B, dated 08.09.2008 and received by Council on 23 June 2009, the application form and on any supporting information received with the application, as amended by the Section 96 plans numbered DA01 – DA03, Issue A, dated 08.09.2008 and plans numbered 20885, Sheets 1 of 3 to 3 of 3, dated 6 September 2010 and all received by Council on 30 September 2010, only in so far as they relate to the modifications highlighted on the Section 96 plans and detailed in the Section 96 application, except as may be amended  by the following conditions and as may be shown in red on the attached plans.

 

MOTION: (Andrews/Procopiadis) CARRIED UNANIMOUSLY- SEE RESOLUTION.

 

Note: Cr Woodsmith was not present at the meeting during the vote on the above resolution.

 

 

D87/10     Development Application Report - 390 Maroubra Road, Maroubra (DA/388/2010)

PL119/10

RESOLUTION: (Andrews/Procopiadis) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20B(1), 20B(4) and 20F(1) of Randwick Local Environmental Plan 1998, relating to site areas and frontage for subdivision, minimum frontages for attached dual occupancies and floor space ratio respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 388/2010 for the demolition of the existing dwelling, the construction of a new attached dual occupancy and the creation of two Torrens Title allotments at No. 390 Maroubra Road, Maroubra, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered project 08005, architectural plans numbered 1,2, 3, 4, and 5 dated 21.03.2010, the landscape plan numbered 0, issue c dated 23 March 2010, the summary of Basix commitments, all of which was received by Council on 26 May 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The proposed garages shall be reduced in width in order to provide for an additional car space between each of the proposed garages. The new carspaces shall have a minimum width of 3.0 metres in accordance with Council’s Development Control Plan - Parking. Details of the amended carparking arrangement must be submitted to the Director of City Planning for approval prior to the issuing of a construction certificate.

 

3.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

4.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

Section 94A Development Contributions applicable to all applications lodged from 2 July 2007:

 

The following condition is applied to meet additional demands for public facilities;

 

5.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $499,565 the following applicable monetary levy must be paid to Council: $4,995.65.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

6.       Street numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the development.

 

7.       The finished ground levels external to the building are to be consistent with the development consent and are not to be raised (other than for the provision of approved paving or the like on the ground) without the written consent of Council.

 

8.       Eaves, gutters, hoods and similar structures or attachments are required to be setback from the side boundaries of the allotment a minimum distance of 500mm and details of compliance are to be included in the construction certificate details.

 

9.       External lighting to the premises shall be designed so as not to cause a nuisance to nearby residents.

 

10.     No cooking facilities or sanitary fittings other than those indicated on the approved plans are to be installed in the premises without the prior written consent of the Council.

 

11.     Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

The following condition/s are imposed to satisfy the requirements of the Sydney Water Corporation.

 

12.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

13.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

14.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

15.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

16.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

17.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

18.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

19.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

20.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

21.     The building works must be inspected by the Principal Certifying Authority (or other certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

22.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·        name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·        name, address and telephone number of the Principal Certifying Authority,

·        a statement stating that “unauthorised entry to the work site is prohibited”.

 

23.     The relevant requirements of the Home Building Act 1989 must be complied with, in accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000.

 

Details of the Licensed Building Contractor (and a copy of any relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council prior to commencement of works.

 

24.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

25.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

26.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority or other suitably qualified person, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

27.     Smoke alarms must be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance with the provisions of the Building Code of Australia must be included in the plans / specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

28.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change and Randwick City Council policies, including:

 

·          Occupational Health & Safety Act 2000 & Regulations

·          WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·          WorkCover NSW Guidelines and Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

29.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

30.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy (adopted 13 September 2005)

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

31.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

32.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

33.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

 

b)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

34.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

35.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared by a suitably qualified person is to be implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

The Construction Noise Management Plan is to be prepared in accordance with the NSW DECC Construction Noise Guideline.

 

36.     A Registered Surveyor’s check survey certificate or compliance certificate is to be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority:

 

·        prior to construction of the footings or first completed floor slab (prior to the pouring of concrete),

 

·        upon completion of the building, prior to issuing an occupation certificate.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority.  

 

37.     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

38.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

39.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works. The site management plan must include the following measures, as applicable to the type of development:

 

·      location and construction of protective fencing/hoardings to the perimeter of the site;

·      location of site storage areas/sheds/equipment;

·      location of building materials for construction;

·      provisions for public safety;

·      dust control measures;

·      site access location and construction

·      details of methods of disposal of demolition materials;

·      protective measures for tree preservation;

·      provisions for temporary sanitary facilities;

·      location and size of waste containers/bulk bins;

·      details of proposed sediment and erosion control measures;

·      construction noise and vibration management;

·      construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council.  A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

40.     Sediment and erosion control measures must be provided in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

41.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)       Building materials, sand, soil, waste materials, construction equipment or5 other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)       Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

c)       Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)       Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

e)       Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

42.     The air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

43.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min  sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

(Noise from domestic air conditioners)

 

44.     The installation of rainwater tanks shall comply with the following noise control requirements:

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tank(s) are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with the rainwater tank(s)  are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

●        before 8.00am or after 8.00pm on weekends or public holiday; or

●        before 7.00am or after 8.00pm on weekdays.

 

The following conditions are applied to ensure that adequate provisions are made for the management of waste from the development:

 

45.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council and details are to be included in the construction certificate documentation.

 

46.     A demolition and construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council, prior to the commencement of works.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

The following conditions have been applied to ensure that adequate security provisions are made for vehicular access, parking and public infrastructure:

Security Deposit Conditions

 

Security Deposit Conditions

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

47.     The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)     $2000.00 - Damage/Civil Works Security Deposit

 

       The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

Civil Works Conditions

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

48.     Prior to the issuing of an Occupation Certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)     Construct concrete vehicular crossings and laybacks at kerb opposite the vehicular entrances to the site.

 

b)     Remove any redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

 

49.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

50.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)   All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)   Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)   If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)   The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Alignment Level Conditions

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

51.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level at the street property boundary for driveways, access ramps and pathways or the like, must be;

 

Second Avenue Frontage

 

§  Graded in a straight line from RL 28.20 at the western property boundary to RL 28.15 at the eastern property boundary.

 

Maroubra Road Frontage

 

§  Match back of existing footpath along the full site frontage.

 

52.     The design alignment levels issued by Council must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

53.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $603 calculated at $44.00 (inclusive of GST) per metre of site frontage. This amount is to be paid to Council prior to a construction certificate being issued for the development.

 

Service Authority Conditions

The following conditions are applied to provide adequate consideration for service authority assets:

 

54.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

55.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

56.     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Councils Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

57.     A Section 73 Compliance Certificate under the Sydney water Act 1994 must be obtained from Sydney Water Corporation.

 

Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the website www.sydneywater.com.au then refer to “Water Servicing Coordinator” under Developing Your Land” or telephone 13 20 92 for assistance.

 

Following application a “Notice of Requirements” will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.

 

The Notice must be issued to the Principal Certifying Authority prior to the construction certificate being issued.

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to whichever occurs first of the following;

 

a.  Occupation of the development

b.  Subdivision of the property.

 

Waste Management Conditions

The following conditions are applied to provide adequate provisions for waste management:

 

58.     Prior to the Principal Certifying Authority issuing an occupation certificate for the proposed development the applicant is to contact Council’s Manager of Waste in regards to meeting Council’s requirements for waste services to the dual occupancy.

 

Drainage Conditions

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

59.     Stormwater drainage plans have not been approved as part of this development consent. Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issue, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)     A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

 

b)     A layout of the proposed drainage system including pipe sizes, type, grade, length, and invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system.  This may involve either connection to the Council's street gutter, or into a Council stormwater pit.  Note:  All proposals should indicate the location of the closest Council stormwater pit and line regardless of the point of discharge.  This information can be obtained by a visual inspection of the area and perusing Council's drainage plans.

 

c)     Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (ie. above the 1 in 20 year storm) to the proposed drainage system.

 

d)     The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

 

i.        Roof areas

ii.       Paved areas

iii.       Grassed areas

iv.      Garden areas

 

e)     Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

 

f)     Proposed finished surface levels and grades of car parks, internal driveways and access aisles which are to be related to Council's design alignment levels.

 

g)     The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

60.     All stormwater run-offs naturally draining to the site must be collected and discharged through this property's stormwater system.  Such drainage must, if necessary, be constructed prior to the commencement of building work.

 

61.     All site stormwater must be discharged (by gravity) to either:

 

a)     The kerb and gutter or drainage system at the front of the property in Maroubra Road; OR

 

62.     On-site detention must be provided to ensure that the maximum discharge from the above site is not to exceed that which would occur during a 1 in 10 year storm of 1 hour duration for the existing site conditions. All other stormwater run-off from the above site for all storms up to the 1 in 20 year storm is to be retained on the site for gradual release to the kerb and gutter or drainage system as required by the Director of City Planning.  Provision is to be made for satisfactory overland flow should a storm in excess of the above parameters occur.

 

Should no formal overland escape route be provided for storms greater than the design storm, the on-site detention system shall be sized for the 1 in 100 year storm event.

 

For small areas up to 0.5 hectares, determination of the required cumulative storage must be calculated by the mass curve technique as detailed in Technical Note 1, Chapter 14 of the Australian Rainfall and Run-off Volume 1, 1987 Edition.

 

Where possible the detention tank must have an open base to infiltrate stormwater to the groundwater. Note that the ground water and any rock stratum has to be a minimum of 2.0 metres below the base of the tank.

 

63.     The detention area must be regularly cleaned and maintained to ensure it functions as required by the design.

 

64.     The maximum depth of ponding in above ground detention areas  shall be as follows:

 

a)     150mm in uncovered carparking areas (with an isolated maximum depth of 200mm permissible at the low point pit within the detention area).

 

b)     300mm in landscaped areas (where child proof fencing is not provided around the outside of the detention area and sides slopes are steeper than 1 in 10)

 

c)     600mm in landscaped areas where the side slopes of the detention area have a maximum grade of 1 in 10.

 

d)     1200mm in landscaped areas where a childproof fence is provided around the outside of the detention area.

 

Note:

§  Mulch/bark must not be used in onsite detention areas.

 

65.     The stormwater detention must be suitably signposted where required, warning people of the maximum flood level.

 

66.     The floor level of all habitable and storage areas adjacent to the detention area must be a minimum of 300mm above the maximum water level for the design storm or alternately a permanent 300mm high water proof barrier is to be constructed.

 

(In this regard, it must be noted that this condition must not result in any increase in the heights or levels of the building.  Any variations to the heights or levels of the building will require a new or amended development consent from the Council prior to a construction certificate being issued for the development).

 

67.     A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

 

68.     A `V' drain is to be constructed along the perimeter of the property, where required, to direct all stormwater to the detention area.

 

69.     A sediment/silt arrester pit must be provided:-

 

a)  within the site at or near the street boundary prior to the site stormwater discharging by gravity to the kerb/street drainage system; and

 

b)  prior to stormwater discharging into any absorption/infiltration system.

 

The sediment/silt arrester pit shall be constructed in accordance with the following requirements:-

·      The base of the pit located a minimum 300mm under the invert level of the outlet pipe.

·      The pit constructed from cast in-situ concrete, precast concrete or double brick.

·      A minimum of 4 x 90 mm diameter weep holes located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

·      A galvanised heavy-duty screen located over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

·      The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

·      A child proof and corrosion resistant fastening system provided for the access grate.

·      A sign adjacent to the pit stating:

 

“This sediment/silt arrester pit shall be regularly inspected and cleaned.”

 

Note: Sketch details of a standard sediment/silt arrester pit may be obtained from Council’s Drainage Engineer.

 

70.     Prior to the issuing of an occupation certificate, the applicant shall submit to Council, a works-as-executed drainage plan prepared by a registered surveyor and approved by a suitably qualified and experienced Hydraulic Engineer. The works-as-executed drainage plan shall be to the satisfaction of the Principal Certifying Authority (PCA) and shall include the following details:

 

a)     The location of the detention basin with finished surface levels;

b)     Finished site contours at 0.2 metre intervals;

c)     Volume of storage available in the detention areas;

d)     The location, diameter, gradient and material (i.e PVC, RC etc) of all stormwater pipes;

e)     The orifice size(s) (if applicable);

f)     Details of any infiltration/absorption systems; and

g)     Details of any pumping systems installed (including wet well volumes).

 

71.     Prior to the issuing of an occupation certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer confirming that the design and construction of the stormwater drainage system complies with the conditions of development consent. The certification must be provided to the satisfaction of the PCA.

 

72.     A "restriction on the use of land” and “positive covenant" (under section 88E of the Conveyancing Act 1919) shall be placed on the title of the subject property to ensure that the onsite detention system is maintained and that no works which could affect the design function of the detention system are undertaken without the prior consent (in writing) from Council. Such restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

 

Notes:

a.      The "restriction as to user” and “positive covenant" are to be to the satisfaction of Council. A copy of Council’s standard wording/layout for the restriction and positive covenant may be obtained from Council’s Development Engineer.

b.      The works as executed drainage plan and hydraulic certification must be submitted to Council prior to the “restriction on the use of land” and “positive covenant” being executed by Council.

 

73.     The "restriction on the use of land” and “positive covenant” must be placed on the title of the subject property prior to whichever occurs first of the following;

 

a.     Occupation of the Development

b.     Subdivision of the property (may be placed in conjunction with registration of subdivision plan via 88B instrument).

 

74.     If seepage or groundwater is encountered within the depth of any excavation, any habitable structures below ground level are to be suitably tanked and waterproofed. A Structural Engineer\Geotechnical Engineer shall certify the tanking & waterproofing has been carried out to an acceptable standard, to the satisfaction of the certifying authority. A copy of the certification is to be forwarded to Council.

 

Notes:

a)  Any subsoil drainage is to be disposed of within the site and is not to be discharged to Council’s kerb & gutter.

 

b)  Adequate provision is to be made for the ground water to drain around the dwellings (to ensure that they do not dam or slow the movement of the ground water through the development site).

 

c)  Seepage water must not be collected and discharged from the site.

 

Subdivision Conditions

 

The following conditions are applied to satisfy the provisions of Council’s environmental plans, policies and codes for subdivision works:

 

75.     The applicant shall create suitable right of carriageway, easements for services and internal stormwater lines, as required. The applicant shall be advised that the minimum easement width for any internal stormwater line is 0.9 metres.

 

76.     A formal subdivision application is required to be submitted to and approved by the Council or an accredited certifier and all conditions of this development consent are required to be satisfied prior to the release of the subdivision plans.

 

77.     Details of critical stage inspections carried out by the principal certifying authority, together with any other certification relied upon, must be provided to Council or the accredited certifier prior to the issuing of a subdivision certificate.

 

Landscape Conditions

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

78.     The submitted Landscape Plan, drawing no.0, issue C, dated 21/3/2010, cannot be accepted by Council as it contains both an insufficient level of detail and treatment for a development of this size and type.

 

79.     A new plan which has been prepared by a qualified professional in the Landscape/Horticultural industry (must be a registered member of a nationally recognised organisation/association such as AILDM, AILA or equivalent), must be submitted to, and be approved by, the Principal Certifying Authority (PCA), prior to the commencement of any site works, and must include:

 

a)     A plant schedule which includes proposed species, botanic and common names, pot size at the time of planting, quantity, location, dimensions at maturity, maintenance practices (hedging, shaping etc), as well as any other landscape details to describe the proposed works;

 

b)     Replacing the majority of proposed species which those that can tolerate the prevailing salt laden winds and poor quality sandy soils, using local indigenous coastal species that require minimal watering or fertilising once established, or, species with water needs that match rainfall and drainage conditions;

 

c)     A minimum of 2 x 45 litre (pot size at the time of planting) feature native tree species which will attain a minimum height at maturity of between 4-7 metres shall be provided within the front setback, comprising one each within each of the front yards of the proposed dwellings;

 

d)     A further 2 x 100 litre (pot/bag size) native tree species (not palms) which will attain a minimum height of 6 metres at maturity shall be provided within the rear setback, comprising one each within each of the rear yards of the proposed dwellings;

 

e)     Incorporation of a 1 metre wide garden bed along both the eastern and western site boundaries (adjoining no.392 & 368A respectively), between the proposed alfresco areas and garages, to which an evergreen hedge/screen shall be planted, selecting a species which will attain the same height as the common fencing in these locations at maturity.

 

80.     The PCA must ensure that landscaping at this site is installed in accordance with the approved documentation, prior to the issue of a Final Occupation Certificate, with the owners to ensure this landscaping is maintained in a healthy and vigorous state until maturity.

 

81.     The nature-strips upon both of Council's footways shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

Removal & Replacement of Council’s Street Trees

 

82.     Approval is granted for the applicant to remove and dispose of (at their own cost) the existing Callistemon salignus (Weeping Bottlebrush) and recently planted Metrosideros excelsa (NZ Xmas Tree) both located on Council’s Second Avenue verge, to the east of the existing layback, during excavations associated with the eastern most vehicle crossing as shown, and must satisfy themselves as to the location of all site services, prior to the commencement of any works on public property.

 

83.     The applicant shall submit a total payment of $350.00 (including GST) to Council, being to reimburse Council for the cost of originally planting these street trees which are only being removed to accommodate the development of private property, as well as to cover the costs or Council to supply and install 1 x 25 litre replacement Callistemon salignus (Weeping Bottlebrush), between both proposed vehicle crossings at the completion of all works.

 

The contribution shall be paid into Tree Amenity Income at the Cashier on the Ground Floor of the Administrative Centre prior to a Construction Certificate being issued for the development.

 

The applicant shall contact Council’s Landscape Development Officer on 9399-0613 (quoting the receipt number), and giving at least four working weeks notice to arrange for the replacement street tree upon completion of all site works.

 

Removal of trees within the site

 

84.     Approval is granted for the removal of all existing vegetation from within the site in order to accommodate the proposed works and landscaping as shown, including:

 

a)     Those small Callistemon viminalis (Weeping Bottlebrush’s) set into planters within the front boundary fence, as well as the dead tree near the southeast corner of the site, and the unknown species along the western side setback, near the southwest corner of the existing dwelling;

 

b)     The semi-mature Washingtonia robusta (Washingtonia Palm) located centrally in the rear yard, as in accordance with sub-clause 4.b.vii of Council’s Tree Preservation Order (TPO), it is exempt due to its location only 800mm from the southeast corner of the existing brick garage;

 

c)     The Photinia x fraseri ‘Robusta’ (Photonia) in the rear yard, against the eastern site boundary, due to its small size;

 

d)     The Schefflera actinophylla (Umbrella Tree) just to its north, as it is regarded as an invasive environmental weed.

 

Protection of Council’s Street Trees

 

85.     In order to ensure retention of the Banksia serrata (Saw Toothed Banksia) on Council’s Maroubra Road verge, in line with the western site boundary as well as the smaller, recently Banksia integrifolia (Coastal Banksia), to its east, centrally across the width of the site in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the construction certificate application must show the retention of these street trees, with the position and diameter of both of their trunks and canopies to be clearly shown on all drawings.

 

b.       Any new services, pipes, stormwater systems or similar that need to be installed over public property along this frontage, must be done so either an equal distance between both trees; or, against the eastern site boundary, so as to minimise root damage.

 

c.       Each of these street trees must be physically protected by installing a total of four star pickets at a setback of 1.5 metres to their east and west (measured off the outside edge of their trunks at ground level), as well as against the back of the kerb to their south, and against the footpath to their north, to which shade cloth, safety tape/para-webbing shall be permanently attached so as to completely enclose each tree for the duration of works.

 

d.       This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed.

 

e.       The applicant is not authorised to perform any works to either of these street trees, and shall contact Council’s Landscape Development Officer on 9399-0613 should pruning or any similar such work appear necessary, with the applicant required to cover all associated costs with such work, to Council’s satisfaction, prior to the issue of a Final Occupation Certificate.

 

f.        Within the zone specified in point ‘c’, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble.

 

g.       Any roots encountered during the course of the approved works must be cut cleanly by hand, and the affected area backfilled with clean site soil as soon as practically possible.

 

h.       A refundable deposit in the form of cash, credit card or cheque for an amount of $750.00 shall also be paid at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development, in order to ensure compliance with the conditions listed in this consent, and ultimately, preservation of these street trees.

 

The refundable deposit will be eligible for refund following the issue of a Final Occupation Certificate, subject to completion and submission of Council’s ‘Security Deposit Refund Application Form’, and pending a satisfactory inspection by Council’s Landscape Development Officer (9399-0613).

 

Any contravention of Council's conditions relating to either tree at any time during the course of the works, or prior to the issue of a Final Occupation Certificate, may result in Council claiming all or part of the lodged security in order to perform any rectification works necessary, as per the requirements of 80A (6) of the Environmental Planning and Assessment Act 1979.

 

·      Further information and details on Council's requirements for trees on development sites can be obtained from the recently adopted Tree Technical Manual, which can be downloaded from Council’s website at the following link, http://www.randwick.nsw.gov.au - Looking after our environment – Trees – Tree Management Technical Manual; which aims to achieve consistency of approach and compliance with appropriate standards and best practice guidelines.

 

Advisory Conditions

 

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

86.     The gradient of the internal access driveway must be designed and constructed in accordance with AS 2890.1 (2004) – Off Street Car Parking and the levels of the driveway must match the alignment levels at the property boundary (as specified by Council). Details of compliance are to be included in the construction certificate.

 

The height of the building must not be increased to satisfy the required driveway gradients.

 

87.     A Road/Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road/Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Council’s Road/Asset Opening Officer on 9399 0691 or 9399 0999.

 

ADVISORY MATTERS:

 

A1      Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Certification Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Certification Services on 9399 0944.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

MOTION: (Andrews/Procopiadis) CARRIED UNANIMOUSLY- SEE RESOLUTION.

 

Note: Cr Woodsmith was not present at the meeting during the vote on the above resolution.

 

 

D88/10     Development Application Report - 17 Woonah Street, Little Bay (DA/709/2010)

PL120/10

RESOLUTION: (Andrews/Procopiadis) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F(1) of Randwick Local Environmental Plan 1998 (Consolidation), relating to maximum floor space ratio, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 709/2010 for the construction of a new two (2) storey attached dual occupancy with garaging and associated works, at 17 Woonah Street, Little Bay, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered sheets 2, 3 ,6, 7, 8, 9, 10, and 11, dated 26 April 2010, and received by Council on 26 August 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be implemented substantially in accordance with the Schedule of External Finishes received by Council on 26 August 2010 and be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

3.       The Woonah Street façade ensuite windows servicing the master bedrooms of both dwellings shall have minimum sill heights of 1m above the finished first floor level and be provided with obscure glazing to afford a reasonable level of modesty and amenity for future occupants of the dwellings as well as provide appropriate articulation to the front building façade. Details of compliance are to be provided in the construction certificate plans.

 

4.       A separate development application is required to be submitted to, and approved by, Council prior to the construction of any side and/or rear fencing, with the exception of those fencing types that are listed in the Randwick Development Control Plan – Exempt and Complying Development or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008.

 

The applicant and owner is advised that the relevant provisions of the Dividing Fences Act 1991 are to be satisfied and any necessary approvals or agreements should be obtained from the owner/s of the adjoining land beforehand.

 

5.       The garage door width of both units shall have a width of 2.5m to ensure there is adequate room to enter and exit from the garage and details of compliance are to be provided in the construction certificate plans.

 

6.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

7.       Street numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the development.

 

8.       Metal roof sheeting is to be pre-painted (e.g. colourbond) and form part of the colour scheme and external finishes for the development.

 

9.       The finished ground levels external to the building are to be consistent with the development consent and are not to be raised (other than for the provision of approved paving or the like on the ground) without the written consent of Council.

 

10.     External lighting to the premises shall be designed so as not to cause a nuisance to nearby residents.

 

11.     No cooking facilities or sanitary fittings other than those indicated on the approved plans are to be installed in the premises without the prior written consent of the Council.

 

12.     Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

The following condition/s are imposed to satisfy the requirements of the Sydney Water Corporation.

 

13.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

14.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $643,728, the following applicable monetary levy must be paid to Council: $6,437.30.

       

The levy must be paid in cash, bank cheque or by credit card prior to

 

a)   a construction certificate being issued

 

for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

15.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

16.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

17.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

18.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

19.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

20.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

21.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

22.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

23.     The building works must be inspected by the Principal Certifying Authority (or other certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

24.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

·        name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·        name, address and telephone number of the Principal Certifying Authority,

·        a statement stating that “unauthorised entry to the work site is prohibited”.

 

25.     The relevant requirements of the Home Building Act 1989 must be complied with, in accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000.

 

Details of the Licensed Building Contractor (and a copy of any relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council prior to commencement of works.

 

26.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

27.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

28.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority or other suitably qualified person, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

29.     Smoke alarms must be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance with the provisions of the Building Code of Australia must be included in the plans / specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

30.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change and Randwick City Council policies, including:

 

·          Occupational Health & Safety Act 2000 & Regulations

·          WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·          WorkCover NSW Guidelines and Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

31.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

32.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

b)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

33.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

34.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared by a suitably qualified person is to be implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

The Construction Noise Management Plan is to be prepared in accordance with the NSW DECC Construction Noise Guideline.

 

35.     A Registered Surveyor’s check survey certificate or compliance certificate is to be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority:

 

·        prior to construction of the footings or first completed floor slab (prior to the pouring of concrete),

 

·        upon completion of the building, prior to issuing an occupation certificate.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority.  

 

36.     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

37.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

38.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works. The site management plan must include the following measures, as applicable to the type of development:

 

·      location and construction of protective fencing/hoardings to the perimeter of the site;

·      location of site storage areas/sheds/equipment;

·      location of building materials for construction;

·      provisions for public safety;

·      dust control measures;

·      site access location and construction

·      details of methods of disposal of demolition materials;

·      protective measures for tree preservation;

·      provisions for temporary sanitary facilities;

·      location and size of waste containers/bulk bins;

·      details of proposed sediment and erosion control measures;

·      construction noise and vibration management;

·      construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council.  A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

39.     Sediment and erosion control measures must be provided in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

40.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)       Building materials, sand, soil, waste materials, construction equipment or5 other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

a)       Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

b)       Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)       Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)       Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following conditions are applied to ensure compliance with the Swimming Pools Act 1992 and to maintain public safety and amenity:

 

41.     Swimming pools are to be provided with childproof fences and self-locking gates, in accordance with the Swimming Pools Act 1992 and regulations.

 

The swimming pool is to be surrounded by a fence having a minimum height of 1.2m, that separates the pool from any residential building situated on the premises and from any place (whether public or private) adjoining the premises; and that is designed, constructed and installed in accordance with AS 1926.1 - 2007.

 

Gates to pool area shall be a maximum width of 1 metre, and be self-closing and latching; the gate is required to open outwards from the pool area and prevent a small child opening the gate or door when the gate or door is closed.

 

Temporary pool safety fencing is to be provided pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

A ‘warning notice’ must be erected in a prominent position in the immediate vicinity of the swimming pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

42.     Swimming pools are to be designed, installed and operated in accordance with the following general requirements: -

 

a)       Backwash of the pool filter and other discharge of water is to be drained to the sewer in accordance with the requirements of the Sydney Water Corporation; and

a)       All pool overflow water is to be drained away from the building and adjoining premises, so as not to result in a nuisance or damage to premises; and

b)       Water recirculation and filtrations systems are required to comply with AS 1926.3 – 2003:  Swimming Pool Safety – Water Recirculation and Filtration Systems; and

c)       Pool plant and equipment is to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents; and

d)       The pool plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

i.      before 8.00am or after 8.00pm on any Sunday or public holiday; or

i.      before 7.00am or after 8.00pm on any other day.

 

43.     Written notification must be provided to Council advising of the installation and completion of the Swimming Pool, to satisfy the requirements of the Swimming Pools Act 1992, prior to issuing an Occupation Certificate.

 

Council’s “Notification & Registration of a Swimming Pool” form must be completed and forwarded to Council prior to any Occupation Certificate being issued for the pool.

 

44.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min  sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

45.     Any proposed air conditioning unit must be located:

 

·      a minimum of 900mm from property boundaries;

·      at ground level;

·      at the side or rear of the building; and

·      away from windows of any existing or proposed habitable rooms on neighbouring properties.

 

The unit shall also be adequately screened if visible from a public place.

 

The plans submitted for the construction certificate shall demonstrate compliance with this requirement.

 

46.     The air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

47.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min  sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

48.     The installation of rainwater tanks shall comply with the following noise control requirements:-

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

b)     Plant and equipment associated with rainwater tank(s) are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

c)     The operation of plant and equipment associated with the rainwater tank(s)  are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

●        before 8.00am or after 8.00pm on weekends or public holiday; or

●        before 7.00am or after 8.00pm on weekdays.

 

The following conditions are applied to ensure that adequate provisions are made for the management of waste from the development:

 

49.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council and details are to be included in the construction certificate documentation.

 

50.     Demolition and construction wastes shall be managed in general accordance with the submitted Waste Management Plan dated 19.08.10 received by Council on the 26 August 2010.

 

Where practicable waste materials must be re-used or recycled, rather than disposed. Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

The following conditions are applied to provide adequate security against damage to Council's infrastructure:

 

51.     The following damage / civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)     $1000.00   - Damage/Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

"A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and "Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

52.     Prior to the issuing of an Occupation Certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)   Construct a concrete vehicular crossing and laybacks at kerb opposite the vehicular entrances to the site.

 

b)   Remove the redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

 

53.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

54.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works" and the following requirements:

 

a)     All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)     Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)     If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council's design details and payment of a Council design and supervision fee.

 

d)     The civil works must be completed in accordance with Council's conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

55.     The Council's Development Engineer has inspected the above site and has determined that the design alignment level at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

56.     The design alignment levels issued by Council and their relationship to the footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

57.     The above alignment levels and the site inspection by Council's Development Engineering Section have been issued at a prescribed fee of $671.00 calculated at $44.00 (inclusive of GST) per metre of site frontage. This amount is to be paid to Council prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

58.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

59.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

60.     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Council's Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

61.     A Section 73 Compliance Certificate under the Sydney water Act 1994 must be obtained from Sydney Water Corporation.

 

Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the website www.sydneywater.com.au then refer to "Water Servicing Coordinator" under Developing Your Land" or telephone 13 20 92 for assistance.

 

Following application a "Notice of Requirements" will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.

The Notice must be issued to the Principal Certifying Authority prior to the construction certificate being issued.

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to occupation of the development.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

62.     Stormwater drainage plans have not been approved as part of this development consent. Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issue, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)     A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

 

b)     A layout of the proposed drainage system including pipe sizes, type, grade, length, invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system.  This may involve either connection to the Council's street gutter, or into a Council stormwater pit.  Note:  All proposals should indicate the location of the closest Council stormwater pit and line regardless of the point of discharge.  This information can be obtained by a visual inspection of the area and perusing Council's drainage plans.

 

c)     Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (ie. above the 1 in 20 year storm) to the proposed drainage system.

 

d)     The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

 

i.      Roof areas

ii.      Paved areas

iii.     Grassed areas

iv.     Garden areas

 

e)     Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

 

f)     Proposed finished surface levels and grades of car parks, internal driveways and access aisles which are to be related to Council's design alignment levels.

 

g)     The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

63.     All stormwater run-off naturally draining to the site must be collected and discharged through this property's stormwater system.  Such drainage must, if necessary, be constructed prior to the commencement of building work.

 

64.     All site stormwater must be discharged (by gravity) to either:

 

a)     The kerb and gutter or drainage system at the front of the property; OR

 

b)     To an infiltration system designed in accordance with Council's requirements (subject to a satisfactory Geotechnical Engineers report).

 

Should the ground conditions preclude the use of infiltration, a pump system may be permitted. The pump system must be designed with a minimum of two pumps being installed, connected in parallel (with each pump capable of discharging at the permissible  discharge rate) and connected to a control board so that each pump will operate alternatively. The pump wet well shall be sized for the 1 in 100 year, 2 hour storm assuming both pumps are not working.

 

The pump system must also be designed and installed strictly in accordance with "Section 8.4 PUMP SYSTEMS" as stipulated in Randwick City Council's Private Stormwater Code.

 

65.     Should stormwater be discharged to Council's street drainage system, on-site detention must be provided to ensure that the maximum discharge from the above site is not to exceed that which would occur during a 1 in 10 year storm of 1 hour duration for the existing site conditions. All other stormwater run-off from the above site for all storms up to the 1 in 20 year storm is to be retained on the site for gradual release to the kerb and gutter or drainage system as required by the Director of City Planning.  Provision is to be made for satisfactory overland flow should a storm in excess of the above parameters occur.

 

Should no formal overland escape route be provided for storms greater than the design storm, the on-site detention system shall be sized for the 1 in 100 year storm event.

 

For small areas up to 0.5 hectares, determination of the required cumulative storage must be calculated by the mass curve technique as detailed in Technical Note 1, Chapter 14 of the Australian Rainfall and Run-off Volume 1, 1987 Edition.

 

Where possible the detention tank must have an open base to infiltrate stormwater to the groundwater. Note that the ground water and any rock stratum has to be a minimum of 2.0 metres below the base of the tank.

 

66.     Should stormwater be discharged to an infiltration system, the infiltration area shall be  sized for all storm events up to the 1 in 20 year storm event with provision for a formal overland flow path to Council's Street drainage system.

 

Should no formal overland escape route be provided for storms greater than the design storm, the infiltration system shall be sized for the 1 in 100 year storm event.

 

67.     Any Infiltration systems/Absorption Trenches must be designed in accordance with "Section 8.5 ABSORPTION TRENCHES" as stipulated in Randwick City Council's Private Stormwater Code.

 

68.     The detention area/infiltration system must be regularly cleaned and maintained to ensure it functions as required by the design.

 

69.     The maximum depth of ponding in above ground detention areas (and/or infiltration systems with above ground storage) shall be as follows:

 

a)   150mm in uncovered carparking areas (with an isolated maximum depth of 200mm permissible at the low point pit within the detention area).

 

b)   300mm in landscaped areas (where child proof fencing is not provided around the outside of the detention area and sides slopes are steeper than 1 in 10)

 

c)   600mm in landscaped areas where the side slopes of the detention area have a maximum grade of 1 in 10.

 

d)   1200mm in landscaped areas where a childproof fence is provided around the outside of the detention area.

 

Notes:

·      It is noted that above ground storage will not be permitted in basement carparks or in any area which may be used for storage of goods.

·      Mulch/bark must not be used in onsite detention areas.

 

70.     The stormwater detention area (and/or infiltration systems with above ground storage) must be suitably signposted where required, warning people of the maximum flood level.

 

71.     The floor level of all habitable and storage areas adjacent to the detention area (and/or infiltration systems with above ground storage) must be a minimum of 300mm above the maximum water level for the design storm or alternately a permanent 300mm high water proof barrier is to be constructed.

 

(In this regard, it must be noted that this condition must not result in any increase in the heights or levels of the building.  Any variations to the heights or levels of the building will require a new or amended development consent from the Council prior to a construction certificate being issued for the development).

 

72.     A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

 

73.     A `V' drain is to be constructed along the perimeter of the property, where required, to direct all stormwater to the detention/infiltration area.

 

74.     Should a pump system be required to drain any portion of the site the system must be designed with a minimum of two pumps being installed, connected in parallel (with each pump capable of discharging at the permissible discharge rate) and connected to a control board so that each pump will operate alternatively. The pump wet well shall be sized for the 1 in 100 year, 2 hour storm assuming both pumps are not working.

 

The pump system must also be designed and installed strictly in accordance with "Section 8.4 PUMP SYSTEMS" as stipulated in Randwick City Council's Private Stormwater Code.

 

75.     A sediment/silt arrester pit must be provided:-

 

a)   within the site at or near the street boundary prior to the site stormwater discharging by gravity to the kerb/street drainage system; and

b)   prior to stormwater discharging into any absorption/infiltration system.

 

The sediment/silt arrester pit shall be constructed in accordance with the following requirements:-

 

The base of the pit located a minimum 300mm under the invert level of the outlet pipe.

 

The pit constructed from cast in-situ concrete, precast concrete, double brick or equivalent.

 

A minimum of 4 x 90 mm diameter weep holes located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

 

A galvanised heavy-duty screen located over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

 

The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

 

A child proof and corrosion resistant fastening system provided for the access grate.

 

A sign adjacent to the pit stating:

 

This sediment/silt arrester pit shall be regularly inspected and cleaned."

 

Note:      Sketch details of a standard sediment/silt arrester pit may be obtained from Council's Drainage Engineer.

 

76.     Prior to the issue of an occupation certificate, a "restriction on the use of land" and "positive covenant" (under section 88E of the Conveyancing Act 1919) shall be placed on the title of the subject property to ensure that the onsite detention system and/or infiltration system is maintained and that no works which could affect the design function of the detention system are undertaken without the prior consent (in writing) from Council. Such restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

 

Notes:

a.   The "restriction as to user" and "positive covenant" are to be to the satisfaction of Council. A copy of Council's standard wording/layout for the restriction and positive covenant may be obtained from Council's Development Engineer.

 

b.   The works as executed drainage plan and hydraulic certification must be submitted to Council prior to the "restriction on the use of land" and "positive covenant" being executed by Council.

 

77.     Prior to the issuing of an occupation certificate, the applicant shall submit to Council, a works-as-executed drainage plan prepared by a registered surveyor and approved by a suitably qualified and experienced Hydraulic Engineer. The works-as-executed drainage plan shall be to the satisfaction of the Principal Certifying Authority (PCA) and shall include the following details:

 

a)   The location of the detention basin with finished surface levels;

b)   Finished site contours at 0.2 metre intervals;

c)   Volume of storage available in the detention areas;

d)   The location, diameter, gradient and material (i.e PVC, RC etc) of all stormwater pipes;

e)   The orifice size(s) (if applicable);

f)    Details of any infiltration/absorption systems; and

g)   Details of any pumping systems installed (including wet well volumes).

 

78.     Prior to the issuing of an occupation certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer confirming that the design and construction of the stormwater drainage system complies with the conditions of development consent. The certification must be provided to the satisfaction of the PCA.

 

The following conditions are applied to provide adequate provisions for waste management:

 

79.     Prior to the Principal Certifying Authority issuing an occupation certificate for the proposed development the applicant is to contact Council's Manager of Waste in regards to meeting Council's requirements for waste services to the dual occupancy

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

80.     Landscaping shall be provided to the site to enhance its amenity and reduce the impact of the development upon neighbouring properties. A landscape plan shall be submitted to and approved by the Director of City Planning, in accordance with section 80A(2) of the Environmental Planning and Assessment Act 1979, prior to a construction certificate being issued.

 

81.     Landscaped areas must contain a predominance of species that require minimal watering once established or species with water needs that match rainfall and drainage conditions.

 

82.     The landscaping shall be installed in accordance with the approved documentation prior to the issue of a final occupation certificate and shall be maintained in accordance with those plans.

 

83.     The naturestrip upon Council's footway shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

ADVISORY MATTERS:

 

A1      Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Certification Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Certification Services on 9399 0944.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A4      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A5      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Andrews/Procopiadis) CARRIED UNANIMOUSLY- SEE RESOLUTION.

 

Note: Cr Woodsmith was not present at the meeting during the vote on the above resolution.

 


 

 

D89/10     Development Application Report - 4 Edgecliffe Avenue, South Coogee (DA/1055/2005/B)

PL121/10

RESOLUTION: (Andrews/Procopiadis) that Council, as the consent authority, grant its consent under Section 96 of the Environmental Planning and Assessment Act 1979 as amended to modify Development Consent No DA/1055/2005 by extending the basement area, alteration to garage door, new rain water tank, shower/toilet for outdoor pavilion, move pavilion skylights, internal alterations, alterations to west facing windows, addition of skylight to dwelling and location of AC condenser on terrace at 4 Edgecliffe Avenue, South Coogee in the following manner:

 

Amend Condition No. 1 to read:

 

1.     The development must be implemented substantially in accordance with the plans numbered DA-01, DA-02 and DA-03, dated 27 March 2006 and received by Council on 27 March 2006, the application form and on any supporting information received with the application, as amended by the following: -

 

·    Section 96 ‘A’ plans numbered DA-01 Revision E, DA-02 Revision E and DA-03 Revision E, dated 20 September 2006, all received by Council on 26 September 2006, and

·    Section 96 ‘B’ plans numbered 1012, CC.01 through to CC.11, inclusive, Revision C, all dated 5 October 2010 and received by Council on 6 October 2010

 

only in so far as they relate to the modifications highlighted on the Section 96 plans and detailed in the Section 96 application, except as may be amended by the following conditions and as may be shown in red on the attached plans.

 

Add the following Conditions:

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

74.     The air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

75.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min  sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

76.     The installation of rainwater tanks shall comply with the following noise control requirements:

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

b)     Plant and equipment associated with rainwater tank(s) are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

c)     The operation of plant and equipment associated with the rainwater tank(s)  are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

●    before 8.00am or after 8.00pm on weekends or public holiday; or

        ●    before 7.00am or after 8.00pm on weekdays.

 

MOTION: (Andrews/Procopiadis) CARRIED UNANIMOUSLY- SEE RESOLUTION.

 

Note: Cr Woodsmith was not present at the meeting during the vote on the above resolution.

 

 

D90/10     Development Application Report - 69 Storey Street, Maroubra (DA/695/2010)

PL122/10

RESOLUTION: (Andrews/Procopiadis) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F of Randwick Local Environmental Plan 1998, relating to floor space ratio on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 695/2010 for alterations and additions to the existing semi-detached dwelling including extension of the first floor level towards the rear, and a new upper level balcony to the front of the dwelling at 69 Storey Street, Maroubra, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plan numbered 01 (Job No. 1701/10), dated June 2010 and received by Council on the 24 August 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the proposed building works are to be compatible with the existing building and adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

3.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

4.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

5.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $108,000 the following applicable monetary levy must be paid to Council: $540.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

6.       In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

7.       In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

8.       The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

9.       In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

10.     Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

11.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

12.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

13.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

14.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

15.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

16.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·          name, address and telephone number of the Principal Certifying Authority; and

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

17.     The relevant requirements of the Home Building Act 1989 must be complied with, in accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000.

 

Details of the Licensed Building Contractor (and a copy of any relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council prior to commencement of works.

 

18.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

19.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

20.     Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

21.     Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the upper floor addition.

 

22.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·          Occupational Health and Safety Act 2000 & Regulations

·          WorkCover NSW Guidelines & Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

23.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council, not less than 2 days before commencing such works.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

24.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy (adopted 13 September 2005)

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the principal certifying authority immediately upon completion of the asbestos related works, which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

25.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

26.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·        excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·        new dwellings or additions to dwellings sited up to shared property boundaries (e.g. additions to a semi-detached dwelling or a terraced dwelling),

·        excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·            as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

27.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

28.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

A Construction Noise Management Plan, is required to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of site works.

 

The Construction Noise Management Plan is to be prepared in accordance with the relevant provisions of the DECC Construction Noise Guideline.

 

29.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

30.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing/hoardings to the perimeter of the site;

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction

·       details of methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·       construction noise and vibration management;

·       construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

31.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following conditions have been applied to ensure that adequate security provisions are made for vehicular access, parking and public infrastructure:

 

32.     A Road/Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Council’s Road/Asset Opening Officer on 9399 0691 or 9399 0999.

 

ADVISORY MATTERS:

 

A1    Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A4      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

MOTION: (Andrews/Procopiadis) CARRIED UNANIMOUSLY- SEE RESOLUTION.

 

Note: Cr Woodsmith was not present at the meeting during the vote on the above resolution.

 

 

D91/10     Development Application Report - 72 Doncaster Avenue, Kensington (DA/78/2010/A)

PL123/10

RESOLUTION: (Andrews/Tracey) that Council, as the consent authority, grant consent under Section 96 of the Environmental Planning and Assessment Act 1979 as amended to modify Development Consent No. DA/78/2010 to delete Condition No. 2 and allow for construction of a hardstand carspace to the front of the site at 72 Doncaster Avenue, Kensington subject to the following;

 

A       Condition No. 1 be amended to read as follows;

 

1.     The development must be implemented substantially in accordance with the plans numbered job no. 029/09, sheets 1 & 2, dated 04/02/2010 and received by Council on 09/02/2010, the application form and on any supporting information, as amended by the Section 96 plans numbered 029/09, sheets 1 & 2, dated 4/02/2010 and received by Council on the 19 August 2010, only in so far as they relate to the modifications highlighted in the Section 96 plans and detailed in the Section 96 application, except as may be amended by the following conditions and as may be shown in red on the attached plans;

 

B       Delete Condition No. 2.

 

C       The following Condition be included;

 

Civil Works Conditions

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

34.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)                 Construct a concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site.

 

MOTION: (Andrews/Tracey) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Procopiadis

Councillor Belleli

 

Councillor Bowen

 

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Notley-Smith

 

Councillor Smith

 

Councillor Stevenson

 

Councillor Tracey

 

Councillor White

 

Councillor Woodsmith

 

Total (13)

Total (1)

 

 

 

D92/10     Development Application Report - 18 Clifton Road, Clovelly (DA/550/2010)

PL124/10

RESOLUTION: (Andrews/Procopiadis) -

 

A.     That Council supports the Objection under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F(1) of Randwick Local Environmental Plan 1998 (Consolidation) relating to floor space ratio, on the grounds that the proposed development complies with the objectives of the above clause, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 550/2010 for alterations and additions to an existing semi-detached dwelling including construction of a first floor level with elevated decking to the rear and associated works, at No. 18 Clifton Road, Clovelly, subject to the following conditions:

 

Conditions of Consent

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the following plans (Job Number 0118):

 

Plan Number

Dated

Received

Prepared By

A02/1

Sep 2010

9 September 2010

ISATO

A03/1

Sep 2010

9 September 2010

A04/1

Sep 2010

9 September 2010

A09/1

Sep 2010

9 September 2010

 

the application form and any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be consistent with the drawing numbered A08/1 (job number 0118), entitled “Finishes”, dated Sep 2010, prepared by ISATO and received by Council on 9 September 2010.

 

3.       The proposed south-facing windows attached to the first floor walk-in-wardrobe (W5) and ensuite (W6) shall be constructed with obscured / translucent glazing up to a minimum of 1600mm above the finished ground level. Details demonstrating compliance shall be incorporated in the Construction Certificate documentation.

 

4.       The planter boxes on the western and southern elevations of the first floor rear deck shall be provided with a suitable hedge, which is capable of reaching a minimum height of 1500mm (as measured from the finished floor level) at maturity. Details demonstrating compliance shall be incorporated in the Construction Certificate documentation.

 

5.       The proposed privacy screen on the northern elevation of the first floor rear deck shall have a minimum height of 1600mm, as measured from the finished floor level. The screen shall be constructed with 30mm wide timber / metal slats, and spaced at a maximum of 30mm, or another appropriate design that effectively restricts cross-viewing into the adjoining dwelling at No. 16 Clifton Road. Details demonstrating compliance shall be incorporated in the Construction Certificate documentation.

 

6.       Street numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the development.

 

7.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

8.       Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation:

 

9.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities:

 

10.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $250,000 the following applicable monetary levy must be paid to Council: $2,500.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency:

 

11.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

12.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

13.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

14.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments has been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

15.     Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

16.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

17.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

18.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

19.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

20.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

21.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·          name, address and telephone number of the Principal Certifying Authority; and

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

22.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

23.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

24.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

25.     Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

26.     Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structures to support the upper floor addition.

 

27.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·          Occupational Health and Safety Act 2000 & Regulations

·          WorkCover NSW Guidelines & Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

28.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council, not less than 2 days before commencing such works.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

29.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy (adopted 13 September 2005)

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the principal certifying authority immediately upon completion of the asbestos related works, which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

30.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

31.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

 

b)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

32.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·            excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·            new dwellings or additions to dwellings sited up to shared property boundaries (e.g. additions to a semi-detached dwelling or a terraced dwelling),

·            excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·            as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

33.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

34.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, is required to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of site works.

 

The Construction Noise Management Plan is to be prepared in accordance with the relevant provisions of the DECC Construction Noise Guideline.

 

35.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

36.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing/hoardings to the perimeter of the site;

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction;

·       details of methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·       construction noise and vibration management;

·       construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

37.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

38.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

39.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following condition is applied to provide adequate consideration for service authority assets:

 

40.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

Tree Management

 

41.     Permission is granted for the selective pruning of branches from the trees located within the site towards the rear of the existing building which may be affected by the proposed addition. All pruning must be undertaken by a qualified Arborist, with suitable qualifications in Arboriculture and to Australian Standard AS 4373-1996 'Pruning of Amenity Trees.’

 

ADVISORY MATTERS:

 

A1    Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A4      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A5      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Andrews/Procopiadis) CARRIED UNANIMOUSLY- SEE RESOLUTION.

 

Note: Cr Woodsmith was not present at the meeting during the vote on the above resolution.

 

 

D93/10     Development Application Report - 175 Avoca Street, Randwick (DA/219/2010)

 

 

 

 

PL125/10

Having declared a significant non pecuniary interest in the item earlier in the meeting, Cr Notley-Smith left the meeting during the debate and the vote on the matter.

 

RESOLUTION: (Nash/Andrews)

 

A.     That Council supports the objection under State Environmental Planning Policy No. 1 Development Standards in respect to non-compliance with Clauses 20G(2) and (4) of Randwick Local Environmental Plan 1998 (Consolidation), relating to maximum building and external wall heights respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 219/2010 for demolition of existing structures on site and construction of a part 4- and part 5-storey boarding house consisting of 40 x self-contained rooms, 1 x manager’s flat, car parking for 2 vehicles, landscaping and associated works, at No. 175 Avoca Street, Randwick, subject to the following conditions:

 

Conditions of Consent

 

The following conditions are applied to satisfy the provisions of Section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the following plans:

 

Plan Number

Dated

Received

Prepared By

02-12(DA-C)

October 2010

12 October 2010

Julie Cracknell & Peter Lonergan Architects

03-12(DA-D)

October 2010

15 October 2010

04-12(DA-D)

October 2010

15 October 2010

05-12(DA-D)

October 2010

15 October 2010

06-12(DA-D)

October 2010

15 October 2010

07-12(DA-D)

October 2010

15 October 2010

08-12(DA-D)

October 2010

15 October 2010

09-12(DA-D)

October 2010

15 October 2010

 

the application form and any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be consistent with the submitted “Finishes Schedule”, numbered DA11-11, dated March 2010, prepared by Julie Cracknell & Peter Lonergan Architects, and received by Council on 1 April 2010.

 

3.       The floor to ceiling height of the boarding rooms within the western (front) block of the development at ground, first, second and third levels shall be 2700mm.

 

In addition, the maximum ridge height of the western (front) block of the development shall not exceed RL81.45 AHD.

 

Details demonstrating compliance with the above requirements are to be incorporated in the Construction Certificate documentation.

 

4.       The south-facing windows attached to the common circulation walkways at ground, first, second and third levels shall be designed and constructed in the following manner: 

 

(i)   Fixed obscured/translucent glazing up to 1500mm above the finished floor levels; and

(ii)  Operable clear louvred glazing above.

 

Details demonstrating compliance are to be incorporated in the Construction Certificate documentation.

 

5.       A 1500mm high privacy screen shall be installed on the southern edge of that part of the first floor walkway, which is directly opposite to the communal courtyard (in between the building blocks). The screen is to be constructed with obscured/translucent glass or another appropriate design that effectively restricts cross viewing into the adjoining properties to the south. Details demonstrating compliance are to be incorporated in the Construction Certificate documentation.

 

6.       Appropriate sound absorbent finishes are to be provided to the ceilings and/or side walls of the north-facing balconies at the ground, first, second and third levels, in order to provide a suitable level of acoustic amenity within the dwelling units. Details demonstrating compliance are to be incorporated in the Construction Certificate documentation.

 

7.       The proposed fencing on the Avoca Street boundary of the site shall have a maximum height of 1500mm, as measured from the footpath level, to maintain reasonable levels of amenity to the adjoining residential development and the streetscape.

 

8.       Any fencing located on the side and rear property boundaries of the site shall have a maximum height of 1800mm, as measured from the existing ground levels.

 

On sloping sites or at changes in ground levels, the maximum height of the fence may exceed the above-mentioned specified height by up to 150mm maximum adjacent to any required ‘step-downs’ or changes in ground level.

 

The applicant and owner are advised that the relevant provisions of the Dividing Fences Act 1991 are to be satisfied accordingly and any necessary approvals or agreements should be obtained from the owner/s of the adjoining land beforehand.

 

9.       Any gate openings shall be constructed so that the gates, when hung, will be fitted in such as manner that they will not open over the footway or a public place.

 

10.     The reflectivity index of external glazing for windows and wall openings and balcony balustrades is to be no greater than 20%. Written confirmation of the reflectivity index of glazing materials is to be submitted with the Construction Certificate application.

 

11.     A minimum of eight (8) bicycle parking spaces are to be provided within the proposed development. The design and construction of the bicycle parking facilities are to be compliant with Australian Standard 2890.3: Bicycle parking facilities. Details of compliance are to be included in the Construction Certificate application.

 

12.     Street and unit numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the development.

 

13.     A single common television aerial, and/or satellite dish (having a maximum diameter of 700mm and not located on the front or street elevation of the building) is to be installed to serve the development.

 

14.     Lighting to the premises shall be designed in accordance with Australian Standard 4282-1997: Control of the Obtrusive Effects of Outdoor Lighting, so as not to cause a nuisance to nearby residents or motorists and to ensure that light overspill does not affect the amenity of the area.

 

15.     In accordance with the provisions of Clauses 143A and 154A of the Environmental Planning and Assessment Regulation 2000, a ‘Design Verification Certificate’ must be provided to the accredited certifier / Council, prior to issuing a Construction Certificate and an Occupation Certificate, respectively.

 

16.     In accordance with the provisions of the Environmental Planning and Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a Construction Certificate being issued.

 

The following condition is applied to meet additional demands for public facilities:

 

17.     In accordance with Council’s Section 94A Development Contributions Plan, effective from 2 July 2010, the following monetary levy must be paid to Council:

 

Category

Cost

Applicable Levy

S94A Levy

Development cost more than $200000

$2,380,000

 

1.0%

$23,800.00

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contributions Plan may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions have been applied to maintain reasonable levels of amenity to the area:

 

18.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment (excluding plant and equipment during the construction phase) shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

19.     There are to be no emissions or discharges from the premises, which will give rise to a public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

The following conditions are applied to ensure proper operation and management of the subject boarding house:

 

20.     Use of the premises must be in accordance with the Operation and Management information stated on pages 55, 56 and 57 of the Statement of Environmental Effects, prepared by Cracknell Lonergan Architects, and stamp-received by Council on 1 April 2010.

 

21.     The boarding house premises shall be operated in accordance with the definition of “boarding house” as stipulated in Randwick Local Environmental Plan 1998 (Consolidation). Accommodation is not to be provided on a temporary basis to persons whose principal place of residence is elsewhere and/or for tourism purposes.

 

22.     Each proposed dwelling unit within the development, including the manager’s room / caretaker’s flat, shall accommodate a maximum of 2 residents at all times. The maximum number of residential occupants must not exceed 82 at all times.

 

23.     Each dwelling unit shall only be leased to related family members or couples. The manager/caretaker shall be responsible for ensuring that this requirement is adhered to by validating relevant personal details before admission. This condition is to ensure that strangers are not sharing the units and potentially altering the approved use of the premises.

 

24.     The manager/caretaker of the boarding house must reside on the premises and must be a person over the age of 18 years.

 

25.     The use and occupation of the communal courtyard at first floor level within the central portion of the site shall be restricted to a curfew of no later than 10:00pm and no earlier than 6:00am,7 days a week.

 

26.     The manager shall ensure that a notice is placed near the entrance to the property in a visible position to the public, advising of the manager’s/ caretaker’s name and contact number.

 

27.     The manager/caretaker shall maintain a record of all residents with details of their names, length of stay and number of persons in each room. This information shall be stored for a minimum of 12 months on site and made available to Council’s Officers upon request.

 

28.     All residents in the boarding house are to sign a lease or license agreeing to comply with the house rules for the boarding house, with a copy of the house rules being given to each occupant.

 

29.     The individual rooms and common areas of the boarding house, including the common room, toilet, outdoor communal courtyards and forecourt areas shall be maintained in a clean and tidy condition at all times.

 

30.     Places of Shared Accommodation must comply with the Local Government (General) Regulation 2005 and the premises must be registered with the Council, and the approved registration/inspection fee is to be forwarded to Council prior to issuing an occupation certificate.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

31.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

32.     All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA), in accordance with Clause 98 of the Environmental Planning and Assessment Regulation 2000.

 

33.     Prior to the commencement of any building works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans & specifications and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

34.     Prior to the commencement of any building works, the person having the benefit of the development consent must:

 

i)    appoint a Principal Certifying Authority for the building work, and

 

ii)       appoint a principal contractor for the building work, or in relation to residential building work, obtain an owner-builder permit in accordance with the requirements of the Home Building Act 1989, and notify the Principal Certifying Authority and Council accordingly in writing, and

 

iii)       unless the person having the benefit of the consent is the principal contractor (i.e. owner-builder), notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

 

iv)      give at least two days notice to the Council, in writing, of the persons intention to commence building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

35.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected in accordance with section 81A (2) (b1) (ii) of the Environmental Planning & Assessment Regulation 2000 and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Documentary evidence of the building inspections carried out and details of compliance with Council’s consent is to be maintained by the Principal Certifying Authority.  Details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council with the occupation certificate.

 

The principal contractor or owner-builder (as applicable) must ensure that the required critical stage and other inspections, as specified in the Principal Certifying Authority’s “Notice of Critical Stage Inspections”, are carried out to the satisfaction of the Principal Certifying Authority and at least 48 hours notice (excluding weekends and public holidays) is to be given to the Principal Certifying Authority, to carry out the required inspection, before carrying out any further works.

 

36.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·                     ·  name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·                     ·  name, address and telephone number of the Principal Certifying Authority,

·                     ·  a statement stating that “unauthorised entry to the work site is prohibited”.

 

37.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

38.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon must also be provided to Council with the occupation certificate.

 

39.     In accordance with clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition, that in the case of residential building work, a contract of insurance must be obtained and in force, in accordance with the provisions of the Home Building Act 1989.

 

Where the work is to be done by a licensed contractor, excavation or building work must not be carried out unless the Principal Certifying Authority (PCA):

 

·       has been informed in writing of the licensee’s name and contractor number; and

·       is satisfied that the licensee has complied with the insurance requirements of Part 6 of the Home Building Act 1989, or

 

Where the work to be done by any other person (i.e. an owner-builder), excavation or building work must not be carried out unless the Principal Certifying Authority:

 

·       has been informed of the person’s name and owner-builder permit number, or

·       has been given a declaration, signed by the owner of the land that states that the market cost of the labour and materials involved in the work does not exceed $5,000.

 

Details of the principal building contractor and compliance with the provisions of the Home Building Act 1989 (i.e. Details of the principal licensed building contractor and a copy of the Certificate of Insurance) are to be submitted to Council prior to the commencement of works, with the notice of appointment of the PCA/notice of intention to commence building work.

 

40.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

41.     A Fire Safety Certificate must be submitted to Council prior to the issuing of an Occupation Certificate, in accordance with the requirements of the Environmental Planning and Assessment Regulation 2000.

 

A single and complete Fire Safety Certificate must be provided which includes details of all of the fire safety measures contained in the building and as detailed in the fire safety schedule attached to the Construction Certificate.

 

Prior to issuing any Occupation Certificate the Principal Certifying Authority must be satisfied that all of the relevant fire safety measures have been included and are sufficiently detailed within the Fire safety Certificate.

 

A copy of the fire safety certificate must be displayed in the building near the entrance and a copy must be forwarded to the NSW Fire Brigades.

 

42.     The building is required to be provided with a smoke alarm system complying with Clause 4 of Specification E2.2a of the Building Code of Australia.

 

Additional requirements regarding the design and installation of the smoke detection and alarm system may be specified in the construction certificate for the development.

 

43.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following group of conditions have been applied to ensure the structural adequacy and integrity of the proposed building and adjacent premises:

 

44.     Documentary evidence prepared by a suitably qualified professional geotechnical engineer shall be submitted to the certifying authority prior to the issuing of a construction certificate, certifying the suitability and stability of the site for the proposed building and certifying the suitably and adequacy of the proposed design and construction of the building for the site.

 

45.     A report shall be prepared by a professional engineer and submitted to the certifying authority prior to the issuing of a construction certificate, detailing the proposed methods of excavation, shoring or pile construction, including details of potential vibration emissions.  The report, must demonstrate the suitability of the proposed methods of construction to overcome any potential damage to nearby land/premises.

 

Any practices or procedures specified in the engineer’s report in relation to the avoidance or minimisation of structural damage to nearby premises, must be fully complied with and incorporated into the documentation for the construction certificate.

 

A copy of the engineers report is to be submitted to the Council, if the Council is not the certifying authority.

 

46.     Driven type piles/shoring must not be provided unless a geotechnical engineer’s report is submitted to the certifying authority, prior to the issuing of a construction certificate, which demonstrates that damage should not occur to any adjoining premises and public place as a result of the works.

 

Any practices or recommendations specified in the engineer’s report in relation to the avoidance or minimisation of structural damage to nearby premises or land must be fully complied with and incorporated into the documentation for the construction certificate.

 

47.     A dilapidation report prepared by a professional engineer or suitably qualified and experienced building surveyor shall be submitted to the certifying authority prior to the commencement of demolition, excavation or building works detailing the current condition and status of all buildings, including ancillary structures (i.e. including dwellings, residential flat buildings, commercial/industrial building, garages, carports, verandah’s, fences, retaining walls, swimming pools and driveways etc.) located upon:

 

a)   all of the premises adjoining the subject site.

 

The report is to be supported with photographic evidence of the status and condition of the buildings and a copy of the report must also be forwarded to the Council and to the owners of each of the abovementioned premises, prior to the commencement of any works.

 

48.     The installation of ground or rock anchors underneath any adjoining premises must not be carried out without specific written consent of the owners of the affected adjoining premises (including the Council if bounding a public roadway or public place) and where applicable, details of compliance must be provided to the certifying authority prior to the commencement of any excavation or building works.

 

49.     A Certificate prepared by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to occupation of the building, which certifies that the building works satisfy the relevant structural design requirements of the Building Code of Australia.

 

Occupant Safety

 

50.     Openable windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i.     The window having a minimum sill height of 1.5m above the internal floor level,

ii.    Providing a window locking device at least 1.5m above the internal floor level,

iii.    Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum width of 125mm,

iv.   Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

Other appropriate effective safety measures or barrier.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

51.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

52.     The adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

If an excavation associated with the erection or demolition of a building extends below the level of the base of the footings of any building located on an adjoining allotment of land, the person causing the excavation must:

 

·       preserve and protect the building /s on the adjoining land from damage; and

·       effectively support the excavation and building; and

·       at least seven (7) days before excavating below the level of the base of the footings of a building on an adjoining allotment of land (including a public road or public place), give notice of the intention and particulars of the works to the owner of the adjoining land.

 

·                      Notes

 

·     This consent and condition does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the principal contractor or owner-builder must obtain:

a)       the consent of the owners of such adjoining or supported land to trespass or encroach, or

b)       an access order under the Access to Neighbouring Land Act 2000, or

c)       an easement under section 88K of the Conveyancing Act 1919, or

d)       an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

·     Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

53.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and (except as detailed below) between 8.00am to 5.00pm on Saturdays.

 

All building, demolition and associated site works are strictly prohibited on Sundays, Public Holidays and also on Saturdays adjacent to a Public Holiday.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

54.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant provisions of the Protection of the Environment Operations Act 1997 must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery and pile drivers (or the like) must be minimised by using appropriate plant and equipment and silencers and a construction noise and vibration minimisation strategy, prepared by a suitably qualified consultant is to be implemented during the works, to the satisfaction of the Principal Certifying Authority.

 

55.     A report prepared by a suitably qualified and experienced person shall be submitted to the Principal Certifying Authority (PCA) and a copy is to be provided to Council upon commencement of works or as otherwise specified by the PCA or Council, certifying that noise and vibration emissions from the construction of the development satisfies the relevant provisions of the Protection of the Environment Operations Act 1997, Councils conditions of consent and relevant Standards relating to noise and vibration.  In support of the above, it is necessary to submit all relevant readings and calculations made.

 

Any recommendations and requirements contained in the report are to be implemented accordingly and should noise and vibration emissions not comply with the terms and conditions of consent, work must cease forthwith and is not to recommence until details of compliance are submitted to the PCA and Council.

 

56.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

a)     Building materials, sand, soil, waste materials, construction equipment or other materials or articles must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Bulk bins, waste containers or other articles must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container or other articles in a public place can be made to Council’s Health, Building & Regulatory Services department.

 

c)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)     A temporary timber, asphalt or concrete crossing is to be provided to the site entrance across the kerb and footway area, with splayed edges, to the satisfaction of Council, unless access is via an existing concrete crossover.

 

e)     A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road or nature strip or in any public place:

 

·       Install or erect any site fencing, hoardings or site structures

·       Operate a crane or hoist goods or materials over a footpath or road

·       Placement of a waste skip or any other container or article on the road, nature strip or footpath.

 

f)      The applicant/builder is required to hold Public Liability Insurance, with a minimum liability of $10 million and a copy of the Insurance cover is to be provided to Council.

 

g)     A Road/Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

h)     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

57.     A Registered Surveyor’s check survey certificate or compliance certificate is to be forwarded to the principal certifying authority (and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority), detailing compliance with Council’s approval at the following stage/s of construction:

 

a)      Prior to construction of the first completed floor/floor slab (prior to         pouring of concrete), showing the area of land, building and                    boundary setbacks and verifying that the building is being                      construction at the approved levels.

 

b)      On completion of the erection of the building showing the area of the         land, the position of the building and boundary setbacks and                   verifying the building has been constructed at the approved levels.

 

58.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of demolition, excavation or building works. The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing/hoardings to the perimeter of the site;

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction

·       details and methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·           construction noise and vibration management;

·           construction traffic management provisions.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and convenience to the satisfaction of Council.  A copy of the approved Construction Site Management Plan must be maintained on site and be made available to Council officers upon request.

 

59.     During demolition excavation and construction works, dust emissions must be minimised, so as not to result in a nuisance to nearby residents or result in a potential pollution incident.

 

Adequate dust control measures must be provided to the site prior to the works commencing and the measures and practices must be maintained throughout the demolition, excavation and construction process, to the satisfaction of Council.

 

Dust control measures and practices may include:-

 

·       Provision of geotextile fabric to all perimeter site fencing (attached on the prevailing wind side of the site fencing).

·       Covering of stockpiles of sand, soil and excavated material with adequately secured tarpaulins or plastic sheeting.

·       Installation of a water sprinkling system or provision hoses or the like.

·       Regular watering-down of all loose materials and stockpiles of sand, soil and excavated material.

·       Minimisation/relocation of stockpiles of materials, to minimise potential for disturbance by prevailing winds.

·       Revegetation of disturbed areas.

·                      

60.     During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing.

 

Details of the proposed sediment control measures are to be detailed in the Site Management Plan and must be submitted to and approved by the principal certifying authority prior to the commencement of any site works.  The sediment and erosion control measures must be implemented prior to the commencement of any site works and be maintained throughout construction.  A copy of the approved details must be forwarded to the Council and a copy is to be maintained on-site and be made available to Council officers upon request.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

A warning sign for soil and water management must be displayed in a prominent position on the building site, visible to both the public and site workers.  The sign must be displayed throughout the construction period.  Copies of a suitable warning sign are available at Council’s Customer Service Centre for a nominal fee.

 

61.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If the work involved in the erection or demolition of a building is likely to cause pedestrian or vehicular traffic in a public place to be obstructed or rendered inconvenient or the building involves the enclosure of a public place, a hoarding or fence must be erected between the work site and the public place.

 

If necessary, an awning is to be erected sufficiently to prevent any substance from, or in connection with, the work from falling into the public place or adjoining premises.

 

Temporary fences or hoardings are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or any public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

62.     The demolition, removal, storage, handling and disposal of  materials and all building work must be carried out in accordance with the following requirements (as applicable):

 

§   Australian Standard 2601 (2001) – Demolition of Structures

§   Occupational Health and Safety Act 2000

§   Occupational Health and Safety (Hazardous Substances) Regulation 2001

§   Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

§   WorkCover NSW – Guidelines and Codes of Practice

§   Randwick City Council’s Asbestos Policy

§   The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

 

63.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Work Plan must include the following information (as applicable):

 

§   The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

§   Details of hazardous materials, including asbestos

§   Method/s of demolition and removal of asbestos

§   Measures and processes to be implemented to ensure the health & safety of workers and community

§   Measures to be implemented to minimise any airborne asbestos and dust

§   Methods and location of disposal of any asbestos or other hazardous materials

§   Other relevant details, measures and requirements to be implemented as identified in the Asbestos Survey

§   Date the demolition and removal of asbestos will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition works.  A copy of the Demolition Work Plan must be forwarded to Council and a copy must also be maintained on site and be made available to Council officers upon request.

 

64.     Any work involving the demolition, storage and disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

a)     Randwick City Council’s Asbestos Policy (adopted 13 September 2005).

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

a)     A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

b)     On sites involving the removal of asbestos, a professionally manufactured sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS” and include details of the licensed contractor.  The sign shall measure not less than 400mm x 300mm and the sign is to be installed prior to demolition work commencing and is to remain in place until such time as all asbestos has been safely removed from the site.

 

c)     Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 1996. Asbestos waste must be disposed of at an approved waste disposal depot (refer to the DEC or Waste Service NSW for details of sites). Copies of all receipts detailing method and location of disposal must be maintained on site and be provided to Council officers upon request, as evidence of correct disposal.

 

d)     A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council upon completion of the works prior to an Occupation Certificate being issued, which confirms that the asbestos material have been removed appropriately and the relevant requirements contained in the Asbestos Survey and conditions of consent in relation to the safe removal and disposal of asbestos, have been satisfied.

 

The following conditions are applied to provide reasonable levels of access for people with disabilities:

 

65.     Access and provisions for people with a disability are to be provided to the development generally in accordance with the relevant requirements of Part 5.4 of Council’s Development Control Plan for Multi-Unit Housing, AS 1428.1 – Design for Access and Mobility and AS 4299 – Adaptable Housing. Details are to be included in the Construction Certificate to the satisfaction of the certifying authority.

 

The following conditions are applied to provide adequate provisions for infrastructure and services:

 

66.     Any openings within or upon the road, footpath, nature strip or in any public place (i.e. for proposed drainage works or installation of services), must be carried out in accordance with the following requirements, to the satisfaction of Council:

 

a)       A Road/Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road/ Asset Opening Permit must be complied with.

 

b)       The owner/developer must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

c)       Relevant Road/Asset Opening Permit fees, construction fees, inspection fees and security deposits, must be paid to Council prior to commencing any works within or upon the road, footpath, nature strip or other public place.

 

d)       Excavations and trenches must be back-filled and compacted in accordance with AUSPEC standards 306U.

 

e)       Excavations or trenches located upon a road or footpath are required to be provided with 50mm depth of cold-mix bitumen finish, level with the existing road/ground surface, to enable Council to readily complete the finishing works at a future date.

 

f)       Excavations or trenches located upon turfed areas are required to be back-filled, compacted, top-soiled and re-turfed with Kikuyu turf.

 

g)       The work and area must be maintained in a clean, safe and tidy condition at all times and the area must be thoroughly cleaned at the end of each days activities and upon completion.

 

h)       Public and vehicular safety must be maintained at all times and any related directions issued by Council officers must be complied with.

 

i)        The work can only be carried out in accordance with approved hours of building work as specified in the development consent, unless the express written approval of Council has been obtained beforehand.

 

j)        All work, including the provision of barricades, fencing, lighting, signage and traffic control, must be carried out in accordance with the NSW Roads and Traffic Authority publication - ‘Traffic Control at Work Sites’ and Australian Standard AS 1742.3 – Traffic Control Devices for Works on Roads, at all times.

 

k)       Not more than half of any road is to be opened up at any one time and excavations must be provided with suitable fencing/ barricades and flashing amber lights if not completed by the end of the day.

 

l)        Any necessary approvals must be obtained from NSW Police, Roads & Traffic Authority, State Transit Authority and relevant Service Authorities, prior to commencing work upon or within the road, footway or nature strip.

 

All conditions and requirements of the NSW Police, Roads & Traffic Authority, State Transit Authority and Council must be complied with at all times.

 

m)      A detailed Traffic Management Plan must be submitted to and approved by Council and relevant Authorities, prior to carrying out any work which results in the closure or partial closure of a State or Regional Road , as identified by the NSW Roads & Traffic Authority.

 

n)       Sediment control measures must be implemented in accordance with the conditions of development consent and soil, sand or any other material must not be allowed to enter the stormwater drainage system or cause a pollution incident.

 

o)       The owner/developer must have a Public Liability Insurance Policy in force, with a minimum cover of $10 million and a copy of the insurance policy must be provided to Council prior to carrying out any works within or upon the road, footpath, nature strip or in any public place.

 

p)       Council’s Road/Asset Opening Officer must be notified at least 48 hours in advance of commencing any excavation works and also immediately upon completing the works (on 9399 0691 or 0409 033 921 during business hours), to enable any necessary inspections or works to be carried out.

 

Security Deposit Conditions

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

67.     The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $4000.00   -      Damage/Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

 

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

Traffic conditions/Civil Works Conditions

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

68.     Prior to the issuing of an Occupation Certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

·      Construct a 3.5m wide concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site.

 

·      Re-construct kerb and gutter for the full site frontage except opposite the vehicular entrance and exit points.

 

·      Construct a 1.3m wide concrete footpath along the full site frontage and remove remaining bitumen path on the nature strip and turf and landscape to Council’s specification.

 

NOTE: The design and construction of the gutter crossing off Avoca Street shall be in accordance with RTA requirements. Details of these requirements should be obtained from RTA's Project Services Manager, Traffic Projects Section, Parramatta (Ph: 8849 2144).

 

Detailed design plans of the proposed gutter crossing are to be submitted to the RTA for approval prior to the commencement of any road works.

 

It should be noted that a plan checking fee (amount to be advised) and lodgement of a performance bond may be required from the applicant prior to the release of the approved road design plans by the RTA.

 

69.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

70.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)     All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)     Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)     If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)     The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.   

 

71.     A Works Zone is to be provided in Avoca Street for the duration of the construction works.  The ‘Works Zone’ shall be provided to the satisfaction of the Randwick Traffic Committee and shall have a minimum length of 12 metres. The prescribed fee for the Works Zone must be paid to Council at least four (4) weeks prior to the commencement of work on the site.

 

It is noted that the requirement for a Works Zone may be waived if it can be demonstrated (to the satisfaction of Council’s traffic engineer) that all construction related activities (including all loading and unloading operations) may be undertaken wholly within the site.

 

Traffic & RTA conditions

 

The following conditions are applied to comply with the requirements of the RTA and Council’s Traffic Engineering section:

 

72.     All new walls adjacent to vehicular crossings must be lowered to a height of 600mm above the internal driveway level for a distance of 1.5m within the site or splayed 1.5m metre by 1.5 metre to provide satisfactory sight lines. Details are to be submitted to the Certifying Authority prior to the release of the construction certificate showing compliance with this condition.

 

73.     The proposed access driveway shall comply with the following additional requirements:

 

a)     A traffic safety mirror is to be installed on the southern face of the northern boundary retaining wall at the eastern end of the access driveway & opposite the security roller door to enable vehicles inside the parking area and coming down the driveway to see each other.

 

b)     A Give Way sign shall be installed or stencilled on the pavement inside the basement carpark to indicate to vehicles that they must give way to vehicles coming down the access ramp.

 

c)     The 2m long transition of grade 18% at the eastern end of the access driveway occurring immediately before entering the basement garage shall be amended in grade to 12.5% to avoid vehicles scraping and comply with Australian Standard 2890.1:2004.

 

d)     The access driveway shall be widened to 3.5m at the front property alignment.

 

74.     Prior to commencement of works a Road Occupancy Licence should be obtained from the RTA for any works that may impact on traffic flows on Avoca Street during construction activities.

 

75.     Prior to the issue of a construction certificate, the applicant shall submit for approval and have approved by Council's Traffic Engineer a detailed construction traffic management plan. The plan shall demonstrate how construction and delivery vehicles will access the development site during the demolition and construction phase of the development.

 

All traffic associated with the subject development shall comply with the terms of the approved construction traffic management plan.

 

76.     All vehicles are to enter and leave the site in a forward direction.

 

77.     All works/regulatory signposting associated with the proposed development are to be at no cost to the RTA or Council.

 

78.     The layout of the proposed basement carparking associated with the subject development (including driveways, grades, turning paths, sight distance requirements, aisle widths, aisle lengths and parking bay dimensions, etc) shall be in accordance with Australian Standard 2890.1:2004 (Part 1-Off street car parking) and Australian Standard 2890.2:2002 (Part 2 -Off-street commercial vehicle facilities).

 

79.     The applicant is to submit detailed design drawings and geotechnical reports relating to the excavation of the site and support structures to the RTA for assessment. The applicant is to meet the full cost of the assessment by the RTA.

 

This report shall address the following key issues:

 

a)     The impact of excavation/rock anchors on the stability of Avoca Street and detailing how the carriageway would be monitored for settlement.

b)     The impact of the excavation on the structural stability of Avoca Street.

c)     Any other issues that may need to be addressed. (Contact: Geotechnical Engineer Stanley Yuen on phone 8837 0246 or Graham Yip on phone 8837 0245 for details).

 

NOTE:

If it is necessary to excavate below the level of the base of the footings of the adjoining roadways, the person acting on the consent shall ensure that the owners of the roadway are given at least seven (7) days notice of the intention to excavate below the base of the footings. The notice is to include complete details of the work.

 

80.     Detailed design plans and hydraulic calculations of any changes to the stormwater drainage system are to be submitted to the RTA for approval, prior to the commencement of any works.

 

Details should be forwarded to:

The Sydney Asset Management

Roads and Traffic Authority

PO Box 973 Parramatta CBD 2124.

A plan checking fee will be payable and a performance bond may be required before the RTA’s approval is issued. With regard to the Civil Works requirement please contact the RTA’s Project Engineer, External Works Ph: 8849 2114 or Fax: 8849 2766.

 

81.     Sight distances from the proposed access driveway to pedestrians and vehicles entering and existing Avoca Street are to be in accordance with AS 2890.1 – 2004. Vegetation and proposed landscaping / fencing must not hinder sight lines to and from the access driveway to motorists, pedestrians and cyclists.

 

82.     The proposed development should be designed such that road traffic noise from Avoca Street is mitigated by durable materials, in accordance with EPA criteria for new land use developments (The Environmental Criteria for Road Traffic Noise, May 1999). The RTA’s Environmental Noise Management Manual provides practical advice in selecting noise mitigation treatments.

 

83.     A Demolition and Construction Traffic Management Plan detailing construction / demolition vehicle routes, number of trucks, hours of operation, access arrangements and traffic control should be submitted to Council prior to the issue of a Construction Certificate.

 

Alignment Level Conditions

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

84.     The Council’s Development Engineer has inspected the above site and have determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, shall be:

 

·      Match back of existing bitumen pathway, along the full site frontage.

 

The design alignment level at the property boundary must be strictly adhered to.

 

85.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the kerb must be indicated on the building plans for the construction certificate.

 

86.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $873 calculated at $44.00 (inclusive of GST) per metre of site frontage. This amount is to be paid prior to a construction certificate being issued for the development.

 

Service Authority Conditions

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

87.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

88.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

89.     Documentary evidence from the relevant public utility authorities confirming that their requirements have been satisfied, must be submitted to the certifying authority prior to a construction certificate being issued for the development.

 

90.     Any electricity substation required for the site as a consequence of this development shall be located within the site and shall be screened from view. The proposed location and elevation shall be shown on all detailed landscape drawings and specifications. The applicant must liaise with Energy Australia prior to lodging the construction certificate to determine whether or not an electricity substation is required for the development.

 

91.     The applicant shall meet the full cost of the overhead power lines and telecommunication cables located in the vicinity of the development site to be relocated underground and all redundant power poles to be removed. The applicant shall liaise directly with the relevant service utility authorities to organise for the wires/cables to be relocated. All wires cables must be relocated underground to the satisfaction of the relevant service utility authority prior to the issuing of an occupation certificate for the development.

 

92.     A Section 73 Compliance Certificate under the Sydney water Act 1994 must be obtained. Application must be made through an authorised Water Servicing Coordinator. Please refer to “Your Business” section of Sydney Water’s web site at www.sydneywater.com.au then the “e-developer” icon or telephone 13 20 92.

 

Following application a “Notice of Requirements” will detail water and sewer extensions to be built and charges paid. Please make early contact with the Coordinator, since building of water/sewer extensions can be time consuming and may impact on other services and building, driveway or landscape design.

 

The Notice must be issued to the Principal Certifying Authority prior to the construction certificate being issued.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to occupation of the development.

 

Drainage Conditions

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

93.     Stormwater drainage plans have not been approved as part of this development consent. Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issued, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)       A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

 

b)       A layout of the proposed drainage system including pipe sizes, type, grade, length, invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system. 

 

c)       Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (ie. above the 1 in 20 year storm) to the proposed drainage system.

 

d)       The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

 

i.        Roof areas

ii.       Paved areas

iii.       Grassed areas

iv.      Garden areas

 

e)       Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

 

f)       Proposed finished surface levels and grades of car parks, internal driveways and access aisles which are to be related to Council's design alignment levels.

 

g)       The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

94.     All stormwater run-off naturally draining to the site must be collected and discharged through this property's stormwater system.  Such drainage must, if necessary, be constructed prior to the commencement of building work.

 

95.     As the subject development site falls away from Avoca Street, all site stormwater must be discharged either:

 

1.   To council’s street drainage system in Milford Street by gravity via a private drainage easement through an adjoining private property (or properties); OR

2.   To the kerb and gutter in Avoca Street via a pump out system.

 

The pump out system must be designed with a minimum of two pumps being installed, connected in parallel (with each pump capable of discharging at the permissible  discharge rate) and connected to a control board so that each pump will operate alternatively. The pump wet well shall be sized for the 1 in 100 year, 2 hour storm assuming both pumps are not working.

 

The pump system must also be designed and installed strictly in accordance with "Section 8.4 PUMP SYSTEMS" as stipulated in Randwick City Council's Private Stormwater Code.

 

96.     Should stormwater be discharged to Council’s street drainage system, on-site detention must be provided to ensure that the maximum discharge from the above site is not to exceed that which would occur during a 1 in 5 year storm of 1 hour duration for the existing site conditions. All other stormwater run-off from the above site for all storms up to the 1 in 20 year storm is to be retained on the site for gradual release to the kerb and gutter or drainage system as required by Council.  Provision is to be made for satisfactory overland flow should a storm in excess of the above parameters occur.

 

Should no formal overland escape route be provided for storms greater than the design storm, the on-site detention system shall be sized for the 1 in 100 year storm event.

 

For small areas up to 0.5 hectares, determination of the required cumulative storage must be calculated by the mass curve technique as detailed in Technical Note 1, Chapter 14 of the Australian Rainfall and Run-off Volume 1, 1987 Edition.

 

Where possible the detention tank must have an open base to infiltrate stormwater to the groundwater. Note that the ground water and any rock stratum has to be a minimum of 2.0 metres below the base of the tank.

 

97.     The detention area must be regularly cleaned and maintained to ensure it functions as required by the design.

 

98.     Any onsite detention systems shall be located in areas accessible by residents of all dwellings.

 

99.     The maximum depth of ponding in above ground detention areas (and/or infiltration systems with above ground storage) shall be as follows:

 

·      150mm in uncovered carparking areas (with an isolated maximum depth of 200mm permissible at the low point pit within the detention area).

 

·      300mm in landscaped areas (where child proof fencing is not provided around the outside of the detention area and sides slopes are steeper than 1 in 10)

 

·      600mm in landscaped areas where the side slopes of the detention area have a maximum grade of 1 in 10.

 

·      1200mm in landscaped areas where a childproof fence is provided around the outside of the detention area

 

Notes:

§  It is noted that above ground storage will not be permitted in basement carparks or in any area which may be used for storage of goods.

§  Mulch/bark must not be used in onsite detention areas

 

100.    Any above ground stormwater detention areas (and/or infiltration systems with above ground storage) must be suitably signposted where required, warning people of the maximum flood level.

 

101.    The floor level of all habitable and storage areas adjacent to the detention area (and/or infiltration systems with above ground storage) must be a minimum of 300mm above the maximum water level in the detention area for the design storm or alternately a permanent 300mm high water proof barrier is to be constructed.

 

(In this regard, it must be noted that this condition must not result in any increase in the heights or levels of the building.  Any variations to the heights or levels of the building will require a new or amended development consent from the Council prior to a construction certificate being issued for the development).

 

102.    A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

 

103.    A `V' drain is to be constructed along the perimeter of the property, where required, to direct all stormwater to the detention/infiltration area.

 

104.    A sediment/silt arrester pit must be provided:-

 

·      within the site at or near the street boundary prior to the site stormwater discharging by gravity to the kerb/street drainage system; and

·      prior to stormwater discharging into any absorption/infiltration system.

 

The sediment/silt arrester pit shall be constructed in accordance with the following requirements:-

 

·      The base of the pit located a minimum 300mm under the invert level of the outlet pipe.

 

·      The pit constructed from cast in-situ concrete, precast concrete or double brick.

 

·      A minimum of 4 x 90 mm diameter weep holes located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

 

·      A galvanised heavy-duty screen located over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

 

·      The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

 

·      A child proof and corrosion resistant fastening system provided for the access grate (e.g. spring loaded j-bolts or similar).

 

·      A sign adjacent to the pit stating:

 

“This sediment/silt arrester pit shall be regularly inspected and cleaned.”

 

Note: Sketch details of a standard sediment/silt arrester pit may be obtained from Council’s Drainage Engineer.

 

105.    Prior to occupation of the development, a "restriction on the use of land” and “positive covenant" (under section 88E of the Conveyancing Act 1919) shall be placed on the title of the subject property to ensure that the onsite detention/infiltration system is maintained and that no works which could affect the design function of the detention/infiltration system are undertaken without the prior consent (in writing) from Council. Such restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

 

Notes:

a.  The “restriction on the use of land” and “positive covenant” are to be to the satisfaction of Council. A copy of Council’s standard wording/layout for the restriction and positive covenant may be obtained from Council’s Development Engineer.

 

b.  The works as executed drainage plan and hydraulic certification must be submitted to Council prior to the “restriction on the use of land” and “positive covenant” being executed by Council.

 

106.    Prior to the issuing of an occupation certificate, the applicant shall submit to Council, a works-as-executed drainage plan prepared by a registered surveyor and approved by a suitably qualified and experienced Hydraulic Engineer. The works-as-executed drainage plan shall be to the satisfaction of the Principal Certifying Authority (PCA) and shall include the following details:

 

·      The location of the detention basin with finished surface levels;

·      Finished site contours at 0.2 metre intervals;

·      Volume of storage available in the detention areas;

·      The location, diameter, gradient and material (i.e PVC, RC etc) of all stormwater pipes;

·      The orifice size(s) (if applicable);

·      Details of any infiltration/absorption systems; and

·      Details of any pumping systems installed (including wet well volumes).

 

107.    Prior to the issuing of an occupation certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer confirming that the design and construction of the stormwater drainage system complies with the conditions of development consent. The certification must be provided following inspection/s of the site stormwater drainage system by the certifying engineers and shall be provided to the satisfaction of the PCA.

 

108.    As the above site may encounter seepage water within the depth of the basement, the basement carpark or similar structures are to be suitably tanked and waterproofed. A Structural Engineer\Geotechnical Engineer shall certify the tanking & waterproofing has been carried out to an acceptable standard, to the satisfaction of the certifying authority. A copy of the certification is to be forwarded to Council.

 

Notes:

 

a)  Any subsoil drainage (from planter boxes etc)  is to be disposed of within the site and is not to be discharged to Council’s kerb & gutter and/or underground drainage system.

 

b)  Adequate provision is to be made for the seepage water to drain around the basement carpark (to ensure that the basement will not dam or slow the movement of the ground water through the development site).

 

c)  Seepage Water must not be drained from the site

 

109.    A report must be submitted to and approved by the Certifying Authority or an accredited certifier, prior to issuing the Construction Certificate, detailing the proposed method of excavation and dewatering process.  This report is to be prepared by suitably qualified and experienced Geotechnical, Hydrological and Structural Engineers and is to include but not limited to:

 

·        The proposed method of shoring/piling and dewatering.

·        The zone of influence of any possible settlement.

·        The location of any proposed re-injection points in relation to the property boundaries (where re-injection equipment is to be located on land other than the subject premises, the written consent of the owner must also be provided to Council).

·        Monitoring of fluctuations of the water table during dewatering/construction to be undertaken by consulting engineers to ensure that the conditions of consent and other relevant requirements are satisfied.

·        The location of all proposed monitoring equipment in relation to the property boundaries (where monitoring equipment is to be located on land other than the subject premises, the written consent of the owner must also be provided to Council).

·        Details of any consultation and arrangements made with owners of any potentially affected nearby premises (ie in relation to access, monitoring and rectification of possible damage to other premises).

·        Details of groundwater quality and proposed disposal of any potentially contaminated groundwater in accordance with relevant requirements of the Department of Environment & Conservation, Council and the Protection of the Environment Operations Act 1997, in an environmentally sensitive manner.

·        The location of all pumping equipment in relation to the property boundaries.

·        The proposed method of noise attenuation for all pumping equipment, so as not to be more than 5dB (A) greater than the A – weighted L90 background sound pressure level between the hours of 7am to 10pm within any residential premises and not to be audible at all between the hours of 10pm and 7am within any residential dwelling.

·        Confirmation that the proposed methods of dewatering and excavation are appropriate and in accordance with ‘best practice’ principles and should not result in any unacceptable levels of settlement or damage of the adjoining or nearby buildings within the zone of influence.

 

The dewatering process must be monitored by the consulting Engineer/s to the satisfaction of the principal certifying authority and documentary evidence of compliance with the relevant conditions of consent and dewatering requirements must be provided to the principal certifying authority and the Council.

 

The site conditions and fluctuations in the water table are to be reviewed by the consulting Engineer prior to and during the excavation/construction process, to ensure the suitability of the excavation and dewatering process and compliance with Council's conditions of consent.

 

Waste Management Conditions

 

The following conditions are applied to provide adequate provisions for waste management:

 

110.    The garbage room area will have to be designed so as to be able to contain a total of 29 x 240 litre bins (15 garbage bins & 14 recycle bins) whilst providing satisfactory access to these bins. Details showing compliance with this requirement are to be shown on the plans submitted to the certifying authority for the construction certificate.

 

111.    The waste storage area is to be provided with a tap and hose and the floor is to be graded and drained to the sewer to the requirements of Sydney Water.

 

112.    The waste storage areas shall be clearly signposted.

 

113.    Prior  to the issuing of a construction certificate for the proposed development the applicant is to resubmit to Council and have approved by Council’s Manager of Waste Services, an amended Waste Management Plan detailing waste and recycling storage and disposal for the development site.

 

The plan shall detail the type and quantity of waste to be generated by the development; demolition waste; construction waste; materials to be re-used or recycled; facilities/procedures for the storage, collection recycling & disposal of waste and the on-going management of waste for the boarding house with the following additional requirements and amendments:

 

§ The applicant shall further detail how the caretaker will transfer the bins to the kerbside for collection as the access ramp grade of 25% is considered too steep for the manual handling of bins. Some kind of mechanical assist must therefore be employed with appropriate details supplied in the amended Waste Management Plan.

 

§ Recyclables are collected fortnightly only by Council. The Waste Management plan shall be amended to reflect this frequency.

 

§ The applicant may wish to consider the use of compaction to reduce the amount of bins being presented kerbside for collection.

 

§ The applicant shall comply with any other additional requirements as directed by Council’s Manager of Waste - Talebul Islam.

 

Landscape Conditions

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

114.    Landscaping at this site must be installed substantially in accordance with the Landscape Plan by Michael Zinn Landscape Designer, project no.497, drawing no.01, amendment 3, dated 2 August 2010, stamp-received by Council on 6 August 2010, subject to the following changes being made on an amended plan, which must be submitted to, and be approved by, the PCA, prior to the commencement of site works:

 

·      In order to avoid future maintenance/nuisance issues between the landscaping, building and outdoor balconies (not shown on the landscape plan), the row of 3 x Tristaniopsis laurina ‘Luscious’ (Watergum) proposed across the rear (eastern) boundary shall be replaced with a more upright and compact native tree that will attain a similar height at maturity; ie, a minimum of 8 metres, such as Eleaocarpus reticulatus (Blueberry Ash), Syzygium leuhmannii (Small Leafed Lilly Pilly) or similar.

 

·      All planter boxes and garden beds constructed on slab must have a minimum soil depth and width of 600mm, with construction details to be submitted.

 

·      In order to reduce the amount of storm-water generated by the site, as well as to recharge groundwater supplies, porous/permeable paving shall be used in all hard surfacing not over slab.

 

·      To ensure satisfactory maintenance of the landscaped areas, an automatic drip irrigation system shall be installed throughout all planted areas (including the under-croft area along the western edge of the proposed building). Details shall be provided showing that the system will be connected to the sites rainwater tanks, with back-up connection to the mains supply, in accordance with all current Sydney Water requirements.

 

·      All detention tanks and below ground stormwater infiltration systems located within the landscaped areas shall have a minimum soil cover of 600mm to ensure sufficient soil depth to permit the establishment of landscaping.

 

·      Any substation required shall be screened from view. The proposed location and elevation shall be shown on all detailed landscape drawings and specifications.

 

Certification of landscape works

 

115.    Upon completion of works, but prior to the issue of a Final Occupation Certificate, written certification from a suitably qualified professional in the Landscape/Horticultural industry shall be provided, to the satisfaction of the PCA (with a copy to be forwarded to Council if not the PCA) which confirms that landscaping has been fully installed with the approved documentation.

 

116.    The Plan of Management for the facility must include suitable provisions to ensure that the approved landscaping is maintained in a healthy and vigorous state until maturity, for the life of the development.

 

Removal of Trees within site

 

117.    Approval is granted for removal of the following trees, subject to full implementation of the approved landscape plans:

 

·      The Phoenix canariensis (Canary Island Date Palm, Tree 4 in the Arborists Report by Andrew Morton of Earthscape Horticultural Services, dated 15 December 2009, ‘the Arborist Report’) located in the front yard, towards the northwest corner of the site, in order to accommodate the proposed building and under-croft area as shown;

 

·      The Brachychiton acerifolius (Illawarra Flame Tree, Tree 9) and Camelia sasanqua (Camelia, Tree 10) both close to the rear (eastern) boundary, about halfway across the width of the site, so as to accommodate the proposed building and outdoor balconies as shown.

 

Pruning of Date Palm

 

118.    Permission is granted for the selective and minimal pruning of only those lower growing fronds from the Phoenix canariensis (Canary Island Date Palm) which is located in the front yard, near the southwest corner of the site, only where they need to be pruned in order to avoid damage to the tree, or, conflict with the proposed works either during construction or upon completion, and must not be amount which will affect its appearance.

 

119.    All pruning must be undertaken by an Arborist who holds a minimum of AQF Level V in Arboriculture, and who is also a registered member of a nationally recognised organisation/association (‘the site Arborist’), with all pruning to be performed to Australian Standard AS 4373-1996 'Pruning of Amenity Trees’.

 

Protection of Council’s Street Tree

 

120.    In order to ensure retention of the Corymbia citriodora (Lemon Scented Gum, Tree 1) located within Council’s Avoca Street footpath, centrally across the width of the site in good health, the following measures are to be undertaken:

 

·      All documentation submitted for the construction certificate application must show the retention of this street tree, with the position and diameter of both its trunk and canopy to be clearly shown on all drawings.

 

·      Any new services, pipes, stormwater systems or similar that need to be installed over public property, must be done so along either the sites side boundaries; or, against either side of the new crossing, so as to minimise root damage.

 

·      The applicant is not authorised to perform any works to this street tree, and shall contact Council’s Landscape Development Officer on 9399-0613 should pruning or any similar such work appear necessary, with the applicant required to cover all associated costs with such work, to Council’s satisfaction, prior to the issue of a Final Occupation Certificate.

 

·      There is to be no storage of materials or machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble surrounding its trunk, or, placed in an area where they may wash or run-off towards this tree.

 

·      In order to prevent soil/sediment being washed over its root system, suitable erosion control measures shall be provided at ground level, with all Site Management Plans needing to recognise the fact that material storage cannot be located in the area that may affect this tree.

 

·      A refundable deposit in the form of cash, credit card or cheque for an amount of $2,500.00 shall also be paid at the Cashier on the Ground Floor of the Administrative Centre, prior to a construction certificate being issued for the development, in order to ensure compliance with the conditions listed in this consent, and ultimately, preservation of this street tree.

 

The refundable deposit will be eligible for refund following the issue of a Final Occupation Certificate, subject to completion and submission of Council’s ‘Security Deposit Refund Application Form’, and pending a satisfactory inspection by Council’s Landscape Development Officer (9399-0613).

 

Any contravention of Council's conditions relating to the tree at any time during the course of the works, or prior to the issue of a final occupation certificate, may result in Council claiming all or part of the lodged security in order to perform any rectification works necessary, as per the requirements of 80A (6) of the Environmental Planning and Assessment Act 1979.

 

Protection of Palm in front yard

 

121.    In order to ensure retention of the Phoenix canariensis (Canary Island Date Palm, Tree 2) located in the front yard, near the southwest corner of the site in good health, the following measures are to be undertaken:

 

·      All documentation submitted for the construction certificate application must show the retention of this tree, with the position and diameter of both its trunk and crown to be clearly shown on all drawings.

 

·      The Stormwater Concept Discharge Plan by M. Zimmerman, drawing no 2035-3-1, B, dated March 2010 must be amended to show the 900mm x 900mm pit being located further to the southeast, a minimum distance of 4.5 metres off the outside edge of its trunk at ground level, with the 100mm UVPC pipes in this area to be located outside of this zone also. 

 

·      Any paving within a radius of 4 metres of its trunk must be porous/permeable, with a construction note confirming this to be included on the plans.

 

·      In order to prevent the introduction of pathogens such as Fusarium sp, to which this species of palm is particularly vulnerable, any imported soils and mulch must comply with the requirements of AS4419 – 2003: Soils for landscaping & garden use, and AS4454 – 2003 Composts, Soil Conditioners & Mulches respectively, with the PCA to obtain certificates of compliance, prior to the issue of a Final Occupation Certificate.

 

·      This tree is to be physically protected by the installation of 1.8 metre high steel mesh/chainwire fencing, which shall be located a minimum distance of 4.0 metres to its north and east (measured off the outside edge of its trunk at ground level), matching up with the western and southern site boundaries respectively in order to completely enclose this palm for the duration of works.

 

·      This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

·      Within this TPZ, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble, with all Site Management Plans needing to acknowledge this requirement.

 

·      Any roots encountered during the course of the approved works must be cut cleanly by hand, and the affected area backfilled with clean site soil as soon as practically possible.

 

·      A layer of woodchip mulch to a depth of between 50-75mm must be maintained within the TPZ for the duration of works.

 

Protection of significant Palm along southern boundary

 

122.    In order to also ensure retention of the significant Washingtonia robusta (Washington Palm, Tree 6) located along the southern site boundary, against the existing dividing fence in good health, the following measures are to be undertaken:

 

a)   All documentation submitted for the construction certificate application must show its retention, with the position and diameter of both its trunk and crown to be clearly shown on all drawings.

 

b)   Prior to the commencement of any site works, the PCA must ensure that a site Arborist who holds a minimum of AQF Level V in Arboriculture (and is also a registered member of a nationally recognised organisation/association) has been engaged for the duration of the project (‘the site Arborist’), to undertake, implement, monitor, supervise and instruct site staff in regards to compliance with these conditions.

 

c)   All Construction Certificate plans must also show that existing ground levels in the area between the southern basement wall and southern site boundary, extending also a distance of 3.5 metres to its east and west (measured off the outside edge of its trunk at ground level) will be maintained.

 

d)   The most eastern access stairs proposed near the southeast corner of the basement level must be slightly relocated further to the east, so that any excavations associated with this structure are setback a minimum distance of 3.5 metres off its trunk.  

 

e)   The construction method used for both the southern basement/building wall, as well as the western edge of the proposed access stairs, within a radius of 4.0 metres off the outside edge of its trunk at ground level, must be one that does not require any further excavations, battering of the soil profile or any other works beyond this zone, such as contiguous bored piers, sheet piling or a similar approved alternative.

 

f)    Any new fencing along the southern site boundary, within a radius of 4 metres off the outside edge of its trunk at ground level, must be a system which requires the use of localised pad footings only.

 

g)   The Stormwater Concept Discharge Plan by M. Zimmerman, drawing no 2035-3-1, B, dated March 2010 must be amended to show the 100mm UVPC pipe proposed along this side setback being installed a minimum distance of 2.5 metres to its north, ie, as close as practically possible to the proposed building. 

 

h)   This palm is to be physically protected by the installation of 1.8 metre high steel mesh/chainwire fencing, which shall be located a minimum distance of 2.5 metres to its north (measured off the outside edge of its trunk at ground level), as well as 3.5m to its west and east, matching up with the southern site boundary in order to completely enclose this palm for the duration of works.

 

i)    This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

j)    Within the zone specified in point ‘h’ above, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble.

 

k)   Any roots encountered during the course of the approved works must be cut cleanly by hand by the site Arborist, with the affected area to be backfilled with clean site soil as soon as practically possible.

 

l)    A layer of woodchip mulch to a depth of between 50-75mm must be maintained within the TPZ for the duration of works.

 

m)  Prior to the PCA issuing a Final Occupation Certificate, the site Arborist must submit a certificate of compliance confirming attendance on site at the relevant stages during the course of works, and that all conditions were adhered to.

 

Further information and details on Council's requirements for trees on development sites can be obtained from the recently adopted Tree Technical Manual, which can be downloaded from Council’s website at the following link, http://www.randwick.nsw.gov.au - Looking after our environment – Trees – Tree Management Technical Manual; which aims to achieve consistency of approach and compliance with appropriate standards and best practice guidelines.

 

ADVISORY MATTERS:

 

1.       The applicant is advised that the Construction Certificate plans and specification must comply with the provisions of the Building Code of Australia (BCA).

 

In this regard, the development consent plans do not show compliance with the deemed-to-satisfy provisions of the BCA, including:

 

a)     Part B1                  -     Structural provisions

b)     Part C1                 -     Fire resistance and stability

c)     Part C2                 -     Compartmentation and separation

d)     Part D1                 -     Provisions for escape

e)     Clause D1.4            -     Exit travel distances

f)      Part D2                 -     Construction of exits

g)     Clause D2.4            -     Separation of rising and descending stair flights

h)     Part D3                 -     Access for people with disabilities

i)      Clause D3.5            -     Car parking for people with disabilities

j)      Part E1                  -     Fire fighting equipment

k)      Part E2                  -     Smoke Hazard Management

l)      Part E3                  -     Lift Installations

m)     Part E4                  -     Emergency lighting, exit signs & warning                                             systems

n)     Part F1                  -     Damp and weatherproofing

o)     Part F2                  -     Sanitary and other facilities

p)     Part F4                  -     Light and ventilation

q)     Part F5                  -     Sound Transmission and Insulation

 

Details of compliance with the relevant provisions of the Building Code of Australia and conditions of development consent are to be provided in the plans and specifications for the construction certificate.

 

The applicant/developer is advised to ensure that the development is not inconsistent with Council's consent and if necessary consult with Council’s Building Certification Services or your accredited certifier (as applicable) prior to submitting your construction certificate application to enable these matters to be addressed accordingly.

 

2.       The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Nash/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

Cr Hughes vacated the Chair at this point in the meeting (8.08pm) and the Mayor, Cr Matson, took the Chair in order to put forward the following Mayoral Minutes.

 

Mayoral Minutes

 

PL126/10

RESOLUTION: (Mayor, Cr Matson) that:

 

a)            the report be received and noted;

 

b)            professional historian Pauline Curby be congratulated on receiving the NSW Premier’s History Award (NSW Community & Regional History Prize) and the NSW History Fellowship 2010; and

 

c)            Council library staff be congratulated for their efforts.

 

MOTION: (Mayor, Cr Matson) CARRIED - SEE RESOLUTION.

 

 

MM60/10  Mayoral Minute - Waiving of Fees - Express Glass Island Challenge (F2009/08286 )

PL127/10

RESOLUTION: (Mayor, Cr Matson) that:

 

a)            Council vote $2,663.00 to cover the fees associated with the Express Glass Island Challenge and funds be charged to the 2010-11 Contingency Fund;

 

b)            The event organiser undertake to appropriately and prominently acknowledge and promote Council’s contribution prior to and during the event; and

 

c)            The Mayor or his representative be given the opportunity to address the event on behalf of Council.

 

MOTION: (Mayor, Cr Matson) CARRIED - SEE RESOLUTION.

 

 

MM61/10  Mayoral Minute - New South Wales International Cycling Grand Prix Event - Coogee (F2010/00096 )

PL128/10

RESOLUTION: (Mayor, Cr Matson) that:

 

a)            the applicant be advised that Council gives its “in principle approval” to the running of the NSW International Cycling Grand Prix event on Saturday 11 December 2010 at Coogee; and

 

b)            Council provide a clean circuit by way of sweeping the affected streets prior to and after the event and provide twenty special event bins.

 

MOTION: (Mayor, Cr Matson) CARRIED - SEE RESOLUTION.

 

Cr Hughes returned to the Chair.

 

Miscellaneous Reports

Nil.  

 


Notice of Rescission Motions

Nil. 

 

 

The meeting closed at 8.13pm.

 

The minutes of this meeting were confirmed at the Planning Committee Meeting of the Council of the City of Randwick held on Tuesday, 7 December 2010.

 

 

 

 

 

 

 

...................................................

CHAIRPERSON