MINUTES OF Ordinary Council Meeting of the

Council of the City of Randwick HELD ON

Tuesday, 23 November 2010 AT 6:08pm

 

Present:

 

The Mayor, Councillor M Matson (Chairperson) (East Ward)

 

Councillor K Smith (Deputy Chairperson) (North Ward)

 

North Ward                                           -   Councillors P Tracey & M Woodsmith 

 

South Ward                                          -   Councillors R Belleli, C Matthews & A White

 

East Ward                                            -   Councillors T Bowen & B Notley-Smith

 

West Ward                                           -   Councillors J Procopiadis & S Nash

 

Central Ward                                        -   Councillors A Andrews, T Seng &

                                                              G Stevenson

 

Officers Present:

 

General Manager                                             Mr R Brownlee

Director City Services                                      Mr J Frangoples

Director City Planning                                       Ms S Truuvert

Director Governance & Financial Services             Mr G Banting

Manager Administrative Services                        Mr D Kelly

Manager Development Assessment                     Mr K Kyriacou

Manager Organisational Staff Services                 Ms F Calabrese

Media Officer                                                  Ms A Power

 

 

Prayer & Acknowledgement of Local Indigenous People

 

The Council Prayer was read by Cr White. The Acknowledgement of Local Indigenous People was read by Cr Woodsmith.

 

Apologies/Granting of Leave of Absences 

 

An apology was received from Cr Hughes.

 

RESOLVED: (Smith/Nash) that the apology received from Cr Hughes be accepted and leave of absence from the meeting be granted.

 

A one minute silence was observed to mark the untimely passing of Cr Hughes’ father.

 


Confirmation of the Minutes

 

Confirmation of the Minutes of the Ordinary Council Meeting held on Tuesday 19 October 2010

713/10

RESOLUTION: (Woodsmith/Nash) that the Minutes of the Ordinary Council Meeting held on Tuesday 19th October 2010 (copies of which were circulated to all Councillors) be and are hereby confirmed as a correct record of the proceedings of that meeting.

 

Declarations of Pecuniary and Non-Pecuniary Interests

 

(a)    The Mayor declared significant non pecuniary interests in Items CP107/10 and         CP108/10 as he is one of Council’s delegates on the Joint Regional Planning         Panel and his daughter attends a school in the vicinity of the subject application         in CP107/10. The Mayor will not be participating in the debate or voting on these         matters.

(b)    Cr Nash declared significant non pecuniary interests in Items CP107/10 and         CP108/10 as he is one of Council’s delegates on the Joint regional Planning         Panel. Cr Nash will not be participating in the debate or voting on these matters.

(c)    Cr Nash declared a significant pecuniary interest in Item CP96/10 as his parents         own a property in the vicinity of the property in question. Cr Nash will not be         participating in the debate or voting on this matter.

(d)    Cr Nash declared a non significant non pecuniary interest in Item CP105/10 as         he has a professional association with a representative of one of the objectors.

(e)    Cr Nash declared a significant pecuniary interest in Item GF63/10 as his parents         own a property in the vicinity of the development in question. Cr Nash will not         be participating in the debate or voting on this matter.

(f)    Cr Nash declared a significant non pecuniary interest in Item GF66/10 as he has         a professional relationship with some of the tenderers. Cr Nash will not be         participating in the debate or voting on this matter.

(g)    Cr Bowen declared a non significant non pecuniary interest in Item CP105/10 as         the ALP State member for Coogee has made a submission on this matter.

(h)    Cr Bowen declared significant non pecuniary interests in Items CP107/10 and         CP108/10 as he is one of Council’s delegates on the Joint regional Planning         Panel. Cr Bowen will not be participating in the debate or voting on these         matters.

(i)     Cr Bowen declared a significant non pecuniary interest in Item GF66/10 as two of the tenderers are former employers of his and two have previously retained      him for professional services. Cr Bowen will not be taking any part in the debate or voting on this matter.

(j)    Cr Andrews declared a non significant non pecuniary interest in Item CP107/10         as he knows the applicant as he lives in the Randwick area.

(k)    Cr Andrews declared a non significant non pecuniary interest in Item CP108/10         as he has previously received and declared a Christmas gift from the applicant.

(l)     Cr Procopiadis declared a non significant non pecuniary interest in Item         CP107/10 as he knows the owner.

(m)   Cr Tracey declared non significant non pecuniary interests in Items CP88/10 and         CP105/10 as his employer has made submissions to Council on both matters.

(n)    Cr Smith declared a non significant non pecuniary interest in Item CP105/10 as

        his parents are Directors of a company that own a unit in the vicinity of this         application.

 

(o)    Cr Smith declared significant non pecuniary interests in Items CP110/10 and         MM70/10 as he works in the alcohol industry. Cr Smith will not be participating in the debate or voting on this matter.

(p)    Cr Matthews declared a significant non pecuniary interest in Item CP105/10 as         he knows the applicant. Cr Matthews will not be participating in the debate or         voting on this matter.

(q)    Cr Seng, on behalf of all Liberal Councillors, declared a non significant non         pecuniary interest in Item CP107/10 as the applicant is associated with a         company who has previously sponsored a State Liberal Party luncheon.

(r)    Cr Seng declared a non significant non pecuniary interest in Item CP108/10 as         the applicant presented him with a tie during his term as Mayor and also gave a         gift of some wine which he declared and donated to charity.

(s)    Cr White declared a non significant non pecuniary interest in Item GF66/10 as         he once went to a Christmas party held by one of the tenderers.

(t)    Cr White declared a significant non pecuniary interest in Item CP99/10 as his         accountant owns the subject property. Cr White will not be participating in the         debate or voting on this matter.

(u)    Cr White declared a non significant non pecuniary interest in Item CP90/10 as         the applicants are neighbours of his.

(v)    Cr Notley-Smith declared a significant non pecuniary interest in Item CP88/10 as         the applicant is the father of someone who has previously made donations to his         campaign. Cr Notley-Smith will not be participating in the debate or voting on         this matter.

(w)   Cr Nash declared a non significant non pecuniary interest in Item MM68/10 as         he is a close friend of the organiser of this event.

 

Address of Council by Members of the Public

Prior to consideration of the Agenda by the Council, deputations were received in respect of the following matters:

 

CP87/10    52 Sturt Street, Kingsford

 

For                      Scott Lockrey

 

CP89/10    97-99 Anzac Parade, Kensington

 

For                      Miccal Cummins - Applicant

 

CP94/10    65 Earl Street, Randwick

 

Against               Christopher Dauth - objector

 

CP95/10    86 Dudley Street, Coogee

 

For                      Michael Richards - objector

 

CP96/10    44 Prince Edward Street, Malabar

 

Against               Kerry Nash – on behalf of objectors

 

For                      Anthony Betros on behalf of applicant

 

 

CP97/10    7 Darley Road, Randwick

 

Against               Elizabeth Rice

 

For                  Gary Breasley

 

CP105/10   2 Wolseley Road, Coogee

 

Against               Caroline Mock - objector

 

For                      Gary Shields on behalf of the applicant

 

CP107/10   JRPP Report - for 265-271 Avoca Street, Randwick

 

For                      Spiro Stavis - Planner for the Applicant

 

The meeting was adjourned at 7.25pm and was resumed at 7.48pm.

 

Mayoral Minutes

 

 

714/10

RESOLUTION: (His Worship the Mayor, Cr M Matson) that:

 

a)     Council respond to the Governor-General, Her Excellency Ms Quentin Bryce AG indicating that the Mayor and Councillors of Randwick City Council have received the commissions (as detailed in her letter dated 10 August 2010) openly and enthusiastically and that Council will support the proposed CEFA initiatives ‘AusCivics Film Festivals: Celebrating the Australian Way’ and the Governor-General’s National Film Prize in any way possible;

 

b)     the 2011 Governor-General’s Undergraduate Essay Competition be publicised to undergraduates in the area via the Mayor’s column;

 

c)     this matter be referred to the Youth Council.

 

MOTION: (His Worship the Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

MM63/10  Mayoral Minute - Passing of Former Councillor - Sheila Dorothy Rimmer AM (F2005/00266)

715/10

RESOLUTION: (His Worship the Mayor, Cr M Matson) that Council sends its condolences to the Rimmer family on the passing of former Councillor Sheila Dorothy Rimmer AM.

 

MOTION: (His Worship the Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

MM64/10  Mayoral Minute - Australia Day Botany Bay Regatta - Request for Financial Assistance (F2004/07076)

716/10

RESOLUTION: (His Worship the Mayor, Cr M Matson) that:

 

a)       Council vote $750.00 from the 2010-11 Contingency Fund as a contribution towards the 2011 Australia Day Botany Bay Regatta activities;

 

b)       Council nominate two Council representatives for the ‘Councillors’ Challenge’ event;

 

c)       the event organisers undertake to appropriately and prominently acknowledge and promote Council’s contribution at the Regatta events; and

 

d)       this be the final year in which Council participates in this event.

 

MOTION: (His Worship the Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

MM65/10  Mayoral Minute - Malabar Beach - Water Quality (F2009/00560)

717/10

RESOLUTION: (His Worship the Mayor, Cr M Matson) that Council:

 

(a)    agree to fund its contribution for this project from the WaSIP funds;

 

(b)    enter into a Deed of Agreement with Sydney Water that includes the following:

 

1.     Sydney Water will commence construction of the works by October 2011;

2.     Sydney Water will complete the Design and the Review of Environmental Factors at there expense;

3.     Sydney Water will carry the construction risks, i.e. if cost is higher then they will fund, if costs are lower the council contributions less;

4.     the project will be funded by a 50:50 contribution between Sydney Water and Council;

5.     the Councils' contribution will be a maximum of $1 Million; and

 

(c)    write to the State Member for Maroubra to thank him for his assistance in this matter.

 

MOTION: (His Worship the Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

MM66/10  Mayoral Minute - Sydney Water's Every Drop Counts 5-star Recognition for Randwick Council (F2004/06495)

718/10

RESOLUTION: (His Worship the Mayor, Cr M Matson) that Council receive and note this report and the relevant staff be congratulated for their efforts in regard to this important recognition from Sydney Water.

 

MOTION: (His Worship the Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

MM67/10  Mayoral Minute - Supporting "Sense of Community" Street Parties (F2004/07232)

719/10

RESOLUTION: (His Worship the Mayor, Cr M Matson) that Council:

 

a)   support “Sense of Community” street parties by arranging, on behalf of residents:-

 

i)     traffic control plans

ii)    the preparation of traffic management plans and road occupancy licenses for submission to the RTA (if necessary), and

iii)    all traffic control measures associated with street parties including all signage and other materials as well as labour on the day of the event;

 

b)   vote $6,000.00 to cover the costs associated with the four requested street party applications, with funds being allocated from the 2010-11 Contingency Fund; and

 

c)   does not extend blanket support to street closures for purposes such as political campaigns, community action rallies or commercial activities.

 

MOTION: (His Worship the Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

 

MM68/10  Mayoral Minute - White Ribbon Day Breakfast, 25 November 2010, Parliament House (F2010/00001)

720/10

RESOLUTION: (His Worship the Mayor, Cr M Matson) that Council purchase a table for ten people to attend the White Ribbon Campaign Breakfast at Parliament House on 25th November 2010 and that the cost ($500.00) be funded from the 2010-11 Contingency Fund.

 

MOTION: (His Worship the Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

MM69/10  Mayoral Minute - Dedication of Randwick Environmental Park to Council (F2004/06778)

721/10

RESOLUTION: (His Worship the Mayor, Cr M Matson) that Council:

 

a)     receive and note this report;

 

b)     thank the Hon Peter Garrett for his efforts in securing the REP dedication; and

 

c)     thank the Moverly Precinct Committee for their continued support; and

 

d)     thank the adjoining residents around the park for their active campaign to secure the dedication of the REP.

 

MOTION: (His Worship the Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

MM70/10  Mayoral Minute - Regulation of Violent Pubs and Clubs  (F2004/07767)

722/10

RESOLUTION: (His Worship the Mayor, Cr M Matson) that Randwick City Council write to the Mr Barry O’Farrell MP, Member of Ku-ring-gai and Leader of the NSW Opposition, requesting details of the Coalition’s “three strike” policy in regard to violent licensed premises and seeking information on what other measures the Coalition will introduce to assist local councils address issues relating to the adverse impacts from the operation of licensed premises, should the Coalition win Government in March 2011.

 

MOTION: (His Worship the Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

MM71/10  Mayoral Minute - Raising the Profile of Council's Sporting Awards (F2004/08203)

723/10

RESOLUTION: (His Worship the Mayor, Cr M Matson) that the Bradley Matthews Award ceremony and the Randwick City Sports Awards be combined into the one event as of 2011.

 

MOTION: (His Worship the Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

724/10

RESOLUTION: (His Worship the Mayor, Cr M Matson) that Council:

 

a)     note and endorse the Maroubra Beach Precinct Committee’s resolution of 22 November that Council approach the Commonwealth Government seeking their agreement as land owner to commence a rezoning process for the Headland’s Lots 2 and 4;

 

b)     write to the local member, Mr Peter Garrett, seeking his support for the proposed spot rezoning;

 

c)     respond to the Precinct’s request for more information on the consultation process for the proposed western walking track; and

 

d)     erect a new warning sign at the Maroubra rock pools, in relation to swimming after rainfall events.

 

MOTION: (His Worship the Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

 

MM73/10  Mayoral Minute - Chinese Market Gardens - Proposed Rezoning (F2004/07905)

725/10

RESOLUTION: (His Worship the Mayor, Cr M Matson) that Council write to the NSW Government reiterating its support for retaining the Chinese Market Gardens and seeking support to proceed with a spot rezoning of the site to conserve its market garden use.

 

MOTION: (His Worship the Mayor, Cr M Matson) CARRIED - SEE RESOLUTION.

 

Councillors Andrews and Matthews called for a DIVISION.

 

The DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Belleli

Councillor Andrews

Councillor Bowen

Councillor Matthews

Councillor Matson

Councillor Stevenson

Councillor Nash

 

Councillor Notley-Smith

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Tracey

 

Councillor White

 

Councillor Woodsmith

 

 

 

Total (11)

Total (3)

 

Urgent Business

Nil.

 

Director City Planning Reports

 

CP87/10   Director City Planning Report - 52 Sturt Street, Kingsford (DA/392/2010)

726/10

RESOLUTION: (Belleli/Andrews) that Council as the responsible authority grant its development consent under Section 80 and 80A of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No. DA/392/2010 to carry out alterations & additions to existing dwelling including new first floor, double garage with terrace above to front of dwelling, pool shade structure to rear,  front fencing, landscaping and associated works at 52 Sturt Street, Kingsford,  subject to the following:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the following plans:

 

Plans numbered

Dated

Date received

DA01 Revision A

8 April 2010

5 August 2010

DA02 Revision A

8 April 2010

5 August 2010

DA03 Revision A

8 April 2010

5 August 2010

DA04 Revision A

8 April 2010

5 August 2010

DA05 Revision B

4 August 2010

5 August 2010

DA06 Revision B

4 August 2010

5 August 2010

DA07 Revision B

4 August 2010

5 August 2010

DA08 Revision B

4 August 2010

5 August 2010

DA09 Revision B

4 August 2010

5 August 2010

 

the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The rear addition shall be setback a minimum of 300mm from the western side boundary in accordance with the agreement between the parties. Details of compliance shall be shown on the Construction Certificate plans and verified by the Principal Certifying Authority prior to commencement of works.

 

3.       The colours, materials and finishes of the external surfaces to the building are to be generally consistent with the schedule of colours and materials received by Council on 27 May 2010.

 

4.       Metal roof sheeting is to be pre-painted (e.g. colourbond).

 

5.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

6.       Prior to the issue of a Construction Certificate, the BASIX certificate shall be amended to reflect the changes made to the skylights (as detailed on the plans referenced in condition 1).

 

7.       This consent does not grant any approval for changes to the existing side boundary fencing.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

8.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is are applied to meet additional demands for public facilities;

 

9.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $300,000 the following applicable monetary levy must be paid to Council: $3,000.00.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

10.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

11.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

12.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

13.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

14.     Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

15.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

16.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

17.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

18.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

19.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

20.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·          name, address and telephone number of the Principal Certifying Authority; and

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

21.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

22.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

23.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

24.     Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

25.     Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the upper floor addition.

 

26.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·          Occupational Health and Safety Act 2000 & Regulations

·          WorkCover NSW Guidelines & Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

27.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council, not less than 2 days before commencing such works.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

28.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy (adopted 13 September 2005)

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the principal certifying authority immediately upon completion of the asbestos related works, which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

29.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

30.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

b)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

31.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·        excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·        new dwellings or additions to dwellings sited up to shared property boundaries (e.g. additions to a semi-detached dwelling or a terraced dwelling),

·        excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·        as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

32.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

33.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan is required to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of site works.

 

The Construction Noise Management Plan is to be prepared in accordance with the relevant provisions of the DECC Construction Noise Guideline.

 

34.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

35.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing/hoardings to the perimeter of the site;

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction

·       details of methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·       construction noise and vibration management;

·       construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

36.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

37.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

38.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)       Construct a concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site.

 

39.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

40.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

41.     The Council’s Development Engineer has inspected the above site and have determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

42.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $121.00 (inclusive of GST). This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

43.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

44.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

45.     As the above site may encounter groundwater/seepage water within the depth of the basement excavation, the basement garage and storage area are to be suitably tanked and/or waterproofed. A Structural Engineer\Geotechnical Engineer shall certify the tanking and/or waterproofing has been carried out to an acceptable standard, to the satisfaction of the certifying authority. A copy of the certification is to be forwarded to Council.

 

Notes:-

 

a)  Any subsoil drainage (from planter boxes etc) is to be disposed of within the site and is not to be discharged to Council’s kerb & gutter and/or underground drainage system.

 

b)  Adequate provision is to be made for the ground water to drain around the basement garage (to ensure that the basement will not dam or slow the movement of the ground water through the development site).

 

46.     Seepage water must not be collected and discharged from the site.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

Tree Management

 

47.     Permission is granted for the applicant to remove the dead Council street tree, at their own cost, which is located within the construction zone for the proposed vehicular crossing.

 

48.     Approval is granted for the removal of the Peppercorn tree located in the rear yard.

 

49.     The applicant shall submit a total payment of $107.25 to Council,

 

a.       Being the cost for Council to supply and install 1 x 25 litre street tree at the completion of all works ($97.50) + GST.

 

The contribution shall be paid into Tree Amenity Income account no 4001.768401 at the Cashier on the Ground Floor of the Administrative Centre prior to a construction certificate being issued for the development.

 

The applicant will be required to contact Council’s Landscape Development Officer on 9399-0613, giving at least two working weeks notice, to arrange for removal of the existing street tree/provision of a replacement street tree upon completion.

 

50.     That part of the naturestrip upon Council's footway which is damaged during the construction of the proposed works shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu turf or similar. Such works shall be completed at the applicant’s expense prior to the issue of a final Occupation Certificate.

 

ADVISORY MATTERS:

 

A1    Demolition, building or excavation work must not be commenced until;

 

·      A Construction Certificate has been obtained from Council or an Accredited Certifier

·      Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·      Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2    A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·      Install or erect any site fencing, hoardings or site structures

·      Operate a crane or hoist goods or materials over a footpath or road

·      Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3    Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A4    This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A5    The applicant is to advise Council in writing and/or photographs of any signs of         existing damage to the Council roadway, footway, or verge prior to the         commencement of any building/demolition works.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

CP88/10   Director City Planning Report - 152 Coogee Bay Road, Coogee (DA/598/2010)

 

 

 

727/10

Having previously declared an interest in this item, Cr Notley-Smith left the chamber, taking no part in the debate or voting on the matter.

 

RESOLUTION: (Andrews/Nash)

 

A.       That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F(1) of Randwick Local Environmental Plan 1998 (Consolidation), relating to Floor Space Ratio, on the grounds that the proposed development complies with the objectives of the above clause, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.       That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/598/2010 for permission to use the lower ground floor of existing multi-unit flat building as a residential unit at 152 Coogee Bay Road, Coogee, subject to the following conditions:

 

1.       The development must be implemented substantially in accordance with the plans numbered 6664Adetail Issue I, dated 29 June 2010  and received by Council on 30 July 2010, the application form and on any supporting information received with the application, except as may be amended  by the following conditions and as may be shown in red on the attached plans:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

2.       Street numbering must be provided to the premises in a prominent position, to the satisfaction of Council.

 

          In this regard, prior to occupation of the building, an application must be submitted to and approved by Council’s Director of City Planning, together with the required fee, for the allocation of an appropriate street number/s to the development.

 

3.       Lighting to the premises shall be designed so as not to cause a nuisance to nearby residents or motorists and to ensure that light overspill does not affect the amenity of the area.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations and to provide for reasonable levels of safety and amenity:

 

4.       The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

5.       All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA), in accordance with Clause 98 of the Environmental Planning and Assessment Regulation 2000.

 

6.       Prior to the commencement of any building or fire safety works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment

 

7.       Prior to the commencement of any building,  the person having the benefit of the development consent must:

 

i)        appoint a Principal Certifying Authority for the building work, and

 

ii)       appoint a principal contractor for the building work, or in relation to residential building work, obtain an owner-builder permit in accordance with the requirements of the Home Building Act 1989, and notify the Principal Certifying Authority and Council accordingly in writing, and

 

iii)       unless the person having the benefit of the consent is the principal contractor (i.e. owner-builder), notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

 

iv)      give at least two days notice to the Council, in writing, of the person’s intention to commence building works.

 

8.       The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected in accordance with section 81A (2) (b1) (ii) of the Environmental Planning & Assessment Regulation 2000 and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Documentary evidence of the building inspections carried out and details of compliance with Council’s consent is to be maintained by the Principal Certifying Authority.  Details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council with the occupation certificate.

 

The principal contractor or owner-builder (as applicable) must ensure that the required critical stage and other inspections, as specified in the Principal Certifying Authority’s “Notice of Critical Stage Inspections”, are carried out to the satisfaction of the Principal Certifying Authority and at least 48 hours notice (excluding weekends and public holidays) is to be given to the Principal Certifying Authority, to carry out the required inspection, before carrying out any further works.

 

9.       An Occupation Certificate must be obtained from the Principal Certifying Authority prior to the use of the lower ground level area (Unit 7) for habitable/residential purposes, in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

10.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon and must also be provided to Council with the occupation certificate.

 

11.     A Fire Safety Certificate must be submitted to Council prior to the issuing of an Occupation Certificate, in accordance with the requirements of the Environmental Planning and Assessment Regulation 2000.

 

A single and complete Fire Safety Certificate must be provided which includes details of all of the fire safety measures contained in the building and as detailed in the fire safety schedule attached to the Construction Certificate.

 

Prior to issuing any Occupation Certificate the Principal Certifying Authority must be satisfied that all of the relevant fire safety measures have been included and are sufficiently detailed within the Fire safety Certificate.

 

A copy of the fire safety certificate must be displayed in the building near the entrance and a copy must be forwarded to the NSW Fire Brigades.

 

12.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

13.     A Certificate prepared by a professional engineer shall be submitted to the certifying authority (and the Council) prior to issuing an occupation certificate which certifies that the structural adequacy of the new building works.

 

14.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and (except as detailed below) between 8.00am to 5.00pm on Saturdays.

 

All building, demolition and associated site works are strictly prohibited on Sundays, Public Holidays and also on Saturdays adjacent to a Public Holiday.

 

15.     The existing levels of fire and safety within the building are to be upgraded in accordance with the following requirements and the fire safety certificate provisions of Part 9 of the Environmental Planning and Assessment Regulation 2000 must be complied with, prior to issuing an occupation certificate and lawful use of the lower ground level (unit 7) as a habitable area or occupation:

 

a)  The fire safety upgrading works required under Councils Fire Safety Order, dated 30th July 2010 in relation to the subject premises are to be implemented in accordance with the order.

 

b)  The following works are to be undertaken in accordance with the specified provisions of the Building Code of Australia (BCA):

 

1)    Provide a ceiling having a resistance to the incipient spread of fire to the space above of not less than 60 minutes, throughout the lower ground floor area (Unit 7) including storerooms.

 

2)    The storerooms are not to be used for habitable purposes.

 

3)    Install a smoke detection and alarm system in the sole occupancy unit in accordance with specification E2.2a of the BCA,

 

c)  All new building works must satisfy the relevant performance or deemed-to-satisfy provisions of the Building Code of Australia.

 

d)  All of the fire safety upgrading works and new building work must be detailed in the Construction Certificate for the development.

 

16.     The fire safety upgrading works must be carried out prior to issuing of an Occupation Certificate for the development and written confirmation must be provided to Council (from the Principal Certifying Authority) which confirms that all of the upgrading works have been carried out in accordance with the conditions of consent.

 

Health and Safety

 

17.     The storeroom at the rear of the kitchen/lounge to the lower ground floor unit must only be used for storage purposes as there is insufficient light and ventilation and it does not comply with Clauses F4.2 (natural light) and F4.6 (natural ventilation) of Volume 1 of BCA 2010.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

18.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

19.     Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

Advisory Conditions

 

A1      It is suggested that the applicant engage the services of a Level 1 Accredited Certifier in order to assess if the new sole occupancy unit (ie Unit 7) complies with the performance based requirements of Section C (fire resistance) of Volume 1 of BCA 2010 prior to the issue of the Construction Certificate.   

 

A2      The bedroom, located between the kitchen and the bathroom, may not comply with the requirements of Clauses F4.2 and F4.6 of Volume 1 of BCA 2010. It is suggested that a report be obtained from a Level 1 Accredited Certifier to ensure compliance with the deemed to satisfy solutions or performance provisions for the Building Code of Australia (BCA) prior to the issue of the Construction Certificate:

 

MOTION: (Andrews/Nash) CARRIED – SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Smith

Councillor Belleli

 

Councillor Bowen

 

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Stevenson

 

Councillor Tracey

 

Councillor White

 

Councillor Woodsmith

 

Total (12)

Total (1)

 

 

 

CP89/10   Director City Planning Report - 97-99 Anzac Parade, Kensington  (DA/562/2010)

728/10

RESOLUTION: (Belleli/Andrews) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 562/2010 for use of the first floor and part of the ground floor of the existing premises as a commercial kitchen with associated office area, at No. 97-99 Anzac Parade, Kensington, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered DA00 and DA010 dated 4/7/10 and received by Council on 19 July 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

2.       The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

3.       The proposed use of the premises and the operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the premises and plant and equipment shall not give rise to a sound pressure level at any affected premises that exceeds the background (LA90), 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A).  The source noise level shall be assessed as an LAeq, 15 min and adjusted in accordance with the NSW Environmental Protection Authority’s Industrial Noise Policy 2000 and Environmental Noise Control Manual (sleep disturbance).

 

4.       A report, prepared by a suitably qualified and experienced consultant in acoustics, shall be submitted to the Council one month after commencement of use for the development, which demonstrates and certifies that the  noise and vibration emissions from the operation of the entire premises and the attenuation measures comply with acoustic report prepared by Acoustic Logic titled 4/97-103 Anzac Parade, Kensington DA Acoustic Assessment project  number  2010845, the relevant provisions of the Protection of the Environment Operations Act 1997, NSW Environmental Protection Authority Noise Control Manual & Industrial Noise Policy and conditions of Council’s approval, to the satisfaction of Council’s Manager Environmental Health & Building Services.

 

5.       The following noise attenuation measures recommended in acoustic report prepared by Acoustic Logic titled 4/97-103 Anzac Parade, Kensington DA Acoustic Assessment project  number  2010845  shall be complied with:

 

·      Install a 2metre high acoustic screen to the west and south of level 1 balcony housing the hoist and kitchen air-conditioning condenser. This barrier may be constructed of colour bond, fibre cement sheet, Perspex or toughened glass. Two nominal 20mm diameter drainage holes are permitted in the corners, otherwise the screen shall be gap free;

·      Line the underside of the hoist awning with 50mm thick Bradford Ultraphon or equivalent;

·      Line the inside of the acoustic screen (except Perspex) with 50mm thick Bradford Ultraphon or equivalent;

·      Roof top Plant is acoustically acceptable for 24 hour operation without additional treatment.

 

Details of compliance with recommended acoustic attenuation measures shall be submitted to the certifying authority and form part of construction certificate plans .

 

Service Authority Conditions

The following conditions are applied to provide adequate consideration for service authority assets:

 

6.       The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required. The applicant must make the necessary arrangements with the service authority.

 

Operational Matters

 

7.       The business premises must only operate within the following hours:

 

The Office and Kitchen:  6am to 12 midnight, seven (7) days per week.

Food preparation:          between 6am to 6pm, seven (7) days per week.

 

8.       Staff members are limited to a maximum of 25 on-site at any one time.

 

ADVISORY MATTERS:

 

A1    Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A4      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

CP90/10   Director City Planning Report - 26 Canara Avenue, Philip Bay (DA/446/2010)

729/10

RESOLUTION: (White/Belleli) that this application be deferred to the next available meeting at the request of the applicant in order to hold further discussions with Council officers.

 

MOTION: (White/Belleli) CARRIED - SEE RESOLUTION.

 

 

The DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

 

FOR

AGAINST

Councillor Andrews

Councillor Smith

Councillor Belleli

Councillor Tracey

Councillor Bowen

Councillor Woodsmith

Councillor Matson

 

Councillor Matthews

 

Councillor Nash

 

Councillor Notley-Smith

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Stevenson

 

Councillor White

 

Total (11)

Total (3)

 

 

 

CP91/10   Director City Planning Report - 133 Barker Street, Randwick (DA/519/2010)

730/10

RESOLUTION: (Belleli/Andrews) -

 

A.       That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20E of the Randwick Local Environmental Plan 1998 (Consolidation), relating to the landscaped area, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.       That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 519/2010 for alterations and additions to an existing semi-detached building, including construction of a first floor level containing a 2-bedroom dwelling, installation of a canopy structure over the rear section of the driveway, demolition of the existing shed at the rear of the site and associated site works, and retention of the existing health consulting practice at the ground floor level, at No. 133 Barker Street, Randwick, subject to the following conditions:

 

Conditions of Consent

 

The following conditions are applied to satisfy the provisions of Section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the following plans:

 

Plan Number

Dated

Received

Prepared By

DA01(B)

October 2010

19 October 2010

Allan Nicholls Architectural Design and Management

DA02(A)

October 2010

19 October 2010

 

the application form and any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent residential development to maintain the integrity and amenity of the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule, brochure/s or sample board) are to be submitted to, and approved by, Council’s Director of City Planning, in accordance with Section 80A(2) of the Environmental Planning and Assessment Act 1979 prior to a Construction Certificate being issued for the relevant building works.

 

The above information is to include details of the materials and finishes of the following:

·    External walls

·    Roof

·    Awning

·    Window and door frames

·    Balcony balustrades

·    Downpipes and gutters

 

3.       Revised architectural drawings indicating the accurate property boundaries of the site and reference levels (to AHD) of the roof ridge, gutters, finished floor levels of the ground and first storeys, and awning structures, shall be submitted with the Construction Certificate application to the satisfaction of the Council or Accredited Certifier. The above data shall be based on a detailed survey plan prepared by a registered surveyor.

 

4.       The following changes shall be made to the proposed car parking design:

 

(i)  The proposed car spaces numbered 1, 2, 3 and 6 as shown on the approved plans shall be DELETED.

 

(ii) Car spaces numbered 5 and 7 shall be allocated for the exclusive use of the staff of the health consulting practice during its opening hours. Suitable line-marking and signposting are to be provided to indicate the above.

 

(iii) Car space numbered 4 shall be allocated for use by the patients / visitors of the health consulting business. Suitable line-marking and signposting are to be provided to indicate the above.

 

Details demonstrating compliance are to be incorporated in the Construction Certificate documentation.

 

5.       All car parking spaces shall have dimensions of 5.5m (length) x 2.5m (width).

 

6.       A minimum of two (2) bicycle parking spaces are to be provided within the development site. The design and construction of bicycle parking facilities are to be compliant with Australian Standard 2890.3 - Bicycle parking facilities. Details demonstrating compliance are to be incorporated in the Construction Certificate application.

 

7.       The existing single-storey shed at the rear of the site shall be demolished as part of the proposed development.

 

8.       Landscaping shall be provided to the site to enhance its amenity and reduce the impact of the development upon the neighbouring properties and the streetscape. In particular, suitable soft landscaping (that is, grass, shrub and/or tree planting) shall be provided at the rear section of the site to the north of car space number 7.

 

9.       A landscape plan prepared by a qualified landscape architect or designer shall be submitted to, and be approved by, the Director of City Planning, in accordance with Section 80A(2) of the Environmental Planning and Assessment Act 1979, prior to a Construction Certificate being issued. The plan shall demonstrate compliance with the relevant conditions of this consent relating to landscaping requirements.

 

10.     The landscaped areas should contain a predominance of species that require minimal watering once established or species with water needs that match rainfall and drainage conditions.

 

11.     The landscaping provision shall be installed in accordance with the approved documentation prior to the issue of any interim / final occupation certificate, and the landscaping is to be maintained in accordance with the approved plans and specifications.

 

12.     Appropriate waste storage areas for both the health consulting business and the residential dwelling are to be provided within the subject development site.

 

The waste storage areas are to be provided behind the front building line and must not obstruct the movement of vehicles entering and exiting the site.

 

Appropriate enclosure structures are to be installed so that the waste bins associated with the health consulting practice will not be accessible by the residents of the dwelling.

 

Details demonstrating compliance are to be incorporated in the Construction Certificate documentation.

 

13.     The proposed privacy screens on the side elevations of the first floor rear balcony (adjacent to Bedroom 1) shall have a minimum height of 1800mm as measured from the finished floor level. The screens shall be constructed with 30mm wide timber slats, horizontally positioned, and spaced at a maximum of 25mm; or another appropriate design that effectively restricts cross-viewing into the adjoining residential properties. Details demonstrating compliance are to be incorporated in the Construction Certificate documentation.

 

14.     The following windows are to be constructed with obscured / translucent glazing:

 

a.  First floor bathroom window on the western elevation of the building; and

b.  Stairwell window on the western elevation of the building.

 

Details demonstrating compliance with the above requirements are to be incorporated in the Construction Certificate documentation.

 

15.     The reflectivity index of glass used in the external façades of the proposed development must not exceed 20 percent.

 

16.     Street numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the proposed development.

 

17.     Any proposed fences on the side or rear boundaries of the site shall not exceed a maximum height of 1800mm, as measured above the existing ground levels.

 

On sloping sites or at changes in ground levels, the maximum height of the fence may exceed the abovementioned specified height by up to 150mm maximum adjacent to any required ‘step-downs’ or changes in ground level.

 

The applicant and owner are advised that the relevant provisions of the Dividing Fences Act 1991 are to be satisfied accordingly and any necessary approvals or agreements are to be obtained from the owner/s of the adjoining land beforehand.

 

18.     There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

19.     No goods, machinery or advertising signs (including A-frame signs) are to be placed on Council’s footway at any time.

 

The following conditions are applied to ensure the health consulting business is operated in a proper manner:

 

20.     A maximum of one (1) health care practitioner (e.g. medical doctor) may operate at the premises at any one time.

 

21.     A maximum of three (3) staff members, including the health care practitioner, may be present at the premises at any one time.

 

22.     The hours of operation of the subject health consulting business are restricted to:

9:00am to 6:00pm, Monday to Friday only.

 

The premises shall not be opened to the patients / visitors outside the above approved operation hours.

 

The following condition is applied to meet additional demand for public infrastructure:

 

23.     In accordance with Council’s Section 94A Development Contributions Plan, effective from 2 July 2007, based on the development cost of $300,000, the following applicable monetary levy must be paid to Council: $3,000.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contributions Plan may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following condition is imposed to promote ecologically sustainable development and energy efficiency:

 

24.     In accordance with the provisions of the Environmental Planning and Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

The following conditions are applied to ensure that the development satisfies relevant legislative requirements and to provide adequate levels of health, safety and amenity:

 

Building Regulation & Construction Work

 

25.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times. Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

26.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA) Volume One.  Details of compliance are to be provided in the construction certificate.

 

27.     Prior to the commencement of any building, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

28.     Prior to the commencement of any building or ‘fit-out’ works, the person having the benefit of the development consent must:-

 

·       appoint a Principal Certifying Authority for the building work, and

·       appoint a principal contractor for the building work and notify the Principal Certifying Authority and Council accordingly in writing, and

·       notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

·       give at least two days notice to the Council, in writing, of the person’s intention to commence building works.

 

29.     The works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

30.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation or use of the development encompassed in this development consent, in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon and must also be provided to Council with the occupation certificate.

 

31.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority (or other suitably qualified person), which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

32.     A Fire Safety Certificate must be submitted to Council prior to the issuing of an Occupation Certificate, in accordance with any applicable requirements of the Environmental Planning and Assessment Regulation 2000.

 

The Fire Safety Certificate must include details of all of the fire safety measures contained in the building as detailed in the fire safety schedule attached to the Construction Certificate.

 

Prior to issuing any Occupation Certificate the Principal Certifying Authority must be satisfied that all of the relevant fire safety measures have been included and are sufficiently detailed within the Fire safety Certificate. A copy of the fire safety certificate must be displayed in the building near the entrance and a copy must be forwarded to the NSW Fire Brigades.

 

An annual Fire Safety Statement is also required to be submitted to the Council and the NSW Fire Brigades, each year after the date of the Fire Safety Certificate, in accordance with the Environmental Planning & Assessment Regulation 2000.

 

33.     Any required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

34.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of any relevant Certificate of Insurance) must be provided to the Principal Certifying Authority and Council prior to commencement of works.

 

35.     New building work and fire safety works are to be carried out in accordance with the relevant provisions of the Building Code of Australia (BCA) and details are to be included in the Construction Certificate, to the satisfaction of the Certifying Authority.

 

36.     In existing buildings, the following works are to be carried out to ensure minimum levels of fire safety:-

 

a)     Any new or replacement ceilings walls and floor linings and doorways are required to satisfy the relevant requirements of the Building Code of Australia.

 

b)     Any residential parts of the building must be provided with a smoke detection and alarm system, in accordance with the relevant provisions of the Building Code of Australia.

 

c)     The residential parts of the building are to be suitably fire-separated from the commercial area encompassed in the development application or, alternatively, provide an interconnected smoke detection and alarm system between the separate occupancies.

 

Details of the above works are to be provided in the construction certificate, to the satisfaction of the Certifying Authority.

 

37.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Additional requirements for all development, except for single residential dwellings

·   Saturdays and Sundays before or after a public holiday - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

38.     Public health, safety and convenience must be maintained at all times during demolition and building works and the following requirements must be complied with at all times (as applicable):

 

a)     Demolition work must be carried out in accordance with Australian Standard, AS2601 (2001) - The Demolition of Structures and a Demolition Work Plan is required to developed and implemented to the satisfaction of the Principal Certifying Authority prior to commencing any demolition works.

 

b)     The demolition, removal, storage and disposal of any materials containing asbestos must be carried out in accordance with the relevant requirements of WorkCover NSW, Council’s Asbestos Policy and the following requirements:

 

·         A licence must be obtained from WorkCover NSW for the removal of friable asbestos and or more than 10m2  of bonded asbestos (i.e. fibro)

·         Asbestos waste must be disposed of in accordance with the Protection of the Environment Operations Act 1997 & relevant Regulations

·         A sign must be provided to the site/building stating “Danger Asbestos Removal In Progress”

·         A Clearance Certificate or Statement must be obtained from a suitably qualified person (i.e. Occupational Hygienist) upon completion of the asbestos removal works, which is to be submitted to the Principal Certifying Authority and Council prior to issuing an Occupation Certificate.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

c)     A sign must be provided and maintained in a prominent position, which contains the following details:

·     name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours,

·     name, address and telephone number of the Principal Certifying Authority,

·     a statement stating that “unauthorised entry to the work site is prohibited”.

 

d)     The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, trip hazards, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

e)     Building materials, sand, soil, waste materials, construction equipment or other materials or articles must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

f)     Bulk bins, waste containers or other articles must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container or other articles in a public place can be made to Council’s Building Services section.

 

g)     During demolition and construction, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council.

 

h)     Details of the proposed sediment control measures are to be detailed in the site management plan which must be submitted to the Principal Certifying Authority and Council prior to the commencement of any site works.  The sediment and erosion control measures must be implemented prior to the commencement of any site works and be maintained throughout construction.  A copy of the plan is to be maintained on-site and be made available to Council officers upon request.

 

i)      Public safety must be maintained at all times and public access to any demolition and building works, materials and equipment on the site is to be restricted. If necessary, a temporary safety fence or hoarding (having a minimum height of 1.5m) is to be provided to protect the public. Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible. If necessary, an overhead (B Class type) hoarding may need to be provided to protect the public.

 

If it is proposed to locate any site fencing, hoardings or items upon any part of the footpath, nature strip or any public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services department beforehand. Details and plans are to be submitted with the application, together with payment of the weekly charge in accordance with Council’s adopted Pricing Policy.

 

j)      A Road / Asset Opening application must be submitted to and be approved by Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of an occupation certificate for the development. For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

39.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant provisions of the Protection of the Environment Operations Act 1997 must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise and Vibration Management Plan, prepared in accordance with the DECC Construction Noise Guideline, by a suitably qualified person is to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the plan must be provided to the Council and Principal Certifying Authority prior to the commencement of site works.

 

Environmental health & amenity

 

40.     The use and operation of the premises shall not give rise to an environmental health or public nuisance, cause a vibration nuisance or, result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

41.     The proposed use of the premises and the operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the premises and plant and equipment shall not give rise to a sound pressure level at any affected premises that exceeds the background (LA90), 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A).  The source noise level shall be assessed as an LAeq, 15 min and adjusted in accordance with the NSW DECC/EPA Industrial Noise Policy 2000 and Environmental Noise Control Manual (sleep disturbance).

 

42.     In relation to buildings provided with plant and equipment (e.g. air-conditioners, mechanical ventilation/exhaust systems or refrigeration motors etc), a report must be obtained from a suitably qualified and experienced consultant in acoustics, prior to an occupation certificate being issued for the development, which demonstrates and certifies that noise and vibration from the development satisfies the relevant provisions of the Protection of the Environment Operations Act 1997, NSW EPA/DECC Noise Control Manual & Industrial Noise Policy, Council’s conditions of consent (including any relevant approved acoustic report and recommendations), to the satisfaction of Council.  The assessment and report must include all relevant fixed and operational noise sources and a copy of the report must be provided to Council prior to/upon issuing an occupation certificate.

 

 

Waste Management

 

43.     Adequate provisions are to be made within the premises for the storage, collection and disposal of trade/commercial waste and recyclable materials, to the satisfaction of Council.

 

Trade/commercial waste materials must not be disposed in or through Council’s domestic garbage service.  All trade/commercial waste materials must be collected by Council’s Trade Waste Service or a waste contractor authorised by the Waste Service of New South Wales and details of the proposed waste collection and disposal service are to be submitted to Council prior to commencing operation of the business.

 

The operator of the business must also arrange for the recycling of appropriate materials and make the necessary arrangements with an authorised waste services contractor accordingly.

 

Services

 

44.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If the proposed works are suitable, the plans will be appropriately stamped by Sydney Water or their Agent.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority is required to ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans prior to the commencement of any building works.

 

Civil Works Conditions

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

45.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

46.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Service Authority Conditions

The following conditions are applied to provide adequate consideration for service authority assets:

 

47.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

48.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

Drainage Conditions

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

49.     Stormwater runoff from the redeveloped portion of the site shall be discharged to the kerb and gutter along the site frontage by gravity (without the use of a charged system).

 

Waste Management Conditions

The following conditions are applied to provide adequate provisions for waste management:

 

50.     Prior to the Principal Certifying Authority issuing an occupation certificate for the proposed development the applicant is to contact Council’s Manager of Waste in regards to meeting Council’s requirements for waste services to the new residence.

 

Advisory

 

A1      The assessment of this development application does not include an assessment of the proposed building work under the Building Code of Australia (BCA).

 

All new building work must comply with the BCA and relevant Australian Standards and details of compliance must be provided in the Construction Certificate application.

 

A2      In existing buildings, the levels of fire and occupant safety should be upgraded where necessary and details should be incorporated in the Construction Certificate to the satisfaction of the Certifying authority.

 

Where the levels of accessibility to existing buildings do not meet current standards, if practicable, the level of accessibility should also be upgraded in conjunction with the proposed development (e.g. provision of a disabled sanitary facility) and details included in the construction certificate application.

 

Building owners, applicants and builders are advised to liaise with the appointed Certifying Authority prior to lodgement of the Construction Certificate.

 

A3      The applicant/owner is advised that this approval does not guarantee compliance with the provisions of the Disability Discrimination Act 1992 and the applicant should therefore consider their liability under the Act.  In this regard, the applicant is advised that compliance with the requirements of the Building Code of Australia and Australian Standard 1428.1 - Design for Access and Mobility does not necessarily satisfy the objectives of the Disability Discrimination Act 1992.

 

The applicant/owner is requested to give consideration to providing access and facilities for people with disabilities in accordance with Australian Standard 1428 Parts 1, 2, 3 and 4 - Design for Access and Mobility, which may be necessary to satisfy the objectives of the Disability Discrimination Act 1992.

 

A4      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

CP92/10   Director City Planning Report - 42 Moverly Road, Maroubra (DA/812/2010)

731/10

RESOLUTION: (Belleli/Andrews) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F of the Randwick Local Environmental Plan 1998 (Consolidation), relating to Floor Space Ratio, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/812/2010 for the demolition of an existing shed and construction of a new shed on the eastern side of the dwelling, at No. 42 Moverly Road, Maroubra, subject to the following conditions:

 

1.      The development must be implemented substantially in accordance with the plans numbered 1 of 3 through to 3 of 3, dated August 2010 and received by Council on 21 September 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.      The external materials, colours and finishes of the shed are required to match, as closely as possible, the existing building.

 

3.      Metal roof sheeting is to be pre-painted (e.g. colourbond).

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

4.      All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

5.      Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

If required, absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

6.      External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

7.      The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

8.      In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

9.      Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

10.    The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

11.    A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·          name, address and telephone number of the Principal Certifying Authority; and

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

12.    In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

13.    An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

14.    The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·          Occupational Health and Safety Act 2000 & Regulations

·          WorkCover NSW Guidelines & Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

15.    A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council, not less than 2 days before commencing such works.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

16.    Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy (adopted 13 September 2005)

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the principal certifying authority immediately upon completion of the asbestos related works, which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

17.    All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

If required, retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

If required, retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

18.    In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

 

b)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

19.    Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

20.    Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, is required to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of site works.

 

The Construction Noise Management Plan is to be prepared in accordance with the relevant provisions of the DECC Construction Noise Guideline.

 

21.    Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

22.    A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing / hoardings to the perimeter of the site;

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction

·       details of methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·       construction noise and vibration management;

·       construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

23.    Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following conditions have been applied to ensure that adequate security provisions are made for vehicular access, parking and public infrastructure:

 

24.    A Road / Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

 

ADVISORY MATTERS:

 

A1      Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A1      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A2      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

CP93/10   Director City Planning Report - 10 Waratah Avenue, Randwick (DA/538/2010)

732/10

RESOLUTION: (Belleli/Andrews) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20E of Randwick Local Environmental Plan 1998, relating to Landscaped area on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 538/2010 for ground floor alterations to the existing semi-detached dwelling; with new terrace and swimming pool at rear; and part side boundary fencing at 10 Waratah Avenue, Randwick, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the amended plans numbered DA 01 to DA 04 (Issue B), dated 27/10/2010 and received by Council on the 27 October  2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the proposed building works are to be compatible with the existing building and adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

3.       Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work (this includes the wall on the eastern side of the rear terrace) will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

4.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

5.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

6.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $172,480 the following applicable monetary levy must be paid to Council: $862.40.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

7.       In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

8.       In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

9.       The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

10.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

11.     Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

12.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

13.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

14.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

15.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

16.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

17.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·          name, address and telephone number of the Principal Certifying Authority; and

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

18.     The relevant requirements of the Home Building Act 1989 must be complied with, in accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000.

 

Details of the Licensed Building Contractor (and a copy of any relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council prior to commencement of works.

 

19.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

20.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

21.     Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

22.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·          Occupational Health and Safety Act 2000 & Regulations

·          WorkCover NSW Guidelines & Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

23.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council, not less than 2 days before commencing such works.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

24.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy (adopted 13 September 2005)

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the principal certifying authority immediately upon completion of the asbestos related works, which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

25.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

26.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

b)     The condition referred to in subclause a) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

27.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·        excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·        new dwellings or additions to dwellings sited up to shared property boundaries (e.g. additions to a semi-detached dwelling or a terraced dwelling),

·        excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·            as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

28.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

29.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, is required to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of site works.

 

The Construction Noise Management Plan is to be prepared in accordance with the relevant provisions of the DECC Construction Noise Guideline.

 

30.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

31.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing / hoardings to the perimeter of the site;

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction

·       details of methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·       construction noise and vibration management;

·       construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

32.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

a.     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

33.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

34.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

35.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

36.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

37.     Prior to the issuing of a construction certificate the approved plans must be submitted to a Sydney Water Quick Check agent or Customer Centre to determine whether the development will affect any Sydney Water asset’s sewer and water mains, stormwater drains and/or easement, and if further requirements need to be met. Plans will be appropriately stamped.

 

         Please refer to the web site www.sydneywater.com.au for Quick Check agent details and Guidelines for Building Over/Adjacent to Sydney Water Assets.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

38.     All proposed footings located adjacent to the drainage easement within No.8 Waratah Avenue  shall either be:

A.      Founded on rock, or;

B.      Extend below a 30 degrees line taken from the level of the pipe invert     at the edge of the drainage reserve/easement (angle of repose).

Structural details demonstrating compliance with this condition shall be submitted with the construction certificate application.

The footings must be inspected by the applicant's engineer to ensure that these footings are either founded on rock or extend below the "angle of repose”. Documentary evidence of compliance with this condition is to be submitted to certifying authority, prior to proceeding to the subsequent stages of construction.

 

39.       Detailed drainage plans shall be submitted to and approved by the certifying authority prior to the issue of a construction certificate. The drainage plans shall demonstrate compliance with the conditions of this development approval.

 

40.     Stormwater runoff from the redeveloped portion of the site shall be discharged either:

 

1.       To the kerb and gutter along the site frontage by gravity (preferably without the use of a charged system); OR

 

2.       To Council’s underground drainage system by gravity (without the use of a charged system) along the site frontage.

 

3.       Through a private drainage easement(s) to Council’s kerb and gutter (or underground drainage system); OR

 

41.     Should a charged system be required to drain any portion of the site, the charged system must be designed with suitable clear-outs/inspection points at pipe bends and junctions.

 

         NOTE: The amount of head in the charged line shall not exceed 1.0m in depth.

 

42.     Should the site discharge to Council’s underground drainage system (option b) a reflux valve shall be provided (within the site) over any pipelines discharging from the site to ensure that stormwater from Council drainage system does not surcharge back into the site stormwater system.

 

43.     Should a pump system be required to drain any portion of the site the system must be designed with a minimum of two pumps being installed, connected in parallel (with each pump capable of discharging at the required discharge rate) and connected to a control board so that each pump will operate alternatively. The pump wet well shall be sized for the 1 in 100 year, 2 hour storm assuming both pumps are not working.

 

The pump system must also be designed and installed strictly in accordance with Randwick City Council's Stormwater Code.

 

All pump out water must pass through a stilling pit prior to being discharged by gravity to the kerb and gutter.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

44.     That part of the nature-strip upon Council's footway which is damaged during the construction of the proposed works shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

45.     A landscape plan prepared by a qualified professional in the Landscape/Horticultural industry (must be a registered member of either AILDM or AILA) shall be submitted to, and be approved by, the PCA, prior to the commencement of any site works, and must detail the following:

 

a.   A Planting Plan & Plant Schedule which includes proposed species, botanic and common names, pot size at the time of planting, quantity, location, dimensions at maturity, maintenance practices (hedging, shaping etc), as well as any other landscape details to describe the proposed works;

 

b.   In order to prevent overlooking into neighbouring properties from the elevated deck/pool surrounds, species provided within the raised planter shown along the eastern and southern boundaries must be those which will achieve a minimum height of 1.8 metres above the water level of the pool.

 

46.     Approval is granted for removal of the following trees as part of the proposed works:

 

·              A Pseudoacacia species (Robinia), Tibouchina granulosa (Lasiandra), Olea europaea (Olive Tree) and two Pittosporum variegatum (Native Daphne’s), all in the rear yard, due both to inappropriate location and over-crowding, as well as to accommodate the proposed pool a shown.

 

NOTE: Separate approval has already been granted for the removal of these same trees as part of TA/265/2010; however, this only lasts for 12 months (June 2011). The approval contained in this consent relates directly to the proposed development, and lasts for 5 years from the date of determination.

 

47.     In order to ensure retention of the Archontophoenix cunninghamiana (Bangalow Palm) and Dypsis lutescens (Golden Cane Palm) located in the rear yard, along the western boundary in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the Construction Certificate application must show their retention, with the position and diameter of both their trunks and canopies to be clearly shown on all drawings.

 

b.       Any excavations associated with any new services, pipes, stormwater systems or similar in the rear yard, must be setback a minimum distance of 2 metres of their trunks at ground level so as to minimise root damage.

 

c.       These two palms must be physically protected by installing a total of four star pickets at a setback of 1 metre to their north, east and south (measured off the outside edge of their trunks at ground level), matching up with the western site boundary, to which shade cloth, safety tape/para-webbing or similar shall be permanently attached so as to completely enclose these two palms as one group for the duration of works.

 

d.       This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

e.       Within the TPZ, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble.

 

f.        Any roots encountered during the course of the approved works must be cut cleanly by hand, and the affected area backfilled with clean site soil as soon as practically possible.

 

ADVISORY MATTERS:

 

A1    Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A4      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

CP94/10   Director City Planning Report - 65 Earl Street , Randwick (DA/608/2010)

733/10

RESOLUTION: (Woodsmith/Tracey) that the application be deferred for mediation and the applicant consider increasing the southern side setback on the first floor to 1.5 metres.

 

MOTION: (Woodsmith/Tracey) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Bowen

Councillor Andrews

Councillor Matson

Councillor Belleli

Councillor Nash

Councillor Matthews

Councillor Notley-Smith

Councillor Seng

Councillor Procopiadis

Councillor Stevenson

Councillor Smith

Councillor White

Councillor Tracey

 

Councillor Woodsmith

 

 

 

Total (8)

Total (6)

 

 

 

CP95/10   Director City Planning Report - 86 Dudley Street, Coogee (da/452/2010)

734/10

RESOLUTION: (Belleli/Andrews) -

 

A.       That Council, as the consent authority, refuse development consent under Section 80 of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/452/2010 for  demolition of existing dwelling and construction of a three storey residential flat building containing 6x2 bedroom units; and basement parking for 9 vehicles, at No. 86 Dudley Street, Coogee, for the following reasons:

 

1.       The proposal does not maintain the desirable height and separation characteristics of the streetscape and is likely to have an adverse impact on the amenity of existing residents. The proposal does not satisfy the 2C Residential Zone objectives specified in Clause 12 Randwick Local Environmental Plan 1998.

 

2.       The proposal has a floor space ratio of 0.89:1 and exceeds the maximum development standard of 0.65:1 specified in Clause 20F of Randwick Local Environmental Plan 1998. The proposal has an adverse impact on the aesthetic character and environmental amenity of the area and does not satisfy the purpose for the standard. The accompanying objection to the development standard is not well founded as required by Clause 7 of State Environmental Planning Policy No 1 – Development Standards.

 

3.       The proposal has an external wall height of up to 11.8m and exceeds the maximum development standard of 10m specified in Clause 20G of Randwick Local Environmental Plan 1998. The proposal has an adverse impact on the aesthetic character and environmental amenity of the area and does not satisfy the purpose for the standard. The accompanying objection to the development standard is not well founded as required by Clause 7 of State Environmental Planning Policy No 1 – Development Standards.

 

4.       The proposal does not address comments from the Randwick Waverly Design Review Panel about the configuration of the stair, location of the lift and relationship of the central courtyard to other landscaping. The proposal therefore does not satisfy the design principle for Built Form specified in Clause 11 of State Environmental Planning Policy No 65 –Design Quality of Residential Flat Buildings.

 

5.       The subject site has a frontage of 10.93m and does not meet the preferred solution for lot frontage of 20m specified in Clause 3.1 of the Randwick Multi-Unit Housing Development Control Plan. The site does not allow for the satisfactory siting of the building or ensure adequate separation between buildings and therefore does not satisfy the performance requirements for the preferred solution.

 

6.       The proposal has a minimum side boundary setback of 1.45m and a minimum average side boundary setback of 2.04m. The proposal does not meet the minimum preferred solutions of 3.5m and 5m specified in Clause 3.3 of the Randwick Multi Unit Housing Development Control Plan. The building does not achieve adequate separation from neighbouring buildings and adversely impacts on the streetscape and the neighbour’s amenity and therefore does not satisfy the performance requirements for the preferred solution.

 

7.       The likely overshadowing from the proposed development is poorly demonstrated and does not allow a full impact assessment against the objectives and performance requirements for solar access, building height, density and boundary setbacks in the Randwick Multi-Init Housing Development Control Plan. Overshadowing at 88 Dudley Street is likely to be severe and a major hindrance to its redevelopment.

 

8.       The proposal is likely to result in the isolation of the adjoining lot at 88 Dudley Street, Coogee. The proposal was not accompanied by information sufficient to establish that reasonable attempts were made to consolidate and develop the lots together.

 

9.       The proposal requires the removal of trees at 88 Dudley Street and there is no consent from the affected land owner.

 

10.     The proposal has an internal driveway gradient of approximately 1:6 for the first 3.4m into the site and this is inadequate to allow an appropriate waiting bay for a vehicle leaving the site.

 

11.     The development application was not accompanied by the landowners consent as required by Clause 49 of Environmental Planning and Assessment Regulation 2000.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

 

CP96/10   Director City Planning Report - 44 Prince Edward Street, Malabar (DA/390/2010)

735/10

RESOLUTION: (White/Belleli) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, to Development Application No. DA/390/2010 for demolition of the existing dwelling and construction of a new 3 level dwelling with garage, retention of existing pool and associated works at 44 Prince Edward St, Malabar subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered 1 and 2, stamped received by Council 25 August 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

3.       The foyer windows in the north west elevation must be installed with a fixed external privacy screen or frosted or other obscure glass to a height of at least 1.5m above the floor level. Design details must be shown on the Construction Certificate plans.

 

4.       The formal living and kitchen windows in the south east elevation must be installed with a fixed external privacy screen or frosted or other obscure glass to a height of at least 1.5m above the floor level. Design details must be shown on the Construction Certificate plans.

 

5.       The balcony off the formal living room must be installed with a fixed privacy screen or frosted or other obscure glass balustrade to a height of 1.5m above the level of the balcony in the south east elevation. Design details must be shown on the Construction Certificate plans.

 

6.       The balcony of the master bedroom and bedroom 2 must be installed with a fixed privacy screen or frosted or other obscured glass balustrade to a height of 1.5m above the level of the balcony on the south east and north west elevation. Design details must be shown on the Construction Certificate plans.

 

7.       The front boundary garden and wall treatment must be at least 50% open for the upper two-thirds of its 1.8m height. Design details must be shown on the Construction Certificate plans.

 

8.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

9.       Street numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the development.

 

10.     The finished ground levels external to the building are to be consistent with the development consent and are not to be raised (other than for the provision of approved paving or the like on the ground) without the written consent of Council.

 

11.     External lighting to the premises shall be designed so as not to cause a nuisance to nearby residents.

 

12.     No cooking facilities or sanitary fittings other than those indicated on the approved plans are to be installed in the premises without the prior written consent of the Council.

 

13.     Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

The following condition/s are imposed to satisfy the requirements of the Sydney Water Corporation.

 

14.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

15.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $489,500.00, the following applicable monetary levy must be paid to Council: $4,895.00

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

16.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

17.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

18.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

19.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

20.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

21.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

22.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

23.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

24.     The building works must be inspected by the Principal Certifying Authority (or other certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

25.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·        name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·        name, address and telephone number of the Principal Certifying Authority,

·        a statement stating that “unauthorised entry to the work site is prohibited”.

 

26.     The relevant requirements of the Home Building Act 1989 must be complied with, in accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000.

 

Details of the Licensed Building Contractor (and a copy of any relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council prior to commencement of works.

 

27.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

28.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

29.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority or other suitably qualified person, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

30.     Smoke alarms must be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance with the provisions of the Building Code of Australia must be included in the plans / specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

31.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change and Randwick City Council policies, including:

 

·          Occupational Health & Safety Act 2000 & Regulations

·          WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·          WorkCover NSW Guidelines and Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

32.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Demolition Work Plan must include the following information (as applicable):

 

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

33.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy (adopted 13 September 2005)

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

34.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

35.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

36.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

 

b)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

37.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

38.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared by a suitably qualified person is to be implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

The Construction Noise Management Plan is to be prepared in accordance with the NSW DECC Construction Noise Guideline.

 

39.     A Registered Surveyor’s check survey certificate or compliance certificate is to be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority:

 

·        prior to construction of the footings or first completed floor slab (prior to the pouring of concrete),

·        upon completion of the building, prior to issuing an occupation certificate.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority.  

 

40.     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

41.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

42.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works. The site management plan must include the following measures, as applicable to the type of development:

 

·      location and construction of protective fencing/hoardings to the perimeter of the site;

·      location of site storage areas/sheds/equipment;

·      location of building materials for construction;

·      provisions for public safety;

·      dust control measures;

·      site access location and construction

·      details of methods of disposal of demolition materials;

·      protective measures for tree preservation;

·      provisions for temporary sanitary facilities;

·      location and size of waste containers/bulk bins;

·      details of proposed sediment and erosion control measures;

·      construction noise and vibration management;

·      construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council.  A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

43.     Sediment and erosion control measures must be provided in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

44.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)       Building materials, sand, soil, waste materials, construction equipment or5 other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

a)       Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

b)       Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)       Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)       Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following conditions are applied to ensure compliance with the Swimming Pools Act 1992 and to maintain public safety and amenity:

 

45.     Swimming pools are to be provided with childproof fences and self-locking gates, in accordance with the Swimming Pools Act 1992 and regulations.

 

The swimming pool is to be surrounded by a fence having a minimum height of 1.2m, that separates the pool from any residential building situated on the premises and from any place (whether public or private) adjoining the premises; and that is designed, constructed and installed in accordance with AS 1926.1 - 2007.

 

Gates to pool area shall be a maximum width of 1 metre, and be self-closing and latching; the gate is required to open outwards from the pool area and prevent a small child opening the gate or door when the gate or door is closed.

 

Temporary pool safety fencing is to be provided pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

A ‘warning notice’ must be erected in a prominent position in the immediate vicinity of the swimming pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

46.     The installation of rainwater tanks shall comply with the following noise control requirements:-

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tank(s) are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with the rainwater tank(s)  are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

●        before 8.00am or after 8.00pm on weekends or public holiday; or

●        before 7.00am or after 8.00pm on weekdays.

 

The following conditions are applied to ensure that adequate provisions are made for the management of waste from the development:

 

47.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council and details are to be included in the construction certificate documentation.

 

48.     A demolition and construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council, prior to the commencement of works.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

49.     The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $1000.00   -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

·      A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

·      Completion of the civil works as conditioned in this development consent by Council.

·      The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

50.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)  Construct concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site.

 

b)  Remove any redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

 

51.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

52.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

53.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

54.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

55.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $536.00 calculated at $44.00 (inclusive of GST) per metre of site frontage. This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

56.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

57.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

58.     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any public utility service works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

59.     Generally all site stormwater shall be piped to a sediment/silt arrester pit that drains to an infiltration area with a minimum 5 m2 base area. An overflow pipe shall be provided from the silt arrestor pit to drain to Council's kerb and gutter.

 

The location and details of the proposed internal stormwater pipelines, silt arrestor pit and the infiltration area shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the plans shall be forwarded to Council, prior to a construction certificate being issued, if Council is not the certifying authority.

 

Notes:

 

a.   The sediment/silt arrestor pit shall be constructed:-

 

i.        within the site at or near the street boundary.

i.        with a child proof and corrosion resistant fastening system (e.g. spring loaded jay-bolt).

ii.       with a minimum of 4 x 90 mm diameter weep holes (preferably located in the walls of the pit at the floor level) and with a suitable geotextile material with a high filtration rating located around the weep holes.

iii.       with the pit floor being a minimum 300mm below the invert level of the outlet pipelines.

iv.      with a galvanised heavy duty screen (Lysaght RH3030 Maximesh or similar) located over the outlet pipes draining to the infiltration pit and the kerb. (Similar to a Mascot GRC stormwater discharge control pit, product code DS3SDC).

 

b.  The infiltration/rubble pit shall:-

     

i.        have a minimum 300 mm of soil cover (600 mm where the pit is located under a garden/landscaping area).

ii.       be located a minimum of 3.0 metres from the dwelling or other structure (closer if a structural engineer certifies that the infiltration area will not adversely affect the structure) and 2.1 metres from the adjacent side or rear boundaries.

iii.       be constructed with a minimum 200 mm thick layer of 20 mm basalt/blue metal (or similar) that is wrapped in a suitable geotextile material covering with a high filtration rating (Geofabrics Bidim "A" range of filtration fabrics or equivalent). A suitable means of dispersing the stormwater over the area of infiltration is to be constructed.

Note:  other equivalent methods of infiltration may be adopted.

iv.   have a minimum base area of  5.0 square metres (m2).

 

The outlet from the silt arrestor pit to the infiltration area shall be located at least 50 mm below the outlet from the silt arrestor pit to the kerb and gutter.

 

c.  The requirement for an infiltration/rubble pit will not be enforced should the underground soil conditions preclude the construction of the infiltration pit (eg rock is located within 300 mm of the base of the infiltration area). If the infiltration/rubble pit is not constructed then all site stormwater shall be discharged to the kerb and gutter via a sediment/silt arrestor pit (as detailed in note a. above).

 

           All works shall be to the satisfaction of the certifying authority.

 

d.  The overflow pipe/s from the rainwater tank/s shall be directed into the infiltration area.

 

60.     As the above site may encounter groundwater/seepage water within the depth of the basement excavation, the basement carpark or similar structures are to be suitably tanked and/or waterproofed. A Structural Engineer\Geotechnical Engineer shall certify the tanking and/or waterproofing has been carried out to an acceptable standard, to the satisfaction of the certifying authority. A copy of the certification is to be forwarded to Council.

 

Notes:-

 

a)  Any subsoil drainage (from planter boxes etc) is to be disposed of within the site and is not to be discharged to Council’s kerb & gutter and/or underground drainage system.

 

b)  Adequate provision is to be made for the ground water to drain around the basement carpark (to ensure that the basement will not dam or slow the movement of the ground water through the development site).

 

61.     Seepage water must not be collected and discharged from the site.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

62.     A landscape plan prepared by a qualified professional in the Landscape/Horticultural   industry (must be a registered member of either AILDM or AILA) shall be submitted to, and be approved by the PCA, prior to the issue of a construction certificate (with a copy of the approved plan to be forwarded to Council prior to the commencement of site works if not the PCA) and must detail the following:

 

a)  A Planting Plan & Plant Schedule which includes proposed species, botanic and common names, pot size at the time of planting, quantity, location, dimensions at maturity, maintenance practices (hedging, shaping etc), as well as any other landscape details to describe the proposed works;

 

b)  A predominance of species with low water requirements that can withstand poor quality sandy soils;

 

c)  A total number of 2 x 25 litre (pot size at the time of planting) trees within the site, comprising one each within the front and rear portions of the site, selecting those species which will attain a minimum height of between 4-7 metres at maturity;

 

63.     The landscaping shall be installed in accordance with the approved documentation prior to the issue of a final occupation certificate and shall be maintained in accordance with those plans.

 

64.     The naturestrip upon Council's footway shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

ADVISORY MATTERS:

 

A1    Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Certification Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Certification Services on 9399 0944.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A4      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A5      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Matthews/Andrews) that this application be refused as the proposal results in view loss, is excessive in bulk & scale, it exceeds the FSR and it is not in the public interest. LOST.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Matthews

Councillor Andrews

 

Councillor Belleli

 

Councillor Bowen

 

Councillor Matson

 

Councillor Nash

 

Councillor Notley-Smith

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor Tracey

 

Councillor White

 

Councillor Woodsmith

 

 

Total (1)

Total (13)

 

MOTION: (White/Belleli) CARRIED – SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Matthews

Councillor Belleli

 

Councillor Bowen

 

Councillor Matson

 

Councillor Nash

 

Councillor Notley-Smith

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor Tracey

 

Councillor White

 

Councillor Woodsmith

 

 

 

Total (13)

Total (1)

 

AMENDMENT: (Matthews/Andrews) that this application be deferred for mediation and the installation of height poles by the applicant to allow for a proper assessment to be undertaken. LOST.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Belleli

Councillor Matthews

Councillor Bowen

 

Councillor Matson

 

Councillor Nash

 

Councillor Notley-Smith

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor Tracey

 

Councillor White

 

Councillor Woodsmith

 

 

Total (2)

Total (12)

 

 

 

CP97/10   Director City Planning Report - 7 Darley Road, Randwick (DA/632/2010)

736/10

RESOLUTION: (Andrews/Matthews)

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F Randwick Local Environmental Plan 1998 (Consolidation), relating to Floor Space Ratio, on the grounds that the proposed development complies with the specified purpose of the clause, and will not adversely affect the character and amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/632/2010 for partial demolition of the existing dwelling and construction of a new 9 room boarding house to rear under SEPP (Affordable Housing) including retention of part of existing dwelling as Manager’s Residence at 7 Darley Road, Randwick, subject to the following conditions:

 

1.       The development must be implemented substantially in accordance with the plans numbered 03 stamped received by Council 4 November 2010 and 04a stamped received by Council 28 October 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

The following condition is applied to meet additional demands for public facilities

 

2.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $560,000.00, the following applicable monetary levy must be paid to Council: $5,600.00

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions have been applied to maintain reasonable levels of amenity to the area:

 

3.       The premises must be managed by a live-in boarding house manager.

 

4.       Use of the premises must be in accordance with the Operation and Management schedule on pages 45 to 47 of the Statement of Environmental Effects received by Council 9 August 2010 as amended to include a regular schedule for the cleaning of external bins and the bin enclosure to control the build-up of odours.

 

5.       No boarding room shall be occupied by more than 2 adult lodgers.

 

6.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

7.       Street numbering must be provided to the premises in a prominent position, to the satisfaction of Council.

 

In this regard, prior to occupation of the building, an application must be submitted to and approved by Council’s Director of City Planning, together with the required fee, for the allocation of an appropriate street number/s to the development.

 

8.       A single common television aerial, and/or satellite dish (having a maximum diameter of 700mm and not located on the front or street elevation of the building) is to be installed to serve the development.

 

9.       The finished ground levels external to the building are to be consistent with the development consent and are not to be raised (other than for the provision of paving or the like on the ground) without the written consent of Council.

 

10.     Lighting to the premises shall be designed so as not to cause a nuisance to nearby residents or motorists and to ensure that light overspill does not affect the amenity of the area.

 

The following conditions have been applied to maintain reasonable levels of amenity for boarding house lodgers:

 

11.     The floor of the kitchen area in each boarding room and the common room must be installed with a smooth and impervious floor.

 

12.     A washing machine must be installed in each boarding room. The washing machine must have a minimum capacity of 3.5kg and a minimum energy and water efficiency rating of 3.5 stars.

 

13.     A drying line must be installed in a sunny part of the communal court yard at the rear of the premises. The drying line must be at least 22.5m long and may be retractable.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

14.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

15.     There are to be no emissions or discharges from the premises, which will give rise to a public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

The following conditions are applied to satisfy the relevant pollution control criteria and to maintain reasonable levels of health, safety and amenity to the locality:

 

16.     The use and operation of the premises shall not give rise to an environmental health or public nuisance.

 

17.     There are to be no emissions or discharges from the premises which will give rise to a public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

18.     Adequate provisions are to be made within the premises for the storage, collection and disposal of waste and recyclable materials, to the satisfaction of Council.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

19.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min  sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations and to provide for reasonable levels of safety and amenity:

 

Regulatory

 

20.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

21.     All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA), in accordance with Clause 98 of the Environmental Planning and Assessment Regulation 2000.

 

22.     Prior to the commencement of any building works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans & specifications and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

23.     Prior to the commencement of any building works, the person having the benefit of the development consent must:

 

i)      appoint a Principal Certifying Authority for the building work, and

 

ii)      appoint a principal contractor for the building work and notify the Principal Certifying Authority and Council accordingly in writing, and

 

iii)     notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

 

iv)     give at least two days notice to the Council, in writing, of the person’s intention to commence building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

24.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected in accordance with section 81A (2) (b1) (ii) of the Environmental Planning & Assessment Regulation 2000 and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Documentary evidence of the building inspections carried out and details of compliance with Council’s consent is to be maintained by the Principal Certifying Authority.  Details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council with the occupation certificate.

 

The principal contractor must ensure that the required critical stage and other inspections, as specified in the Principal Certifying Authority’s “Notice of Critical Stage Inspections”, are carried out to the satisfaction of the Principal Certifying Authority and at least 48 hours notice (excluding weekends and public holidays) is to be given to the Principal Certifying Authority, to carry out the required inspection, before carrying out any further works.

 

25.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·       name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours,

·       name, address and telephone number of the Principal Certifying Authority,

·       a statement stating that “unauthorised entry to the work site is prohibited”.

 

26.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

27.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon must also be provided to Council with the occupation certificate.

 

28.     In accordance with clause 98 of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition, that in the case of residential building work, a contract of insurance must be obtained and in force, in accordance with the provisions of the Home Building Act 1989.

 

Where the work is to be done by a licensed contractor, excavation or building work must not be carried out unless the Principal Certifying Authority (PCA):

 

·       has been informed in writing of the licensee’s name and contractor number; and

·       is satisfied that the licensee has complied with the insurance requirements of Part 6 of the Home Building Act 1989, or

 

Excavation or building work must not be carried out unless the Principal Certifying Authority:

 

·       has been informed of the person’s name and owner-builder permit number, or

·       has been given a declaration, signed by the owner of the land that states that the market cost of the labour and materials involved in the work does not exceed $5,000.

 

Details of the principal building contractor and compliance with the provisions of the Home Building Act 1989 (i.e. Details of the principal licensed building contractor and a copy of the Certificate of Insurance) are to be submitted to Council prior to the commencement of works, with the notice of appointment of the PCA / notice of intention to commence building work.

 

29.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

30.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

Fire safety

 

31.     The existing levels of fire and safety within the building are to be upgraded in accordance with the following requirements and the fire safety certificate provisions of Part 9 of the Environmental Planning and Assessment Regulation 2000 must be complied with, prior to issuing an occupation certificate:

 

a)     The following works are to be undertaken in accordance with the specified provisions of the Building Code of Australia (BCA), as applicable:

 

1)       Smoke alarms (connected to the electrical mains power system and provided with battery back-up) must be installed within each residential occupancy, located and designed in accordance with specification E2.2a of the BCA,

 

2)       Balustrades and handrails to stairway/s, balconies, decks or the like are to be designed and constructed to satisfy clause D2.16 & D2.17 of the BCA,

 

3)       The main entry/exit doors are to be provided with a ‘hold-open’ device, or swing in the direction of egress, to facilitate people seeking egress from  the building in the event of an emergency,

 

4)       Prior to commencing  the abovementioned works, a Construction Certificate must be obtained from Council’s Building Certification Services or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

32.     A Fire Safety Certificate must be submitted to Council prior to the issuing of an Occupation Certificate, in accordance with the requirements of the Environmental Planning and Assessment Regulation 2000.

 

A single and complete Fire Safety Certificate must be provided which includes details of all of the fire safety measures contained in the building and as detailed in the fire safety schedule attached to the Construction Certificate.

 

Prior to issuing any Occupation Certificate the Principal Certifying Authority must be satisfied that all of the relevant fire safety measures have been included and are sufficiently detailed within the Fire safety Certificate.

 

A copy of the fire safety certificate must be displayed in the building near the entrance and a copy must be forwarded to the NSW Fire Brigades.

 

Construction site management

 

33.     Demolition work  and the removal, storage, handling and disposal of building materials must be carried out in accordance with the following requirements  (ass applicable):

 

·           Australian Standard 2601 (2001) – Demolition of Structures

·           Occupational Health and Safety Act 2000

·           Occupational Health and Safety (Hazardous Substances) Regulation 2001

·           Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·           WorkCover NSW Codes of Practice and Guidelines

·           The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

·           Protection Authority (EPA) and WorkCover NSW Guidelines.

·           Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

34.     In accordance with Council’s Asbestos Policy, the following requirements are to be satisfied if any materials containing asbestos are present in the building:

 

a)     Randwick City Council Asbestos Policy (adopted 13 September 2005).

       

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

b)     A Demolition Work Plan must be developed and implemented in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

c)     A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation). Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

d)     Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 1996. Asbestos waste must be disposed of at an approved waste disposal depot (refer to the DEC or Waste Service NSW for details of sites). Copies of all receipts detailing method and location of disposal must be maintained on site and be provided to Council officers upon request, as evidence of correct disposal.

 

e)     On demolition sites involving the removal of asbestos, a  professionally manufactured sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS” and include details of the licensed contractor. The sign shall measure not less than 400mm x 300mm and the sign is to be installed prior to demolition work commencing and is to remain in place until such time as all asbestos has been safely removed from the site.

 

f)      A certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council upon completion of the works (prior to an Occupation Certificate being issued), which confirms that the relevant requirements and conditions of consent, in relation to the safe removal and disposal of asbestos, have been satisfied.

 

35.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

Internal work only within a commercial or industrial development, located in a commercial or industrial zone, which is not audible within any residential dwelling or commercial or industrial premises

·   Monday to Saturday - No time limits (subject to column 1)

·   Sunday & public holidays - No work permitted

Additional requirements for all development (except for single residential dwellings)

·   Saturdays and Sundays where the preceding Friday and/or the following Monday is a public holiday - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

36.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents. The relevant provisions of the Protection of the Environment Operations Act 1997 and Department of Climate Change Guidelines must be satisfied at all times.

 

37.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be satisfied:

 

a)  The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

b)  A Road Opening Permit must be obtained from the Council and other relevant Authorities prior to excavating or opening-up the road or footway for services or the like.

 

c)  Building materials, sand, soil, waste materials or construction equipment must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

d)  Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council. Applications to place a waste container in a public place can be made to Council’s Health, Building & Regulatory Services department.

 

e)  During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing. Sediment and erosion control measures must be implemented prior to the commencement of any site works and be maintained throughout construction. 

 

f)   Public safety must be maintained at all times and public access to demolition/building works, materials and equipment on the site is to be restricted. If required, a temporary 1.8m high safety fence or hoarding must be provided to protect the public, located between the work site and the public place. An awning may also be required to prevent any substance from, or in connection with, the work from falling into the public place or adjoining premises.

 

Temporary fences or hoardings or the like are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences or hoardings must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any hoardings, site fencing or amenities upon any part of the footpath, nature strip or any public place, the written consent from Council’s Health, Building & Regulatory Services department must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

Access and facilities for people with disabilities

 

38.     Access and toilet facilities for people with a disability are to be provided in the Class 3 building in accordance with Parts D3 of the Building Code of Australia & AS1428.1. Details are to be included in the construction certificate to the satisfaction of the certifying authority.

 

The following condition is applied to satisfy the relevant pollution control criteria and to maintain reasonable levels of health, safety and amenity to the locality:

 

39.     The use and operation of the premises shall not give rise to an environmental health or public nuisance, vibration to other premises or, result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

The following conditions are applied to provide adequate provisions for waste management:

 

40.     Adequate provisions are to be made within the premises for the storage, collection and disposal of trade/commercial waste and recyclable materials, to the satisfaction of Council.

 

Trade/commercial waste materials must not be disposed in or through Council’s domestic garbage service.  All trade/commercial waste materials must be collected by Council’s Trade Waste Service or a waste contractor authorised by the Waste Service of New South Wales and details of the proposed waste collection and disposal service are to be submitted to Council prior to commencing operation of the business.

 

The operator of the business must also arrange for the recycling of appropriate materials and make the necessary arrangements with an authorised waste services contractor accordingly.

 

Security Deposit Conditions

The following conditions are applied to provide adequate security against Damage to Council’s infrastructure:

 

41.     The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $4000.00   -      Damage / Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

Traffic conditions/Civil Works Conditions

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

42.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

43.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

44.     All new walls & fences adjacent to vehicular crossings must be lowered to a height of 600mm above the internal driveway level for a distance of 1.50m within the site or splayed 1.5 metre by 1.5 metre to provide satisfactory sight lines. Details are to be submitted to the Certifying Authority prior to the release of the construction certificate showing compliance with this condition.

 

Alignment Level Conditions

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

45.     Council’s Development Engineer has inspected the above site and has determined that the design alignment level at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

46.     The design alignment levels issued by Council and their relationship to the footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

47.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $121 (inclusive of GST). This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

48.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

49.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

50.     Documentary evidence from the relevant public utility authorities confirming that their requirements have been satisfied, must be submitted to the certifying authority prior to a construction certificate being issued for the development.

 

51.     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any public utility service works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

                                         

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Councils Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

52.     A Section 73 Compliance Certificate under the Sydney water Act 1994 must be obtained from Sydney Water Corporation.

 

Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the website www.sydneywater.com.au then refer to “Water Servicing Coordinator” under Developing Your Land” or telephone 13 20 92 for assistance.

 

Following application a “Notice of Requirements” will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.

 

The Notice must be issued to the Principal Certifying Authority prior to the construction certificate being issued.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to occupation of the development.

 

Drainage Conditions

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

53.     Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issued, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)       A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

 

b)       A layout of the proposed drainage system including pipe sizes, type, grade, length, invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system. 

 

c)       Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (ie. above the 1 in 20 year storm) to the proposed drainage system.

 

d)       The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

 

i.        Roof areas

ii.       Paved areas

iii.       Grassed areas

iv.      Garden areas

 

e)       Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

 

f)       Proposed finished surface levels and grades of car parks, internal driveways and access aisles which are to be related to Council's design alignment levels.

 

g)       The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

54.     All stormwater run-off naturally draining to the site must be collected and discharged through this property's stormwater system.  Such drainage must, if necessary, be constructed prior to the commencement of building work.

 

55.     All site stormwater must be discharged (by gravity) to either:

 

a.   The kerb and gutter at the front of the property; OR

b.   To Council’s underground drainage system in Darley Road via a new kerb inlet pit and pipe section to the existing kerb inlet pit in front of No.5 Darley road; OR

c.   A suitably sized infiltration system (subject to geotechnical investigation confirming that the ground conditions are suitable for an infiltration system).

 

NOTES

 

§ All new kerb inlet pits shall be constructed in general accordance with Council’s standard drawing SD7a.

§ With the exception of the site discharge pipe, all new pipelines constructed within council’s road reserve shall be minimum 375 mm diameter, spigot and socket rubber ringed jointed, steel reinforced concrete pipeline (RRRCP). Prior to backfilling, all pipelines in council’s road reserve shall be inspected and approved by the Hydraulic Engineer certifying the works and Council.

§ Site discharge pipelines shall cross the verge at an angle no less than 45 degrees to the kerb line

 

56.     All drainage details (for any external drainage works) shall be prepared by a suitably qualified hydraulic consultant who shall, at the completion of the works, certify that the drainage works have been constructed in accordance with the approved drainage plans and relevant standards. The plans and specifications for all works on Council property shall be submitted to and approval by Council prior to the issuing of a construction certificate.

 

57.     Should stormwater be discharged to Council’s street drainage system, on-site detention must be provided for the redeveloped portion of the site to ensure that the maximum discharge from the site does not exceed what would occur during a 1 in 5 year storm of 1 hour duration for the existing site conditions. All other stormwater run-off from the above site for all storms up to the 1 in 20 year storm is to be retained on the site for gradual release to the kerb and gutter or drainage system as required by Council.  Provision is to be made for satisfactory overland flow should a storm in excess of the above parameters occur.

 

Should no formal overland escape route be provided for storms greater than the design storm, the on-site detention system shall be sized for the 1 in 100 year storm event.

 

For small areas up to 0.5 hectares, determination of the required cumulative storage must be calculated by the mass curve technique as detailed in Technical Note 1, Chapter 14 of the Australian Rainfall and Run-off Volume 1, 1987 Edition.

 

Where possible the detention tank must have an open base to infiltrate stormwater to the groundwater. Note that the ground water and any rock stratum has to be a minimum of 2.0 metres below the base of the tank.

 

58.     Should stormwater be discharged to an infiltration system, the infiltration area shall be  sized for all storm events up to the 1 in 20 year storm event with provision for a formal overland flow path to Council’s Street drainage system.

 

Should no formal overland escape route be provided for storms greater than the design storm, the infiltration system shall be sized for the 1 in 100 year storm event.

 

59.     Any Infiltration systems/Absorption Trenches must be designed in accordance with "Section 8.5 ABSORPTION TRENCHES" as stipulated in Randwick City Council's Private Stormwater Code.

 

60.     The detention area/infiltration system must be regularly cleaned and maintained to ensure it functions as required by the design.

 

61.     Any onsite detention/infiltration systems shall be located in areas easily accessible by residents.

 

62.     The maximum depth of ponding in above ground detention areas (and/or infiltration systems with above ground storage) shall be as follows:

 

i) 150mm in uncovered carparking areas (with an isolated maximum depth of 200mm permissible at the low point pit within the detention area)

ii) 300mm in landscaped areas (where child proof fencing is not provided around the outside of the detention area and sides slopes are steeper than 1 in 10)

iii)  600mm in landscaped areas where the side slopes of the detention area have a maximum grade of 1 in 10.

iv) 1200mm in landscaped areas where a childproof fence is provided around the outside of the detention area

 

Notes:

§ Above ground detention will not be permitted any area which may be used for storage of goods.

§ Mulch/bark must not be used in onsite detention areas

 

63.     Any above ground stormwater detention areas (and/or infiltration systems with above ground storage) must be suitably signposted where required, warning people of the maximum flood level.

 

64.     The floor level of all habitable and storage areas adjacent to the detention area (and/or infiltration systems with above ground storage) must be a minimum of 300mm above the maximum water level in the detention area for the design storm or alternately a permanent 300mm high water proof barrier is to be constructed.

 

(In this regard, it must be noted that this condition must not result in any increase in the heights or levels of the building.  Any variations to the heights or levels of the building will require a new or amended development consent from the Council prior to a construction certificate being issued for the development).

 

65.     A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

 

66.     A `V' drain is to be constructed along the perimeter of the property, where required, to direct all stormwater to the detention/infiltration area.

 

67.     If connecting to Council’s underground drainage system a reflux valve shall be provided (within the site) over any pipelines discharging from the site to ensure that stormwater from Council drainage system does not surcharge back into the site stormwater system.

 

68.     Should a pump system be required to drain any portion of the site the system must be designed with a minimum of two pumps being installed, connected in parallel (with each pump capable of discharging at the permissible discharge rate) and connected to a control board so that each pump will operate alternatively. The pump wet well shall be sized for the 1 in 100 year, 2 hour storm assuming both pumps are not working.

 

The pump system must also be designed and installed strictly in accordance with "Section 8.4 PUMP SYSTEMS" as stipulated in Randwick City Council's Private Stormwater Code.

 

69.     A sediment/silt arrester pit must be provided:

 

i)   within the site at or near the street boundary prior to the site stormwater discharging by gravity to the kerb/street drainage system; and

ii)  prior to stormwater discharging into any absorption/infiltration system.

 

The sediment/silt arrester pit shall be constructed in accordance with the following requirements:-

 

·      The base of the pit located a minimum 300mm under the invert level of the outlet pipe.

 

·      The pit constructed from cast in-situ concrete, precast concrete, double brick or equivalent.

 

·      A minimum of 4 x 90 mm diameter weep holes located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

 

·      A galvanised heavy-duty screen located over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

 

·      The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

 

·      A child proof and corrosion resistant fastening system provided for the access grate (e.g. spring loaded j-bolts or similar).

 

·      A sign adjacent to the pit stating:

 

“This sediment/silt arrester pit shall be regularly inspected and cleaned.”

 

Note: Sketch details of a standard sediment/silt arrester pit may be obtained from Council’s Drainage Engineer.

 

70.     Prior to occupation of the development, a "restriction on the use of land” and “positive covenant" (under section 88E of the Conveyancing Act 1919) shall be placed on the title of the subject property to ensure that the onsite detention/infiltration system is maintained and that no works which could affect the design function of the detention/infiltration system are undertaken without the prior consent (in writing) from Council. Such restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

 

Notes:

a.  The “restriction on the use of land” and “positive covenant” are to be to the satisfaction of Council. A copy of Council’s standard wording/layout for the restriction and positive covenant may be obtained from Council’s Development Engineer.

b.  The works as executed drainage plan and hydraulic certification must be submitted to Council prior to the “restriction on the use of land” and “positive covenant” being executed by Council.

 

71.     Prior to the issuing of an occupation certificate, the applicant shall submit to Council, a works-as-executed drainage plan prepared by a registered surveyor and approved by a suitably qualified and experienced Hydraulic Engineer. The works-as-executed drainage plan shall be to the satisfaction of the Principal Certifying Authority (PCA) and shall include the following details:

 

i)   The location of the detention basin with finished surface levels;

ii)  Finished site contours at 0.2 metre intervals;

iii)  Volume of storage available in the detention areas;

iv) The location, diameter, gradient and material (i.e PVC, RC etc) of all stormwater pipes;

v)  The orifice size(s) (if applicable);

vi) Details of any infiltration/absorption systems; and

vii) Details of any pumping systems installed (including wet well volumes).

 

72.     Prior to the issuing of an occupation certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer confirming that the design and construction of the stormwater drainage system complies with the conditions of development consent. The certification must be provided following inspection/s of the site stormwater drainage system by the certifying engineers and shall be provided to the satisfaction of the PCA.

 

Waste Management Conditions

The following conditions are applied to provide adequate consideration for waste management:

 

73.     The garbage area will have to be designed so as to be able to contain a total of 7 x 240 litre bins (4 normal waste bins & 3 recycle bins) whilst providing satisfactory access to these bins. Details showing compliance with this requirement are to be shown on the plans submitted to the certifying authority for the construction certificate.

 

74.     The waste storage area shall be clearly signposted.

 

75.     Prior to the issuing of a construction certificate for the proposed development the applicant is to submit to Council and have approved by Council’s Manager of Waste Services, a Waste Management Plan detailing waste and recycling storage and disposal for the development site.

 

The plan shall detail the type and quantity of waste to be generated by the development; demolition waste; construction waste; materials to be re-used or recycled; facilities/procedures for the storage, collection recycling & disposal of waste and the on-going management of waste for the boarding house.

 

Landscape Conditions

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

76.     Landscaping at this site shall be installed substantially in accordance with the Landscape Plan by Michael Zinn - Landscape Designer, drawing number 01, project number 703, dated August 2010, subject to the following changes being made on an amended plan, which must be submitted to, and be approved by, the PCA, prior to the commencement of site works:

 

a.   The specific written permission of the adjoining property owner to the south, 2-20 King Street (Randwick TAFE), must be provided to the PCA (with a copy forwarded to Council if not the PCA), confirming that they raise no objections to the landscape works shown on the current plan encroaching beyond the common boundary, and onto their site.

 

b.   Should specific written permission not be obtained as described above, the plans must be amended to show all landscape works being contained wholly within the subject site.

 

c.   To ensure satisfactory maintenance of the landscaped areas, an automatic drip irrigation system shall be installed throughout all planted areas. Details shall be provided showing that the system will be connected to the sites rainwater tanks, with back-up connection to the mains supply, in accordance with all current Sydney Water requirements.

 

d.   Amendments and augmentation to reflect the building layout changes in amended plans submitted to Council 4 November 2010.

 

77.     The PCA must ensure that the landscaping is installed as per the approved documentation, prior to issuing a Final Occupation Certificate, with suitable strategies to be incorporated into the Management Plan to ensure that this landscaping is maintained in a healthy and vigorous state until maturity, for the life of the development.

 

Removal of trees within site

 

78.     Approval is granted for removal of the following trees, subject to full implementation of the approved landscape plan:

 

a)        The Eriobotrya japonica (Loquat) in the front yard, along the western site boundary, so as to accommodate the proposed building and landscape works as shown, as this will improve presentation of the development to the public domain;

 

b)        The Syagrus romanzoffianum (Cocos Palm) located about halfway along the length of the western boundary, as it is exempt from the provisions of Council’s Tree Preservation Order (TPO) due to its low landscape and amenity value;

 

c)        The Schinus areira (Peppercorn Tree) in the rear yard, close to the southwest corner of the existing dwelling, as well as the Prunus species (Prunus) close to the southeast corner, so as to accommodate the proposed building and landscape works shown for these areas of the site;

 

Pruning of neighbours tree

 

79.     Permission is granted for the selective and minimal pruning of only those lower growing, lower order branches from the northern aspect of the Persea amercianna (Avocado Tree) which is located beyond the southern site boundary, on the adjoining property at 2-20 King Street (Randwick TAFE), only where they overhang the common boundary into the subject site, and need to be pruned in order to avoid damage to the tree; or; interference with the proposed building during construction.

 

80.     This approval does not imply any right of entry onto a neighbouring property nor does it allow pruning beyond a common boundary; however, where such measures are desirable in the best interests of correct pruning procedures, and ultimately, the ongoing health of this tree, the applicant must negotiate with the neighbour/tree owner for access to perform this work.

 

81.     All pruning must be undertaken by an Arborist who holds a minimum of AQF Level V in Arboriculture, and who is also a registered member of a nationally recognised organisation/association, with all pruning to be performed to Australian Standard AS 4373-1996 'Pruning of Amenity Trees.’

 

Protection of neighbours tree

 

82.     In order to ensure retention of the Persea amercianna (Avocado Tree) located beyond the southern site boundary,  in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the Construction Certificate application must show the retention of this neighbouring tree, with the position and diameter of both its trunk and canopy to be clearly shown on all drawings.

 

b.       Any excavations associated with the installation of new services, pipes, stormwater systems or similar that need to be installed in the rear yard must be located on the eastern side of the site, a minimum distance of 4 metres from its trunk, so as to minimise root damage and disturbance.

 

c.       This tree is to be physically protected by the installation of 1.8 metre high steel mesh/chainwire fencing, which shall be located a minimum distance of 1.5 metres off the rear (southern) site boundary, adjacent its trunk, extending a distance of 3 metres to its east and west, matching back up with the southern site boundary, so as to completely enclose this tree for the duration of works.

 

d.       This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

e.       Within the TPZ there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble, with all Site Management Plans to acknowledge this requirement.

 

f.        Any roots encountered during the course of the approved works must be cut cleanly by hand, and the affected area backfilled with clean site soil as soon as practically possible.

 

ADVISORY MATTERS:

 

1.       The applicant is advised that the Construction Certificate plans and specification must comply with the provisions of the Building Code of Australia (BCA).

In this regard, the development consent plans do not show compliance with the deemed-to-satisfy provisions of the BCA, in particular in relation to access for people with disabilities and the provision of laundry facilities. Details of compliance with the relevant provisions of the Building Code of Australia and conditions of development consent are to be provided in the plans and specifications for the construction certificate.

 

You are also advised to ensure that the development is not inconsistent with Council's consent and if necessary consult with Council’s Building Certification Services or your accredited certifier prior to submitting your construction certificate application to enable these matters to be addressed accordingly.

 

2.       The applicant/owner is advised that this approval does not guarantee compliance with the provisions of the Disability Discrimination Act 1992 and the applicant should therefore consider their liability under the Act.  In this regard, the applicant is advised that compliance with the requirements of the Building Code of Australia and Australian Standard 1428.1 - Design for Access and Mobility does not necessarily satisfy the objectives of the Disability Discrimination Act 1992.

 

The applicant/owner is requested to give consideration to providing access and facilities for people with disabilities in accordance with Australian Standard 1428 Parts 1, 2, 3 and 4 - Design for Access and Mobility, which may be necessary to satisfy the objectives of the Disability Discrimination Act 1992.

 

3.       The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Andrews/Matthews) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Matson

Councillor Belleli

Councillor Notley-Smith

Councillor Bowen

Councillor Procopiadis

Councillor Matthews

Councillor Woodsmith

Councillor Nash

 

Councillor Seng

 

Councillor Smith

 

Councillor Stevenson

 

Councillor Tracey

 

Councillor White

 

 

 

Total (10)

Total (4)

 

 

 

CP98/10   Director City Planning Report - 325 Rainbow Street, South Coogee (DA/751/2010)

737/10

RESOLUTION: (Belleli/Andrews) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20F, 20G(1) & 20G(3) of Randwick Local Environmental Plan 1998 (Consolidation), relating to FSR, overall heights and external wall heights respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/751/2010 for substantial alterations and additions to existing dwelling including new first floor, carport to front, swimming pool and decking to rear and associated works at No. 325 Rainbow Street, South Coogee, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity.

 

1.       The development must be implemented substantially in accordance with the plan numbered 012/10, dated 1 September 2010 and received by Council on 3 September 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

3.       The proposed pool and associated decking shall be reduced by 570mm down to RL52.00 (the level proposed for the rear deck area). Details of compliance shall be provided in the construction certificate plans.

 

4.       The bottom fixed parts of windows W2, W6 & W7 to the lounge, and family/dinning rooms on the western elevation at ground floor level, shall be treated with obscured glazing. Details of compliance shall be provided in the construction certificate plans.

 

5.       The elevated rear ground level deck and associated structures shall be reduced in width by 1.3m so that no portion projects beyond the western face of the existing building. This will necessitate the deletion of the timber stairs proposed at the western side passageway adjacent to the south western corner of the development and reinstatement of natural ground level along this part of the site.

 

6.       A 1.8m high screen shall be placed along the western side of the rear elevated ground level deck. The total area of any openings within the privacy screen along the western side of the rear deck must not exceed 25% of the area of the screen. Details of compliance shall be provided in the Construction certificate plans.

 

7.       A 600mm wide strip of landscaping shall be provided along the western side of the rear yard area extending from the proposed rear planter for a distance of 9m. The selected planting within this landscaped area shall be an evergreen species and shall attain a height of approximately 2m above natural ground level. Details of plant selection and compliance with this condition shall be submitted to Council for approval prior to a Construction Certificate being issued for the development. This condition has been included to ensure reasonable privacy levels are maintained between the proposed pool/associated decking and the rear yard of the western neighbour.

 

8.       Metal roof sheeting is to be pre-painted (e.g. colourbond) and form part of the colour scheme and external finishes for the development.

 

9.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

10.     Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

11.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)       Construct a concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site.

 

b)       Reconstruct the Council footpath and steps to suit the new vehicular entrance to Council's specification.

 

12.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

13.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

14.     The Council’s Development Engineer has inspected the above site and have determined that the design alignment level (concrete/paved/tiled level) at the property boundary for the driveway shall be as follows:

 

               Western Edge – RL 49.30 AHD

               Eastern Edge –  RL 49.45 AHD

 

15.     The design alignment levels (concrete/paved/tiled level) issued by Council must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

16.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $135.00 (inclusive of GST). This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

17.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

18.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

19.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

20.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $350,900 the following applicable monetary levy must be paid to Council: $3,509.00.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

21.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

22.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

23.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

24.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

25.     Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

26.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

27.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

28.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

29.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

30.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

31.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·          name, address and telephone number of the Principal Certifying Authority; and

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

32.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

33.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

34.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

35.     Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

36.     Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the additional storey/upper floor addition.

 

37.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·          Occupational Health and Safety Act 2000 & Regulations

·          WorkCover NSW Guidelines & Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

38.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council, not less than 2 days before commencing such works.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

39.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy (adopted 13 September 2005)

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the principal certifying authority immediately upon completion of the asbestos related works, which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

40.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

41.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

b)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

42.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·            excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·            new dwellings or additions to dwellings sited up to shared property boundaries (e.g. additions to a semi-detached dwelling or a terraced dwelling),

·            excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·            as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

43.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

44.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, is required to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of site works.

 

The Construction Noise Management Plan is to be prepared in accordance with the relevant provisions of the DECC Construction Noise Guideline.

 

45.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

46.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing / hoardings to the perimeter of the site;

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction

·       details of methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·       construction noise and vibration management;

·       construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

47.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following conditions are applied to ensure compliance with the Swimming Pools Act 1992 and to maintain public safety and amenity:

 

48.     Swimming pools are to be provided with childproof fences and self-locking gates, in accordance with the Swimming Pools Act 1992 and regulations.

 

The swimming pool is to be surrounded by a fence having a minimum height of 1.2m, that separates the pool from any residential building situated on the premises and from any place (whether public or private) adjoining the premises; and that is designed, constructed and installed in accordance with AS 1926.1 - 2007.

 

Gates to pool area shall be a maximum width of 1 metre, and be self-closing and latching; the gate is required to open outwards from the pool area and prevent a small child opening the gate or door when the gate or door is closed.

 

Temporary pool safety fencing is to be provided pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

A ‘warning notice’ must be erected in a prominent position in the immediate vicinity of the swimming pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

49.     Swimming pools are to be designed, installed and operated in accordance with the following general requirements: -

 

a)    Backwash of the pool filter and other discharge of water is to be drained to the sewer in accordance with the requirements of the Sydney Water Corporation; and

a)    All pool overflow water is to be drained away from the building and adjoining premises, so as not to result in a nuisance or damage to premises; and

b)    Water recirculation and filtrations systems are required to comply with AS 1926.3 – 2003:  Swimming Pool Safety – Water Recirculation and Filtration Systems; and

c)    Pool plant and equipment is to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents; and

d)    The pool plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

i.      before 8.00am or after 8.00pm on any Sunday or public holiday; or

ii.     before 7.00am or after 8.00pm on any other day.

 

50.     Written notification must be provided to Council advising of the installation and completion of the Swimming Pool (or Spa Pool), to satisfy the requirements of the Swimming Pools Act 1992, prior to issuing an Occupation Certificate.

 

Council’s “Notification & Registration of a Swimming Pool” form must be completed and forwarded to Council prior to any Occupation Certificate being issued for the pool.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

51.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

52.     The installation of rainwater tanks shall comply with the following noise control requirements:-

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

b)     Plant and equipment associated with rainwater tank(s) are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

c)     The operation of plant and equipment associated with the rainwater tank(s) are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

          ●     before 8.00am or after 8.00pm on weekends or public holiday; or

●     before 7.00am or after 8.00pm on weekdays.

 

The following conditions have been applied to ensure that adequate security provisions are made for vehicular access, parking and public infrastructure

 

A1      Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A4      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate

 

A5      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

CP99/10   Director City Planning Report - 22 Mirrabooka Crescent, Little Bay (DA/924/2010)

738/10

RESOLUTION: (Belleli/Andrews) -

 

A.       That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20B(1) of Randwick Local Environmental Plan 1998, relating to minimum allotment sizes respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.       That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 924/2010 for the strata subdivision of an existing dual occupancy at 22 Mirrabooka Crescent, Little Bay subject to the following conditions:

 

1.       The development must be implemented substantially in accordance with the plans reference 101/0423, dated 29/03/10 and received by Council on 25 October 2010, the application form and on any supporting information received with the application, except as may be amended  by the following conditions and as may be shown in red on the attached plans:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

2.       The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot`

Penalty infringements or service of a notice and order by Council.

 

The following conditions are applied to satisfy the provisions of Council’s environmental plans, policies and codes for subdivision works:

 

3.       All floors, external walls and ceilings depicted in the proposed strata plan must correspond to those of the building as constructed.

 

4.       All floors, external walls and ceilings depicted in the proposed strata plan must correspond to those depicted in the approved building plans for the site in DA/714/2001 & CC/75/2006.

 

5.       Prior to endorsement of the strata plans, all facilities required under previous development approvals (such as parking spaces, terraces and courtyards) must been provided in accordance with the relevant requirements.

 

6.       A Section 73 Compliance Certificate under the Sydney Water Act 1994 must be obtained from Sydney Water Corporation.

 

Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the website www.sydneywater.com.au then refer to “Water Servicing Coordinator” under Developing Your Land” or telephone 13 20 92 for assistance.

 

Following application a “Notice of Requirements” will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to release of the strata plan of subdivision.

 

7.       The applicant shall provide Council with a survey plan of the property prior to receiving subdivision approval.

 

8.       The applicant shall create suitable rights of carriageway, easements for services, support and stormwater lines, as required. The applicant shall be advised that the minimum easement width for any stormwater line is 0.9 metres.

 

9.       A "restriction on the use of land” and “positive covenant" (under section 88B of the Conveyancing Act 1919) shall be placed on the title of the subject property, in conjunction with the registration of the proposed plan of strata subdivision for this property, to ensure that the onsite detention system is maintained and that no works which could affect the design function of the detention system are undertaken without the prior consent (in writing) from Council. Such restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

 

Notes:

a.  The "restriction as to user and positive covenant" are to be to the satisfaction of Council. A copy of Council’s standard wording/layout for the restriction and positive covenant may be obtained from Council’s Development Engineer.

 

a.  The works as executed drainage plan and hydraulic certification must be submitted to Council prior to the “restriction on the use of land” and “positive covenant” being executed by Council.

 

10.     A formal subdivision application is required to be submitted to and approved by the Council or an accredited certifier and all conditions of this development consent are required to be satisfied prior to the release of the subdivision plans.

 

11.     Details of critical stage inspections carried out by the principal certifying authority, together with any other certification relied upon, and must be provided to Council or the accredited certifier prior to the issuing of a strata certificate.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

CP100/10 Director City Planning Report - 7 Monmouth Street, Randwick (DA/854/2010)

739/10

RESOLUTION: (Belleli/Andrews) -

 

A.       That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F of Randwick Local Environmental Plan 1998, relating to floor space ratio on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.       That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 854/2010 for a new first floor addition to the existing semi-detached dwelling at No. 7 Monmouth Street, Randwick, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered 1068-1 to 1068-04, dated September 2010 and received by Council on the 30 September 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

Details of the proposed paint scheme are to be submitted to and approved by Council’s Director City Planning, in accordance with Section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development. Unpainted surfaces, eg brickwork/stonework are to remain unchanged.

 

3.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

4.       Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

5.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

6.       In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

7.       In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

8.       The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

9.       In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

10.     Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

11.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

12.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

13.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

14.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

15.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

16.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·      name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·      name, address and telephone number of the Principal Certifying Authority; and

·      a statement stating that “unauthorised entry to the work site is prohibited”.

 

17.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

18.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

19.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

20.     Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

21.     Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the upper floor addition.

 

22.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·      Occupational Health and Safety Act 2000 & Regulations

·      WorkCover NSW Guidelines & Codes of Practice

·      Australian Standard 2601 (2001) – Demolition of Structures

·      The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·      Relevant DECC/EPA Guidelines

·      Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

23.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

24.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)  If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)   protect and support the adjoining premises from possible damage from the excavation, and

ii)  where necessary, underpin the adjoining premises to prevent any such damage.

 

b)  The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

25.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·      excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·      new dwellings or additions to dwellings sited up to shared property boundaries (e.g. additions to a semi-detached dwelling or a terraced dwelling),

·      excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·      as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

26.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

27.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, is required to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of site works.

 

The Construction Noise Management Plan is to be prepared in accordance with the relevant provisions of the DECC Construction Noise Guideline.

 

28.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

29.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·    location and construction of protective fencing / hoardings to the perimeter of the site;

·    location of site storage areas/sheds/equipment;

·    location of building materials for construction;

·    provisions for public safety;

·    dust control measures;

·    site access location and construction

·    details of methods of disposal of demolition materials;

·    protective measures for tree preservation;

·    provisions for temporary sanitary facilities;

·    location and size of waste containers/bulk bins;

·    details of proposed sediment and erosion control measures;

·    construction noise and vibration management;

·    construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

30.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

d)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

ADVISORY MATTERS:

 

A1     Demolition, building or excavation work must not be commenced until;

·      A Construction Certificate has been obtained from Council or an Accredited Certifier

·      Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·      Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2    A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·      Install or erect any site fencing, hoardings or site structures

·      Operate a crane or hoist goods or materials over a footpath or road

·      Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3    Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A4    This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A5      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

CP101/10 Director City Planning Report - 218 Clovelly Road, Randwick  (DA/543/2010)

740/10

RESOLUTION: (Belleli/Andrews) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F of Randwick Local Environmental Plan (Consolidation) 1998, relating to floor space ratio, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 543/2010 for alterations and additions to the existing residential dwelling located above the ground level shop including a new second floor level addition, at No. 218 Clovelly Road, Clovelly, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered A02 to A07, dated 18 march 2010 and received by Council on 13 July 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the existing building and adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning & Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

3.       The stairwell window shall have an obscure glazed finish to ensure sightlines to neighbouring properties are prevented. Details shall be provided as part of an application for a construction certificate

 

4.       Metal roof sheeting is to be pre-painted (e.g. colourbond) and form part of the colour scheme and external finishes for the development.

 

5.       Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

6.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

7.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $120,000 the following applicable monetary levy must be paid to Council: $600.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

8.       In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

9.       In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

10.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

11.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following conditions are applied to satisfy relevant legislative requirements and to provide reasonable levels of safety and amenity:

 

Building regulation & construction

 

12.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

13.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).  Details of compliance are to be provided in the construction certificate.

 

14.     Prior to the commencement of any building work, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment

 

15.     Prior to the commencement of any building or ‘fit-out’ works, the person having the benefit of the development consent must:-

 

·       appoint a Principal Certifying Authority for the building work, and

·       appoint a principal contractor for the building work and notify the Principal Certifying Authority and Council accordingly in writing, and

·       notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

·       give at least two days notice to the Council, in writing, of the person’s intention to commence building works.

 

16.     The works must be inspected by the Principal Certifying Authority, in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

17.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation or use of the development encompassed in this development consent (including alterations, additions and ‘fit-out’ work to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

18.     Where applicable, a Fire Safety Certificate must be submitted to Council prior to the issuing of an Occupation Certificate, in accordance with the requirements of the Environmental Planning and Assessment Regulation 2000.

 

The Fire Safety Certificate must include details of all of the fire safety measures contained in the building and as detailed in the fire safety schedule attached to the Construction Certificate.

 

Prior to issuing any Occupation Certificate the Principal Certifying Authority must be satisfied that all of the relevant fire safety measures have been included and are sufficiently detailed within the Fire Safety Certificate. A copy of the fire safety certificate must be displayed in the building near the entrance and a copy must be forwarded to the NSW Fire Brigades.

 

An annual Fire Safety Statement is also required to be submitted to the Council and the NSW Fire Brigades, each year after the date of the Fire Safety Certificate, in accordance with the Environmental Planning & Assessment Regulation 2000.

 

19.     Any required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

20.     In existing buildings, the following works are to be carried out to ensure minimum levels of fire safety (as applicable):-

 

1)     Any new or replacement ceilings walls and floor linings and doorways are required to satisfy the relevant requirements of the Building Code of Australia. 

 

2)     Any residential parts of the building must be provided with a smoke detection and alarm system, in accordance with the relevant provisions of the Building Code of Australia.

 

3)     Any residential part/s of the building are to be suitably fire-separated from the commercial area encompassed in this development application.

 

Details of the abovementioned items and other building and fire safety works are to be provided in the construction certificate.

 

21.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

1)     If the development involves an excavation or underpinning that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

a)     protect and support the adjoining premises from possible damage from the excavation, and

b)     where necessary, underpin the adjoining premises to prevent any such damage.

 

2)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

22.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

Internal work only within a commercial or industrial development, located in a commercial or industrial zone, which is not audible within any residential dwelling or commercial or industrial premises

·   Monday to Saturday - No time limits (subject to column 1)

·   Sunday & public holidays - No work permitted

Additional requirements for all development, except for single residential dwellings

·   Saturdays and Sundays before or after a public holiday - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

23.     Public health, safety and convenience must be maintained at all times during demolition and building works and the following requirements must be complied with at all times (as applicable):

 

1)     Demolition work must be carried out in accordance with Australian Standard, AS2601 (2001) - The Demolition of Structures and a Demolition Work Plan is required to developed and implemented to the satisfaction of the Principal Certifying Authority prior to commencing any demolition works.

 

2)     The demolition, removal, storage and disposal of any materials containing asbestos must be carried out in accordance with the relevant requirements of WorkCover NSW, Council’s Asbestos Policy and the following requirements:

 

·         A licence must be obtained from WorkCover NSW for the removal of friable asbestos and or more than 10m2  of bonded asbestos (i.e. fibro)

·         Asbestos waste must be disposed of in accordance with the Protection of the Environment Operations Act 1997 & relevant Regulations

·         A sign must be provided to the site/building stating “Danger Asbestos Removal In Progress”

·         A Clearance Certificate or Statement must be obtained from a suitably qualified person (i.e. Occupational Hygienist) upon completion of the asbestos removal works, which is to be submitted to the Principal Certifying Authority and Council prior to issuing an Occupation Certificate.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

3)     A sign must be provided and maintained in a prominent position, which contains the following details:

·         name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours,

·         name, address and telephone number of the Principal Certifying Authority,

·         a statement stating that “unauthorised entry to the work site is prohibited”.

 

4)     The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, trip hazards, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

5)     A Road / Asset Opening application must be submitted to and approved by Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council.  For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

6)     Building materials, sand, soil, waste materials, construction equipment or other materials or articles must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

7)     Bulk bins, waste containers or other articles must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container or other articles in a public place can be made to Council’s Building Services section.

 

8)     During demolition and construction, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council.

 

9)     Public safety must be maintained at all times and public access to any demolition and building works, materials and equipment on the site is to be restricted. If necessary, a temporary safety fence or hoarding is to be provided to protect the public. Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

If it is proposed to locate any site fencing, hoardings or items upon any part of the footpath, nature strip or any public place, a Local Approval application must be submitted to and approved by Council’s Health, Building & Regulatory Services department beforehand. Details and plans are to be submitted with the application, together with payment of the weekly charge in accordance with Council’s adopted Pricing Policy.

 

10)   Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents.

 

The requirements and practices contained in the Protection of the Environment Operations Act 1997 and relevant DECC Construction Noise and Vibration Guidelines are to be satisfied and a Construction Noise and Vibration Management Plan is to be developed and implemented throughout the works to the satisfaction of Council, prior to the commencement of works.

 

Structural adequacy

 

24.     A Certificate prepared by a professional engineer, shall be submitted to the Council prior to the issuing of a construction certificate, certifying the structural adequacy of the existing structure to support the proposed works.

 

25.     A Certificate prepared by a professional engineer, shall be submitted to the Council prior to the issuing of an occupation certificate, certifying the structural adequacy of the building.

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

26.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

27.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following condition is applied to provide adequate consideration for service authority assets:

28.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

The following condition is applied to provide adequate provisions for drainage and associated infrastructure:

 

29.     Stormwater runoff from the site shall be discharged to the kerb and gutter along the site frontage by gravity (without the use of a charged system).

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

30.     The applicant shall meet all costs associated with upgrading the Clovelly Road site frontage in accordance with Council’s Urban Design Elements Manual for Clovelly. All works carried out on Council property, shall be in accordance with Council’s requirements for Civil Works on Council property.

 

A detailed streetscape plan for the Clovelly Road frontage showing proposed paving design, grades, finished levels, extent and location of awnings, doors/entranceways, services and any other details required by Council’s Landscape Architect (9399-0911) shall be submitted to, and approved by, Council’s Director of City Services, prior to the commencement of streetscape works.

 

Following approval of the streetscape plan; and prior to commencement of the streetscape works on Council property, the applicant shall liaise with Council’s Engineering Technical Officer (9399-0922), regarding scheduling of work including inspections, supervision fees and compliance with Council’s requirements for public liability insurance.

 

The approved streetscape works shall be completed to the satisfaction of Council’s Landscape Architect and Engineering Technical Officer, prior to the issue of a Final Occupation Certificate.

 

Advisory

 

A1      The assessment of this development application does not include an assessment of the proposed building work under the Building Code of Australia (BCA).

 

All new building work must comply with the BCA and relevant Australian Standards and details of compliance must be provided in the Construction Certificate application.

 

A2      In existing buildings, the levels of fire and occupant safety should be upgraded where necessary and details should be incorporated in the Construction Certificate to the satisfaction of the Certifying authority.

 

Where the levels of accessibility to existing buildings do not meet current standards, if practicable, the level of accessibility should also be upgraded in conjunction with the proposed development (e.g. via the installation of a 1:8 access ramp within the building) and details included in the construction certificate application.

 

Building owners, applicants and builders are advised to speak to the appointed Certifying Authority prior to lodgement of the Construction Certificate.

 

A3      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

CP102/10 Director City Planning Report - 255 Fitzgerald Avenue, Maroubra (DA/585/2010)

741/10

RESOLUTION: (Belleli/Andrews) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 20E(2) and 20F(1) of Randwick Local Environmental Plan 1998 (Consolidation), relating to Landscaped Area and Floor Space Ratio respectively, on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/585/2010 for alterations and additions to the existing multi unit development including construction of a new community room with conversion of existing unit, additional floor space, relocation of garbage storage area and alterations to landscaping and external paving, at No. 255 Fitzgerald Avenue & 106-108 Yorktown Parade, Maroubra, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered DA02, DA04, DA05 and DA06 (all amendment 1), dated 21 June 2010 and received by Council on 27 July 2010, the application form and on any supporting information received with the application:

 

2.       The colours, materials and finishes of the external surfaces to the works are to be implemented substantially in accordance with the Finished Schedule numbered 468.07 DA08 Amendment 1, dated 21 June 2010 and received by Council on 27 July 2010 and are to be compatible with the existing building and adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

3.       There must be no encroachment of the structure/s onto Council’s road reserve, footway or public place, unless written permission has been obtained from the Council beforehand.

 

4.       Lighting to the premises shall be designed so as not to cause a nuisance to nearby residents.

 

The following condition/s are imposed to satisfy the requirements of the Sydney Water Corporation.

 

5.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation to ensure the development will not adversely affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

6.       In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

7.       In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to Housing New South Wales, to the satisfaction of Housing NSW with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Housing NSW.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained.

 

8.       The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of Housing NSW:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

9.       External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies   the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

10.     The development shall comply with the state’s buildings laws.

 

11.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to commencement of work, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

12.     A copy of the approved construction plans and development consent conditions must be provided to Council and a copy is to be kept on the site at all times and be made available to the Council officers and personnel for assessment.

 

13.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Certifier or other suitability qualified person prior to commencing such excavations or works.

 

14.     Building, demolition and associated site works must be carried out in accordance with the following requirements:

 

Activity

Permitted working hours

All building, demolition and site work, including site deliveries (except as detailed below)

·   Monday to Friday - 7.00am to 5.00pm

·   Saturday - 8.00am to 5.00pm

·   Sunday & public holidays - No work permitted

Excavating of rock, use of jack-hammers, pile-drivers or the like

 

·   Monday to Friday - 8.00am to 5.00pm

·   Saturday - No work permitted

·   Sunday & public holidays - No work permitted

Internal work only within a commercial or industrial development, located in a commercial or industrial zone, which is not audible within any residential dwelling or commercial or industrial premises

·   Monday to Saturday - No time limits (subject to column 1)

·   Sunday & public holidays - No work permitted

Additional requirements for all development, except for single residential dwellings

·   Saturdays and Sundays before or after a public holiday - No work permitted

 

An application to vary the abovementioned hours may be submitted to Council’s Manager Health, Building & Regulatory Services for consideration and approval to vary the specified hours may be granted in exceptional circumstances and for limited occasions (e.g. for public safety, traffic management or road safety reasons).  Any applications are to be made on the standard application form and include payment of the relevant fees and supporting information.  Applications must be made at least 10 days prior to the date of the proposed work and the prior written approval of Council must be obtained to vary the standard permitted working hours.

 

15.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

b)     Building materials, sand, soil, waste materials or construction equipment must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.

 

Applications to place a waste container in a public place can be made to Council’s Building Services section.

 

c)     A temporary timber, asphalt or concrete crossing is to be provided to the site entrance across the kerb and footway area, with splayed edges, to the satisfaction of Council, unless access is via an existing concrete crossover.

 

16.     A Construction Site Management Plan is to be prepared by a suitably qualified person (and a copy is to be forwarded to Council) prior to the commencement of demolition, excavation or building works. The site management plan must include the following measures, as applicable to the type of development:

 

·           location and construction of protective fencing / hoardings to the perimeter of the site;

·           location of site storage areas/sheds/equipment;

·           location of building materials for construction;

·           provisions for public safety;

·           dust control measures;

·           site access location and construction

·           details of methods of disposal of demolition materials;

·           protective measures for tree preservation;

·           provisions for temporary sanitary facilities;

·           location and size of waste containers/bulk bins;

·           details of proposed sediment and erosion control measures;

·           construction noise and vibration management,

·           construction traffic management.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and convenience to the satisfaction of Council.  A copy of the approved Construction Site Management Plan must be maintained on site and be made available to Council officers upon request.

 

17.     During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing.

 

Details of the proposed sediment control measures are to be detailed in a site water management plan and must be prepared prior to the commencement of any site works.  The sediment and erosion control measures must be implemented prior to the commencement of any site works and be maintained throughout construction. A copy of the approved details must be forwarded to the Council and a copy is to be maintained on-site and be made available to Council officers upon request.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

18.     The demolition, removal, storage, handling and disposal of  materials and all building work must be carried out in accordance with the following requirements (as applicable):

 

§   Australian Standard 2601 (2001) – Demolition of Structures

§   Occupational Health and Safety Act 2000

§   Occupational Health and Safety (Hazardous Substances) Regulation 2001

§   Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

§   WorkCover NSW – Guidelines and Codes of Practice

§   Randwick City Council’s Asbestos Policy

§   The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

 

19.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Work Plan must include the following information (as applicable):

 

§   The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

§   Details of hazardous materials, including asbestos

§   Method/s of demolition and removal of asbestos

§   Measures and processes to be implemented to ensure the health & safety of workers and community

§   Measures to be implemented to minimise any airborne asbestos and dust

§   Methods and location of disposal of any asbestos or other hazardous materials

§   Other relevant details, measures and requirements to be implemented as identified in the Asbestos Survey

§   Date the demolition and removal of asbestos will commence

 

The Demolition Work Plan must be submitted to Council and the relevant Building Certifier, not less than two (2) working days before commencing any demolition works involving asbestos products or materials.  A copy of the Demolition Work Plan must also be maintained on site and be made available to Council officers upon request.

 

20.     Construction and demolition Waste shall be managed in general accordance with the undated and unnumbered Waste Management Plan (WMP) (5 sheets in total) received by Council on 27 July 2010.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

21.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

22.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

23.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

24.     That part of the nature-strip upon Council's footway which is damaged during the construction of the proposed works shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu turf or similar. Such works shall be completed at the applicant’s expense.

 

25.     Landscaping at the site shall be installed substantially in accordance with the Landscape Sketch Plan by RFA Landscape Architects, project 2677d, drawing No L-01 dated 02/07/10.

 

Tree Management

 

26.     Approval is granted for removal of the following trees:

 

a)     Only the most eastern Allocasurina glauca (Swamp She Oak), in the group of four trees growing in the area between the existing bin storage area facing Malabar Road, and the pedestrian access facing Yorktown Parade, so as to accommodate the enlarged bin storage area as shown;

 

b)     The row of four Callistemon viminalis (Weeping Bottlebrush), to the south of the 3 most western Swamp She Oaks, to accommodate the proposed planting as shown.

 

Protection of Street Trees

 

27.     In order to ensure retention of the three Banksia integrifolia (Coast Banksia’s) on Council’s verge, at the corner of Malabar Road and Yorktown Parade in good health, the following measures are to be undertaken:

 

a.     Each of these street trees shall be physically protected by the installation of 1.8 metre high steel mesh/chainwire fencing, which shall be located a minimum distance of 1.5 metres on all four sides (measured off the outside edge of their trunks at ground level), so as to completely enclose each tree for the duration of works.

 

b.     This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

c.     The applicant is not authorised to perform any works to these street trees, and shall contact Council’s Landscape Development Officer on 9399-0613 should pruning or any similar such work appear necessary, with the applicant required to cover all associated costs with such work, to Council’s satisfaction, prior to the issue of a final occupation certificate.

 

d.     Within the TPZ, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble.

 

Protection of trees within site

 

28.     The three most western Allocasurina glauca (Swamp She Oaks) in the group between the existing bin storage area facing Malabar Road and the pedestrian access facing Yorktown Parade must be retained as existing site features due to being significant examples of the species in this area, with the following measures to be undertaken:

 

a.   Any new services, pipes, stormwater systems or similar that need to be installed in this area must be located as close as practically possible to the building so as to minimise root damage or disturbance.

 

b.   These three trees are to be physically protected as one group by the installation of 1.8 metre high steel mesh/chainwire fencing, which shall be located a minimum distance of 1 metre to the north of their trunks (measured off the outside edge of its trunk at ground level), matching up with the proposed bin storage area at the eastern end of this group, and the pedestrian access at the western end of this group, so as to completely enclose them as one group for the duration of works.

 

c.   This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

d.   Within the TPZ, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble.

 

e.   Any roots encountered during the course of the approved works must be cut cleanly by hand and the affected area backfilled with clean site soil as soon as practically possible.

 

ADVISORY MATTERS:

 

A1      The applicant is advised that the construction plans and specification must comply with the provisions of the Building Code of Australia (BCA).

 

Details of compliance with the relevant provisions of the Building Code of Australia and conditions of development consent are to be provided in the construction plans and specifications.

 

You are also advised to ensure that the development is not inconsistent with Council's consent and if necessary consult with your certifier prior to preparing your construction plans to enable these matters to be addressed accordingly.

 

A2      You are advised that this approval does not guarantee compliance with the provisions of the Disability Discrimination Act 1992 and you should therefore consider your liability under the Act.  In this regard, you are advised that compliance with the requirements of the Building Code of Australia and Australian Standard 1428.1 - Design for Access and Mobility does not necessarily satisfy the objectives of the Disability Discrimination Act 1992.

 

You are requested to give consideration to providing access and facilities for people with disabilities in accordance with Australian Standard 1428 Parts 1, 2, 3 and 4 - Design for Access and Mobility, which may be necessary to satisfy the objectives of the Disability Discrimination Act 1992.

 

A3      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

CP103/10 Director City Planning Report - 15 Araluen Street, Kingsford (DA/855/2010)

742/10

RESOLUTION: (Belleli/Andrews) -

 

A.       That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F of Randwick Local Environmental Plan 1998, relating to floor space ratio on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.       That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 855/2010 for alterations and additions to the existing semi-detached dwelling at No. 15 Araluen Street, Kingsford, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plan numbered 000-10, dated 7 November 2010 and received by Council on 7 November 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the existing building and adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

3.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

4.       The fence on the street alignment is to be at least 50% open (excluding any piers or posts), to maintain reasonable levels of amenity to the adjoining residential development and the streetscape

 

5.       Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

6.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

7.       In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

8.       In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

9.       The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

10.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following condition is applied to meet additional demands for public facilities;

 

11.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $250,000 the following applicable monetary levy must be paid to Council: $2,500.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

12.     Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

13.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

14.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

15.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

16.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

17.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

18.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·      name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·      name, address and telephone number of the Principal Certifying Authority; and

·      a statement stating that “unauthorised entry to the work site is prohibited”.

 

19.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

20.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

21.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

22.     Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

23.     Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the upper floor addition.

 

24.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·      Occupational Health and Safety Act 2000 & Regulations

·      WorkCover NSW Guidelines & Codes of Practice

·      Australian Standard 2601 (2001) – Demolition of Structures

·      The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·      Relevant DECC/EPA Guidelines

·      Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

25.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

26.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)  If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)   protect and support the adjoining premises from possible damage from the excavation, and

ii)  where necessary, underpin the adjoining premises to prevent any such damage.

 

b)  The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

27.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·      excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·      new dwellings or additions to dwellings sited up to shared property boundaries (e.g. additions to a semi-detached dwelling or a terraced dwelling),

·      excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·      as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

28.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

29.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, is required to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of site works.

 

The Construction Noise Management Plan is to be prepared in accordance with the relevant provisions of the DECC Construction Noise Guideline.

 

30.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

31.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·    location and construction of protective fencing / hoardings to the perimeter of the site;

·    location of site storage areas/sheds/equipment;

·    location of building materials for construction;

·    provisions for public safety;

·    dust control measures;

·    site access location and construction

·    details of methods of disposal of demolition materials;

·    protective measures for tree preservation;

·    provisions for temporary sanitary facilities;

·    location and size of waste containers/bulk bins;

·    details of proposed sediment and erosion control measures;

·    construction noise and vibration management;

·    construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

32.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

Civil Works Conditions

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

33.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)       Construct a concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site.

 

34.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

35.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

Alignment Level Conditions

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

36.     The Council’s Development Engineer has inspected the above site and have determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

37.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the roadway/kerb/footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

38.     The above alignment levels and the site inspection by Council’s Development Engineer have been issued at a prescribed fee of $135.00 (inclusive of GST). This amount is to be paid prior to a construction certificate being issued for the development.

 

Service Authority Conditions

The following conditions are applied to provide adequate consideration for service authority assets:

 

39.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

40.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

41.     Prior to the issuing of a construction certificate the approved plans must be submitted to a Sydney Water Quick Check agent or Customer Centre to determine whether the development will affect any Sydney Water asset’s sewer and water mains, stormwater drains and/or easement, and if further requirements need to be met. Plans will be appropriately stamped.

 

         Please refer to the web site www.sydneywater.com.au for Quick Check agent details and Guidelines for Building Over/Adjacent to Sydney Water Assets.

 

Drainage Conditions

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

42.     Stormwater runoff from the redeveloped portion of site shall be discharged to the kerb and gutter along the site frontage by gravity (without the use of a charged system).

 

Landscape Conditions

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

43.     That part of the nature-strip upon Council's footway which is damaged during the construction of the proposed works shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu turf or similar. Such works shall be completed at the applicant/s expense prior to the issue of a final Occupation Certificate.

 

Street Tree

 

44.     Approval is granted for the applicant to remove and dispose of (at their own cost) the existing Agonis flexuosa (Willow Myrtle), on Council’s Araluen Street nature strip, located centrally across the width of the site, during excavations associated with the proposed vehicle crossing as shown, and must satisfy themselves as to the location of all site services prior to the commencement of any works on public property.

 

45.     The applicant shall submit a total payment of $250.00 (including GST), being to cover Council’s costs to supply and install 1 x 25 litre street tree of the same species back on the Araluen Street verge, to the west of this site, in front of no. 13, at the completion of all works.

 

The contribution shall be paid into Tree Amenity Income at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development.

 

The applicant must contact Council’s Landscape Development Officer on 9399-0613, giving at least four working weeks notice, to arrange for planting of the replacement street tree upon completion of all site works.

 

Tree Removal & Replacement

 

46.     Approval is granted for removal of the Eucalyptus nicholii (Willow Leafed Peppermint) located in the rear yard, along the western boundary, near the southwest corner of the dwelling, due to its poor condition and concerns over its safety and stability.

 

47.     This approval is subject to 1 x 25 litre (pot size at the time of planting) replacement tree, selecting a native species that will achieve a minimum height at maturity of between 4-7 metres being planted in the rear yard, with the species and its location to be shown on the Construction Certificate plans.

 

48.     The PCA must ensure that this replacement tree is properly planted, prior to issuing a Final Occupation Certificate, with the owner to ensure it is maintained in a healthy and vigorous state until maturity.

 

ADVISORY MATTERS:

 

A1     Demolition, building or excavation work must not be commenced until;

 

·      A Construction Certificate has been obtained from Council or an Accredited Certifier

·      Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·      Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2    A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·      Install or erect any site fencing, hoardings or site structures

·      Operate a crane or hoist goods or materials over a footpath or road

·      Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3    Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A4    This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A5    The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

CP104/10 Director City Planning Report - 11 Kitchener Street, Maroubra (DA/795/2010)

743/10

RESOLUTION: (Belleli/Andrews) -

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clause 20F of Randwick Local Environmental Plan (Consolidation) 1998, relating to floor space ratio on the grounds that the proposed development complies with the objectives of the above clauses, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 795/2010 for alterations and additions to the existing semi-detached dwelling at No. 11 Kitchener Street, Maroubra, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered A-03.1, A-03 to A-07, Rev A, dated January 2005 and received by Council on 15 September 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be implemented in accordance with the material sample board received by Council on 15 September 2010.

 

3.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

4.       The proposed front fence including the side fence before the building line and gate shall have a maximum height of 1,500mm, measured from any point of the fence to existing ground level and half of the fence is to be at least 50% open when viewed from Kitchener Street. Details of compliance are to be provided in the construction certificate plans.

 

5.       The proposed pool is to be lowered by 300mm to have a maximum height of 900mm, measured from any point of the pool coping to the existing ground level and the maximum height of the proposed fences on the eastern, western and southern side boundaries are to be lowered by 300mm to have a maximum height of 2.2 metres, measured from any point of the fence to the existing ground level, to maintain reasonable levels of amenity to the adjoining properties. Details of compliance are to be provided in the construction certificate plans.

 

6.       The stairwell window shall have an obscure glazed finish to ensure sightlines to neighbouring properties are prevented. Details of compliance are to be provided in the construction certificate plans.

 

7.       The sill height of the window to Bedroom 2 at first floor level is to be increased to be a minimum height of 1.5m above floor level, or alternatively, the window is to be fixed and provided with translucent, obscured, frosted or sandblasted glazing below 1.5m above floor level. Details of compliance are to be provided in the construction certificate plans.

 

8.       Any gate openings shall be constructed so that the gates, when hung, will be fitted in such a manner that they will not open over the footway or public place.

 

9.       Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

10.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

11.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

12.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

13.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

14.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following condition is applied to meet additional demands for public facilities;

 

15.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $232,100 the following applicable monetary levy must be paid to Council: $2,321.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

16.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

17.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

18.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)     a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)     a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)     a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

 

d)     the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)     at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

19.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

20.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·      name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·      name, address and telephone number of the Principal Certifying Authority; and

·      a statement stating that “unauthorised entry to the work site is prohibited”.

 

21.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

22.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

23.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

24.     Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

25.     Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the upper floor addition.

 

26.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·      Occupational Health and Safety Act 2000 & Regulations

·      WorkCover NSW Guidelines & Codes of Practice

·      Australian Standard 2601 (2001) – Demolition of Structures

·      The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·      Relevant DECC/EPA Guidelines

·      Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

27.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

28.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)  If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)   protect and support the adjoining premises from possible damage from the excavation, and

ii)  where necessary, underpin the adjoining premises to prevent any such damage.

 

b)  The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

29.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·      excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·      new dwellings or additions to dwellings sited up to shared property boundaries (e.g. additions to a semi-detached dwelling or a terraced dwelling),

·      excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·      as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

30.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

31.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, is required to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of site works.

 

The Construction Noise Management Plan is to be prepared in accordance with the relevant provisions of the DECC Construction Noise Guideline.

 

32.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

33.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·    location and construction of protective fencing / hoardings to the perimeter of the site;

·    location of site storage areas/sheds/equipment;

·    location of building materials for construction;

·    provisions for public safety;

·    dust control measures;

·    site access location and construction

·    details of methods of disposal of demolition materials;

·    protective measures for tree preservation;

·    provisions for temporary sanitary facilities;

·    location and size of waste containers/bulk bins;

·    details of proposed sediment and erosion control measures;

·    construction noise and vibration management;

·    construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

34.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following condition has been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

35.     The installation of rainwater tanks shall comply with the following noise control requirements:-

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Climate Change Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tank/s and greywater treatment systems are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with the rainwater tank/s and greywater treatment systems are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

·       before 8.00am or after 8.00pm on weekends or public holiday; or

·       before 7.00am or after 8.00pm on weekdays.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

36.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

37.     All external civil work to be carried out on Council property (including the installation and repair of roads, footpaths, vehicular crossings, kerb and guttering and drainage works), must be carried out in accordance with Council’s Policy for “Vehicular Access and Road and Drainage Works” and the following requirements:

 

a)       All work on Council land must be carried out by Council, unless specific written approval has been obtained from Council to use non-Council contractors.

 

b)       Details of the proposed civil works to be carried out on Council land must be submitted to Council in a Pre-paid Works Application Form, prior to issuing an occupation certificate, together with payment of the relevant fees.

 

c)       If it is proposed to use non-Council contractors to carry out the civil works on Council land, the work must not commence until the written approval has been obtained from Council and the work must be carried out in accordance with the conditions of consent, Council’s design details and payment of a Council design and supervision fee.

 

d)       The civil works must be completed in accordance with Council’s conditions of consent and approved design and construction documentation, prior to occupation of the development, or as otherwise approved by Council in writing.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

38.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

39.     Detailed drainage plans shall be submitted to and approved by the certifying authority prior to the issue of a construction certificate. The drainage plans shall demonstrate compliance with the conditions of this development approval.

 

40.     Stormwater runoff from the site shall be discharged either:

 

a)       To the kerb and gutter along the site frontage by gravity (preferably without the use of a charged system); OR

 

b)       Through a private drainage easement(s) to Council’s kerb and gutter (or underground drainage system); OR

 

c)       To a suitably sized infiltration area. As a guide the infiltration area shall be sized based on a minimum requirement of 1 m2 of infiltration area (together with 1 m3 of storage volume) for every 20 m2 of roof/impervious area on the site.

 

Prior to the use of infiltration in rear draining lots (where there is no formal overland escape route to Council’s kerb and gutter/street drainage system),  a geotechnical investigation will be required to determine whether the ground is suitable for infiltration. Should rock and/or a water table be encountered within two metres of the proposed base of the infiltration pit, or the ground conditions comprise low permeability soils such as clay, infiltration may not be appropriate.

 

NOTE: Should the applicant be unable to obtain a private drainage easement over properties to the rear of the development site (to facilitate stormwater discharge in accordance with option b)); and ground conditions preclude the use of infiltration (Option c), consideration may be given to the use of a charged system or a pump out system to drain that portion of the site that cannot be drained by gravity to the kerb and gutter at the front of the property.

 

41.     Should a charged system be required to drain any portion of the site, the charged system must be designed with suitable clear-outs/inspection points at pipe bends and junctions.

 

42.     Should a pump system be required to drain any portion of the site the system must be designed with a minimum of two pumps being installed, connected in parallel (with each pump capable of discharging at the required discharge rate) and connected to a control board so that each pump will operate alternatively. The pump wet well shall be sized for the 1 in 100 year, 2 hour storm assuming both pumps are not working.

 

The pump system must also be designed and installed strictly in accordance with Randwick City Council's Stormwater Code.

 

43.     All pump out water must pass through a stilling pit prior to being discharged by gravity to the kerb and gutter.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

44.     That part of the nature-strip upon Council's footway which is damaged during the construction of the proposed works shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu turf or similar. Such works shall be completed at the applicant’s expense prior to the issue of a final Occupation Certificate.

 

Pruning of neighbours trees

 

45.     Permission is granted for the selective pruning of only those lowest growing, lower order branches from the eastern aspect of the Citrus x lemon (Lemon Tree) which is growing in the rear yard of the adjoining property to the west, 9 Kitchener Street, as well as from the western aspects of the Melaleuca quinquinervia (Broad Leafed Paperbark) and Leptospermum patersonii (Lemon Scented Tea Tree), both growing in the rear yard of the adjoining property to the east, 11A Kitchener Street, all close to the common boundaries, only where they need to be pruned in order to avoid damage to these trees, or, conflict with the proposed works as shown.

 

46.     This approval does not imply any right of entry onto a neighbouring property nor does it allow pruning beyond a common boundary; however, where such measures are desirable in the best interests of correct pruning procedures, and ultimately, the ongoing health of these trees, the applicant must negotiate with the neighbour/tree owner for access to perform this work.

 

47.     All pruning must be undertaken by an Arborist who holds a minimum of AQF Level V in Arboriculture, and who is also a registered member of a nationally recognised organisation/association, with all pruning to be performed to Australian Standard AS 4373-1996 'Pruning of Amenity Trees.’

 

Protection of Street Tree

 

48.     In order to ensure retention of the Hibiscus tiliaceus (Cottonwood) located on Council’s Kitchener Street nature strip, close to the eastern site boundary in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the Construction Certificate application must show the retention of this street tree, with the position and diameter of both its trunk and canopy to be clearly shown on all drawings.

 

b.       Any new services, pipes, stormwater systems or similar that need to be installed over public property, must be done so along the western site side boundary, so as to minimise root damage and future maintenance issues.

 

c.       This tree is to be physically protected by the installation of 1.8 metre high steel mesh/chainwire fencing, which shall be located a minimum distance of 1 metre to its east and west (measured off the outside edge of its trunk at ground level), matching up with the back of the kerb to its north, and the pedestrian footpath to its south, in order to completely enclose this tree for the duration of works.

 

d.       This fencing shall be installed prior to the commencement of demolition and construction works and shall remain in place until all works are completed, to which signage containing the following words shall be clearly displayed and permanently attached: “TREE PROTECTION ZONE (TPZ), DO NOT REMOVE/ENTER".

 

e.       Within the TPZ, there is to be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble, with all Site Management Plans needing to acknowledge this requirement.

 

f.        The applicant is not authorised to perform any works to this street tree, and shall contact Council’s Landscape Development Officer on 9399-0613 should pruning or any similar such work appear necessary, with the applicant required to cover all associated costs with such work, to Council’s satisfaction, prior to the issue of a Final Occupation Certificate.

 

g.       A refundable deposit in the form of cash, credit card or cheque for an amount of $750.00 shall be paid at the Cashier on the Ground Floor of the Administrative Centre, prior to a Construction Certificate being issued for the development, in order to ensure compliance with the conditions listed in this consent, and ultimately, preservation of this street tree.

 

The refundable deposit will be eligible for refund following the issue of a Final Occupation Certificate, subject to completion and submission of Council’s ‘Security Deposit Refund Application Form’, and pending a satisfactory inspection by Council’s Landscape Development Officer (9399-0613).

 

Any contravention of Council's conditions relating to the tree at any time during the course of the works, or prior to the issue of a final occupation certificate, may result in Council claiming all or part of the lodged security in order to perform any rectification works necessary, as per the requirements of 80A (6) of the Environmental Planning and Assessment Act 1979.

 

Protection of neighbouring trees

 

49.     In order to also ensure retention of the Melaleuca quinquinervia (Broad Leafed Paperbark) and Leptospermum patersonii (Lemon Scented Tea Tree) both located in the rear yard of 11A Kitchener Street, as well as the Citrus x lemon (Lemon Tree) growing in the rear yard of 9 Kitchener Street, all close to the common boundaries in good health, the following measures are to be undertaken:

 

a.       All documentation submitted for the Construction Certificate application must show the retention of these neighbouring trees, with the position and diameter of their trunks and canopies to be clearly shown on all drawings.

b.       Any excavations associated with the installation of new services, pipes, stormwater systems or similar in the rear yard must be setback a minimum distance of 2 metres off the boundary, measured adjacent their trunks.

c.       The new fencing proposed along the eastern site boundary in the rear yard must be a system that utilises localised pad footings only, so as to prevent root damage and future maintenance issues associated with the large Paperbark, with details confirming compliance to be submitted to the satisfaction of the PCA.

d.       There shall be no storage of materials, machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble beneath the extent of the driplines/canopies of these trees, with all Site Management Plans needing to acknowledge this requirement.

e.       Any roots encountered during the course of the approved works must be cut cleanly by hand, and the affected area backfilled with clean site soil as soon as practically possible.

 

ADVISORY MATTERS:

 

A1     Demolition, building or excavation work must not be commenced until;

 

·      A Construction Certificate has been obtained from Council or an Accredited Certifier

·      Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·      Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2    A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·      Install or erect any site fencing, hoardings or site structures

·      Operate a crane or hoist goods or materials over a footpath or road

·      Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3    Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

A4    This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A5    The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Belleli/Andrews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

 

CP105/10  Director City Planning Report - 2 Wolseley Road, Coogee (DA/12/2009)

 

 

 

744/10

Having previously declared an interest in this item, Cr Matthews left the chamber taking no part in the debate or voting on the matter.

 

RESOLUTION: (Notley-Smith/Nash) that the application be deferred for mediation between the applicant and the objectors.

 

MOTION: (Woodsmith/Smith) that this application be refused for the following reasons:

 

1.       The proposed development is inconsistent with the aims and objectives of the Randwick Local Environmental Plan 1998.

 

2.       The proposal fails to meet aim (g) of the Randwick Local Environmental Plan 1998 in that the proposal does not seek to promote, protect and enhance the environmental qualities of the City.

 

3.       The proposed development is contrary to the purpose and numerical requirements of Clause 32(3) of the Randwick Local Environmental Plan 1998 relating to the floor space ratio of the development.

 

4.       The proposal fails to comply with Clause 3.2 – Height of Develo