MINUTES OF Planning Committee Meeting of the

Council of the City of Randwick HELD

ON Tuesday, 11 May 2010 AT 6:27pm

 

Present:

 

The Mayor, Councillor J Procopiadis (West Ward)

 

North Ward                                              - Councillors K Smith, P Tracey &

                                                              M Woodsmith

 

South Ward                                             - Councillors R Belleli, C Matthews &

                                                                A White

 

East Ward                                               - Councillors T Bowen, M Matson &

                                                                B Notley-Smith

                                                              

West Ward                                              - Councillors B Hughes

 

Central Ward                                           - Councillors A Andrews (Chairperson) &

                                                              T Seng & G Stevenson

 

Officers present:

 

General Manager                                             Mr R Brownlee

Director City Services                                      Mr J  Frangoples

Director City Planning                                       Ms S Truuvert

Director Governance & Financial Services             Mr G Banting

Manager Development Assessment                     Mr K Kyriacou

Senior Administrative Coordinator                       Ms J Hartshorn

Media Officer                                                  Ms A Power

 

The meeting was adjourned at 6.27pm and was resumed at 6.39pm.

 

Apologies/Granting of Leave of Absences 

 

Apologies were received from Cr Nash and Notley-Smith.

 

RESOLVED: (Belleli/Smith) that the apologies received from Crs Nash and Notley-Smith be accepted and leave of absences from the meeting be granted.

 

Confirmation of the Minutes

 

Confirmation of the Minutes of the Planning Committee Meeting held on Tuesday 13 April 2010

PL34/10

RESOLUTION: (Matson/Smith) that the Minutes of the Planning Committee Meeting held on Tuesday 13 April 2010 (copies of which were circulated to all Councillors) be and are hereby confirmed as a correct record of the proceedings of that meeting.


Declarations of Pecuniary and Non-Pecuniary Interests

 

a)     Cr Matson declared a non significant non pecuniary interest in Item D26/10 as         one of the objectors assisted with his election campaign at the last Council         elections.

b)     Cr Matson declared a non significant non pecuniary interest in Item D28/10 as         one of the objectors and a speaker on the matter is related to a former         Councillor.

c)     Cr Smith declared a non significant non pecuniary interest in Item D28/10 as         one of objectors is a member of the political party that he represents on         Council.

d)     Cr Belleli declared a non significant non pecuniary interest in Item D28/10 as         one of objectors is a member of the political party that he represents on         Council.

e)     Cr Matthews declared a non significant non pecuniary interest in Item D24/10 as         he knows some of the objectors.

f)     Cr Seng declared a non significant non pecuniary interest in Item D28/10 as         one of objectors is a member of the political party that he represents on         Council.

g)     Cr White declared a non significant non pecuniary interest in Item D28/10 as         one of the objectors and a speaker on the matter is related to a former         Councillor.

h)     Cr Tracey declared a non significant non pecuniary interest in Item D28/10 as         one of the objectors and a speaker on the matter is related to a former         Councillor.

i)      Cr Woodsmith declared a non significant non pecuniary interest in Item D28/10         one of the objectors and a speaker on the matter is related to a former         Councillor.

j)      Cr Hughes declared a non significant non pecuniary interest in Item D28/10 as         one of the objectors and a speaker on the matter is related to a former         Councillor.

 

Address of Council by Members of the Public

Prior to consideration of the Agenda by the Committee, deputations were received in respect of the following matters:

 

D24/10      35 NAPIER STREET, MALABAR

                   Against               Robert Farrugia

               For                      Eleni Katholos

 

D27/10      133 Oberon Street, Coogee

For                      Kristy Lee

 

D28/10      72 Denning Street, South Coogee

Against               Johanne Kenny

For                      Con Hairis - Applicant

 

Urgent Business

Nil.

 

The meeting was adjourned at 7.10pm and was resumed at 7.28pm.
Development Application Reports

 

D24/10     Development Application Report - 35 Napier Street, Malabar (DA/795/2009)

 

 

 

 

PL35/10

Note: A rescission motion on this matter was submitted in accordance with Council’s Code of Meeting Practice and will be considered at the Ordinary Council Meeting to be held on 25 May 2010.

 

RESOLUTION: (Tracey/Belleli) that Council, as the consent authority, refuses development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 795/2009 for demolition of existing structures and construction of new part 2, part 3 storey attached dual occupancy with garaging, swimming pool and associated works at No. 35 Napier Street, Malabar for the following reasons:

 

1.             the proposal has excessive bulk and scale.

 

2.             the proposal will adversely impact on the views from neighbouring properties.

 

3.             the proposal will result in adverse overshadowing to 105 Victoria Street, Malabar.

 

4.             the proposal does not comply with the Floor Space Ratio standard of Council’s LEP

 

MOTION: (Tracey/Belleli) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Belleli

Councillor Andrews

Councillor Bowen

Councillor Hughes

Councillor Matson

Councillor Procopiadis

Councillor Matthews

Councillor Seng

Councillor Smith

Councillor Stevenson

Councillor Tracey

Councillor White

Councillor Woodsmith

 

Total (7)

Total (6)

 

 

D25/10     Development Application Report - 2 - 4 Strachan Street, Kingsford (DA/1077/2007/A)

PL36/10

RESOLUTION: (Belleli/Matthews) that Council, as the consent authority, grant consent under Section 96 of the Environmental Planning and Assessment Act 1979 as amended to modify Development Consent No. DA/1077/07 to provide for a garage above the approved car space at the rear of the property at 2 Strachan Street, Kingsford subject to the following;

 

A       Condition No. 1 be amended to read as follows;

 

1.     The development must be implemented substantially in accordance with the plans numbered job no. 0710, sheets A01 to A08 inclusive dated November 2007 and received by Council on the 20th March 2008 and the plan numbered job no. 0610, sheet A09 dated February 2008 and received by Council on the 20th March 2008, the application form and on any supporting information, as amended by the Section 96 plans numbered 1924-96A, dated 4/11/2009 and received by Council on the 4th November 2009, only in so far as they relate to the modifications highlighted in the Section 96 plans and detailed in the Section 96 application, except as may be amended by the following conditions and as may be shown in red on the attached plans;

 

B       The following condition be included;

 

110.  The proposed garage shall be enlarged to have a minimum internal width of 5.4m. Plans submitted for the amended construction certificate shall demonstrate compliance with this requirement.

 

NOTE: The protrusion of piers into the garage may be ignored when determining minimum internal width.

 

MOTION: (Belleli/Matthews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

D26/10     Development Application Report - 88 - 102 Moverly Road, South Coogee  (DA/126/2010)

PL37/10

RESOLUTION: (Belleli/Matthews) that Council, as the consent authority, grant development consent under of Section 80 and 80A of the Environmental Planning and Assessment Act 1979 to Development Application No. DA/126/2010 for the construction of 24 dwelling houses, public domain works within Stage 3A of Endeavour House site and construction of an extension of pedestrian accessway to Tallow Place at 88-102 Moverly Road, South Coogee, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the following plans:

 

Drawing No.

Revision

Revision Date

Received on 

001

A

02-02-10

25-02-10

003

B

15-04-10

16-04-10

004

A

02-02-10

25-02-10

005

A

02-02-10

25-02-10

006

A

02-02-10

25-02-10

3A-DA-008

A

02-02-10

25-02-10

3A-DA-009

B

14-04-10

16-04-10

3A-DA-010

A

02-02-10

25-02-10

3A-DA-011

A

02-02-10

25-02-10

3A-DA-012

B

14-04-10

16-04-10

3A-DA-013

B

14-04-10

16-04-10

3A-DA-014

C

14-04-10

16-04-10

3A-DA-015

B

15-04-10

16-04-10

3A-DA-016

B

14-04-10

16-04-10

3A-DA-017

B

14-04-10

16-04-10

3A-DA-018

B

14-04-10

16-04-10

3A-DA-019

B

14-04-10

16-04-10

3A-DA-020

B

15-04-10

16-04-10

3A-DA-021

A

02-02-10

25-02-10

3A-DA-022

C

15-04-10

16-04-10

3A-DA-023

B

26-03-10

29-03-10

3A-DA-024

A

02-02-10

25-02-10

3A-DA-025

A

02-02-10

25-02-10

3A-DA-026

C

15-04-10

16-04-10

3A-DA-027

A

02-02-10

25-02-10

3A-DA-028

A

02-02-10

25-02-10

3A-DA-029

A

02-02-10

25-02-10

3A-DA-030

B

15-04-10

16-04-10

3A-DA-031

A

02-02-10

25-02-10

046

A

02-02-10

25-02-10

047

B

22-04-10

23-04-10

 

the application form and any supporting information received with the application, except as may be amended by the following conditions:

 

2.       The colours, materials and finishes of the external surfaces of the dwelling hours are to be consistent with that indicated on the sample board accompanying the subject development application and received by Council on 25 February 2010.

 

3.       Prior to the issue of any occupation certificate for any dwelling erected within the Stage 3 site, the developer must have completed the construction of the following public pedestrian access ways from the internal roads of the development:

 

(a) to the east to Moverly Road, South Coogee through No. 132 Moverly Road as per Development Consent No. 555/2009; and

 

(b) to the west to Grevillea Place, South Coogee through No. 11 Grevillea Place as per Development Consent No. 554/2009.

 

4.       Fences located on the side or rear boundaries of the premises shall not exceed a maximum height of 1800mm, measured above the finished ground level within the individual site.

 

On sloping sites or at changes in ground levels, the maximum height of the fence may exceed the abovementioned specified height by up to 150mm maximum adjacent to any required ‘step-downs’ or changes in ground level.

 

The applicant and owner is advised that the relevant provisions of the Dividing Fences Act 1991 are to be satisfied accordingly and any necessary approvals or agreements should be obtained from the owner/s of the adjoining land beforehand.

 

5.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

6.       Street numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the development.

 

In this regard, an Application must be submitted to and approved by Council’s Director of City Planning, together with the required fee, for the allocation of appropriate street and unit numbers for the development, prior to issuing an occupation certificate.

 

7.       The finished ground levels external to the building are to be consistent with the development consent and are not to be raised (other than for the provision of approved paving or the like on the ground) without the written consent of Council.

 

8.       External lighting to the premises shall be designed so as not to cause a nuisance to nearby residents.

 

The following condition is imposed to satisfy the requirements of the Sydney Water Corporation.

 

9.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities:

 

10.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, the following monetary levy must be paid to Council.

 

Category

Cost

Applicable Levy

S94A Levy

Development Cost more than $200,000

$8,166,400

1%

$81,664

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

11.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

12.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

13.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

14.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments has been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

15.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

16.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

17.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

18.     The building works must be inspected by the Principal Certifying Authority (or other certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

19.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

·        name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·        name, address and telephone number of the Principal Certifying Authority,

·        a statement stating that “unauthorised entry to the work site is prohibited”.

 

20.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

21.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

22.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

23.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority or other suitably qualified person, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

24.     Smoke alarms must be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance with the provisions of the Building Code of Australia must be included in the plans / specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

25.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

26.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

27.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

b)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

28.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

29.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared by a suitably qualified person is to be implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

The Construction Noise Management Plan is to be prepared in accordance with the NSW DECC Construction Noise Guideline.

 

30.     A Registered Surveyor’s check survey certificate or compliance certificate is to be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority:

 

·        prior to construction of the footings or first completed floor slab (prior to the pouring of concrete),

 

·        upon completion of the building, prior to issuing an occupation certificate.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority.  

 

31.     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

32.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

33.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works. The site management plan must include the following measures, as applicable to the type of development:

 

·      location and construction of protective fencing/hoardings to the perimeter of the site;

·      location of site storage areas/sheds/equipment;

·      location of building materials for construction;

·      provisions for public safety;

·      dust control measures;

·      site access location and construction

·      details of methods of disposal of demolition materials;

·      protective measures for tree preservation;

·      provisions for temporary sanitary facilities;

·      location and size of waste containers/bulk bins;

·      details of proposed sediment and erosion control measures;

·      construction noise and vibration management;

·      construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council.  A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

34.     Sediment and erosion control measures must be provided in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

35.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)       Building materials, sand, soil, waste materials, construction equipment or5 other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)       Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

c)       Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)       Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

e)       Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

36.     The air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

37.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min  sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

38.     The installation of rainwater tanks shall comply with the following noise control requirements:-

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tank(s) are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with the rainwater tank(s)  are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

●        before 8.00am or after 8.00pm on weekends or public holiday; or

●        before 7.00am or after 8.00pm on weekdays.

 

The following conditions are applied to ensure that adequate provisions are made for the management of waste from the development:

 

39.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council and details are to be included in the construction certificate documentation.

 

40.     A construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council, prior to the commencement of works.

 

The Waste Management Plan must provide details of the type and quantities of construction waste materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

The following conditions are applied to maintain reasonable levels of environmental health, safety and amenity:

 

41.     The land must be remediated to meet the relevant criteria in the National Environment Protection (Assessment of Site Contamination) Measure (NEPM) 1999 and the following requirements must be complied with:

 

a)     Prior to the commencement of any works, a Remediation Action Plan (RAP) is required to be prepared and be submitted to Council.  The RAP is also required to be reviewed by an independent NSW Department of Environment & Climate Change (DECC) Accredited Site Auditor and a written statement is to be provided to the Council with the RAP from the Site Auditor, which confirms that the RAP satisfies the relevant legislative guidelines and requirements and that the land is able to be remediated to the required level and will be suitable for the intended development and use.

 

b)     The RAP is to be prepared in accordance with the relevant Guidelines made or approved by the NSW Department of Environment & Climate Change, including the Guidelines for Consultants Reporting on Contaminated Sites.

 

This RAP is to include procedures for the following:

 

·           Excavation, removal and disposal of contaminated soil,

·           Site management planning,

·           Validation sampling and analysis,

·           Prevention of cross contamination and migration or release of contaminants,

·           Ground water remediation, dewatering, drainage, monitoring and validation,

·           Unexpected finds.

 

c)     A NSW Department of Environment & Climate Change (formerly EPA) Accredited Site Auditor, accredited under the Contaminated Land Management Act 1997, must be appointed to assess the suitability of the site for its intended development and use. 

 

d)     A Statutory Site Audit Statement and Summary Site Audit Report is to be submitted to Council which verifies that the land has been remediated and the site is suitable for the intended development and satisfies the relevant criteria in the NEPM 1999.

 

Any requirements contained within an Environmental Management Plan (EMP) which forms part of the Site Audit Statement and Site Audit Report, form part of this consent and must be implemented accordingly.  Council is required to be consulted with prior to the development of the EMP and any comments made by Council are required to be taken into consideration prior to finalising the EMP.

 

e)     The site remediation must be carried out to the satisfaction of the Accredited Site Auditor and a Site Audit Statement and Summary Site Audit Report must be submitted to Council prior to:

 

i)      a construction certificate being issued for the development or

ii)      a subdivision certificate being issued for the development, which ever comes first

 

f)      Remediation works shall be carried out in accordance with the requirements of the Contaminated Land Management Act 1997, environmental planning instruments applying to the site, guidelines made by the NSW Department of Environment & Climate Change and Department of Infrastructure Planning & Natural Resources, Randwick City Council’s Contaminated Land Policy 1999 and the Protection of the Environment Operations Act 1997.

 

g)     Should the approved remediation strategy including the ‘capping’ or ‘containment’ of any contaminated land, details are to be included in the Site Audit Statement (SAS) and Environmental Management Plan (EMP) to the satisfaction of the Site Auditor.

 

Details of the SAS and EMP (including capping and containment of contaminated land) are also required to be included on the Certificate of Title for the subject land under the provisions of section 88 of the Conveyancing Act 1919.

 

h)     The Site Audit Statement must, where no guideline made or approved under the NSW Contaminated Land Management Act is available (as with asbestos), clearly state the source of the standard adopted in determining the suitability of the land for the intended development and use and must also demonstrate its suitability to Council.

 

In relation to any asbestos contamination, a comprehensive remediation strategy and remedial action plan must be developed, to the satisfaction of the Site Auditor and NSW Department of Health or other suitably qualified and experienced specialist to the satisfaction of the Site Auditor. 

 

The remediation strategy and remedial action plan must demonstrate that the land will be remediated in accordance with relevant guidelines (if any) and to a level or standard where no unacceptable health risk remains from asbestos exposure, which shall be verified upon completion of the remediation works to the satisfaction of the Site Auditor.

 

i)      A Site Remediation Management Plan must be prepared prior to the commencement of remediation works by a suitably qualified environmental consultant and be implemented throughout remediation works. The Site Remediation Management Plan shall include measures to address the following matters:

 

·       general site management, site security, barriers, traffic management and signage

·           hazard identification and control

·       worker health & safety, work zones and decontamination procedures

·       prevention of cross contamination

·           site drainage and dewatering

·       air and water quality monitoring

·           disposable of hazardous wastes

·           contingency plans and incident reporting

·           details of provisions for monitoring implementation of remediation works and persons/consultants responsible.

 

A copy of the Site Remediation Management Plan is to be forwarded to Council prior to commencing remediation works.

 

j)      Any fill importation to the site is to be monitored and classified by the Site Auditor appointed for remediation of the site or a person with his qualifications. Only ‘Virgin Excavated Natural Material’ (VENM) is to be imported to the site, as detailed in the NSW DECC Waste Classification Guidelines (2008).

 

k)     Hazardous or intractable wastes arising from the demolition, excavation and remediation process being removed and disposed of in accordance with the requirements of WorkCover NSW and the Environment Protection Authority, and with the provisions of:

 

·       New South Wales Occupational Health and Safety Act, 2000;

·       The Occupational Health and Safety (Hazardous Substances) Regulation 2001;

·       The Occupational Health and Safety (Asbestos Removal Work) Regulation 2001;

·       Protection Of the Environment Operations Act 1997 (NSW) and

·       NSW DECC Waste Classification Guidelines (2008).

 

l)      The works must not cause any environmental pollution, public nuisance or, result in an offence under the Protection of the Environment Operations Act 1997 or NSW Occupational Health & Safety Act (2000) & Regulations (2001).

 

m)     Any new information which is identified during remediation, demolition or construction works that has the potential to alter previous conclusions about site contamination or the remediation strategy shall be notified to the Site Auditor and Council immediately in writing.

 

The written concurrence of Council must be obtained prior to implementing any changes to the remediation action plan or strategies.

 

Security Deposit Conditions

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

42.     The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $5000.00   -      Damage/Civil Works Security Deposit

 

      The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

§  Completion of the civil works as conditioned in this development consent by Council.

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

  The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

Traffic conditions/Civil Works Conditions

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

43.     Prior to the issuing of an Occupation Certificate for any of the residential dwellings the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)     Construct full width concrete vehicular crossings and laybacks at kerb opposite the vehicular entrances to the proposed dwellings.

 

44.     All civil infrastructure works within the proposed development site including, but not limited to, construction of the drainage system within the proposed road reserve, construction of the drainage system from the proposed road reserve to the downstream end of the development site, construction of the private interallotment drainage system/s, construction of the road pavement, construction of kerb and gutter, construction of footpaths within the road reserve and construction of vehicular crossings must be undertaken in accordance with the development consent for Stage 1 and the construction certificates for Stages 2 and 3 civil infrastructure works. Construction certificate applications for the proposed dwellings must demonstrate compliance with this requirement.

 

45.     All private interallotment drainage systems and future Council controlled drainage systems within the proposed Stage 3A (Development Application 126/2010) and Stage 2B (Development Application 578/2009) must be completed prior to the issuing of an occupation certificate for any dwelling within Stage 3A. 

 

46.     All new walls adjacent to vehicular crossings must be lowered to a height of 600mm above the internal driveway level for a distance of 1.50m within the site or splayed 1.5 metre by 1.5 metre to provide satisfactory sight lines. Details are to be submitted to the Certifying Authority prior to the release of the construction certificate showing compliance with this condition.

 

47.     Prior to the issue of a construction certificate for the proposed dwellings, the applicant shall submit for approval and have approved by Council's Traffic Engineer a detailed construction traffic management plan. The plan shall demonstrate how construction and delivery vehicles will access the development site during the construction phase of the development.

 

All traffic associated with the subject development shall comply with the terms of the approved construction traffic management plan.

 

Alignment Level Conditions

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

48.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

·      2.5% above the design top of kerb opposite at all points within the proposed Stage 3A development site. 

 

·      Match the existing access way linking the development site with Tallow place.

 

The design alignment level at the property boundary must be strictly adhered to.

 

49.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the roadway/kerb/footpath must be indicated on the building plans for the construction certificate.

 

Service Authority Conditions

The following conditions are applied to provide adequate consideration for service authority assets:

 

50.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

51.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

52.     All street lighting is to be provided on Energy Australia approved light poles and connected to the Energy Australia street lighting system. The light poles shall be consistent with those approved for Stage 2 works.

 

53.     Documentary evidence from the relevant public utility authorities confirming that their requirements have been satisfied, must be submitted to the certifying authority prior to a construction certificate being issued for the development.

 

54.     Any electricity substation required for the site as a consequence of this development shall be located within the site and shall be screened from view. The proposed location and elevation shall be shown on all detailed landscape drawings and specifications. The applicant must liaise with Energy Australia prior to lodging the construction certificate to determine whether or not an electricity substation is required for the development.

 

55.     All services must be located underground.

 

56.     A Section 73 Compliance Certificate under the Sydney water Act 1994 must be obtained. Application must be made through an authorised Water Servicing Coordinator. Please refer to “Your Business” section of Sydney Water’s web site at www.sydneywater.com.au then the “e-developer” icon or telephone 13 20 92.

 

Following application a “Notice of Requirements” will detail water and sewer extensions to be built and charges paid. Please make early contact with the Coordinator, since building of water/sewer extensions can be time consuming and may impact on other services and building, driveway or landscape design.

 

The Notice must be issued to the Principal Certifying Authority prior to the construction certificate being issued.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to occupation of the development.

 

Drainage Conditions

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

57.     The floor level of all habitable areas, storage areas and garages in the proposed dwellings must be a minimum of 300mm above the critical 1 in 100 year ARI flood level. The applicant’s hydraulic consultant, (i.e. the consultant engaged to prepare the drainage system design for the Stage 3 construction certificate), must provide to the certifying authority certification of compliance with this requirement prior to the issuing of a construction certificate for any dwelling.

 

58.     The proposed internal driveways must be designed with a high point at least 150 mm above the critical 1 in 100 year ARI flood level. The applicant’s hydraulic consultant, (i.e. the consultant engaged to prepare the drainage system design for the Stage 2 construction certificate), must provide to the certifying authority certification of compliance with this requirement prior to the issuing of a construction certificate for any dwelling.

 

59.     All stormwater discharge from the proposed dwellings site shall be directed to either the proposed street drainage system, (for houses on the high side of the proposed road) or to the proposed private interallotment drainage system/s for houses that drain away from the road reserve.

 

60.     Detailed drainage plans for each dwelling shall be submitted to and approved by the certifying authority prior to the issue of a construction certificate for that dwelling. The drainage plans shall demonstrate compliance with the conditions of this development approval. All drainage details shall be prepared by a suitably qualified hydraulic consultant who shall, at the completion of the works, certify that the drainage works have been constructed in accordance with the approved drainage plans and relevant standards.

 

Proposed Public Access way Conditions

 

61.     Lighting along the proposed pedestrian access way shall be designed so as not to cause a nuisance to nearby residents or motorists and to ensure that light overspill does not affect the amenity of the area. Full details of the proposed lighting along the proposed pedestrian access way shall be submitted to and approved by Council’s Director City Planning prior to a Construction Certificate being issued for construction of the public access way.

 

62.     Details of fencing along the northern and southern side of the proposed public pedestrian access way shall be submitted to and approved by Council’s Director City Planning prior to a Construction Certificate being issued for construction of the public access way.

 

63.     The proposed 1.5m wide concrete footpath/public pedestrian access way shall be constructed in accordance with Council’s specifications. The applicant must obtain Council’s requirements and specifications for the construction of the concrete footpath/public pedestrian access way prior to lodging the construction certificate for Stage 3A works. The construction certificate for Stage 3A works must demonstrate compliance with Council’s requirements and specification. The applicant must meet the full cost for Council or a Council approved contractor to construct the footpath. Construction of the public pedestrian access way shall be completed prior to the issue of any occupation certificate for any dwelling erected upon the land the subject of Development Applications No. DA/126/2010.

 

64.     Landscaping for the proposed public pedestrian access way shall be carried out in general accordance with the plan prepared by AECOM, drawing number L-DA-942B and dated 21/02/2010.

 

Waste Management Conditions

The following conditions are applied to provide adequate provisions for waste management:

 

65.     A waste storage area shall be provided within each dwelling, screened from view and sized to contain a total of 3 waste bins (1 x 120L garbage bin, 1 x 240L recycling bin & 1 x 240L green waste bin) whilst providing satisfactory access to these bins. The plans submitted for the construction certificate shall demonstrate compliance with this requirement.

 

66.     Prior to the issuing of a construction certificate for the proposed development the applicant is to submit to Council and have approved by Council’s Manager of Waste Services, a Waste Management Plan detailing waste and recycling storage and disposal for the development site.

 

The plan shall detail the type and quantity of waste to be generated by the development; demolition waste; construction waste; materials to be re-used or recycled; facilities/procedures for the storage, collection recycling & disposal of waste and the on-going management of waste.

 

Landscape Conditions

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

67.     Landscaping for each individual lot within Stage 3A must be installed substantially in accordance with the Private Lot Principles & Planting Schedule and Typical House Layouts by AECOM, drawing numbers L-DA-948B, 949B and 950B, revision B, dated 19.02.2010; however, Council requires that the following changes be shown on amended plans, which must be submitted to, and be approved by the PCA for each lot, prior to the issue of Construction Certificates for each dwelling:

 

a)  Deletion of the following species, which are to be replaced with alternative species of similar form and function:

i)   Pennisetum alopecuroides (Fountain Grass) as this species has also demonstrated a capacity to escape cultivation and spread by wind blow seed;

ii)  Coprosma repens (Looking Glass Plant) as it is recognised as an environmental weed which invades areas of native bushland; and

iii)  Poa labillardieri (Poa) as it does not remain evergreen which gives a poor appearance.  

 

b)  Plant schedules must nominate the quantity, location and spacing for all planting proposed within each lot, and must be shown at their full size at maturity in order to avoid future maintenance issues for both the landscaping and dwellings;

 

c)  Any tree plantings that will achieve a height of 6 metres, and/or, a canopy spread of 4 metres upon maturity, must be setback a minimum distance of 2.5 metres from any physical part of a proposed dwelling;

 

d)  Additional notation or details for soil, mulch, edging, paving, fencing, surface finishes, retaining walls or any other landscape elements in order to fully describe the proposed landscape works;

 

e)  Any hydraulic/stormwater systems must attempt to reduce the placement of detention tanks and pits within areas of private open space so as to maximise the useability of these areas by future occupants.

 

68.     The landscaping must be installed in accordance with the approved documentation, prior to the issue of a Final Occupation Certificate, and must be maintained in accordance with these plans.

 

ADVISORY MATTERS:

 

A1      Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Certification Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Certification Services on 9399 0944.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A4      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A5      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Belleli/Matthews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 


 

 

D27/10     Development Application Report - 133 Oberon Street, Coogee (DA/960/2009)

PL38/10

RESOLUTION: (Belleli/Matthews) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/960/2009 for demolition of the existing dwelling and garage and construction of a new split level dwelling with double garage at 133 Oberon Street, Coogee, subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered 3, 6 – 17, 16a, 17a and 19, dated 16/3/10 and plan numbered 18 dated 14/8/09, all received by Council on 22 March 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

3.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

4.       Street numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the development.

 

5.       The finished ground levels external to the building are to be consistent with the development consent and are not to be raised (other than for the provision of approved paving or the like on the ground) without the written consent of Council.

 

6.       External lighting to the premises shall be designed so as not to cause a nuisance to nearby residents.

 

7.       No cooking facilities or sanitary fittings other than those indicated on the approved plans are to be installed in the premises without the prior written consent of the Council.

 

8.       Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

9.       Prior to the issuing of a construction certificate the applicant is to amend the submitted plans to show the driveway opening at the site frontage being extended to a total width of 3.50m (the opening is to be extended in a westerly direction).

 

The following condition/s are imposed to satisfy the requirements of the Sydney Water Corporation.

 

10.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

11.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $900,000.00, the following applicable monetary levy must be paid to Council: $9,000.00.

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

12.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

13.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

14.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

15.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

16.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

17.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

18.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

19.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

20.     The building works must be inspected by the Principal Certifying Authority (or other certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

21.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·        name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·        name, address and telephone number of the Principal Certifying Authority,

·        a statement stating that “unauthorised entry to the work site is prohibited”.

 

22.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

23.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

24.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

25.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority or other suitably qualified person, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

26.     Smoke alarms must be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance with the provisions of the Building Code of Australia must be included in the plans / specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

27.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change and Randwick City Council policies, including:

 

·          Occupational Health & Safety Act 2000 & Regulations

·          WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·          WorkCover NSW Guidelines and Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

28.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

29.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy (adopted 13 September 2005)

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

30.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

31.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

32.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

 

b)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

33.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

34.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared by a suitably qualified person is to be implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

The Construction Noise Management Plan is to be prepared in accordance with the NSW DECC Construction Noise Guideline.

 

35.     A Registered Surveyor’s check survey certificate or compliance certificate is to be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority:

 

·        prior to construction of the footings or first completed floor slab (prior to the pouring of concrete),

 

·        upon completion of the building, prior to issuing an occupation certificate.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority.  

 

36.     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

37.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

38.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works. The site management plan must include the following measures, as applicable to the type of development:

 

·      location and construction of protective fencing/hoardings to the perimeter of the site;

·      location of site storage areas/sheds/equipment;

·      location of building materials for construction;

·      provisions for public safety;

·      dust control measures;

·      site access location and construction

·      details of methods of disposal of demolition materials;

·      protective measures for tree preservation;

·      provisions for temporary sanitary facilities;

·      location and size of waste containers/bulk bins;

·      details of proposed sediment and erosion control measures;

·      construction noise and vibration management;

·      construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council.  A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

39.     Sediment and erosion control measures must be provided in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

40.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)       Building materials, sand, soil, waste materials, construction equipment or5 other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)       Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

c)       Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)       Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

e)       Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following conditions are applied to ensure compliance with the Swimming Pools Act 1992 and to maintain public safety and amenity:

 

41.     Swimming pools are to be provided with childproof fences and self-locking gates, in accordance with the Swimming Pools Act 1992 and regulations.

 

The swimming pool is to be surrounded by a fence having a minimum height of 1.2m, that separates the pool from any residential building situated on the premises and from any place (whether public or private) adjoining the premises; and that is designed, constructed and installed in accordance with AS 1926.1 - 2007.

 

Gates to pool area shall be a maximum width of 1 metre, and be self-closing and latching; the gate is required to open outwards from the pool area and prevent a small child opening the gate or door when the gate or door is closed.

 

Temporary pool safety fencing is to be provided pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

A ‘warning notice’ must be erected in a prominent position in the immediate vicinity of the swimming pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

42.     Written notification must be provided to Council advising of the installation and completion of the Swimming Pool (or Spa Pool), to satisfy the requirements of the Swimming Pools Act 1992, prior to issuing an Occupation Certificate.

 

Council’s “Notification & Registration of a Swimming Pool” form must be completed and forwarded to Council prior to any Occupation Certificate being issued for the pool.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

43.     The air conditioning plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

 

·       before 8.00am or after 10.00pm on any Saturday, Sunday or public holiday; or

·       before 7.00am or after 10.00pm on any other day.

 

44.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min  sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

45.     The installation of rainwater tanks shall comply with the following noise control requirements:-

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tank(s) are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with the rainwater tank(s)  are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

●        before 8.00am or after 8.00pm on weekends or public holiday; or

●        before 7.00am or after 8.00pm on weekdays.

 

The following conditions are applied to ensure that adequate provisions are made for the management of waste from the development:

 

46.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council and details are to be included in the construction certificate documentation.

 

47.     A demolition and construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council, prior to the commencement of works.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

48.     The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)     $1000.00 -      Damage/Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

●        A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

●        Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

49.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)       Construct concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site.

 

b)       Remove the redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

 

50.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

51.     The applicant shall note that all external work, carried out on Council property, shall be in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works". An application for the cost of the Council civil works is to be submitted to Council at the completion of the internal building works. An application fee shall be payable to Council for the quotation of the required works. The applicant may elect to use his contractor for the required works, subject to Council approval, however a design and supervision fee based on the lowest quotation from Council's nominated contractor will be required to be paid prior to the commencement of any works.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

52.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level at the property boundary for driveways, access ramps and pathways or the like, must match the back of the existing footpath along the full site frontage.

 

53.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

54.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $461.00 calculated at $44.00 (inclusive of GST) per metre of site frontage. This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

55.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

56.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

57.     A Road/Asset Opening Permit must be obtained from Council prior to carrying out any public utility service works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

58.     Generally all site stormwater shall be piped to a sediment/silt arrester pit that drains to an infiltration area with a minimum 5 m2 base area. An overflow pipe shall be provided from the silt arrestor pit to drain to Council's kerb and gutter.

 

The location and details of the proposed internal stormwater pipelines, silt arrestor pit and the infiltration area shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the plans shall be forwarded to Council, prior to a construction certificate being issued, if Council is not the certifying authority.

 

Notes:

 

a)       The sediment/silt arrestor pit shall be constructed:

 

i.   within the site at or near the street boundary.

ii.   with a child proof and corrosion resistant fastening system (e.g. spring loaded jay-bolt).

iii.  with a minimum of 4 x 90 mm diameter weep holes (preferably located in the walls of the pit at the floor level) and with a suitable geotextile material with a high filtration rating located around the weep holes.

iv.  with the pit floor being a minimum 300mm below the invert level of the outlet pipelines.

v.  with a galvanised heavy duty screen (Lysaght RH3030 Maximesh or similar) located over the outlet pipes draining to the infiltration pit and the kerb. (Similar to a Mascot GRC stormwater discharge control pit, product code DS3SDC).

 

b)       The infiltration/rubble pit shall:

 

i.   have a minimum 300 mm of soil cover (600 mm where the pit is located under a garden/landscaping area).

ii.   be located a minimum of 3.0 metres from the dwelling or other structure (closer if a structural engineer certifies that the infiltration area will not adversely affect the structure) and 2.1 metres from the adjacent side or rear boundaries.

iii.  be constructed with a minimum 200 mm thick layer of 20 mm basalt/blue metal (or similar) that is wrapped in a suitable geotextile material covering with a high filtration rating (Geofabrics Bidim "A" range of filtration fabrics or equivalent). A suitable means of dispersing the stormwater over the area of infiltration is to be constructed.

iv.  Note:  other equivalent methods of infiltration may be adopted.

v.  have a minimum base area of  5.0 square metres (m2).

 

The outlet from the silt arrestor pit to the infiltration area shall be located at least 50 mm below the outlet from the silt arrestor pit to the kerb and gutter.

 

c)       The requirement for an infiltration/rubble pit will not be enforced should the underground soil conditions preclude the construction of the infiltration pit (eg rock is located within 300 mm of the base of the infiltration area). If the infiltration/rubble pit is not constructed then all site stormwater shall be discharged to the kerb and gutter via a sediment/silt arrestor pit (as detailed in note a. above).

 

All works shall be to the satisfaction of the certifying authority.

 

d)       The overflow pipe/s from the rainwater tank/s shall be directed into the infiltration area.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

59.     A landscape plan prepared by a qualified professional in the Landscape/Horticultural industry (must be a registered member of either AILDM or AILA) shall be submitted to, and be approved by the PCA, prior to the issue of a construction certificate (with a copy of the approved plan to be forwarded to Council prior to the commencement of site works if not the PCA) and must detail the following:

 

a)       A Planting Plan & Plant Schedule which includes proposed species, botanic and common names, pot size at the time of planting, quantity, location, dimensions at maturity, maintenance practices (hedging, shaping etc), as well as any other landscape details to describe the proposed works;

 

b)       A predominance of species with low water requirements that can withstand poor quality sandy soils;

 

c)       A total number of 1 x 25 litre (pot size at the time of planting) tree within the front portion of the site, selecting a species which will attain a minimum height of between 4-7 metres at maturity.

 

60.     The landscaping shall be installed in accordance with the approved documentation prior to the issue of a final occupation certificate and shall be maintained in accordance with those plans.

 

ADVISORY MATTERS:

 

A1      Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Certification Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Certification Services on 9399 0944.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A4      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Belleli/Matthews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

D28/10     Development Application Report - 72 Denning Street, South Coogee (DA/739/2009)

PL39/10

RESOLUTION: (Matthews/Hughes) that Council, as the consent authority, grants development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. DA/739/2009 for demolition of existing structures on the site and the construction of a new part two (2) part three (3) storey dwelling house with semi basement garage, rear swimming pool and associated site works at 72 Denning Street, South Coogee, subject to the following conditions:

 

REFERENCED PLANS

 

1.       The development must be implemented substantially in accordance with the plan numbered 02a, dated 12/10/2009 and received by Council on 13 October 2009, and plans numbered 03b, 04b and 05b, dated 12/10/2009 and received by Council on 2 March 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

ENVIRONMENTAL AMENITY

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

2.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

3.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

4.       Street numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the development.

 

5.       The finished ground levels external to the building are to be consistent with the development consent and are not to be raised (other than for the provision of approved paving or the like on the ground) without the written consent of Council.

 

6.       External lighting to the premises shall be designed so as not to cause a nuisance to nearby residents.

 

7.       No cooking facilities or sanitary fittings other than those indicated on the approved plans are to be installed in the premises without the prior written consent of the Council.

 

8.       Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

The following condition/s are imposed to satisfy the requirements of the Sydney Water Corporation.

 

9.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

10.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $1,129,000, the following applicable monetary levy must be paid to Council: $11,290.

       

The levy must be paid in cash, bank cheque or by credit card prior to

 

a)   a construction certificate being issued

 

for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

11.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

12.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

13.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

14.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

15.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

16.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

17.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

18.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

19.     The building works must be inspected by the Principal Certifying Authority (or other certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

20.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

·        name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·        name, address and telephone number of the Principal Certifying Authority,

·        a statement stating that “unauthorised entry to the work site is prohibited”.

 

21.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

22.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

23.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

24.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority or other suitably qualified person, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

25.     Smoke alarms must be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.  Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

26.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change and Randwick City Council policies, including:

 

·          Occupational Health & Safety Act 2000 & Regulations

·          WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·          WorkCover NSW Guidelines and Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

27.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council not less than 2 days before commencing those works.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

28.     Any work involving the demolition, storage or disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

·          Relevant Occupational Health & Safety legislation and WorkCover NSW requirements

 

·          Randwick City Council’s Asbestos Policy (adopted 13 September 2005)

 

·          A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

·          On sites involving the removal of asbestos, a sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS’ and include details of the licensed contractor.

 

·          Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 2005.

 

·          A Clearance Certificate or Statement, prepared by a suitably qualified person (ie an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council and the Principal certifying authority upon completion of the asbestos related works which confirms that the asbestos material have been removed appropriately and the relevant conditions of consent have been satisfied.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development Section or a copy can be obtained from Council’s Customer Service Centre.

 

29.     A dilapidation report prepared by a professional engineer, building surveyor or other suitably qualified independent person must be submitted to the satisfaction of the Principal Certifying Authority prior to commencement of any demolition, excavation or building works, in the following cases:

 

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are proposed to be located within the zone of influence of the footings of any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          new dwellings or additions to dwellings sited up to shared property boundaries (e.g.  additions to a semi-detached dwelling or terraced dwellings),

·          excavations for new dwellings, additions to dwellings, swimming pools or the like which are within rock and may result in vibration and or potential damage to any dwelling, associated garage or other substantial structure located upon an adjoining  premises,

·          as otherwise may be required by the Principal Certifying Authority.

 

The report (including photographs) are required to detail the current condition and status of any dwelling, associated garage or other substantial structure located upon the adjoining premises, which may be affected by the subject works.  A copy of the dilapidation report is to be given to the owners of the premises encompassed in the report/s before commencing any works.

 

30.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

31.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 E of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that the adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

a)     If the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development must, at the person’s own expense:

 

i)      protect and support the adjoining premises from possible damage from the excavation, and

ii)      where necessary, underpin the adjoining premises to prevent any such damage.

b)     The condition referred to in subclause 1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

 

32.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

33.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery, pile drivers and all plant and equipment must be minimised, by using appropriate plant and equipment, silencers and the implementation of noise management strategies.

 

A Construction Noise Management Plan, prepared by a suitably qualified person is to be implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of works.

 

The Construction Noise Management Plan is to be prepared in accordance with the NSW DECC Construction Noise Guideline.

 

34.     A Registered Surveyor’s check survey certificate or compliance certificate is to be obtained at the following stage/s of construction to demonstrate compliance with the approved setbacks, levels, layout and height of the building to the satisfaction of the Principal Certifying Authority:

 

·        prior to construction of the footings or first completed floor slab (prior to the pouring of concrete),

 

·        upon completion of the building, prior to issuing an occupation certificate.

 

The survey documentation must be forwarded to the Principal Certifying Authority and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority.  

 

35.     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

36.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

37.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works. The site management plan must include the following measures, as applicable to the type of development:

 

·      location and construction of protective fencing/hoardings to the perimeter of the site;

·      location of site storage areas/sheds/equipment;

·      location of building materials for construction;

·      provisions for public safety;

·      dust control measures;

·      site access location and construction

·      details of methods of disposal of demolition materials;

·      protective measures for tree preservation;

·      provisions for temporary sanitary facilities;

·      location and size of waste containers/bulk bins;

·      details of proposed sediment and erosion control measures;

·      construction noise and vibration management;

·      construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council.  A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

38.     Sediment and erosion control measures must be provided in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to Council’s satisfaction.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

39.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)       Building materials, sand, soil, waste materials, construction equipment or5 other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)       Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

c)       Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)       Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

e)       Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

The following conditions are applied to ensure compliance with the Swimming Pools Act 1992 and to maintain public safety and amenity:

 

40.     Swimming pools are to be provided with childproof fences and self-locking gates, in accordance with the Swimming Pools Act 1992 and regulations.

 

The swimming pool is to be surrounded by a fence having a minimum height of 1.2m, that separates the pool from any residential building situated on the premises and from any place (whether public or private) adjoining the premises; and that is designed, constructed and installed in accordance with AS 1926.1 - 2007.

 

Gates to pool area shall be a maximum width of 1 metre, and be self-closing and latching; the gate is required to open outwards from the pool area and prevent a small child opening the gate or door when the gate or door is closed.

 

Temporary pool safety fencing is to be provided pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

A ‘warning notice’ must be erected in a prominent position in the immediate vicinity of the swimming pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

41.     Swimming pools are to be designed, installed and operated in accordance with the following general requirements:

 

a)       Backwash of the pool filter and other discharge of water is to be drained to the sewer in accordance with the requirements of the Sydney Water Corporation; and

b)       All pool overflow water is to be drained away from the building and adjoining premises, so as not to result in a nuisance or damage to premises; and

c)       Water recirculation and filtrations systems are required to comply with AS 1926.3 – 2003:  Swimming Pool Safety – Water Recirculation and Filtration Systems; and

d)       Pool plant and equipment is to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents; and

e)       The pool plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

i.      before 8.00am or after 8.00pm on any Sunday or public holiday; or

ii.     before 7.00am or after 8.00pm on any other day.

 

42.     Written notification must be provided to Council advising of the installation and completion of the Swimming Pool (or Spa Pool), to satisfy the requirements of the Swimming Pools Act 1992, prior to issuing an Occupation Certificate.

 

Council’s “Notification & Registration of a Swimming Pool” form must be completed and forwarded to Council prior to any Occupation Certificate being issued for the pool.

 

43.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min  sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

44.     The installation of rainwater tanks shall comply with the following noise control requirements:

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tank(s) are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with the rainwater tank(s)  are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

●        before 8.00am or after 8.00pm on weekends or public holiday; or

●        before 7.00am or after 8.00pm on weekdays.

 

The following conditions are applied to ensure that adequate provisions are made for the management of waste from the development:

 

45.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council and details are to be included in the construction certificate documentation.

 

46.     A demolition and construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council, prior to the commencement of works.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

47.     The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $1000.00   -      Damage/Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

48.     Prior to the issuing of an occupation certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a.  Construct concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site.

 

b.  Remove the redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

 

c.  Reconstruct a 1.3m wide concrete footpath along the full site frontage.  Any unpaved areas on the nature strip must be turfed and landscaped to Council’s specification.

 

49.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

50.     The applicant shall note that all external work, carried out on Council property, shall be in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works". An application for the cost of the Council civil works is to be submitted to Council at the completion of the internal building works. An application fee shall be payable to Council for the quotation of the required works. The applicant may elect to use his contractor for the required works, subject to Council approval, however a design and supervision fee based on the lowest quotation from Council's nominated contractor will be required to be paid prior to the commencement of any works.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

51.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level at the property boundary for driveways, access ramps and pathways or the like, shall be;

 

§ Graded in a straight line from 80mm ABOVE the top of the kerb opposite at the south eastern boundary corner to 200mm ABOVE the top of the kerb opposite at the north eastern boundary corner, along the full site frontage.

 

Any queries regarding the above alignment levels shall be directed to Council’s Development Engineer Jason Rider on 9399-0881

 

52.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the roadway/kerb/footpath must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

53.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $442 calculated at $44.00 (inclusive of GST) per metre of site frontage. This amount is to be paid prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

54.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

55.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

56.     A Road/Asset Opening Permit must be obtained from Council prior to carrying out any public utility service works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Councils Road/Asset Opening Officer on 9399 0691 or 9399 0999.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

57.     Generally all site stormwater shall be piped to a sediment/silt arrester pit that drains to Council's kerb and gutter in Denning Street.

 

The location and details of the proposed internal stormwater pipelines and silt arrestor pit shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the plans shall be forwarded to Council, prior to a construction certificate being issued, if Council is not the certifying authority.

 

Notes:

 

a.  The sediment/silt arrestor pit shall be constructed:-

 

i.        within the site at or near the street boundary.

i.        with a child proof and corrosion resistant fastening system (e.g. spring loaded jay-bolt).

ii.       with a minimum of 4 x 90 mm diameter weep holes (preferably located in the walls of the pit at the floor level) and with a suitable geotextile material with a high filtration rating located around the weep holes.

iii.       with the pit floor being a minimum 300mm below the invert level of the outlet pipelines.

iv.      with a galvanised heavy duty screen (Lysaght RH3030 Maximesh or similar) located over the outlet pipes draining to the infiltration pit and the kerb. (Similar to a Mascot GRC stormwater discharge control pit, product code DS3SDC).

v.       With a sign adjacent to the pit stating that “This sediment/silt arrester pit shall be regularly inspected and cleaned”

 

Note: Sketch details of a standard sediment/silt arrester pit can be obtained from Council’s Development Engineer.

 

b.  The overflow pipe from the rainwater tank shall be directed to the sediment arrestor pit.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

58.     The naturestrip upon Council's footway shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

Tree Management

 

59.     The applicant shall submit a total payment of $107.25 (incl. GST)  to Council,

 

a.       Being the cost for Council to supply and install 1 x 25 litre street tree of the species Callistemon viminalis (Weeping Bottlebrush) at the completion of all works on Council’s footpath on the northern side of the vehicular crossing.

 

The contribution shall be paid into Tree Amenity Income account no 4001.768401 at the Cashier on the Ground Floor of the Administrative Centre prior to a construction certificate being issued for the development.

 

The applicant will be required to contact Council’s Landscape Development Officer on 9399-0613, giving at least two working weeks notice, to arrange for provision of the street tree upon completion.

 

60.     A landscape plan prepared by a qualified professional in the Landscape/Horticultural industry (must be a registered member of either AILDM or AILA) shall be submitted to, and be approved by the PCA, prior to the issue of a construction certificate (with a copy of the approved plan to be forwarded to Council prior to the commencement of site works if not the PCA) and must detail the following:

 

a.   A Planting Plan & Plant Schedule which includes proposed species, botanic and common names, pot size at the time of planting, quantity, location, dimensions at maturity, maintenance practices (hedging, shaping etc), as well as any other landscape details to describe the proposed works;

 

b.   A predominance of species with low water requirements that can withstand poor quality sandy soils;

 

c.   A total number of 2 x 25 litre (pot size at the time of planting) trees within the site, comprising one each within the front and rear portions of the site, selecting those species which will attain a minimum height of between 4-7 metres at maturity;

 

Advisory Conditions

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

AMENDMENT: (Tracey/Matson) that the recommendation be adopted, subject to an additional condition of consent requiring a single driveway entrance from the street. LOST.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Bowen

Councillor Andrews

Councillor Hughes

Councillor Belleli

Councillor Matson

Councillor Matthews

Councillor Smith

Councillor Procopiadis

Councillor Tracey

Councillor Seng

Councillor Woodsmith

Councillor Stevenson

 

Councillor White

Total (6)

Total (7)

 

MOTION: (Matthews/Hughes) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Smith

Councillor Belleli

Councillor Tracey

Councillor Bowen

Councillor Woodsmith

Councillor Hughes

 

Councillor Matson

 

Councillor Matthews

 

Councillor Procopiadis

 

Councillor Seng

 

Councillor Stevenson

 

Councillor White

 

Total (10)

Total (3)

 

 

D29/10     Development Application Report - 4 Marville Avenue, Kingsford (DA/100/2010)

PL40/10

RESOLUTION: (Hughes/Matson) that Council, as the consent authority, grant development consent under of Section 80 and 80A of the Environmental Planning and Assessment Act 1979 to Development Application No. DA/100/2010 for alterations and additions to the dwelling at 4 Marville Avenue, Kingsford, subject to the following conditions;

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning & Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered 09-336/01 to 09-336/05 inclusive, dated 15/02/10 and received by Council on the 19th February 2010, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       The external materials, colours and finishes of the building are required to match, as closely as possible, the existing building.

 

3.       The design, materials and colour of the roofing to the proposed building/s is required to match, as closely as possible, the existing roof.

 

4.       Open-able windows to a room, corridor, stairway or the like with a floor level more than 4m above the external ground/surface level, must be designed and constructed to reduce the likelihood of a child accessing and falling through the window opening.

 

Options may include one or more of the following measures:

 

i)        The window having a minimum sill height of 1.5m above the internal floor level,

ii)       Providing a window locking device at least 1.5m above the internal floor level,

iii)       Fixing or securing the window (e.g. by screws or a window locking device) to restrict or to be able to secure the extent of the opening to a maximum of 125mm,

iv)      Installing a fixed heavy-duty gauge metal screen over the opening (e.g. A metal security screen or metal security mesh and frame system, but not standard fly-screen material),

v)       Other appropriate effective safety measures or barrier.

 

5.             To maintain a reasonable degree of privacy to the adjoining property, the window to the sitting room within the south-eastern side elevation of the dwelling is to be amended to have a sill height 1500mm above floor level. The plans accompanying the Construction Certificate are to be amended accordingly.

 

6.             The window to the stairwell shall be constructed of obscure/opaque glass. Details shall be included in the construction certificate application.

 

The following condition is imposed to satisfy relevant requirements of the Sydney Water Corporation.

 

7.       All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

8.       In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $ 163 760 the following applicable monetary levy must be paid to Council: $ 818.80.

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

9.       In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

10.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

11.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

12.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

13.     Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

14.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

15.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA).

 

16.     Prior to the commencement of any building works, the following requirements must be complied with:

 

a)    a Construction Certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.

 

A copy of the construction certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

b)    a Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and

 

c)    a principal contractor must be appointed for the building work, or in relation to residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council are to be notified accordingly; and

                                        

d)    the principal contractor must be advised of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

e)    at least two days notice must be given to the Council, in writing, prior to commencing building works.

 

17.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

18.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·          name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·          name, address and telephone number of the Principal Certifying Authority; and

·          a statement stating that “unauthorised entry to the work site is prohibited”.

 

19.     In accordance with section 80 A (11) of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, the requirements of the Home Building Act 1989 must be complied with.

 

Details of the Licensed Building Contractor (and a copy of the relevant Certificate of Insurance) or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council, in writing, prior to commencement of works.

 

20.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

21.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

22.     Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

23.     Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the proposed new upper level.

 

23.     The demolition of buildings and the removal, storage, handling and disposal of building materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Climate Change (formerly EPA) and Randwick City Council policies, including:

 

·          Occupational Health and Safety Act 2000 & Regulations

·          WorkCover NSW Guidelines & Codes of Practice

·          Australian Standard 2601 (2001) – Demolition of Structures

·          The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 2005

·          Relevant DECC/EPA Guidelines

·          Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

24.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Demolition Work Plan must include the following information (as applicable):

·          The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·          Details of hazardous materials (including asbestos)

·          Method/s of demolition (including removal of any asbestos)

·          Measures and processes to be implemented to ensure the health & safety of workers and community

·          Measures to be implemented to minimise any airborne dust and asbestos

·          Methods and location of disposal of any hazardous materials

·          Other relevant details, measures and requirements to be implemented

·          Date the demolition works will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition work.  A copy of the Demolition Work Plan must be maintained on site and be made available to Council officers upon request.

 

If the work involves asbestos products or materials, a copy of the Demolition Work Plan must also be provided to Council, not less than 2 days before commencing such works.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

25.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

26.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant requirements of the Protection of the Environment Operations Act 1997 and NSW DECC Guidelines must be satisfied at all times.

 

A Construction Noise Management Plan, is required to be developed and implemented throughout the works, to the satisfaction of the Council.  A copy of the strategy must be provided to the Principal Certifying Authority and Council prior to the commencement of site works.

 

The Construction Noise Management Plan is to be prepared in accordance with the relevant provisions of the DECC Construction Noise Guideline.

 

27.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied, to the satisfaction of Council.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

28.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of any works.  The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing/hoardings to the perimeter of the site;

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction

·       details of methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·       construction noise and vibration management;

·       construction traffic management details.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and amenity to the satisfaction of Council. 

 

A copy of the Construction Site Management Plan must be provided to the Principal Certifying Authority and Council.  A copy must also be maintained on site and be made available to Council officers upon request.

 

The sediment and erosion control measures are to be in accordance with the manual for Managing Urban Stormwater – Soils and Construction, published by Landcom, to the satisfaction of Council and details are to be provided in the Construction Site Management Plan. 

 

29.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     Building materials, sand, soil, waste materials, construction equipment or other activities must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

c)     Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container in a public place can be made to Council’s Health Building and Regulatory Services section.

 

d)     Any part of Council’s road, footway or nature strip which is damaged as a result of the work must be repaired or replaced to Council’s satisfaction.

 

30.     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road/Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Council’s Road/Asset Opening Officer on 9399 0691 or 9399 0999.

 

ADVISORY MATTERS:

 

A1      Demolition, building or excavation work must not be commenced until;

 

·          A Construction Certificate has been obtained from Council or an Accredited Certifier

·          Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·          Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip (greater than 3m in length) or any container or other article.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the certifying authority.

 

This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate

 

MOTION: (Hughes/Matson) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

Miscellaneous Reports

 

M9/10       Miscellaneous Report - Use of Trans Fats in Randwick City Council (F2004/08221)

PL41/10

RESOLUTION: (Belleli/Matson) that Council:

 

a)     adopts the following Policy Statements to address and discourage the use of         hydrogenated oils (trans fats) in the preparation of food:

 

i)    “Randwick City Council acknowledges the detrimental impact that the level and use of trans fats may have on the health of the community.”

 

ii)   Randwick City Council will promote and participate in the development and implementation of national, regional and local strategies to limit the level of trans fats in the preparation of food, particularly ‘fast-foods’.

 

iii)   Randwick City Council supports the introduction of mandatory national labelling requirements for food products to identify the content and level of trans fats.

 

b)     makes representation to relevant government authorities including, Food Standards Australia and New Zealand and NSW Food Authority, requesting that they give consideration to the introduction of nationwide regulations to limit the level of trans fats in foods and to introduce mandatory labelling of trans fats.

 

c)     develops and implements the following public and proprietor education and awareness strategies:

 

§  Developing an Information Sheet on the use of trans fats for all (640) permanent food business operators, the public and temporary food stall vendors.

 

§  Providing information on the use of trans fats on Council’s web site.

 

§  Incorporating a segment on the use of trans fats in Council’s Training Workshops for local food business operators.

 

§  Developing and implementing standard advisory conditions and information on development consents for food businesses.

 

§  Consulting with food business operators when carrying out food premises inspections, to discourage the use of ‘hydrogenated oils’ in food preparation activities.

 

MOTION: (Belleli/Matson) CARRIED - SEE RESOLUTION.

  

 

 

Confidential reports (closed session)

 

That the meeting move into closed session in order to consider confidential items.

 

Closed Session

 

D30/10     Confidential - 13-15 Silver Street, Randwick (DA/311/2008/B)

This matter is considered to be confidential under Section 10A(2) (g) Of the Local Government Act, as it deals with advice concerning litigation, or advice that would otherwise be privileged from production in legal proceedings on the ground of legal professional privilege.

PL42/10

RESOLUTION: (Bowen/Procopiadis) that:

 

a)     Council consent to the deletion of Condition No. 76 from the development consent No. 311/2008 in view of legal counsel’s advice on the prospects of successfully defending the Court proceedings in relation to this condition.

 

b)     Council continue to defend the appeal in relation to Condition No. 101 of development consent No. 311/2008.

 

c)     Council amend the current Town Centre DCPs and Section 94 Contribution Plan         to provide for the undergrounding of cabling.

 

MOTION: (Bowen/Procopiadis) CARRIED UNANIMOUSLY - SEE RESOLUTION.

  

 

Open Session

 

That the meeting move back into open session.

 

Notice of Rescission Motions

Note: A rescission motion in relation to item D24/10 (35 Napier Street, Malabar) was submitted in accordance with Council’s Code of Meeting Practice, by Councillors Andrews, Procopiadis and Seng, and will be considered at the Ordinary Council Meeting to be held on 25 May 2010.

 

 

The meeting closed at 7.54pm.

 

 

The minutes of this meeting were confirmed at the Planning Committee Meeting of the Council of the City of Randwick held on Tuesday, 8 June 2010.

 

 

 

 

 

...................................................

CHAIRPERSON