MINUTES OF Planning Committee Meeting of the Council of the City of Randwick HELD

ON Tuesday, 9 March 2010 AT 6:25pm

 

Present:

 

North Ward                                           -  Councillors P Tracey & M Woodsmith

 

South Ward                                          -  Councillors R Belleli, C Matthews &

                                                             A White

 

East Ward                                            -  Councillors T Bowen & M Matson 

                                                                             

West Ward                                           - Councillors B Hughes & S Nash (Deputy Chairperson)

 

Central Ward                                        - Councillors A Andrews (Chairperson) &

                                                            G Stevenson

 

Officers present:

 

General Manager                                             Mr R Brownlee

Director City Services                                      Mr J  Frangoples

Director City Planning                                       Ms S Truuvert

Director Governance & Financial Services             Mr G Banting

Manager Development Assessment                     Mr K Kyriacou

Senior Administrative Coordinator                       Ms J Hartshorn

Communications Officer                                    Mr D Crowhurst

 

 

Apologies/Granting of Leave of Absences 

 

Apologies were received from Crs Procopiadis (Mayor), Notley-Smith, Seng and Smith.

 

RESOLVED: (Belleli/Matthews) that the apologies received from Crs Procopiadis (Mayor), Notley-Smith, Seng and Smith be accepted and leave of absences from the meeting be granted.

 

 

Confirmation of the Minutes

 

Confirmation of the Minutes of the Planning Committee Meeting held on Tuesday 9 February 2010

PL14/10

RESOLUTION: (Matthews/Belleli) that the Minutes of the Planning Committee Meeting held on Tuesday 9 February 2010 (copies of which were circulated to all Councillors) be and are hereby confirmed as a correct record of the proceedings of that meeting.

 


Cr Stevenson left the meeting at this point (7.27pm) and did not return.

 

Procedural Motion – Motion of Dissent

MOTION: (Tracey/Hughes) that the Chairperson’s ruling that Item NR2/10 is unable to be discussed due to the Rescission Motion lapsing, be dissented to.  LOST.

 

Declarations of Pecuniary and Non-Pecuniary Interests

 

a)            Cr Tracey declared a non-significant non-pecuniary interest in D10/10 as he knows the owner of the property.

b)            Cr Bowen declared a non-significant non-pecuniary interest in Item D10/10 as he knows the applicant.

c)            Cr Matthews declared a non-significant non-pecuniary interest in Item D12/10 as he knows the Town Planner representing the applicant.

d)            Cr Matthews declared a non-significant non-pecuniary interest in Item D9/10 as he knows the objector.

 

Address of Council by Members of the Public

Prior to consideration of the Agenda by the Committee, deputations were received in respect of the following matters:

 

D9/10       350 Maroubra Road, Maroubra

 

Against               John Buchanan

 

For                      Felix Antonius (on behalf of applicant)

 

D10/10      2-8 William Street, Randwick

 

For                      Peter Livers (objector)

 

D11/10      66 Gubbuteh Road, Little Bay

 

For                      Corrado Palleschi (on behalf of objector)

 

D12/10      51 Willis Street, Kingsford

 

For                                Nick Salerni (Town Planner speaking on behalf of the Applicant)

 

Urgent Business

Nil.

 

Development Application Reports

 

D9/10        Development Application Report - 350 Maroubra Road, Maroubra (DA/782/2009)

PL15/10

RESOLUTION: (White/Belleli)

 

A.     That Council supports the objections under State Environmental Planning Policy No. 1 – Development Standards in respect to non-compliance with Clauses 32 of Randwick Local Environmental Plan 1998, relating to floor space ratio, on the grounds that the proposed development complies with the objectives of the above clause, and will not adversely affect the amenity of the locality, and that the Department of Planning be advised accordingly.

 

B.     That Council, as the consent authority, grants Development Consent under Section 80 and 80A of the Environmental Planning and Assessment Act 1979 to Development Application No. 782/2009 for demolition of existing building and construction of 4 level attached dual occupancy with lower level garage accessed from Maroubra Road, additional garage accessed from Storey Street, swimming pool and associated works at 350 Maroubra Road, Maroubra subject to the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.       The development must be implemented substantially in accordance with the plans numbered A-03, A-04 and A-05, dated October 2009 and received by Council on 29 October 2009, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.       Privacy screens, planter boxes and the western boundary fences must be constructed in accordance with the sketch plans submitted to Council and dated 27 November 2009.

 

Design details of the screens, boxes and fences are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

3.       The colours, materials and finishes of the external surfaces to the building are to be compatible with the adjacent development to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

4.       There must be no encroachment of the structure/s or associated articles onto Council’s road reserve, footway, nature strip or public place.

 

5.       Street numbering must be provided to the premises in a prominent position, in accordance with the Australia Post guidelines and AS/NZS 4819 (2003) to the satisfaction of Council, prior to an occupation certificate being issued for the development.

 

6.       The earthworks for the driveway between the building and the Maroubra Rd boundary must be battered and retained.

 

Design details of the batters and walls are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

7.       The finished ground levels external to the building are to be consistent with the approved plans and are not to be raised (other than for the provision of approved paving or the like on the ground) without the written consent of Council.

 

8.       The upper 2/3rd of the height of the boundary fence at Maroubra Rd must be at least 50% open.

 

Design details of the boundary fence are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

9.       External lighting to the premises shall be designed so as not to cause a nuisance to nearby residents.

 

10.     No cooking facilities or sanitary fittings other than those indicated on the approved plans are to be installed in the premises without the prior written consent of the Council.

 

The following condition/s are imposed to satisfy the requirements of the Sydney Water Corporation.

 

11.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following condition is applied to meet additional demands for public facilities;

 

12.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, based on the development cost of $1,065,700, the following applicable monetary levy must be paid to Council: $10,657.00

       

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

13.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

14.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

15.     The following provisions are to be implemented in accordance with the relevant BASIX Certificate and details are to be included in the Construction Certificate documentation (as applicable), to the satisfaction of the Certifying Authority:

 

·           Stormwater management (i.e. rainwater tanks)

·           Water efficiency (i.e. triple A rated taps and showers, dual flush toilets and water re-use)

·           Landscaping provisions

·           Thermal comfort (i.e. construction materials, glazing and insulation)

·           Energy efficiency (i.e. cooling & heating provisions and hot water systems)

 

16.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue an Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing an Occupation Certificate.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

17.     External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

18.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

19.     All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA), in accordance with Clause 98 of the Environmental Planning and Assessment Regulation 2000.

 

20.     Prior to the commencement of any building works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans & specifications and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

21.     Prior to the commencement of any building works, the person having the benefit of the development consent must:

 

i)    appoint a Principal Certifying Authority for the building work, and

 

ii)       appoint a principal contractor for the building work, or in relation to residential building work, obtain an owner-builder permit in accordance with the requirements of the Home Building Act 1989, and notify the Principal Certifying Authority and Council accordingly in writing, and

 

iii)       unless the person having the benefit of the consent is the principal contractor (i.e. owner-builder), notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

 

iv)      give at least two days notice to the Council, in writing, of the persons intention to commence building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

22.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected in accordance with section 81A (2) (b1) (ii) of the Environmental Planning & Assessment Regulation 2000 and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Documentary evidence of the building inspections carried out and details of compliance with Council’s consent is to be maintained by the Principal Certifying Authority.  Details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council with the occupation certificate.

 

The principal contractor or owner-builder (as applicable) must ensure that the required critical stage and other inspections, as specified in the Principal Certifying Authority’s “Notice of Critical Stage Inspections”, are carried out to the satisfaction of the Principal Certifying Authority and at least 48 hours notice (excluding weekends and public holidays) is to be given to the Principal Certifying Authority, to carry out the required inspection, before carrying out any further works.

 

23.     A sign must be erected and maintained in a prominent position on the site for the duration of the works, which contains the following details:

 

·       name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details,

·       name, address and telephone number of the Principal Certifying Authority,

·       a statement stating that “unauthorised entry to the work site is prohibited”.

 

24.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

25.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon must also be provided to Council with the occupation certificate.

 

26.     In accordance with clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition, that in the case of residential building work, a contract of insurance must be obtained and in force, in accordance with the provisions of the Home Building Act 1989.

 

Where the work is to be done by a licensed contractor, excavation or building work must not be carried out unless the Principal Certifying Authority (PCA):

 

·       has been informed in writing of the licensee’s name and contractor number; and

·       is satisfied that the licensee has complied with the insurance requirements of Part 6 of the Home Building Act 1989, or

 

Where the work to be done by any other person (i.e. an owner-builder), excavation or building work must not be carried out unless the Principal Certifying Authority:

 

·       has been informed of the person’s name and owner-builder permit number, or

·       has been given a declaration, signed by the owner of the land that states that the market cost of the labour and materials involved in the work does not exceed $5,000.

 

Details of the principal building contractor and compliance with the provisions of the Home Building Act 1989 (i.e. Details of the principal licensed building contractor and a copy of the Certificate of Insurance) are to be submitted to Council prior to the commencement of works, with the notice of appointment of the PCA/notice of intention to commence building work.

 

27.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

28.     A Fire Safety Certificate must be submitted to Council prior to the issuing of an Occupation Certificate, in accordance with the requirements of the Environmental Planning and Assessment Regulation 2000.

 

A single and complete Fire Safety Certificate must be provided which includes details of all of the fire safety measures contained in the building and as detailed in the fire safety schedule attached to the Construction Certificate.

 

Prior to issuing any Occupation Certificate the Principal Certifying Authority must be satisfied that all of the relevant fire safety measures have been included and are sufficiently detailed within the Fire safety Certificate.

 

A copy of the fire safety certificate must be displayed in the building near the entrance and a copy must be forwarded to the NSW Fire Brigades.

 

29.     As a minimum, the building is required to be provided with a smoke alarm system complying with Clause 3 of Specification E2.2a of the Building Code of Australia or a smoke detection system complying with Clause 4 of Specification E2.2a of the Building Code of Australia or a combination of a smoke alarm system within the sole-occupancy units and a smoke detection system in areas not within the sole-occupancy units.  The smoke detectors located within the stairway, corridors or the like must be interconnected.

 

Additional requirements regarding the design and installation of the smoke detection and alarm system may be specified in the construction certificate for the development.

 

30.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following group of conditions have been applied to ensure the structural adequacy and integrity of the proposed building and adjacent premises:

 

31.     Documentary evidence prepared by a suitably qualified professional geotechnical engineer shall be submitted to the certifying authority prior to the issuing of a construction certificate, certifying the suitability and stability of the site for the proposed building and certifying the suitably and adequacy of the proposed design and construction of the building for the site.

 

32.     A report shall be prepared by a professional engineer and submitted to the certifying authority prior to the issuing of a construction certificate, detailing the proposed methods of excavation, shoring or pile construction, including details of potential vibration emissions.  The report, must demonstrate the suitability of the proposed methods of construction to overcome any potential damage to nearby land/premises.

 

Any practices or procedures specified in the engineer’s report in relation to the avoidance or minimisation of structural damage to nearby premises, must be fully complied with and incorporated into the documentation for the construction certificate.

 

A copy of the engineers report is to be submitted to the Council, if the Council is not the certifying authority.

 

33.     Driven type piles/shoring must not be provided unless a geotechnical engineer’s report is submitted to the certifying authority, prior to the issuing of a construction certificate, which demonstrates that damage should not occur to any adjoining premises and public place as a result of the works.

 

Any practices or recommendations specified in the engineer’s report in relation to the avoidance or minimisation of structural damage to nearby premises or land must be fully complied with and incorporated into the documentation for the construction certificate.

 

34.     A dilapidation report prepared by a professional engineer or suitably qualified and experienced building surveyor shall be submitted to the certifying authority prior to the commencement of demolition, excavation or building works detailing the current condition and status of all buildings, including ancillary structures (i.e. including dwellings, residential flat buildings, commercial/industrial building, garages, carports, verandah’s, fences, retaining walls, swimming pools and driveways etc.) located upon      all of the premises adjoining the subject site.

 

The report is to be supported with photographic evidence of the status and condition of the buildings and a copy of the report must also be forwarded to the Council and to the owners of each of the abovementioned premises, prior to the commencement of any works.

 

35.     The installation of ground or rock anchors underneath any adjoining premises must not be carried out without specific written consent of the owners of the affected adjoining premises (including the Council if bounding a public roadway or public place) and where applicable, details of compliance must be provided to the certifying authority prior to the commencement of any excavation or building works.

 

36.     A Certificate prepared by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to occupation of the building, which certifies that the building works satisfy the relevant structural design requirements of the Building Code of Australia.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

37.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

38.     The adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

If an excavation associated with the erection or demolition of a building extends below the level of the base of the footings of any building located on an adjoining allotment of land, the person causing the excavation must:

 

·       preserve and protect the building /s on the adjoining land from damage; and

·       effectively support  the excavation and building; and

·       at least seven (7) days before excavating below the level of the base of the footings of a building on an adjoining allotment of land (including a public road or public place), give notice of the intention and particulars of the works to the owner of the adjoining land.

 

Notes

 

·     This consent and condition does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the principal contractor or owner-builder must obtain:

a)       the consent of the owners of such adjoining or supported land to trespass or encroach, or

b)       an access order under the Access to Neighbouring Land Act 2000, or

c)       an easement under section 88K of the Conveyancing Act 1919, or

d)       an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

·     Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

39.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and (except as detailed below) between 8.00am to 5.00pm on Saturdays.

 

All building, demolition and associated site works are strictly prohibited on Sundays, Public Holidays and also on Saturdays adjacent to a Public Holiday.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

40.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant provisions of the Protection of the Environment Operations Act 1997 must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery and pile drivers (or the like) must be minimised by using appropriate plant and equipment and silencers and a construction noise and vibration minimisation strategy, prepared by a suitably qualified consultant is to be implemented during the works, to the satisfaction of the Principal Certifying Authority.

 

41.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

a)     Building materials, sand, soil, waste materials, construction equipment or other materials or articles must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Bulk bins, waste containers or other articles must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container or other articles in a public place can be made to Council’s Health, Building & Regulatory Services department.

 

c)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)     A temporary timber, asphalt or concrete crossing is to be provided to the site entrance across the kerb and footway area, with splayed edges, to the satisfaction of Council, unless access is via an existing concrete crossover.

 

e)     A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road or nature strip or in any public place:-

 

·       Install or erect any site fencing, hoardings or site structures

·       Operate a crane or hoist goods or materials over a footpath or road

·       Placement of a waste skip or any other container or article on the road, nature strip or footpath.

 

f)      The applicant/builder is required to hold Public Liability Insurance, with a minimum liability of $10 million and a copy of the Insurance cover is to be provided to Council.

 

g)     A Road/Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road/Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Council’s Road/Asset Opening Officer on 9399 0691 or 9399 0999.

 

h)     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

42.     A Registered Surveyor’s check survey certificate or compliance certificate is to be forwarded to the principal certifying authority (and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority), detailing compliance with Council’s approval at the following stage/s of construction:

 

a)     Prior to construction of the first completed floor/floor slab (prior to pouring of concrete), showing the area of land, building and boundary setbacks and verifying that the building is being construction at the approved levels.

 

b)     On completion of the erection of the building showing the area of the land, the position of the building and boundary setbacks and verifying the building has been constructed at the approved levels.

 

43.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of demolition, excavation or building works. The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing/hoardings to the perimeter of the site;

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction

·       details and methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·           construction noise and vibration management;

·           construction traffic management provisions.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and convenience to the satisfaction of Council.  A copy of the approved Construction Site Management Plan must be maintained on site and be made available to Council officers upon request.

 

44.     During demolition excavation and construction works, dust emissions must be minimised, so as not to result in a nuisance to nearby residents or result in a potential pollution incident.

 

Adequate dust control measures must be provided to the site prior to the works commencing and the measures and practices must be maintained throughout the demolition, excavation and construction process, to the satisfaction of Council.

 

Dust control measures and practices may include:-

 

·       Provision of geotextile fabric to all perimeter site fencing (attached on the prevailing wind side of the site fencing).

·       Covering of stockpiles of sand, soil and excavated material with adequately secured tarpaulins or plastic sheeting.

·       Installation of a water sprinkling system or provision hoses or the like.

·       Regular watering-down of all loose materials and stockpiles of sand, soil and excavated material.

·       Minimisation/relocation of stockpiles of materials, to minimise potential for disturbance by prevailing winds.

·       Revegetation of disturbed areas.

 

45.     During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing.

 

Details of the proposed sediment control measures are to be detailed in the Site Management Plan and must be submitted to and approved by the principal certifying authority prior to the commencement of any site works.  The sediment and erosion control measures must be implemented prior to the commencement of any site works and be maintained throughout construction.  A copy of the approved details must be forwarded to the Council and a copy is to be maintained on-site and be made available to Council officers upon request.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

A warning sign for soil and water management must be displayed in a prominent position on the building site, visible to both the public and site workers.  The sign must be displayed throughout the construction period.  Copies of a suitable warning sign are available at Council’s Customer Service Centre for a nominal fee.

 

46.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If the work involved in the erection or demolition of a building is likely to cause pedestrian or vehicular traffic in a public place to be obstructed or rendered inconvenient or the building involves the enclosure of a public place, a hoarding or fence must be erected between the work site and the public place.

 

If necessary, an awning is to be erected sufficiently to prevent any substance from, or in connection with, the work from falling into the public place or adjoining premises.

 

Temporary fences or hoardings are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or any public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

47.     The demolition, removal, storage, handling and disposal of  materials and all building work must be carried out in accordance with the following requirements (as applicable):

 

§   Australian Standard 2601 (2001) – Demolition of Structures

§   Occupational Health and Safety Act 2000

§   Occupational Health and Safety (Hazardous Substances) Regulation 2001

§   Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

§   WorkCover NSW – Guidelines and Codes of Practice

§   Randwick City Council’s Asbestos Policy

§   The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

 

48.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Work Plan must include the following information (as applicable):

 

§   The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

§   Details of hazardous materials, including asbestos

§   Method/s of demolition and removal of asbestos

§   Measures and processes to be implemented to ensure the health & safety of workers and community

§   Measures to be implemented to minimise any airborne asbestos and dust

§   Methods and location of disposal of any asbestos or other hazardous materials

§   Other relevant details, measures and requirements to be implemented as identified in the Asbestos Survey

§   Date the demolition and removal of asbestos will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition works.  A copy of the Demolition Work Plan must be forwarded to Council and a copy must also be maintained on site and be made available to Council officers upon request.

 

49.     Any work involving the demolition, storage and disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

a)     Randwick City Council’s Asbestos Policy (adopted 13 September 2005).

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

a)     A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

b)     On sites involving the removal of asbestos, a  professionally manufactured sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS” and include details of the licensed contractor.  The sign shall measure not less than 400mm x 300mm and the sign is to be installed prior to demolition work commencing and is to remain in place until such time as all asbestos has been safely removed from the site.

 

c)     Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 1996. Asbestos waste must be disposed of at an approved waste disposal depot (refer to the DEC or Waste Service NSW for details of sites). Copies of all receipts detailing method and location of disposal must be maintained on site and be provided to Council officers upon request, as evidence of correct disposal.

 

d)     A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council upon completion of the works prior to an Occupation Certificate being issued, which confirms that the asbestos material have been removed appropriately and the relevant requirements contained in the Asbestos Survey and conditions of consent in relation to the safe removal and disposal of asbestos, have been satisfied.

 

The following conditions are applied to ensure compliance with the Swimming Pools Act 1992 and to maintain public safety and amenity:

 

50.     Swimming pools are to be provided with childproof fences and self-locking gates, in accordance with the Swimming Pools Act 1992 and regulations.

 

The swimming pool is to be surrounded by a fence having a minimum height of 1.2m, that separates the pool from any residential building situated on the premises and from any place (whether public or private) adjoining the premises; and that is designed, constructed and installed in accordance with AS 1926.1 - 2007.

 

Gates to pool area shall be a maximum width of 1 metre, and be self-closing and latching; the gate is required to open outwards from the pool area and prevent a small child opening the gate or door when the gate or door is closed.

 

Temporary pool safety fencing is to be provided pending the completion of all building work and the pool must not be filled until a fencing inspection has been carried out and approved by the principal certifying authority.

 

A ‘warning notice’ must be erected in a prominent position in the immediate vicinity of the swimming pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

51.     Spa pools are to be provided with a child resistant barrier, in accordance with the provisions of the Swimming Pools Act 1992 and regulations.

 

A ‘warning notice’ must be erected  in a prominent position in the immediate vicinity of the swimming pool, in accordance with the provisions of the Swimming Pools Regulation 2008, detailing pool safety requirements, resuscitation techniques and the importance of the supervision of children at all times.

 

52.     Swimming pools are to be designed, installed and operated in accordance with the following general requirements:

 

a)       Backwash of the pool filter and other discharge of water is to be drained to the sewer in accordance with the requirements of the Sydney Water Corporation; and

b)       All pool overflow water is to be drained away from the building and adjoining premises, so as not to result in a nuisance or damage to premises; and

c)       Water recirculation and filtrations systems are required to comply with AS 1926.3 – 2003:  Swimming Pool Safety – Water Recirculation and Filtration Systems; and

d)       Pool plant and equipment is to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents; and

e)       The pool plant and equipment shall not be operated during the following hours if the noise emitted can be heard within a habitable room in any other residential premises, or, as otherwise specified in relevant Noise Control Regulations:

i.      before 8.00am or after 8.00pm on any Sunday or public holiday; or

ii.     before 7.00am or after 8.00pm on any other day.

 

53.     Written notification must be provided to Council advising of the installation and completion of the Swimming Pool (or Spa Pool), to satisfy the requirements of the Swimming Pools Act 1992, prior to issuing an Occupation Certificate.

 

Council’s “Notification & Registration of a Swimming Pool” form must be completed and forwarded to Council prior to any Occupation Certificate being issued for the pool.

 

54.     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min  sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

55.     The installation of rainwater tanks shall comply with the following noise control requirements:

 

a)     The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)     Plant and equipment associated with rainwater tank(s) are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)     The operation of plant and equipment associated with the rainwater tank(s)  are to be restricted to the following hours if the noise emitted can be heard within a habitable room in any other residential premises:

 

●        before 8.00am or after 8.00pm on weekends or public holiday; or

●        before 7.00am or after 8.00pm on weekdays.

 

The following conditions are applied to ensure that adequate provisions are made for the management of waste from the development:

 

56.     Adequate provisions are to be made within the premises for the storage and removal of waste and recyclable materials, to the satisfaction of Council and details are to be included in the construction certificate documentation.

 

57.     A demolition and construction Waste Management Plan (WMP) must be development and implemented for the development, to the satisfaction of Council, prior to the commencement of works.

 

The Waste Management Plan must provide details of the type and quantities of demolition and construction waste materials, proposed re-use and recycling of materials, methods of disposal and details of recycling outlets and land fill sites.

 

Where practicable waste materials must be re-used or recycled, rather than disposed and further details of Council's requirements including relevant guidelines and pro-forma WMP forms can be obtained from Council's Customer Service Centre or by telephoning Council on 9399 0999.

 

Details and receipts verifying the recycling and disposal of materials must be kept on site at all times and presented to Council officers upon request.

 

The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

58.     The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $3000.00   -      Damage/Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

59.     Prior to the issuing of an Occupation Certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

Maroubra Road Frontage

 

a)  Construct a concrete vehicular crossing and layback at kerb opposite the vehicular entrance to the site.

 

b)  Remove the redundant concrete vehicular crossing and layback and to reinstate the area with concrete footpath, turf and integral kerb and gutter to Council's specification.

 

c)  Relocate the “No Stopping” sign located within the construction zone of the vehicular access servicing the dwelling fronting Maroubra Rd, to Council’s requirements.

 

Storey Street Frontage

 

d)  Construct a concrete vehicular crossing to service the new vehicular entrance to the Storey Street frontage.

 

60.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

61.     The applicant shall note that all external work, carried out on Council property, shall be in accordance with Council's Policy for "Vehicular Access and Road and Drainage Works". An application for the cost of the Council civil works is to be submitted to Council at the completion of the internal building works. An application fee shall be payable to Council for the quotation of the required works. The applicant may elect to use his contractor for the required works, subject to Council approval, however a design and supervision fee based on the lowest quotation from Council's nominated contractor will be required to be paid prior to the commencement of any works.

 

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

62.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level at the property boundary for driveways, access ramps and pathways or the like, must be as follows:

 

Maroubra Road Frontage -match the back of the existing footpath along the full site frontage.

 

Storey Street Frontage -      Driveway entrance – southern edge – RL49.60 AHD

                                                  Driveway entrance – northern edge – 49.30 AHD

 

63.     The design alignment levels issued by Council must be indicated on the building plans for the construction certificate. The design alignment level at the street boundary, as issued by the Council, must be strictly adhered to.

 

64.     The above alignment levels and the site inspection by Council’s Development Engineering Section have been issued at a prescribed fee of $1297.00 calculated at $44.00 (inclusive of GST) per metre of site frontage. This amount is to be paid to Council prior to a construction certificate being issued for the development.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

65.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

66.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

Note:       Prior to the issuing of a Construction Certificate the applicant should liaise with Energy Australia in obtaining an indicative cost for the required relocation of the power pole located in Maroubra Rd which is within the construction zone of the vehicular access servicing the dwelling fronting Maroubra Rd.

 

              The applicant is also to liaise with the RTA regarding an indicative cost for the relocation of the DMR signal box located adjacent to the kerb within the construction zone of the vehicular access servicing the dwelling fronting Maroubra Rd.

 

67.     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road/Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Councils Road/Asset Opening Officer on 9399 0691 or 9399 0999.

 

68.     A Section 73 Compliance Certificate under the Sydney water Act 1994 must be obtained from Sydney Water Corporation.

 

Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the website www.sydneywater.com.au then refer to “Water Servicing Coordinator” under Developing Your Land” or telephone 13 20 92 for assistance.

 

Following application a “Notice of Requirements” will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.

 

The Notice must be issued to the Principal Certifying Authority prior to the construction certificate being issued.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to occupation of the development.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

69.     Stormwater drainage plans have not been approved as part of this development consent. Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issue, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)   A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

 

b)   A layout of the proposed drainage system including pipe sizes, type, grade, length, invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system.  This may involve either connection to the Council's street gutter, or into a Council stormwater pit.  Note:  All proposals should indicate the location of the closest Council stormwater pit and line regardless of the point of discharge.  This information can be obtained by a visual inspection of the area and perusing Council's drainage plans.

 

c)   Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (ie. above the 1 in 20 year storm) to the proposed drainage system.

 

d)   The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

 

i.    Roof areas

ii.    Paved areas

iii.   Grassed areas

iv.   Garden areas

 

e)   Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

 

f)   Proposed finished surface levels and grades of car parks, internal driveways and access aisles which are to be related to Council's design alignment levels.

 

g)   The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

70.     All stormwater run-off naturally draining to the site must be collected and discharged through this property's stormwater system.  Such drainage must, if necessary, be constructed prior to the commencement of building work.

 

71.     All site stormwater must be discharged (by gravity) to either:

 

i)   The kerb and gutter or drainage system at the front of the property IN Maroubra Road; OR

ii)  A suitably sized infiltration system.

 

72.     Should stormwater be discharged to Council’s street drainage system, on-site detention must be provided to ensure that the maximum discharge from the above site is not to exceed that which would occur during a 1 in 10 year storm of 1 hour duration for the existing site conditions. All other stormwater run-off from the above site for all storms up to the 1 in 20 year storm is to be retained on the site for gradual release to the kerb and gutter or drainage system as required by the Director of City Planning.  Provision is to be made for satisfactory overland flow should a storm in excess of the above parameters occur.

 

Should no formal overland escape route be provided for storms greater than the design storm, the on-site detention system shall be sized for the 1 in 100 year storm event.

 

For small areas up to 0.5 hectares, determination of the required cumulative storage must be calculated by the mass curve technique as detailed in Technical Note 1, Chapter 14 of the Australian Rainfall and Run-off Volume 1, 1987 Edition.

 

Where possible the detention tank must have an open base to infiltrate stormwater to the groundwater. Note that the ground water and any rock stratum has to be a minimum of 2.0 metres below the base of the tank.

 

73.     Should stormwater be discharged to an infiltration system, the infiltration area shall be  sized for all storm events up to the 1 in 20 year storm event with provision for a formal overland flow path to Council’s Street drainage system.

 

Should no formal overland escape route be provided for storms greater than the design storm, the infiltration system shall be sized for the 1 in 100 year storm event.

 

74.     Any Infiltration systems/Absorption Trenches must be designed in accordance with "Section 8.5 ABSORPTION TRENCHES" as stipulated in Randwick City Council's Private Stormwater Code.

 

75.     The detention area/infiltration system must be regularly cleaned and maintained to ensure it functions as required by the design.

 

76.     The maximum depth of ponding in above ground detention areas (and/or infiltration systems with above ground storage) shall be as follows:

 

i)      150mm in uncovered carparking areas (with an isolated maximum depth of 200mm permissible at the low point pit within the detention area).

ii)     300mm in landscaped areas (where child proof fencing is not provided around the outside of the detention area and sides slopes are steeper than 1 in 10)

iii)    600mm in landscaped areas where the side slopes of the detention area have a maximum grade of 1 in 10.

iv)    1200mm in landscaped areas where a childproof fence is provided around the outside of the detention area.

 

Notes:

§ It is noted that above ground storage will not be permitted in basement carparks or in any area which may be used for storage of goods.

§ Mulch/bark must not be used in onsite detention areas.

 

77.     The stormwater detention area (and/or infiltration systems with above ground storage) must be suitably signposted where required, warning people of the maximum flood level.

 

78.     The floor level of all habitable and storage areas adjacent to the detention area (and/or infiltration systems with above ground storage) must be a minimum of 300mm above the maximum water level for the design storm or alternately a permanent 300mm high water proof barrier is to be constructed.

 

(In this regard, it must be noted that this condition must not result in any increase in the heights or levels of the building.  Any variations to the heights or levels of the building will require a new or amended development consent from the Council prior to a construction certificate being issued for the development).

 

79.     A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

 

80.     A `V' drain is to be constructed along the perimeter of the property, where required, to direct all stormwater to the detention/infiltration area.

 

81.     Should a pump system be required to drain any portion of the site the system must be designed with a minimum of two pumps being installed, connected in parallel (with each pump capable of discharging at the permissible discharge rate) and connected to a control board so that each pump will operate alternatively. The pump wet well shall be sized for the 1 in 100 year, 2 hour storm assuming both pumps are not working.

 

The pump system must also be designed and installed strictly in accordance with "Section 8.4 PUMP SYSTEMS" as stipulated in Randwick City Council's Private Stormwater Code.

 

82.     A sediment/silt arrester pit must be provided:

 

i)   within the site at or near the street boundary prior to the site stormwater discharging by gravity to the kerb/street drainage system; and

ii)  prior to stormwater discharging into any absorption/infiltration system.

 

The sediment/silt arrester pit shall be constructed in accordance with the following requirements:

 

·      The base of the pit located a minimum 300mm under the invert level of the outlet pipe.

 

·      The pit constructed from cast in-situ concrete, precast concrete or double brick.

 

·      A minimum of 4 x 90 mm diameter weep holes located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

 

·      A galvanised heavy-duty screen located over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

 

·      The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

 

·      A child proof and corrosion resistant fastening system provided for the access grate.

 

·      A sign adjacent to the pit stating:

 

“This sediment/silt arrester pit shall be regularly inspected and cleaned.”

 

Note: Sketch details of a standard sediment/silt arrester pit may be obtained from Council’s Drainage Engineer.

 

83.     Prior to the issue of an occupation certificate, a "restriction on the use of land” and “positive covenant" (under section 88E of the Conveyancing Act 1919) shall be placed on the title of the subject property to ensure that the onsite detention system and/or infiltration system is maintained and that no works which could affect the design function of the detention system are undertaken without the prior consent (in writing) from Council. Such restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

 

Notes:

a.   The "restriction as to user” and “positive covenant" are to be to the satisfaction of Council. A copy of Council’s standard wording/layout for the restriction and positive covenant may be obtained from Council’s Development Engineer.

b.   The linen plans shall indicate the location and dimensions of the detention/infiltration areas. 

c.   The works as executed drainage plan and hydraulic certification must be submitted to Council prior to the “restriction on the use of land” and “positive covenant” being executed by Council.

 

84.     Prior to the issuing of an occupation certificate, the applicant shall submit to Council, a works-as-executed drainage plan prepared by a registered surveyor and approved by a suitably qualified and experienced Hydraulic Engineer. The works-as-executed drainage plan shall be to the satisfaction of the Principal Certifying Authority (PCA) and shall include the following details:

 

i)      The location of the detention basin with finished surface levels;

ii)     Finished site contours at 0.2 metre intervals;

iii)    Volume of storage available in the detention areas;

iv)    The location, diameter, gradient and material (i.e PVC, RC etc) of all stormwater pipes;

v)     The orifice size(s) (if applicable);

vi)    Details of any infiltration/absorption systems; and

vii)   Details of any pumping systems installed (including wet well volumes).

 

85.     Prior to the issuing of an occupation certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer confirming that the design and construction of the stormwater drainage system complies with the conditions of development consent. The certification must be provided to the satisfaction of the PCA.

 

86.     As the above site may encounter groundwater/seepage water within the depth of the basement excavation, the basement garage and similar structures are to be suitably tanked and waterproofed. A Structural Engineer\Geotechnical Engineer shall certify the tanking & waterproofing has been carried out to an acceptable standard, to the satisfaction of the certifying authority. A copy of the certification is to be forwarded to Council.

 

Notes:

 

a)  Any subsoil drainage (from planter boxes etc) is to be disposed of within the site and is not to be discharged to Council’s kerb & gutter and/or underground drainage system.

 

b)  Adequate provision is to be made for the ground water to drain around the basement carpark (to ensure that the basement will not dam or slow the movement of the ground water through the development site).

 

87.     Any seepage water must be drained directly into an absorption pit within the site. Seepage water must not be drained from the site.

 

The following conditions are applied to provide adequate provisions for waste management:

 

88.     Prior to the credited certifier issuing an occupation certificate for the proposed development the applicant is to contact Council’s Manager of Waste in regards to meeting Council’s requirements for waste services to the dual occupancy

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

89.     Landscaping shall be provided to the site to enhance its amenity and reduce the impact of the development upon neighbouring properties. A landscape plan shall be submitted to and approved by the Director of City Planning, in accordance with section 80A(2) of the Environmental Planning and Assessment Act 1979, prior to a construction certificate being issued.

 

90.     Landscaped areas must contain a predominance of species that require minimal watering once established or species with water needs that match rainfall and drainage conditions.

 

91.     The landscaping shall be installed in accordance with the approved documentation prior to the issue of a final occupation certificate and shall be maintained in accordance with those plans.

 

Tree Management

 

92.     Prior to the issuing of an occupation certificate the applicant shall, at there own expense, remove and stump grind the following trees located on Council’s nature strip:

 

Maroubra Road Frontage –   The Council street tree opposite the vehicular entrance to the site

 

Storey Street Frontage –     The Swamp She Oak which is in very poor health.

 

The contribution shall be paid into Tree Amenity Income account no 4001.768401 at the Cashier on the Ground Floor of the Administrative Centre prior to a construction certificate being issued for the development.

 

The applicant will be required to contact Council’s Landscape Development Officer on 9399-0613, giving at least two working weeks notice, to arrange for removal of the existing street tree/provision of a replacement street tree upon completion.

 

93.     Approval is granted for the removal of the following trees, covered by Council’s tree preservation order, located within the site:

 

a)     Jacaranda Tree located towards the rear western side boundary.

b)     Macadamia Tree located towards the rear western side boundary.

 

94.     Permission is granted for the removal of only those trees falling within the area occupied by the approved works. Removal of the remaining trees on the site are subject to separate application under the Tree Preservation Order.

 

95.     The applicant shall be required to ensure the retention and long term health of all trees located on adjoining properties adjacent to the proposed development. As a general guide there shall be minimal excavation or root pruning within the dripline/s of the subject tree/s.

 

Advisory Conditions

 

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

ADVISORY MATTERS:

 

A1      Demolition, building or excavation work must not be commenced until;

 

·       A Construction Certificate has been obtained from Council or an Accredited Certifier

·       Council or an Accredited Certifier has been appointed as the Principal Certifying Authority for the development

·       Council and the Principal Certifying Authority have been given at least 2 days notice (in writing) prior to commencing any works.

 

Failure to comply with these important requirements is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.  Alternatively, Council may issue a penalty infringement notice (for up to $1,500) for each offence.

 

A2      A local approval application must be submitted to and be approved by Council's Building Certification Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·          Install or erect any site fencing, hoardings or site structures

·          Operate a crane or hoist goods or materials over a footpath or road

·          Placement of a waste skip or any other container or article.

 

For further information please contact Council’s Building Certification Services on 9399 0944.

 

A3      Specific details of the location of the building/s should be provided in the Construction Certificate to demonstrate that the proposed building work will not encroach onto the adjoining properties, Council’s road reserve or any public place, to the satisfaction of the Certifying Authority.

 

A4      This determination does not include an assessment of the proposed works under the Building Code of Australia (BCA) and other relevant Standards.  All new building work (including alterations and additions) must comply with the BCA and relevant Standards and you are advised to liaise with your architect, engineer and building consultant prior to lodgement of your construction certificate.

 

A5      The applicant is advised that the Construction Certificate plans and specification must comply with the provisions of the Building Code of Australia (BCA).

 

Details of compliance with the relevant provisions of the Building Code of Australia and conditions of development consent are to be provided in the plans and specifications for the construction certificate.

 

The applicant/developer is advised to ensure that the development is not inconsistent with Council's consent and if necessary consult with Council’s Building Certification Services or your accredited certifier (as applicable) prior to submitting your construction certificate application to enable these matters to be addressed accordingly.

 

A6      The applicant/owner is advised that this approval does not guarantee compliance with the provisions of the Disability Discrimination Act 1992 and the applicant should therefore consider their liability under the Act.  In this regard, the applicant is advised that compliance with the requirements of the Building Code of Australia and Australian Standard 1428.1 - Design for Access and Mobility does not necessarily satisfy the objectives of the Disability Discrimination Act 1992.

 

The applicant/owner is requested to give consideration to providing access and facilities for people with disabilities in accordance with Australian Standard 1428 Parts 1, 2, 3 and 4 - Design for Access and Mobility, which may be necessary to satisfy the objectives of the Disability Discrimination Act 1992.

 

A7      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (White/Belleli) CARRIED - SEE RESOLUTION.

 

A DIVISION was taken and the names of the Councillors voting FOR and AGAINST were as follows:

 

FOR

AGAINST

Councillor Andrews

Councillor Matson

Councillor Belleli

Councillor Tracey

Councillor Bowen

Councillor Woodsmith

Councillor Hughes

 

Councillor Matthews

 

Councillor Nash

 

Councillor White

 

Total (7)

Total (3)

 

 

D10/10     Development Application Report - 2-8 William Street, Randwick (DA/855/2009)

PL16/10

RESOLUTION: (Belleli/Matthews) that Council, as the consent authority, refuses development consent under Section 80 of the Environmental Planning and Assessment Act 1979, as amended, to Development Application No. 855/2009 for construction of a 3-bedroom dwelling on the rooftop level of an approved multi-unit residential development to create a total of 13 x 3-bedroom dwellings, at No. 2-8 William Street, Randwick, for the following reasons:

 

1.     The development scheme will significantly intensify the approved use without maintaining a reasonable level of amenity to the adjoining residential use in terms of solar access. Accordingly, the proposal fails to satisfy zoning objective (c) stipulated under Clause 12(1) of Randwick Local Environmental Plan 1998.

 

2.     The proposed development does not comply with Clause 32(1) Floor space ratio of Randwick Local Environmental Plan 1998 in that the proposal will significantly exceed the permissible floor space ratio. The submitted Objection under State Environmental Planning Policy No. 1 Development Standards in relation to this control is not well founded as the development will result in detrimental and unreasonable overshadowing on the neighbouring residential flat building to the south at No. 10 William Street.

 

3.     The proposed development does not comply with Clause 33(4) Building heights of Randwick Local Environmental Plan 1998 in that the proposed rooftop dwelling will exceed the permissible external wall height and that no Objection under State Environmental Planning Policy No. 1 Development Standards has been submitted to justify the variation to the development standard.

 

4.     The proposed development does not satisfy the provisions of State Environmental Planning Policy No. 65 Design Quality of Residential Flat Development in that the proposed density and scale will result in detrimental shadow impacts on the adjoining property to south. Additionally, the extensive use of obscured glass privacy screens and the form of the vergola do not appropriately relate to the architectural character of the rooftop addition and the approved building.

 

5.     The density, scale and form of the proposed development will result in detrimental shadow impacts on the adjoining property to the south and fail to satisfy the objectives for building height and density prescribed under Sections 3.2 and 3.4 of Development Control Plan – Multi-Unit Housing respectively.

 

6.     The proposal has not undertaken a thorough analysis of the nature and built form of the adjoining premises and the consequential constraints they have on the scope of further developments on the subject site. The proposal therefore fails to satisfy the performance requirements for site planning prescribed under Section 3.1 of Development Control Plan – Multi-Unit Housing.

 

7.     The proposed development will result in significant overshadowing of the rear unbuilt upon areas of the adjoining residential flat building to the south at No. 10 William Street, and does not satisfy the performance requirements for solar access and energy efficiency prescribed under Section 4.4 of Development Control Plan – Multi-Unit Housing.

 

8.     The proposed development is not within the public interest and does not satisfy the provisions of Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

MOTION: (Belleli/Matthews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

D11/10     Development Application Report - 66 Gubbuteh Road, Little Bay (DA/781/2008/A)

PL17/10

RESOLUTION: (Belleli/Matthews) that Council as the consent authority grant consent under Section 96 of the Environmental Planning and Assessment Act 1979 as amended to modify Development Consent No DA/781/2009/A for modification by alteration to pool and deck, increase in size at ground level and first floor level decks, addition of pergola, alteration to floor plate, increase in size of rumpus room, alteration to western elevation and addition of privacy screen to deck of master bedroom at 66 Gubbuteh Road, Little Bay in the following manner:

 

Amend Condition 1 to read:

 

1.    The development must be implemented substantially in accordance with the plans numbered DA01 dated 2/9/08 and received by Council 30/10/08 and plans numbered DA02 to DA05 dated May 2009 and received by Council 2/6/09, the application form and on any supporting information received with the application, as amended by the Section 96 plans dated 16 November 2009 and received by Council 19 November 2009 only in so far as they relate to the modifications highlighted on the Section 96 plans and detailed in the Section 96 application, except as may be amended  by the following conditions and as may be shown in red on the attached plans:

 

Insert after condition 60 the following condition:

 

61.   The proposed metal louver sunshading with timber posts over the east facing living room and kitchen deck is not approved and must be deleted from the proposal. The Construction Certificate plans must show compliance with this requirement. 

 

MOTION: (Belleli/Matthews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

D12/10     Development Application Report - 51 Willis Street, Kingsford  (DA/676/2009)

PL18/10

RESOLUTION: (Belleli/Matthews)

 

A.         That Council support the objection under State Environmental Planning No. 1 (SEPP No.1) in respect to non-compliance with Clause 32 of the Randwick Local Environmental Plan 1998 (as amended), relating to maximum floor space ratio, on the grounds that the proposed development is consistent with the relevant objectives of the clauses and will not adversely affect the amenity of the surrounding locality and that the Department of Planning be advised accordingly.

and

 

B.         That Council as the responsible authority grant its development consent under Section 80 and 80A of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No DA676/2009 for the demolition of existing structures on site and construction of part 3 part 4 storey residential flat building containing 5 units with basement carparking accessed from Kennedy Lane at 51 Willis Street, Kingsford, subject to the following conditions:

 

1.       The development must be implemented substantially in accordance with the plans numbered B01, received by Council on 23 November 2009; A02, A03, A04, A05, and A06  stamped received by Council on 22 September 2009, and the application form, and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

2.       The colours, materials and finishes of the external surfaces to the proposed development are to be compatible with adjacent developments to maintain the integrity and amenity of the building and the streetscape.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

3.       Details of bicycle storage as required in the Development Control Plan – Parking shall be submitted to and approved by Council’s Director City Planning Council prior to a Construction Certificate being issued for the development in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

4.       Solid masonry fencing to Willis Street and Kennedy Lane shall be no higher than 1.2m high. Details of fencing along Willis Street and Kennedy Lane in accordance with Council’s DCP – Multi-unit Housing shall be submitted to and approved by Council’s Director City Planning prior to a Construction Certificate being issued for the development in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

5.       The north-facing window to the dining area of Unit 3 on Level 3 shall be a high sill window no lower than 1.6m and/or in accordance with the height of the proposed north-facing high sill window of the living room of Unit 3. Details shall be submitted to and approved by Council’s Director City Planning prior to a Construction Certificate being issued for the development in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

6.       Large areas of retaining wall structures shall be minimised along the northern and southern boundaries. Details of design for the ground lines, retaining walls and fences along the north and south boundaries shall be provided indicating reduction/minimisation of bulky and overbearing retaining walls along the northern and southern boundaries including (but not limited to) measures to lower the planters along these boundaries. Details shall be submitted to and approved by Council’s Director City Planning prior to a Construction Certificate being issued for the development in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

7.       Details of the following features shall be provided:

-    1:50 sections through a series of walls, including the roof, sunshading, fire protection, rainwater management etc, to properly describe the construction, materials and details. 

-    coordinate all windows on plans and elevations

-    coordinate the roof overhangs on all elevations and plans

-    indicate all roofs and pergolas (including entry shelter) on the roof plan

-    show all visible retaining walls and nominate materials and finishes

-    provide north point and scale

-    indicate size of windows where they are covered by screens

-    indicate window types and operation

-    show realistic column sizes, slab thicknesses and edge details

-                weather protection and sun-shading devices to north, east and west windows

 

Details shall be submitted to and approved by Council’s Director City Planning prior to a Construction Certificate being issued for the development in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

8.       Details of all  landscaping on roof terraces shall be provided including, but not limited to,  planter depth and sizes, plant species and maintenance regime. Details shall be submitted to and approved by Council’s Director City Planning prior to a Construction Certificate being issued for the development in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the development.

 

9.       Street numbering must be provided to the premises in a prominent position, to the satisfaction of Council.

 

10.     The reflectivity index of glass used in the external façade of the development must not exceed 20 percent. 

 

11.     Lighting to the premises shall be designed in accordance with AS4282 – 1997 Control of the Obtrusive Effects of  Outdoor Lighting" so as not to cause a nuisance to nearby residents or motorists and to ensure that light overspill does not affect the amenity of the area.

 

12.     In accordance with the provisions of clauses 143A and 154A of the Environmental Planning & Assessment Regulation 2000, a ‘Design Verification Certificate’ must be provided to the Certifying Authority and the Council, prior to issuing a construction certificate and an occupation certificate, respectively.

 

13.     Public access to the visitor’s carparking spaces is to be maintained at all times and an intercom system is to be provided adjacent to the vehicular entrance to the carpark, together with appropriate signage providing instructions for use.

 

14.     In accordance with Section 80A (11) of the Environmental Planning and Assessment Act 1979 and Clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition that all of the required commitments listed in the relevant BASIX Certificate for this development are fulfilled.

 

15.     In accordance with the provisions of the Environmental Planning & Assessment Regulation 2000, a relevant BASIX Certificate and associated documentation must be submitted to the Certifying Authority with the Construction Certificate application for this development.

 

The required commitments listed and identified in the BASIX Certificate are to be included on the plans, specifications and associated documentation for the proposed development, to the satisfaction of the Certifying Authority.

 

The design of the building must not be inconsistent with the development consent and any proposed variations to the building to achieve the BASIX commitments may necessitate a new development consent or amendment to the existing consent to be obtained, prior to a construction certificate being issued.

 

16.     In accordance with Clause 154B of the Environmental Planning & Assessment Regulation 2000, a Certifying Authority must not issue a final Occupation Certificate for this development, unless it is satisfied that each of the required BASIX commitments have been fulfilled.

 

Relevant documentary evidence of compliance with the BASIX commitments is to be forwarded to the Council upon issuing the final Occupation Certificate.

 

The following condition is applied to meet additional demands for public facilities:

17.     In accordance with Council’s Section 94A Development Contributions Plan effective from 2 July 2007, the following monetary levy must be paid to Council.

Category

Cost

Applicable Levy

S94A Levy

Development cost more than $200000

$1,597,673

1.0%

$15,976.73

 

The levy must be paid in cash, bank cheque or by credit card prior to a construction certificate being issued for the proposed development. The development is subject to an index to reflect quarterly variations in the Consumer Price Index (CPI) from the date of Council’s determination to the date of payment.

 

Council’s Section 94A Development Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick or at www.randwick.nsw.gov.au.

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

18.     The proposed use of the premises and the operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the premises and plant and equipment shall not give rise to a sound pressure level at any affected premises that exceeds the background (LA90), 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A).  The source noise level shall be assessed as an LAeq, 15 min and adjusted in accordance with the NSW Environmental Protection Authority’s Industrial Noise Policy 2000 and Environmental Noise Control Manual (sleep disturbance).

 

19.     The use of the premises and the operation of plant and equipment shall not give rise to the transmission of a vibration nuisance or damage to other premises.

 

The following conditions have been applied to maintain reasonable levels of amenity to the area:

 

20.     There are to be no emissions or discharges from the premises, which will give rise to a public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

21.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

22.     All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA), in accordance with Clause 98 of the Environmental Planning and Assessment Regulation 2000.

 

23.     Prior to the commencement of any building works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

A copy of the construction certificate, the approved plans & specifications and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

24.     Prior to the commencement of any building works, the person having the benefit of the development consent must:

 

i)    appoint a Principal Certifying Authority for the building work, and

 

ii)       appoint a principal contractor for the building work, or in relation to residential building work, obtain an owner-builder permit in accordance with the requirements of the Home Building Act 1989, and notify the Principal Certifying Authority and Council accordingly in writing, and

 

iii)       unless the person having the benefit of the consent is the principal contractor (i.e. owner-builder), notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

 

iv)      give at least two days notice to the Council, in writing, of the persons intention to commence building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

25.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected in accordance with section 81A (2) (b1) (ii) of the Environmental Planning & Assessment Regulation 2000 and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Documentary evidence of the building inspections carried out and details of compliance with Council’s consent is to be maintained by the Principal Certifying Authority.  Details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council with the occupation certificate.

 

The principal contractor or owner-builder (as applicable) must ensure that the required critical stage and other inspections, as specified in the Principal Certifying Authority’s “Notice of Critical Stage Inspections”, are carried out to the satisfaction of the Principal Certifying Authority and at least 48 hours notice (excluding weekends and public holidays) is to be given to the Principal Certifying Authority, to carry out the required inspection, before carrying out any further works.

 

26.     A sign must be erected and maintained in a prominent position on the site for       the duration of the works, which contains the following details:

 

·       name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·       name, address and telephone number of the Principal Certifying Authority,

·       a statement stating that “unauthorised entry to the work site is prohibited”.

 

27.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The relevant requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

28.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon must also be provided to Council with the occupation certificate.

 

29.     In accordance with clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition, that in the case of residential building work, a contract of insurance must be obtained and in force, in accordance with the         provisions of the Home Building Act 1989.

 

Where the work is to be done by a licensed contractor, excavation or building work must not be carried out unless the Principal Certifying Authority (PCA):

 

·      has been informed in writing of the licensee’s name and contractor number; and

·      is satisfied that the licensee has complied with the insurance requirements of Part 6 of the Home Building Act 1989, or

 

Where the work to be done by any other person (i.e. an owner-builder), excavation or building work must not be carried out unless the Principal Certifying Authority:

 

·      has been informed of the person’s name and owner-builder permit number, or

·      has been given a declaration, signed by the owner of the land that states that the market cost of the labour and materials involved in the work does not exceed $5,000.

 

Details of the principal building contractor and compliance with the provisions of the Home Building Act 1989 (i.e. Details of the principal licensed building contractor and a copy of the Certificate of Insurance) are to be submitted to Council prior to the commencement of works, with the notice of appointment of the PCA / notice of intention to commence building work.

 

30.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

31.     A Fire Safety Certificate must be submitted to Council prior to the issuing of an Occupation Certificate, in accordance with the requirements of the Environmental Planning and Assessment Regulation 2000.

 

A single and complete Fire Safety Certificate must be provided which includes details of all of the fire safety measures contained in the building and as detailed in the fire safety schedule attached to the Construction Certificate.

 

Prior to issuing any Occupation Certificate the Principal Certifying Authority must be satisfied that all of the relevant fire safety measures have been included and are sufficiently detailed within the Fire safety Certificate.

 

A copy of the fire safety certificate must be displayed in the building near the entrance and a copy must be forwarded to the NSW Fire Brigades.

 

32.     As a minimum, the building is required to be provided with a smoke alarm system complying with Clause 3 of Specification E2.2a of the Building Code of Australia or a smoke detection system complying with Clause 4 of Specification E2.2a of the Building Code of Australia or a combination of a smoke alarm system within the sole-occupancy units and a smoke detection system in areas not within the sole-occupancy units.  The smoke detectors located within the stairway, corridors or the like must be interconnected.

 

Additional requirements regarding the design and installation of the smoke detection and alarm system may be specified in the construction certificate for the development.

 

33.     All building, plumbing and drainage work must be carried out in accordance with the requirements of the Sydney Water Corporation.

 

The approved Construction Certificate plans must be submitted to a Sydney Water Quick Check agent or Customer Centre prior to commencing any building or excavation works, to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if any further requirements need to be met. 

 

If suitable, the plans will be appropriately stamped.  For Quick Check agent details please refer to Sydney Water’s web site at www.sydneywater.com.au and go to the Building, Developing and Plumbing, then Quick Check or Building and Renovating or telephone 13 20 92.

 

The principal certifying authority must ensure that a Quick Check Agent/Sydney Water has appropriately stamped the plans before commencing any works.

 

The following group of conditions have been applied to ensure the structural adequacy and integrity of the proposed building and adjacent premises:

 

34.     The installation of ground or rock anchors underneath any adjoining premises including (a public roadway or public place) must not be carried out without specific written consent of the owners of the affected adjoining premises and (where applicable) details of compliance must be provided to the certifying authority prior to the commencement of any excavation or building works.

 

35.     Documentary evidence prepared by a suitably qualified professional geotechnical engineer shall be submitted to the certifying authority prior to the issuing of a construction certificate, certifying the suitability and stability of the site for the proposed building and certifying the suitably and adequacy of the proposed design and construction of the building for the site.

 

36.     A report shall be prepared by a professional engineer and submitted to the certifying authority prior to the issuing of a construction certificate, detailing the proposed methods of excavation, shoring or pile construction, including details of potential vibration emissions.  The report, must demonstrate the suitability of the proposed methods of construction to overcome any potential damage to nearby land/premises.

 

Any practices or procedures specified in the engineer’s report in relation to the avoidance or minimisation of structural damage to nearby premises, must be fully complied with and incorporated into the documentation for the construction certificate.

 

A copy of the engineers report is to be submitted to the Council, if the Council is not the certifying authority.

 

37.     Driven type piles/shoring must not be provided unless a geotechnical engineer’s report is submitted to the certifying authority, prior to the issuing of a construction certificate, which demonstrates that damage should not occur to any adjoining premises and public place as a result of the works.

 

Any practices or recommendations specified in the engineer’s report in relation to the avoidance or minimisation of structural damage to nearby premises or land must be fully complied with and incorporated into the documentation for the construction certificate.

 

38.     A dilapidation report prepared by a professional engineer or suitably qualified and experienced building surveyor shall be submitted to the certifying authority prior to the commencement of demolition, excavation or building works detailing the current condition and status of all buildings, including ancillary structures all of the premises adjoining the subject site.

 

The report is to be supported with photographic evidence of the status and condition of the buildings and a copy of the report must also be forwarded to the Council and to the owners of each of the abovementioned premises, prior to the commencement of any works.

 

39.     A Certificate prepared by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to occupation of the building, which certifies that the building works satisfy the relevant structural design requirements of the Building Code of Australia.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

40.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

41.     The adjoining land and buildings located upon the adjoining land must be adequately supported at all times.

 

If an excavation associated with the erection or demolition of a building extends below the level of the base of the footings of any building located on an adjoining allotment of land, the person causing the excavation must:

 

·       preserve and protect the building /s on the adjoining land from damage; and

·       effectively support  the excavation and building; and

·       at least seven (7) days before excavating below the level of the base of the footings of a building on an adjoining allotment of land (including a public road or public place), give notice of the intention and particulars of the works to the owner of the adjoining land.

 

Notes

 

·       This consent and condition does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public.  Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is proposed to be carried out upon any adjoining or supported land, the principal contractor or owner-builder must obtain:

 

a)     the consent of the owners of such adjoining or supported land to trespass or encroach, or

b)     an access order under the Access to Neighbouring Land Act 2000, or

c)     an easement under section 88K of the Conveyancing Act 1919, or

d)     an easement under section 40 of the Land & Environment Court Act 1979, as appropriate.

 

·       Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land.  Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).

 

42.     Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and (except as detailed below) between 8.00am to 5.00pm on Saturdays.

 

All building, demolition and associated site works are strictly prohibited on Sundays, Public Holidays and also on Saturdays adjacent to a Public Holiday.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

43.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant provisions of the Protection of the Environment Operations Act 1997 must be satisfied at all times.

 

Noise and vibration from any rock excavation machinery and pile drivers (or the like) must be minimised by using appropriate plant and equipment and silencers and a construction noise and vibration minimisation strategy, prepared by a suitably qualified consultant is to be implemented during the works, to the satisfaction of the Principal Certifying Authority.

 

44.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works and the following requirements must be complied with:

 

a)     The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

a)     Building materials, sand, soil, waste materials, construction equipment or other materials or articles must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

b)     Bulk bins, waste containers or other articles must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council.  Applications to place a waste container or other articles in a public place can be made to Council’s Health, Building & Regulatory Services department.

 

c)     Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

d)     A temporary timber, asphalt or concrete crossing is to be provided to the site entrance across the kerb and footway area, with splayed edges, to the satisfaction of Council, unless access is via an existing concrete crossover.

 

e)     A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road or nature strip or in any public place:-

 

·       Install or erect any site fencing, hoardings or site structures

·       Operate a crane or hoist goods or materials over a footpath or road

·       Placement of a waste skip or any other container or article on the road, nature strip or footpath.

 

f)      The applicant/builder is required to hold Public Liability Insurance, with a minimum liability of $10 million and a copy of the Insurance cover is to be provided to Council.

 

g)     A Road / Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road / Asset Opening Permit must be complied with.

 

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Council’s Road / Asset Opening Officer on 9399 0691 or 9399 0999.

 

h)     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

45.     A Registered Surveyor’s check survey certificate or compliance certificate is to be forwarded to the principal certifying authority (and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority), detailing compliance with Council’s approval at the following stage/s of        construction:

 

a)     Prior to construction of the first completed floor/floor slab (prior to pouring of concrete), showing the area of land, building and boundary setbacks and verifying that the building is being construction at the approved levels.

 

b)     On completion of the erection of the building showing the area of the land, the position of the building and boundary setbacks and verifying the building has been constructed at the approved levels.

 

46.     A Construction Site Management Plan is to be developed and implemented prior to the commencement of demolition, excavation or building works. The site management plan must include the following measures, as applicable to the type of development:

 

·       location and construction of protective fencing / hoardings to the perimeter of the site

·       location of site storage areas/sheds/equipment;

·       location of building materials for construction;

·       provisions for public safety;

·       dust control measures;

·       site access location and construction

·       details and methods of disposal of demolition materials;

·       protective measures for tree preservation;

·       provisions for temporary sanitary facilities;

·       location and size of waste containers/bulk bins;

·       details of proposed sediment and erosion control measures;

·           construction noise and vibration management;

·           construction traffic management provisions.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain reasonable levels of public health, safety and convenience to the satisfaction of Council. A copy of the approved Construction Site Management Plan must be maintained on site and be made available to Council officers upon request.

 

47.     During demolition excavation and construction works, dust emissions must be minimised, so as not to result in a nuisance to nearby residents or result in a potential pollution incident.

 

Adequate dust control measures must be provided to the site prior to the works commencing and the measures and practices must be maintained throughout the demolition, excavation and construction process, to the satisfaction of Council.

 

Dust control measures and practices may include:-

 

·       Provision of geotextile fabric to all perimeter site fencing (attached on the prevailing wind side of the site fencing).

·       Covering of stockpiles of sand, soil and excavated material with adequately secured tarpaulins or plastic sheeting.

·       Installation of a water sprinkling system or provision hoses or the like.

·       Regular watering-down of all loose materials and stockpiles of sand, soil and excavated material.

·       Minimisation/relocation of stockpiles of materials, to minimise potential for disturbance by prevailing winds.

·       Revegetation of disturbed areas.

 

48.     During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing

 

Details of the proposed sediment control measures are to be detailed in the Site Management Plan and must be submitted to and approved by the principal certifying authority prior to the commencement of any site works.  The sediment and erosion control measures must be implemented prior to the commencement of any site works and be maintained throughout construction.  A copy of the approved details must be forwarded to the Council and a copy is to be maintained on-site and be made available to Council officers upon request.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

A warning sign for soil and water management must be displayed in a prominent position on the building site, visible to both the public and site workers.  The sign must be displayed throughout the construction period.  Copies of a suitable warning sign are available at Council’s Customer Service Centre for a nominal fee.

 

49.     Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If the work involved in the erection or demolition of a building is likely to cause pedestrian or vehicular traffic in a public place to be obstructed or rendered inconvenient or the building involves the enclosure of a public place, a hoarding or fence must be erected between the work site and the public place.

 

If necessary, an awning is to be erected sufficiently to prevent any substance from, or in connection with, the work from falling into the public place or adjoining premises.

 

Temporary fences or hoardings are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or any public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

50.     The demolition, removal, storage, handling and disposal of  materials and all building work must be carried out in accordance with the following requirements       (as applicable):

 

§   Australian Standard 2601 (2001) – Demolition of Structures

§   Occupational Health and Safety Act 2000

§   Occupational Health and Safety (Hazardous Substances) Regulation 2001

§   Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

§   WorkCover NSW – Guidelines and Codes of Practice

§   Randwick City Council’s Asbestos Policy

§   The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

 

51.     A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Work Plan must include the following information (as applicable):

 

§   The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

§   Details of hazardous materials, including asbestos

§   Method/s of demolition and removal of asbestos

§   Measures and processes to be implemented to ensure the health & safety of workers and community

§   Measures to be implemented to minimise any airborne asbestos and dust

§   Methods and location of disposal of any asbestos or other hazardous materials

§   Other relevant details, measures and requirements to be implemented as identified in the Asbestos Survey

§   Date the demolition and removal of asbestos will commence

 

The Demolition Work Plan must be submitted to the Principal Certifying Authority (PCA), not less than two (2) working days before commencing any demolition works.  A copy of the Demolition Work Plan must be forwarded to Council and a copy must also be maintained on site and be made available to Council officers upon request.

 

52.     Any work involving the demolition, storage and disposal of asbestos products and materials must be carried out in accordance with the following requirements:

 

a)     Randwick City Council’s Asbestos Policy (adopted 13 September 2005).

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

b)     A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 10m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation).  Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

c)     On sites involving the removal of asbestos, a  professionally manufactured sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS” and include details of the licensed contractor.  The sign shall measure not less than 400mm x 300mm and the sign is to be installed prior to demolition work commencing and is to remain in place until such time as all asbestos has been safely removed from the site.

 

d)     Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 1996. Asbestos waste must be disposed of at an approved waste disposal depot (refer to the DEC or Waste Service NSW for details of sites). Copies of all receipts detailing method and location of disposal must be maintained on site and be provided to Council officers upon request, as evidence of correct disposal.

 

e)     A Clearance Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council upon completion of the works prior to an Occupation Certificate being issued, which confirms that the asbestos material have been removed appropriately and the relevant requirements contained in the Asbestos Survey and conditions of consent in relation to the safe removal and disposal of asbestos, have been satisfied.

 

Road/Asset Openings (Unless otherwise specified by City Services or Development Engineer)

 

The following conditions are applied to provide adequate provisions for infrastructure and services:

 

53.     Any openings within or upon the road, footpath, nature strip or in any public place (i.e. for proposed drainage works or installation of services), must be carried out in accordance with the following requirements, to the satisfaction of Council:

 

a.  A Road/Asset Opening Permit must be obtained from Council prior to carrying out any works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road/Asset Opening Permit must be complied with.

 

b.  The owner/developer must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

c.  Relevant Road/Asset Opening Permit fees, construction fees, inspection fees and security deposits, must be paid to Council prior to commencing any works within or upon the road, footpath, nature strip or other public place,

 

d.  Excavations and trenches must be back-filled and compacted in accordance with AUSPEC standards 306U.

 

e.  Excavations or trenches located upon a road or footpath are required to be provided with 50mm depth of cold-mix bitumen finish, level with the existing road/ground surface, to enable Council to readily complete the finishing works at a future date.

 

f.   Excavations or trenches located upon turfed areas are required to be back-filled, compacted, top-soiled and re-turfed with Kikuyu turf.

 

g.  The work and area must be maintained in a clean, safe and tidy condition at all times and the area must be thoroughly cleaned at the end of each days activities and upon completion.

 

h.  Public and vehicular safety must be maintained at all times and any related directions issued by Council officers must be complied with.

 

i.   The work can only be carried out in accordance with approved hours of building work as specified in the development consent, unless the express written approval of Council has been obtained beforehand.

 

j.   All work, including the provision of barricades, fencing, lighting, signage and traffic control, must be carried out in accordance with the NSW Roads and Traffic Authority publication - ‘Traffic Control at Work Sites’ and Australian Standard AS 1742.3 – Traffic Control Devices for Works on Roads, at all times.

 

k.  Not more than half of any road is to be opened up at any one time and excavations must be provided with suitable fencing/ barricades and flashing amber lights if not completed by the end of the day.

 

l.   Any necessary approvals must be obtained from NSW Police, Roads & Traffic Authority, State Transit Authority and relevant Service Authorities, prior to commencing work upon or within the road, footway or nature strip.

 

All conditions and requirements of the NSW Police, Roads & Traffic Authority, State Transit Authority and Council must be complied with at all times.

 

m.  A detailed Traffic Management Plan must be submitted to and approved by Council and relevant Authorities, prior to carrying out any work which results in the closure or partial closure of a State or Regional Road , as identified by the NSW Roads & Traffic Authority.

 

n.  Sediment control measures must be implemented in accordance with the conditions of development consent and soil, sand or any other material must not be allowed to enter the stormwater drainage system or cause a pollution incident.

 

o.  The owner/developer must have a Public Liability Insurance Policy in force, with a minimum cover of $10 million and a copy of the insurance policy must be provided to Council prior to carrying out any works within or upon the road, footpath, nature strip or in any public place.

 

p.  Council’s Road/Asset Opening Officer must be notified at least 48 hours in advance of commencing any excavation works and also immediately upon completing the works (on 9399 0691 or 0409 033 921 during business hours), to enable any necessary inspections or works to be carried out.

 

Security Deposit Conditions

1)     The following conditions are applied to provide adequate security against damage to Council’s infrastructure:

 

54.     The following damage/civil works security deposit requirement is to be complied with prior to a construction certificate being issued for the development, as security for making good any damage caused to the roadway, footway, verge or any public place; or as security for completing any public work; and for remedying any defect on such public works, in accordance with section 80A(6) of the Environmental Planning and Assessment Act 1979:

 

a)   $5000.00   -      Damage/Civil Works Security Deposit

 

The damage/civil works security deposit may be provided by way of a cash or cheque with the Council and is refundable upon:

 

§  A satisfactory inspection by Council that no damage has occurred to the Council assets such as roadway, kerb, guttering, drainage pits footway, or verge; and

§  Completion of the civil works as conditioned in this development consent by Council.

 

The applicant is to advise Council, in writing, of the completion of all building works and/or obtaining an occupation certificate, if required.

 

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

Traffic conditions/Civil Works Conditions

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

55.     Prior to the issuing of an Occupation Certificate the applicant must meet the full cost for Council or a Council approved contractor to:

 

a)   Construct a full width concrete heavy duty vehicular crossing and layback at kerb opposite the vehicular entrance to the site in Kennedy Lane.

 

b)   Construct a kerb and gutter for the full site frontage except opposite the vehicular entrance to the site in Kennedy lane.

 

c)   Carry out a full depth minimum 2.5 metre wide, road construction in front of the kerb and gutter along the full site frontage in Kennedy Lane.

 

d)   Construct new concrete steps servicing the pedestrian gate entrance in Willis Street to Council’s requirements including acceptable hand railing.

 

e)   Reconstruct a minimum 1.3m wide concrete footpath along the full site frontage in Willis Street. 

 

56.     The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

57.     A separate written approval from Council is required to be obtained in relation to all works which are located externally from the site within the road reserve/public place, in accordance with the requirements of the Roads Act 1993.  Detailed plans and specifications of the proposed works are to be submitted to and approved by the Director of City Services prior to commencing any works within the road reserve/public place.

 

All works within the road reserve/public place must be carried out to the satisfaction of Council and certification from a certified practicing engineer is to be provided to Council upon completion of the works.

 

Relevant Council assessment and inspection fees, as specified in Council's adopted Pricing Policy, are required to be paid to Council prior to commencement of the works.

 

58.     All new walls adjacent to vehicular crossings must be lowered to a height of 600mm above the internal driveway level for a distance of 1.50m within the site or splayed 1.5 metre by 1.5 metre to provide satisfactory sight lines. Details are to be submitted to the Certifying Authority prior to the release of the construction certificate showing compliance with this condition.

 

59.     A Works Zone is to be provided along the Willis Street frontage for the duration of the construction works.  The ‘Works Zone’ shall be provided to the satisfaction of the Randwick Traffic Committee and shall have a minimum length of 12 metres. The prescribed fee for the Works Zone must be paid to Council at least four (4) weeks prior to the commencement of work on the site.

 

It is noted that the requirement for a Works Zone may be waived if it can be demonstrated (to the satisfaction of Council’s traffic engineer) that all construction related activities (including all loading and unloading operations) may be undertaken wholly within the site.

 

60.     Prior to the issue of a construction certificate, the applicant shall submit for approval and have approved by Council's Traffic Engineer a detailed construction traffic management plan. The plan shall demonstrate how construction and delivery vehicles will access the development site during the demolition and construction phase of the development.

 

All traffic associated with the subject development shall comply with the terms of the approved construction traffic management plan.

 

Alignment Level Conditions

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

61.     The Council’s Development Engineer has inspected the above site and have determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, shall be:

 

§ Kennedy Lane Frontage – 50mm above the centreline of the road in Kennedy Lane at all points opposite the centreline of the road.

§ Willis Street Frontage – Pedestrian Gate Entrance RL 48.80 AHD – Approximately.

 

62.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the roadway must be indicated on the building plans for the construction certificate.

 

63.     The above alignment levels and the site inspection by Council’s Development Engineer has been issued at a prescribed fee of $536 calculated at $44.00 (inclusive of GST) per metre of site frontage. This amount is to be paid prior to a construction certificate being issued for the development.

 

Service Authority Conditions

The following conditions are applied to provide adequate consideration for service authority assets:

 

64.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

65.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

66.     Documentary evidence from the relevant public utility authorities confirming that their requirements have been satisfied, must be submitted to the certifying authority prior to a construction certificate being issued for the development.

 

67.     A Road/Asset Opening Permit must be obtained from Council prior to carrying out any public utility service works within or upon a road, footpath, nature strip or in any public place, in accordance with section 138 of the Roads Act 1993 and all of the conditions and requirements contained in the Road/Asset Opening Permit must be complied with.

                                         

The owner/builder must ensure that all works within or upon the road reserve, footpath, nature strip or other public place are completed to the satisfaction of Council, prior to the issuing of a final occupation certificate for the development.

 

For further information, please contact Councils Road/Asset Opening Officer on 9399 0691 or 9399 0999.

 

68.     Any electricity substation required for the site as a consequence of this development shall be located within the site and shall be screened from view. The proposed location and elevation shall be shown on all detailed landscape drawings and specifications. The applicant must liaise with Energy Australia prior to lodging the construction certificate to determine whether or not an electricity substation is required for the development.

 

69.     A Section 73 Compliance Certificate under the Sydney water Act 1994 must be obtained. Application must be made through an authorised Water Servicing Coordinator. Please refer to “Your Business” section of Sydney Water’s web site at www.sydneywater.com.au then the “e-developer” icon or telephone 13 20 92.

 

Following application a “Notice of Requirements” will detail water and sewer extensions to be built and charges paid. Please make early contact with the Coordinator, since building of water/sewer extensions can be time consuming and may impact on other services and building, driveway or landscape design.

 

The Notice must be issued to the Principal Certifying Authority prior to the construction certificate being issued.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to occupation of the development.

 

Drainage Conditions

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

70.     Stormwater drainage plans have not been approved as part of this development consent. Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issued, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)       A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

 

b)       A layout of the proposed drainage system including pipe sizes, type, grade, length, invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system. 

 

c)       Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (ie. above the 1 in 20 year storm) to the proposed drainage system.

 

d)       The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

 

i.        Roof areas

ii.       Paved areas

iii.       Grassed areas

iv.      Garden areas

 

e)       Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

 

f)       Proposed finished surface levels and grades of car parks, internal driveways and access aisles which are to be related to Council's design alignment levels.

 

g)       The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

71.     All stormwater run-off naturally draining to the site must be collected and discharged through this property's stormwater system.  Such drainage must, if necessary, be constructed prior to the commencement of building work.

 

72.     All site stormwater must be discharged (by gravity) to the kerb and gutter at the front of the property in Willis Street

 

73.     On-site detention must be provided to ensure that the maximum discharge from the above site is not to exceed that which would occur during a 1 in 5 year storm of 1 hour duration for the existing site conditions. All other stormwater run-off from the above site for all storms up to the 1 in 20 year storm is to be retained on the site for gradual release to the kerb and gutter or drainage system as required by Council.  Provision is to be made for satisfactory overland flow should a storm in excess of the above parameters occur.

 

Should no formal overland escape route be provided for storms greater than the design storm, the on-site detention system shall be sized for the 1 in 100 year storm event.

 

For small areas up to 0.5 hectares, determination of the required cumulative storage must be calculated by the mass curve technique as detailed in Technical Note 1, Chapter 14 of the Australian Rainfall and Run-off Volume 1, 1987 Edition.

 

Where possible the detention tank must have an open base to infiltrate stormwater to the groundwater. Note that the ground water and any rock stratum has to be a minimum of 2.0 metres below the base of the tank.

 

74.     The maximum depth of ponding in above ground detention areas (and/or infiltration systems with above ground storage) shall be as follows:

 

a)   300mm in landscaped areas (where child proof fencing is not provided around the outside of the detention area and sides slopes are steeper than 1 in 10)

b)   600mm in landscaped areas where the side slopes of the detention area have a maximum grade of 1 in 10.

c)   1200mm in landscaped areas where a childproof fence is provided around the outside of the detention area

 

Notes:

§ It is noted that above ground storage will not be permitted in basement carparks or in any area which may be used for storage of goods.

§ Mulch/bark must not be used in onsite detention areas

 

75.     Any above ground stormwater detention areas must be suitably signposted where required, warning people of the maximum flood level.

 

76.     The detention area must be regularly cleaned and maintained to ensure it functions as required by the design.

 

77.     Any onsite detention systems shall be located in areas accessible by residents of all units.

 

78.     The floor level of all habitable and storage areas adjacent to the detention area (and/or infiltration systems with above ground storage) must be a minimum of 300mm above the maximum water level in the detention area for the design storm or alternately a permanent 300mm high water proof barrier is to be constructed.

 

(In this regard, it must be noted that this condition must not result in any increase in the heights or levels of the building.  Any variations to the heights or levels of the building will require a new or amended development consent from the Council prior to a construction certificate being issued for the development).

 

79.     A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

 

80.     A `V' drain is to be constructed along the perimeter of the property, where required, to direct all stormwater to the detention/infiltration area.

 

81.     A sediment/silt arrester pit must be provided:-

 

a)  within the site at or near the street boundary prior to the site stormwater discharging by gravity to the kerb/street drainage system; and

b)  prior to stormwater discharging into any absorption/infiltration system.

 

The sediment/silt arrester pit shall be constructed in accordance with the following requirements:-

 

·      The base of the pit located a minimum 300mm under the invert level of the outlet pipe.

 

·      The pit constructed from cast in-situ concrete, precast concrete or double brick.

 

·      A minimum of 4 x 90 mm diameter weep holes located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

 

·      A galvanised heavy-duty screen located over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

 

·      The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

 

·      A child proof and corrosion resistant fastening system provided for the access grate (e.g. spring loaded j-bolts or similar).

 

·      A sign adjacent to the pit stating:

 

“This sediment/silt arrester pit shall be regularly inspected and cleaned.”

 

Note: Sketch details of a standard sediment/silt arrester pit may be obtained from Council’s Drainage Engineer.

 

82.     Prior to occupation of the development, a "restriction on the use of land” and “positive covenant" (under section 88E of the Conveyancing Act 1919) shall be placed on the title of the subject property to ensure that the onsite detention is maintained and that no works which could affect the design function of the detention/infiltration system are undertaken without the prior consent (in writing) from Council. Such restriction and positive covenant shall not be released, varied or modified without the consent of the Council.

 

Notes:

a.   The “restriction on the use of land” and “positive covenant” are to be to the satisfaction of Council. A copy of Council’s standard wording/layout for the restriction and positive covenant may be obtained from Council’s Development Engineer.

 

b.   The works as executed drainage plan and hydraulic certification must be submitted to Council prior to the “restriction on the use of land” and “positive covenant” being executed by Council.

 

83.     One covered car washing bay shall be provided for this development.

 

a)       The car washing bay must be drained to sewer to the requirements of Sydney Water and proof of compliance is to be submitted to the certifying authority, prior to an occupation certificate being issued for the proposed development.

 

b)       The car washing bay must be located outside any required/approved stormwater detention system.

 

c)       The car washing bay may be located within the visitor parking spaces provided they are signposted with ‘Exclusive Carwash Bay Use Sat 2:00pm – 5:00pm and Sunday 10:00am – 2:00pm, Visitor parking at other times’

 

d)       The car washing bay must be constructed with a minimum 20mm bund around the perimeter of the car washing bay (or equivalent)

 

e)       A water tap shall be located adjacent to the car washing bay.

 

84.     Prior to the issuing of an occupation certificate, the applicant shall submit to Council, a works-as-executed drainage plan prepared by a registered surveyor and approved by a suitably qualified and experienced Hydraulic Engineer. The works-as-executed drainage plan shall be to the satisfaction of the Principal Certifying Authority (PCA) and shall include the following details:

 

a)     The location of the detention basin with finished surface levels;

b)     Finished site contours at 0.5 metre intervals;

c)     Volume of storage available in the detention areas;

d)     The location, diameter, gradient and material (i.e PVC, RC etc) of all stormwater pipes;

e)     The orifice size(s) (if applicable);

f)     Details of any infiltration/absorption systems; and

g)     Details of any pumping systems installed (including wet well volumes).

 

85.     Prior to the issuing of an occupation certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer confirming that the design and construction of the stormwater drainage system complies with the conditions of development consent. The certification must be provided following inspection/s of the site stormwater drainage system by the certifying engineers and shall be provided to the satisfaction of the PCA.

 

86.     As the above site may encounter groundwater within the depth of the basement excavation, the basement carpark or similar structures are to be suitably tanked and waterproofed. A Structural Engineer\Geotechnical Engineer shall certify the tanking & waterproofing has been carried out to an acceptable standard, to the satisfaction of the certifying authority. A copy of the certification is to be forwarded to Council.

 

Notes:

 

a)  Any subsoil drainage (from planter boxes etc) is to be disposed of within the site and is not to be discharged to Council’s kerb & gutter and/or underground drainage system.

 

b)  Adequate provision is to be made for the ground water to drain around the basement carpark (to ensure that the basement will not dam or slow the movement of the ground water through the development site).

 

c)  Ground Water must not be collected and drained from the site.

 

Waste Management Conditions

The following conditions are applied to provide adequate provisions for waste management:

 

87.     The garbage room areas will have to be designed so as to be able to contain a total of 7 x 240 litre bins (3 garbage bins, 3 recycle bins and 1 green waste bin) whilst providing satisfactory access to these bins. Details showing compliance with this requirement are to be shown on the plans submitted to the certifying authority for the construction certificate.

 

88.     The waste storage areas are to be provided with a tap and hose and the floor is to be graded and drained to the sewer to the requirements of Sydney Water. The waste storage areas shall be clearly signposted.

 

89.     Prior to the issuing of a construction certificate for the proposed development the applicant is to submit to Council and have approved by Council’s Manager of Waste Services, a Waste Management Plan detailing waste and recycling storage and disposal for the development site.

 

The plan shall detail the type and quantity of waste to be generated by the development; demolition waste; construction waste; materials to be re-used or recycled; facilities/procedures for the storage, collection recycling & disposal of waste and the on-going management of waste.

 

Landscape Conditions

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

90.     Landscaping at the site shall be installed substantially in accordance with the Landscape Plan by Greenplan, drawing no 07.726-01, revision B, dated 19.11.07, subject to the following additional requirements being shown on an amended plan, which shall be submitted to, and be approved by the PCA, prior to the issue of a construction certificate (with a copy of the approved plan to be forwarded to Council prior to the commencement of works if not the PCA), and is to include:

 

a.       In order ensure reasonable levels of screening and privacy between the subject site and adjoining property to the north (similar to what has been proposed along the southern boundary), larger screening trees which will achieve a minimum height at maturity of 6 metres shall be incorporated into the perimeter planting along the length of the northern boundary, comprising a minimum of two each on both the lower and upper landscaped levels.

 

b.       Smaller growing, decorative/feature species shall be introduced along the length of the front (western) boundary, in front of the proposed screening hedge, to assist with presentation of the development to the street.

 

c.       The landscape contractor must ensure that both Angophora costata (Sydney Red Gums) are planted a minimum distance of 3.5 metres from the edge of any part of the proposed building.

 

d.       Additional notation showing soil and mulch details, irrigation, lighting, edging, paving, fencing details, surface finishes, retaining wall details, and any other landscape elements in sufficient detail to fully describe the proposed landscape works.

 

e.       Position of existing and proposed site services including water, gas, electricity, sewer, stormwater, etc.

 

f.        Sectional elevations through the site showing the existing and proposed groundlines, building elevations, and mature height of proposed planting.

 

g.       All planter boxes and garden beds constructed on slab must have a minimum soil depth of 600mm, with construction details to be submitted.

 

h.       Location of easements within the site and upon adjacent sites (if any).

 

i.        To ensure satisfactory maintenance of the landscaped areas, an automatic drip irrigation system shall be installed throughout all planted areas. Details shall be provided showing that the system will be connected to the sites rainwater tanks, with back-up connection to the mains supply, in accordance with all current Sydney Water requirements.

 

j.        All detention tanks and below ground stormwater infiltration systems located within the landscaped areas shall have a minimum soil cover of 600mm to ensure sufficient soil depth to permit the establishment of landscaping.

 

k.        Any substation required shall be screened from view, with the proposed location, elevation and screening method to be shown.

 

91.     The landscaping shall be installed in accordance with the approved documentation, prior to the issue of a final occupation certificate, and shall be maintained in accordance with those plans.

 

Streetscape Improvement Conditions

 

92.     The existing grass embankment on Council’s Willis Street nature strip which slopes steeply down to the west, between the front property boundary and existing footpath, is unsightly, unusable and difficult to maintain. As part of constructing new access stairs in this area (refer Council’s Access, Transport & Infrastructure conditions earlier in this report), the applicant will also be responsible for terracing/re-grading, planting and mulching this public area, and must consult Council’s Landscape Development Officer (9399-0613) in regards to Council’s requirements for this component.

 

93.     Prior to the issue of a construction certificate, a sketch plan for the subject area, (i.e. the Willis Street naturestrip/verge fronting the development site), which includes the following items shall be submitted to, and be approved by, Council’s Director of City Planning:

 

a)     Existing and proposed levels;

b)     Location and spot levels of new access stairs;

c)     A planting plan and plant schedule which includes proposed species, pot size at the time of planting, quantity and location, all at a scale of 1:100 or 1:200, with species selection restricted to native species that require minimal watering once established, or species with water needs that match rainfall and drainage conditions;

d)     Location and finished spot heights of any retaining walls, including material, footing and construction details.

 

94.     Landscaping of this public area shall be completed in accordance with the approved plan, Council’s instructions, and Council’s requirements for Civil Works on Council property, wholly at the applicant’s cost, prior to the issue of a final occupation certificate.

 

95.     A refundable deposit in the form of cash, cheque or bank guarantee (with no expiry date) for an amount of $3000.00 (no GST) shall be paid at the Cashier on the Ground Floor of the Administrative Centre, prior to a construction certificate being issued for the development, in order to ensure completion of the public domain works described above.

 

The refundable deposit will be eligible for refund following the issue of a Final Occupation Certificate, subject to completion and submission of Council’s ‘Security Deposit Refund Application Form’, and pending a satisfactory inspection by Council’s Landscape Development Officer (9399-0613).

 

Any contravention of these conditions at any time during the course of the works, or prior to the issue of a final occupation certificate, may result in Council claiming all or part of the lodged security in order to perform any rectification works necessary.

 

Onsite Tree Management

 

96.     Approval is granted for the removal of all vegetation within the site in order to accommodate the proposed works as shown, subject to full implementation of the approved landscaping.

 

Tree Pruning

 

97.     Permission is also granted for the minimal and selective pruning of only those lower growing branches from the southern aspects of those trees which are located in the adjoining property to the north, 47-49 Willis Street, comprising from west to east, two Eucalyptus scoparia (White Gums), near the southwest corner of this neighbouring building, then further to the east, about halfway along the length of this common boundary, a stand of Allocasurina species (She-Oaks), as well as another stand of similarly sized She Oaks existing further to the east, towards Kennedy Lane.

 

98.     This approval is granted in order to avoid damage being caused to these neighbouring trees by site machinery or similar during the course of construction, and may be performed prior to commencement (demolition) if necessary.

 

99.     This approval does not imply any right of entry onto a neighbouring property nor does it allow pruning beyond a common boundary; however, where such measures are desirable in the best interests of correct pruning procedures, and ultimately, the health of these trees, the applicant will need to negotiate with the neighbour/tree owner for access to perform this work.

 

100.    All pruning must be undertaken by an Arborist who holds a minimum of AQF Level III in Arboriculture, and who is also a registered member of a nationally recognised organisation/association, with all pruning to be performed to Australian Standard AS 4373-1996 'Pruning of Amenity Trees.’

 

Tree Protection Measures

 

101.    This approval does not imply any right of entry onto a neighbouring property nor does it allow pruning beyond a common boundary; however, where such measures are desirable in the best interests of correct pruning procedures, and ultimately, the health of these trees, the applicant will need to negotiate with the neighbour/tree owner for access to perform this work.

 

102.    Prior to the lodgement of a Construction Certificate for the development site the applicant must engage a suitably qualified consultant to provide a detailed “Tree Management Strategy” and “Arboricultural Assessment” covering all trees within adjoining properties and within the vicinity of the development site. The strategy and assessment must identify any trees located within adjacent properties which may be affected by the proposed works. Given that all trees within adjoining properties must be retained and protected in conjunction with the proposed development, variations to the internal driveway and basement carpark may be required. The “Tree Management Strategy” and “Arboricultural Assessment” must be submitted to Council for approval and be approved prior to lodgement of a Construction Certificate for the proposed development. Prior to engaging the consultant the applicant must liaise with council’s Landscape Development Officer regarding the scope and nature of the “Tree Management Strategy” and “Arboricultural Assessment”.

 

103.    In order to ensure the retention of those trees on the adjoining property to the south, (53 Willis Street), and the adjoining property to the north, (47-49 Willis Street), being from west to east, two Eucalyptus scoparia (White Gums), near the southwest corner of this neighbouring building, then further to the east, about halfway along the length of this common boundary, a stand of Allocasurina species (She-Oaks), and another stand of similar sized Allocasurina species (She Oaks) further to the east, towards Kennedy Lane in good health, the following measures are to be undertaken:

 

a.       All detailed architectural, building, demolition, engineering (structural, stormwater & drainage, services), and landscape documentation submitted for the construction certificate application must show the retention of these neighbouring trees, with the position of their trunks and full diameter of their canopies to be clearly shown on all drawings.

 

b.       All detailed architectural, building, demolition, engineering (structural, stormwater & drainage, services), and landscape documentation submitted for the construction certificate application must be fully compliant with the recommendations of the approved “Tree Management Strategy” and “Arboricultural Assessment”

 

c.       The construction certificate plans must show that within a radius of 5 metres from the outside edge of the trunks of these neighbouring trees (measured off the submitted plans), contiguous piers or sheet piling will be used for the northern wall of the proposed basement so as to minimise the amount of root damage caused by collapsing of the existing soil profile.

 

d.       Any roots encountered during any works along the length of the northern boundary must be cut cleanly by hand, and the affected area to be either backfilled with clean site soil, supported or shored-up as soon as practically possible.

 

e.       There is to be no storage of materials or machinery or site office/sheds, nor is cement to be mixed or chemicals spilt/disposed of and no stockpiling of soil or rubble beneath the extent of the driplines of any of these trees.

Advisory Conditions

The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

ADVISORY MATTERS:

A1.     The applicant is advised that the Construction Certificate plans and specification must comply with the provisions of the Building Code of Australia (BCA).

 

Details of compliance with the relevant provisions of the Building Code of Australia and conditions of development consent are to be provided in the plans and specifications for the construction certificate.

 

The applicant/developer is advised to ensure that the development is not inconsistent with Council's consent and if necessary consult with Council’s Building Certification Services or your accredited certifier (as applicable) prior to submitting your construction certificate application to enable these matters to be addressed accordingly.

 

A2.     The applicant is advised that the Construction Certificate plans and specification must comply with the provisions of the Building Code of Australia (BCA).

 

In this regard, the development consent plans do not show compliance with the deemed-to-satisfy provisions of the BCA, including:

 

a)     Part B1   -    Structural provisions

b)     Part C1   -    Fire resistance and stability

c)     Part D1   -    Provisions for escape

d)     Part D2   -    Construction of exits

e)     Part E1   -    Fire fighting equipment

f)      Part E2   -    Smoke Hazard Management

g)     Part E3   -    Lift Installations

h)     Part E4   -    Emergency lighting, exit signs & warning systems

i)      Part F1   -    Damp and weatherproofing

j)      Part F2   -    Sanitary and other facilities

k)     Part F4   -    Light and ventilation

 

Details of compliance with the relevant provisions of the Building Code of Australia and conditions of development consent are to be provided in the plans and specifications for the construction certificate.

 

The applicant/developer is advised to ensure that the development is not inconsistent with Council's consent and if necessary consult with Council’s Building Certification Services or your accredited certifier (as applicable) prior to submitting your construction certificate application to enable these matters to be addressed accordingly.

 

A3.      The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Belleli/Matthews) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

Miscellaneous Reports

 

M5/10       Miscellaneous Report - Reporting variations to Development Standard under State Environment Planning Policy No. 1 (SEPP1) from 1 November 2009 to 28 February 2010 (F2008/00122)

PL19/10

RESOLUTION: (Nash/Hughes) that the report be received and noted.

 

MOTION: (Nash/Hughes) CARRIED UNANIMOUSLY - SEE RESOLUTION.

 

 

M6/10       Miscellaneous Report - Maroubra Beach Commerical Centre Planning Review (F2006/00355)

PL20/10

RESOLUTION: (Matson/Hughes) that Council engage Allen Jack+Cottier to further develop the concept plan for the Maroubra Beach Commercial Centre that was endorsed by the Maroubra Beach Renewal Working Group.

 

MOTION: (Matson/Hughes) CARRIED UNANIMOUSLY - SEE RESOLUTION.

  

Notice of Rescission Motions

 

NR2/10     Notice of Rescission Motion - Notice of Rescission Motion submitted by Crs Hughes, Matson and Seng -
9 Lurline Street, Maroubra (DA/956/2007/A)

 

Council was advised that Crs Hughes and Matson had withdrawn their signatures from the Rescission Motion.  No alternative Councillors were prepared to support the Rescission Motion, therefore, the motion lapsed.

 

 

The meeting closed at 7.00pm.

 

 

The minutes of this meeting were confirmed at the Planning Committee Meeting of the Council of the City of Randwick held on Tuesday, 13 April 2010.

 

 

 

 

 

 

...................................................

CHAIRPERSON