MINUTES OF HEALTH BUILDING AND PLANNING COMMITTEE MEETING OF
THE COUNCIL OF THE CITY OF
RANDWICK

HELD ON TUESDAY, 21ST NOVEMBER, 2006 AT 6:49 P.M.

 

 

PRESENT:

 

The Mayor, Cr P. Tracey (North Ward)

 

North Ward                                         -           Cr M. Woodsmith

 

South Ward                                          -           Crs R. Belleli & A. White

 

East Ward                                                        Crs B. Notley-Smith, M. Matson (Deputy Chairperson) & D. Sullivan

 

West Ward                                          -           Crs B. Hughes, S. Nash (Chairperson) &

J. Procopiadis

 

Central Ward                                       -           Crs A. Andrews, C. Bastic (from 7.45 pm)

& T. Seng

 

 

OFFICERS PRESENT:

 

General Manager                                                                                              Mr. R. Brownlee.

Director, City Services                                                                          Mr. J. Frangoples.

Director, City Planning                                                                          Ms. S. Truuvert.

Director, Governance & Financial Services                                                       Mr. G. Banting.

Manager Development Assessment                                                                   Mr. K. Kyriacou.

Manager Administrative Services                                                                      Mr. D. Kelly.

 

1.         APOLOGIES/GRANTING OF LEAVE OF ABSENCE.

 

Apologies were received from Crs Daley and Kenny.

 

RESOLVED:  (Belleli/Procopiadis) that the apologies from Crs Daley and Kenny for non-attendance at the Health, Building & Planning Committee Meeting of the Council held on Tuesday, 21st November, 2006 be received & accepted.

 

2.         CONFIRMATION OF THE MINUTES.

 

CONFIRMATION OF THE MINUTES OF THE HEALTH, BUILDING AND PLANNING COMMITTEE MEETING HELD ON TUESDAY, 10TH OCTOBER, 2006.

 

H115   RESOLUTION:  (Belleli/Procopiadis) that the Minutes of the Meeting of the Health, Building and Planning Committee held on Tuesday, 10th October, 2006 (copies of which were circulated to all Councillors) be and are hereby confirmed as a correct record of the proceedings of that meeting.

 

 

3.         DECLARATION OF PECUNIARY & NON-PECUNIARY INTERESTS.

 

(a)        Councillor Nash declared a non-pecuniary interest in Item 6.1 as one of his relatives lives in close proximity to the development.

 

4.         ADDRESSING OF COUNCIL BY MEMBERS OF THE PUBLIC.

 

Prior to consideration of the Agenda by the Committee, the following deputations were received in respect of the following matters:

 

Item 6.1          DEVELOPMENT APPLICATION REPORT - 1603 ANZAC PARADE, LA PEROUSE.

 

The Objector                Mr David Anderson                  28 Goorawahl Avenue, La Perouse

 

The Applicant               Mr Anthony Betros                   282-290 Oxford Street, Bondi Junction

                                    (on behalf of the applicant)

 

Item 6.3          DEVELOPMENT APPLICATION REPORT - 85 LOCH MAREE STREET, MAROUBRA.

 

The Applicant               Mr Richard Pauliny                   27 Lancelot Street, Condell Park

                                    (on behalf of the applicant)

 

Item 6.4          DEVELOPMENT APPLICATION REPORT – 4 EDGECLIFFE AVENUE, SOUTH COOGEE.

 

The Applicant               Mr Brian Freeman                    4 Edgecliffe Avenue, South Coogee

 

Item 6.5          DEVELOPMENT APPLICATION REPORT - 24 ABOUD AVENUE, KINGSFORD.

 

The Applicant               Mr Ray Delohery                      24 Aboud Avenue, Kingsford

 

Item 6.7          DEVELOPMENT APPLICATION REPORT - 102 PRINCE EDWARD STREET MALABAR.

 

The Objector                Mr Glen Biddle             25 Napier Street, Malabar

 

The Applicant               Mr Steve Haigh                        2A Mawson Parade, Chifley

 

Item 6.8          DEVELOPMENT APPLICATION REPORT - 24 HELENA STREET, RANDWICK.

 

The Applicant               Ms Fay Antonaros                    24 Helena Street, Randwick

 

The meeting was adjourned at 7.24 p.m. and was resumed at 7.45 p.m.

 

5.         URGENT BUSINESS.

 

Nil.

6.         DEVELOPMENT APPLICATIONS.

 

6.1       DEVELOPMENT APPLICATION REPORT - 1603 ANZAC PARADE, LA PEROUSE.  (D/0520/2006)

 

H116   RESOLUTION:  (Belleli/Andrews) that:

 

A.      Council support the objection under State Environmental Planning Policy No. 1 to vary the provisions of Clause 33(5) of the Randwick Local Environmental Plan 1998 (as amended) relating to building height for Development Application No. DA 520/2006 on the grounds that the proposed development complies with the objectives of clause and will not adversely affect the amenity of the locality and the Director of Planning be notified accordingly;

AND

 

B.      Council, as the responsible authority, grant its development consent as a Deferred Commencement under Section 80(3) of the Environmental Planning and Assessment Act, 1979 (as amended) to Development Application No. DA 520/2006 for the construction of a new three bedroom dwelling above the existing mixed use development. at 1603 Anzac Parade, La Perouse, subject to the following deferred commencement condition:-

 

DEFERRED COMMENCEMENT CONDITION

 

The consent is not to operate until the following material has been submitted to and approved by the Director of City Planning:

 

1.       The existing building and new addition are to be rendered with the colours, materials and finishes of the external surfaces to the building to be compatible with the adjacent development to the east in order to maintain the integrity and amenity of the building and the streetscape.  Details of the proposed colours, materials and finishes (i.e. a sample board keyed to all building elevations) are to be submitted and shall include the following:-

 

·        metal roof sheeting painted or colour bonded to minimise reflection and to be sympathetic and compatible with the building and surrounding environment

·        details and samples of the glass to be used.  The reflectivity index of glass used in the external façade of the development must not exceed 20 percent and certification of such is required with the sample board. 

 

Evidence required to satisfy the above condition must be submitted to Council within 12 months of the date of this consent.

 

C.      Subject to compliance with the deferred commencement condition, to the satisfaction of the Director City Planning, development consent be granted under Section 80 and 80A of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No DA 520/2006 for the construction of a new three bedroom dwelling above the existing mixed use development. at 1603 Anzac Parade, La Perouse subject to the following conditions:-

 

REFERENCED PLANS:  

 

1.         The development must be implemented substantially in accordance with the plans numbered DA 01 to DA 04, dated 2 June, 2006, prepared by Cracknell and Lonergan and received by Council on 30 June, 2006 the application form and on any supporting information received with the application, except as may be amended by the satisfaction of the deferred commencement condition and by the following conditions and as may be shown in red on the attached plans:

 

ENVIRONMENTAL AMENTITY:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

2.         The carpark in the development must incorporate the provision of:

 

a)       Car parking spaces allocated at the following rates:- i) a minimum of one (1) undercover carparking space per residential dwelling, ii) three (3) open air spaces at the rear of the property for the use of restaurant during operating hours and a one (1) undercover space for loading and unloading of goods at all times.

 

Details of compliance with the requirement for the use of the (3) open air spaces at the rear of the property for the use of restaurant are to be sign posted as such on site prior to the issue of the occupation certificate.

 

3.         The car parking spaces and driveways must be kept clear of goods at all times and must not be used for storage purposes.

 

4.         External colours, materials and finishes shall be in accordance with those approved by the satisfaction of the Deferred Commencement Condition. No. 1.

 

5.         Metal roof sheeting is to be painted or colour bonded to minimise reflection and to be sympathetic and compatible with the building and surrounding environment.

 

6.         There must be no encroachment of the structure/s onto any adjoining premises or onto Council’s road reserve, footway or public place, unless permission has been obtained from the owner/s of the adjoining land accordingly.

 

7.         All plumbing and drainage pipes, other than rainwater heads, gutters and downpipes, must be concealed within the building.

 

8.         Street numbering must be provided to the premises in a prominent position, to the satisfaction of Council.

 

9.         A single common television aerial, and/or satellite dish (having a maximum diameter of 700mm and not located on the front or street elevation of the building) is to be installed to serve the development.

 

10.       The relevant requirements of the Sydney Water Act 1994 must be complied with and a Section 73 Compliance Certificate under the Sydney Water Act 1994 must be obtained from Sydney Water.  An Application for a Section 73 Certificate must be made through an authorised Water Servicing Co-ordinator. For details, please refer to the “Your Business” section of Sydney Water’s web site www.sydneywater.com.au then the “e-developer” icon or telephone 13 20 92.

 

Following the application, a “Notice of Requirements” will be provided, detailing water and sewer extensions to be built and charges to be paid.  Please make early contact with the Water Servicing Co-ordinator, as building of water/sewer extensions can be time consuming and may impact on other services and building, driveway or landscape design.

 

A copy of Sydney Water’s ‘Notice of Requirements’ must be submitted to the Certifying Authority prior to issuing a Construction Certificate.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to issuing an occupation certificate or subdivision certificate (whichever the sooner).

 

CONSERVATION/HERITAGE:

 

The following conditions are applied to maintain the heritage significance and amenity of the premises and locality:

 

11.       Should any Aboriginal deposits or objects (engravings, middens etc.) be exposed, site work is to temporarily cease within the vicinity while advice is sought from archaeologists, the La Perouse Aboriginal Land Council and the National Parks and Wildlife Service.  A copy of any archaeological excavation permit required under the National Parks and Wildlife Act, shall be submitted to and approved by Council’s Director of Planning and Community Development.

 

12.       Should any European archaeological relics be exposed, site work is to temporarily cease within the vicinity while advice is sought from archaeologists, and the NSW Heritage Office.  A copy of any excavation permit required under Section 140 of the Heritage Act, 1977, shall be submitted to and approved by Council’s Director of Planning and Community Development.

 

ECOLOGICALLY SUSTAINABLE DEVELOPMENT & ENERGY EFFICIENCY: 

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency:

 

13.       The consumption of water within the building shall be minimised by the use of triple A rated water efficient plumbing fixtures (taps and shower roses) and water efficient dual flush toilets.  Details of compliance are to be noted in the construction certificate plans or specifications.

 

14.       External timber or metal framed and brick veneer walls and roofs are to be provided with insulation (i.e. bulk insulation and a reflective building membrane/reflective sarking/foil insulation), having a minimum total thermal resistance R–value of 3.0 in roofs and 1.5 in external walls.  The insulation and reflective building membrane is to be installed in accordance with the relevant requirements of the Building Code of Australia and the manufacturer’s details.

 

Details of compliance with the requirements for insulation are to be included in the construction certificate application.

 

15.       Hot water service pipes are to be provided with insulation and must also satisfy any relevant requirements of Building Code of Australia and AS 3500.

 

SECTION 94 Contributions

 

The following condition/s are applied to satisfy the increased demand for public amenities and public services:

 

16.       In accordance with Council’s Section 94 Contributions Plan effective from 2 September 1999, the following monetary contribution is to be paid to Council.

 

a)       for the provision or improvement of open space                      $2,732.00

b)       for the provision or improvement of community facilities       $1,208.00

c)       Administration fee $425.00                              $

 

The contribution must be paid in cash or by bank cheque prior to

 

a)       a construction certificate being issued

 

for the proposed development, together with payment of the required Section 94 Administration Fee of $425.00.  Council’s Section 94 Contribution Plans may be inspected at the Customer Service Centre, Administrative Centre, 30 Frances Street, Randwick.

 

OCCUPATIONAL HEALTH & SAFETY AND DANGEROUS GOODS: 

 

The following conditions are applied to ensure adequate environmental protection and occupational health and safety:

 

17.       All site works shall comply with the occupational health and safety requirements of WorkCover NSW.

 

18.       All hazardous or intractable wastes and materials (including asbestos) shall be removed and disposed of in accordance with the requirements of WorkCover NSW, the Environmental Protection Authority, including the following provisions:

 

·        Occupational Health and Safety Act 2000

·        Occupational Health and Safety (Hazardous Substances) Regulation 2001

·        Occupational Health and Safety (Asbestos Removal Work) Regulation 2001; and

·        The Protection of the Environment Operations Act 1997 and relevant Environmental Protection Authority Guidelines

 

ASBESTOS POLICY REQUIREMENTS

 

The following conditions are applied to maintain reasonable levels of public health, amenity and safety:

 

19.       The demolition, removal, storage, handling and disposal of products and materials containing asbestos must be carried out in accordance with Randwick City Council’s Asbestos Policy and the relevant requirements of WorkCover NSW and the NSW Department of Environment & Conservation (formerly the Environment Protection Authority), including:

 

·        Occupational Health and Safety Act 2000

·        Occupational Health and Safety (Hazardous Substances) Regulation 2001

·        Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·        WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·        Australian Standard 2601 (2001) – Demolition of Structures

·        The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

·        Relevant Department of Environment & Conservation (DEC) / Environment Protection Authority (EPA) and WorkCover NSW Guidelines.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

20.       A Demolition Work Plan must be prepared for the development in accordance with Australian Standard AS2601-2001, Demolition of Structures.

 

The Work Plan must include the following information (as applicable):

·        The name, address, contact details and licence number of the Demolisher /Asbestos Removal Contractor

·        Details of hazardous materials, including asbestos

·        Method/s of demolition and removal of asbestos

·        Measures and processes to be implemented to ensure the health & safety of workers and community

·        Measures to be implemented to minimise any airborne asbestos and dust

·        Methods and location of disposal of any asbestos or other hazardous materials

·        Other relevant details, measures and requirements to be implemented as identified in the Asbestos Survey

·        Date the demolition and removal of asbestos will commence

 

The Demolition Work Plan must be submitted to Council and the Principal Certifying Authority (PCA) if the Council is not the PCA, not less than two (2) working days before commencing any demolition works involving asbestos products or materials.  A copy of the Demolition Work Plan must also be maintained on site and be made available to Council officers upon request.

 

Note it is the responsibility of the persons undertaking demolition work to obtain the relevant WorkCover licences and permits.

 

21.       A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 200 m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation). Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

22.       On demolition sites involving the removal of asbestos, a  professionally manufactured sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS” and include details of the licensed contractor. The sign shall measure not less than 400mm x 300mm and the sign is to be installed prior to demolition work commencing and is to remain in place until such time as all asbestos has been safely removed from the site.

 

23.       Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 1996.

 

Asbestos waste must be disposed of at an approved waste disposal depot (refer to the DEC or Waste Service NSW for details of sites). Copies of all receipts detailing method and location of disposal must be maintained on site and be provided to Council officers upon request, as evidence of correct disposal.

 

24.       A Certificate or Statement, prepared by a suitably qualified person (i.e. an occupational hygienist, licensed asbestos removal contractor, building consultant, architect or experienced licensed building contractor), must be provided to Council upon completion of the works (prior to an Occupation Certificate being issued), which confirms that the relevant requirements contained in the Asbestos Survey and conditions of consent, in relation to the safe removal and disposal of asbestos, have been satisfied.

 

PRESCRIBED BUILDING & FIRE SAFETY REQUIREMENTS:

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

25.       The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

26.       All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA), in accordance with Clause 98 of the Environmental Planning and Assessment Regulation 2000.

 

27.       Prior to the commencement of any building works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

28.       Prior to the commencement of any building works, the person having the benefit of the development consent must:-

 

i)          appoint a Principal Certifying Authority for the building work, and

 

ii)         appoint a principal contractor for the building work, or in relation to residential building work, obtain an owner-builder permit in accordance with the requirements of the Home Building Act 1989, and notify the Principal Certifying Authority and Council accordingly in writing, and

 

iii)        unless the person having the benefit of the consent is the principal contractor (i.e. owner-builder), notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

 

iv)        give at least two days notice to the Council, in writing, of the person’s intention to commence building works.

 

In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

29.       The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected in accordance with section 81A (2) (b1) (ii) of the Environmental Planning & Assessment Regulation 2000 and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Documentary evidence of the building inspections carried out and details of compliance with Council’s consent is to be maintained by the Principal Certifying Authority.  Details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council with the occupation certificate.

 

The principal contractor or owner-builder (as applicable) must ensure that the required critical stage and other inspections, as specified in the Principal Certifying Authority’s “Notice of Critical Stage Inspections”, are carried out to the satisfaction of the Principal Certifying Authority and at least 48 hours notice (excluding weekends and public holidays) is to be given to the Principal Certifying Authority, to carry out the required inspection, before carrying out any further works.

 

30.       A sign must be erected and maintained in a prominent position on the site, which contains the following details:

 

·        name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·        name, address and telephone number of the Principal Certifying Authority,

·        a statement stating that “unauthorised entry to the work site is prohibited”.

 

31.       An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

32.       Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon must also be provided to Council with the occupation certificate.

 

33.       In accordance with clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition, that in the case of residential building work, a contract of insurance must be obtained and in force, in accordance with the provisions of the Home Building Act 1989.

 

Where the work is to be done by a licensed contractor, excavation or building work must not be carried out unless the Principal Certifying Authority (PCA):

 

·        has been informed in writing of the licensee’s name and contractor number; and

·        is satisfied that the licensee has complied with the insurance requirements of Part 6 of the Home Building Act 1989, or

 

Where the work to be done by any other person (i.e. an owner-builder), excavation or building work must not be carried out unless the Principal Certifying Authority:

 

·        has been informed of the person’s name and owner-builder permit number, or

·        has been given a declaration, signed by the owner of the land that states that the market cost of the labour and materials involved in the work does not exceed $5,000.

 

Details of the principal building contractor and compliance with the provisions of the Home Building Act 1989 (i.e. Details of the principal licensed building contractor and a copy of the Certificate of Insurance) are to be submitted to Council prior to the commencement of works, with the notice of appointment of the PCA / notice of intention to commence building work.

 

34.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

35.       The building is required to be provided with a smoke alarm system complying with Clause 3 of Specification E2.2a of the Building Code of Australia or a smoke detection system complying with Clause 4 of Specification E2.2a of the Building Code of Australia or a combination of a smoke alarm system within the sole-occupancy units and a smoke detection system in areas not within the sole-occupancy units.  The smoke detectors located within the stairway, corridors or the like must be interconnected.

 

Additional requirements regarding the design and installation of the smoke detection and alarm system may be specified in the construction certificate for the development.

 

STRUCTURAL ADEQUACY:

 

The following group of conditions have been applied to ensure the structural adequacy and integrity of the proposed building and adjacent premises:

 

36.       A Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the additional storey.

 

37.       A Certificate of Adequacy prepared by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to occupation of the building, certifying the structural adequacy of the building and that the building works satisfy the relevant structural design requirements of the Building Code of Australia.

 

CONSTRUCTION SITE MANAGEMENT:

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

38.       The demolition, removal, storage, handling and disposal of building products and materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Conservation (formerly the Environment Protection Authority) and Randwick City Council policies and conditions, including:

 

·        Occupational Health and Safety Act 2000

·        Occupational Health and Safety (Hazardous Substances) Regulation 2001

·        Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·        WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·        Australian Standard 2601 (2001) – Demolition of Structures

·        The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

·        Relevant Department of Environment & Conservation (DEC) / Environment Protection Authority (EPA) and WorkCover NSW Guidelines.

·        Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

39.       A copy of the construction certificate, the approved plans & specifications and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

40.       Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and (except as detailed below) between 8.00am to 5.00pm on Saturdays.

 

All building, demolition and associated site works are strictly prohibited on Sundays, Public Holidays and also on Saturdays adjacent to a Public Holiday.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

41.       Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant provisions of the Protection of the Environment Operations Act 1997 must be satisfied at all times.

 

42.       Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

43.       Public safety and convenience must be maintained at all times during demolition, excavation and construction works.

 

The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

A Road Opening Permit must be obtained from the Council and other relevant Authorities prior to excavating or opening-up the road or footway for services or the like.

 

44.       Building materials, sand, soil, waste materials or construction equipment must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council, unless the waste container is located upon the road in accordance with the Roads & Traffic Authority Guidelines and Requirements, and the container is exempt from an approval under Development Control Plan for Exempt & Complying Development and Council’s Local Approvals Policy.  Applications to place a waste container in a public place can be made to Council’s Building Services section.

 

45.       A Construction Site Management Plan is to be submitted to and approved by the principal certifying authority prior to the commencement of demolition, excavation or building works. The site management plan must include the following measures, as applicable to the type of development:

 

·        location and construction of protective fencing / hoardings to the perimeter of the site;

·        location of site storage areas/sheds/equipment;

·        location of building materials for construction;

·        provisions for public safety;

·        dust control measures;

·        site access location and construction

·        details of methods of disposal of demolition materials;

·        protective measures for tree preservation;

·        provisions for temporary sanitary facilities;

·        location and size of waste containers/bulk bins;

·        details of proposed sediment and erosion control measures;

·        construction noise and vibration management.

 

The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain adequate levels of public health and safety.  A copy of the approved Construction Site Management Plan must be maintained on site and be made available to Council officers upon request.

 

46.       During demolition excavation and construction works, dust emissions must be minimised, so as not to result in a nuisance to nearby residents or result in a potential pollution incident.

 

Adequate dust control measures must be provided to the site prior to the works commencing and the measures and practices must be maintained throughout the demolition, excavation and construction process, to the satisfaction of Council.

 

Dust control measures and practices may include:-

 

·        Provision of geotextile fabric to all perimeter site fencing (attached on the prevailing wind side of the site fencing).

·        Covering of stockpiles of sand, soil and excavated material with adequately secured tarpaulins or plastic sheeting.

·        Installation of a water sprinkling system or provision hoses or the like.

·        Regular watering-down of all loose materials and stockpiles of sand, soil and excavated material.

·        Minimisation/relocation of stockpiles of materials, to minimise potential for disturbance by prevailing winds.

·        Revegetation of disturbed areas.

 

47.       During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing.

 

Details of the proposed sediment control measures are to be detailed in a site management plan and must be submitted to and approved by the principal certifying authority prior to the commencement of any site works.  The sediment and erosion control measures must be implemented prior to the commencement of any site works and be maintained throughout construction.  A copy of the approved details must be forwarded to the Council and a copy is to be maintained on-site and be made available to Council officers upon request.

 

Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

A warning sign for soil and water management must be displayed in a prominent position on the building site, visible to both the public and site workers.  The sign must be displayed throughout the construction period.  Copies of a suitable warning sign are available at Council’s Customer Service Centre for a nominal fee.

 

48.       Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

If the work involved in the erection or demolition of a building is likely to cause pedestrian or vehicular traffic in a public place to be obstructed or rendered inconvenient or the building involves the enclosure of a public place, a hoarding or fence must be erected between the work site and the public place.

 

If necessary, an awning is to be erected sufficiently to prevent any substance from, or in connection with, the work from falling into the public place or adjoining premises.

 

Temporary fences or hoardings are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon any part of the footpath, nature strip or any public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

49.       A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road or nature strip or in any public place:-

 

·        Install or erect any site fencing, hoardings or site structures

·        Operate a crane or hoist goods or materials over a footpath or road

·        Placement of a waste skip (grater than 3m in length) or any container or other article.

 

 

SERVICE AUTHORITY CONDITIONS

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

50.       A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

51.       The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

ADVISORY MATTERS:

 

A1.       The applicant is advised that the Construction Certificate plans and specification must comply with the provisions of the Building Code of Australia (BCA).

 

In this regard, the development consent plans do not show compliance with the deemed-to-satisfy provisions of the BCA, including:

 

a)       Part B1                      -       Structural provisions

b)       Part C1                     -       Fire resistance and stability

c)       Part E2                     -       Smoke Hazard Management

d)       Section J                    -       Energy efficiency

 

Details of compliance with the relevant provisions of the Building Code of Australia and conditions of development consent are to be provided in the plans and specifications for the construction certificate.

 

You are advised to ensure that the development is not inconsistent with Council's consent and if necessary consult with Council’s Building Certification Services or your accredited certifier (as applicable) prior to submitting your construction certificate application to enable these matters to be addressed accordingly.

 

A2.       The applicant/owner is advised that this approval does not guarantee compliance with the provisions of the Disability Discrimination Act 1992 and the applicant should therefore consider their liability under the Act.  In this regard, the applicant is advised that compliance with the requirements of the Building Code of Australia and Australian Standard 1428.1 - Design for Access and Mobility does not necessarily satisfy the objectives of the Disability Discrimination Act 1992.

 

The applicant/owner is requested to give consideration to providing access and facilities for people with disabilities in accordance with Australian Standard 1428 Parts 1, 2, 3 and 4 - Design for Access and Mobility, which may be necessary to satisfy the objectives of the Disability Discrimination Act 1992.

 

A3.       The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

A4.       The applicant must meet the full cost for Council or a Council approved contractor to repair/replace any damaged sections of Council's footpath, kerb & gutter, nature strip etc which are due to building works being carried out at the above site. This includes the removal of cement slurry from Council's footpath and roadway.

 

MOTION: (Belleli/Andrews) CARRIED – SEE RESOLUTION.

 

6.2       DEVELOPMENT APPLICATION REPORT - 1-3 MOORINA AVENUE MATRAVILLE.  (DA/654/06 & PROP022511 & PROP022518)

 

H117   RESOLUTION:  (Belleli/Andrews) that Council as the consent authority refuse development consent under Section 80 of the Environmental Planning and Assessment Act 1979 to Development Application No.654/06 for permission to erect a double carport structure to the front of the property at 1-3 Moorina Avenue, MATRAVILLE for the following reasons:-

 

1.       The proposed carport does not satisfy the objectives and performance requirements of the DCP for Dwellings and Attached Dual Occupancies in that the structure being sited at the front of the building will detract from the appearance of the dwelling and the streetscape.

 

2.       The proposed carport does not comply with the preferred solutions of the DCP for Dwellings and Attached Dual Occupancies in that the structure will occupy more than 35% of the width of the allotment, is sited closer than 1m from the side boundary and does not meet the minimum dimension requirements for carparking structures.

 

3.       The proposed carport does not comply with the objectives and performance requirements of the DCP for Dwellings and Attached Dual Occupancies in relation to Building Setbacks as it does not conform to the dominant setback along the street.

 

MOTION: (Belleli/Andrews) CARRIED – SEE RESOLUTION.

 

6.3       DEVELOPMENT APPLICATION REPORT - 85 LOCH MAREE STREET, MAROUBRA.  (DA/672/2006 & PROP005526)

 

H118   RESOLUTION:  (Bastic/Andrews) that:

 

A.      Council as the responsible authority grant its development consent under Section 80 and 80A of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No. 672/2006 for Construction of a carport in front of the building line of the dwelling and alterations to the roof form at the rear. at 85 Loch Maree Street, MAROUBRA subject to the following conditions:-

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.         The development must be implemented substantially in accordance with the plans numbered 16/08/06 (sheets 1 through to 3) and received by Council on the 18th of August 2006, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.         The design, materials and colour of the roofing to the proposed roof extension are required to match, as closely as possible, the existing roof.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

3.         New roofs are to be provided with insulation (i.e. bulk insulation and a reflective building membrane/reflective sarking/foil insulation), having a minimum total thermal resistance R–value of 3.0 in roofs.  The insulation and reflective building membrane is to be installed in accordance with the relevant requirements of the Building Code of Australia and the manufacturer’s details.

 

Details of compliance with the requirements for insulation are to be included in the construction certificate application.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

4.         The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

5.         All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA), in accordance with Clause 98 of the Environmental Planning and Assessment Regulation 2000.

 

6.         Prior to the commencement of any building works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

7.         Prior to the commencement of any building works, the person having the benefit of the development consent must: -

 

i)       appoint a Principal Certifying Authority for the building work; and

 

ii)      appoint a principal contractor for the building work, or in relation to residential building work, obtain an owner-builder permit in accordance with the requirements of the Home Building Act 1989, and notify the Principal Certifying Authority and Council accordingly in writing; and

                                                  

iii)     unless the person having the benefit of the consent is the principal contractor (i.e. owner-builder), notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

iv)     give at least two days notice to the Council, in writing, of the person’s intention to commence building works.

 

            In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

8.         The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected in accordance with section 81A (2) (b1) (ii) of the Environmental Planning & Assessment Regulation 2000 and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Documentary evidence of the building inspections carried out and details of compliance with Council’s consent is to be maintained by the Principal Certifying Authority.  Details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council with the occupation certificate.

 

The principal contractor or owner-builder (as applicable) must ensure that the required critical stage and other inspections, as specified in the Principal Certifying Authority’s “Notice of Critical Stage Inspections”, are carried out to the satisfaction of the Principal Certifying Authority and at least 48 hours notice (excluding weekends and public holidays) is to be given to the Principal Certifying Authority, to carry out the required inspection, before carrying out any further works.

 

9.         A sign must be erected and maintained in a prominent position on the site, which contains the following details:

 

·       name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·       name, address and telephone number of the Principal Certifying Authority; and

·       a statement stating that “unauthorised entry to the work site is prohibited”.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

10.       The demolition, removal, storage, handling and disposal of building products and materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Conservation (formerly the Environment Protection Authority) and Randwick City Council policies and conditions, including:

 

·        Occupational Health and Safety Act 2000

·        Occupational Health and Safety (Hazardous Substances) Regulation 2001

·        Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·        WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·        Australian Standard 2601 (2001) – Demolition of Structures

·        The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

·        Relevant Department of Environment & Conservation (DEC) / Environment Protection Authority (EPA) and WorkCover NSW Guidelines.

·        Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

11.       A copy of the construction certificate, the approved plans & specifications and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

12.       Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

13.       Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant provisions of the Protection of the Environment Operations Act 1997 must be satisfied at all times.

           

14.       Public safety and convenience must be maintained at all times during demolition, excavation and construction works.

 

The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

A Road Opening Permit must be obtained from the Council and other relevant Authorities prior to excavating or opening-up the road or footway for services or the like.

 

15.       Building materials, sand, soil, waste materials or construction equipment must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council, unless the waste container is located upon the road in accordance with the Roads & Traffic Authority Guidelines and Requirements, and the container is exempt from an approval under Development Control Plan for Exempt & Complying Development and Council’s Local Approvals Policy.  Applications to place a waste container in a public place can be made to Council’s Building Services section.

 

16.       During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing

 

Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

A warning sign for soil and water management must be displayed in a prominent position on the building site, visible to both the public and site workers.  The sign must be displayed throughout the construction period.  Copies of a suitable warning sign are available at Council’s Customer Service Centre for a nominal fee.

 

17.       Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied.

 

18.       Any part of Council’s nature strip which is damaged as a result of the work must be back-filled, top-soiled and re-turfed with kikuyu turf prior to occupation or finalisation of the development, to Council’s satisfaction.

 

19.       A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·       Install or erect any site fencing, hoardings or site structures

·       Operate a crane or hoist goods or materials over a footpath or road

·       Placement of a waste skip (grater than 3m in length) or any container or other article.

 

The following conditions are applied to maintain reasonable levels of public health, amenity and safety:

 

20.       The demolition, removal, storage, handling and disposal of products and materials containing asbestos must be carried out in accordance with Randwick City Council’s Asbestos Policy and the relevant requirements of WorkCover NSW and the NSW Department of Environment & Conservation (formerly the Environment Protection Authority), including:

 

·       Occupational Health and Safety Act 2000

·       Occupational Health and Safety (Hazardous Substances) Regulation 2001

·       Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·       WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·       Australian Standard 2601 (2001) – Demolition of Structures

·       The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

·       Relevant Department of Environment & Conservation (DEC) / Environment Protection Authority (EPA) and WorkCover NSW Guidelines.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

ADVISORY MATTERS:

 

A1        Building or excavations works must not be commenced until a construction certificate has been obtained from Council's Building Certification Services or an Accredited Certifier and either Council's Building Certification Services or an Accredited Certifier has been appointed as the Principal Certifying Authority (PCA) for this development.

 

Failure to obtain a Construction Certificate and appoint a PCA before commencing works is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.

 

A2        The applicant is advised that the Construction Certificate plans and specification must comply with the provisions of the Building Code of Australia (BCA) and the construction certificate must not be inconsistent with the development consent.

 

In this regard, the development consent plans do not show compliance with the deemed-to-satisfy provisions of the BCA.

 

Details of compliance with the relevant provisions of the Building Code of Australia and conditions of development consent are to be provided in the plans and specifications for the construction certificate.

 

You are therefore advised to ensure that the development is not inconsistent with Council's consent and to consult with Council’s Building Certification Services or an accredited certifier prior to submitting your construction certificate application to enable these matters to be addressed accordingly.

 

MOTION: (Bastic/Andrews) CARRIED – SEE RESOLUTION.

 

 

 

6.4       DEVELOPMENT APPLICATION REPORT - 4 EDGECLIFFE AVENUE, SOUTH COOGEE.  (1055/2005/A & PROP025548)

 

H119   RESOLUTION:  (Andrews/Seng) that:

 

A.      Council as the responsible authority grant its consent under Section 96 of the Environmental Planning and Assessment Act 1979 (as amended) to Modify Development Consent No.. 1055/2005 on property 4 Edgecliffe Avenue, South Coogee in the following manner:

 

Amend Condition No. 1 to read:

 

The development must be implemented substantially in accordance with the plans numbered DA-01, DA-02 and DA-03, dated 27 March 2006 and received by Council on 27 March 2006, the application form and on any supporting information received with the application, as amended by the Section 96 plans numbered DA-01 Revision E, DA-02 Revision E and DA-03 Revision E, dated 20 September 2006, all received by Council on 26 September 2006, only in so far as they relate to the modifications highlighted on the Section 96 plans and detailed in the Section 96 application, except as may be amended  by the following conditions and as may be shown in red on the attached plans.

 

And add the following conditions:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

71.       A privacy screen having a minimum height of 1.8m is to be provided to the western side of the rear first floor balcony. The screen shall be constructed of timber slats or louvres that are consistent in colour with the ‘Lightweight timber clad structure’ as indicated on the plans.

 

Details are to be submitted to and approved by Council’s Director of Planning & Community Development, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

72.       All concrete sections of the rear first floor balcony are to be rendered and painted to match the colour of the dwelling. Details of compliance are to be provided prior to a construction certificate being issued.

 

73.       To maintain the amenity of the adjoining property at 2 Edgecliffe Avenue, the plant species selected for the front planter box shall have a maximum height at maturity of 500mm. Details of compliance are to be provided in the construction certificate plans.

 

MOTION: (Andrews/Seng)  CARRIED – SEE RESOLUTION.

 

 

 

6.5       DEVELOPMENT APPLICATION REPORT - 24 ABOUD AVENUE, KINGSFORD. (DA/649/2006 & PROP000404)

 

H120   RESOLUTION:  (Mayor, Cr P. Tracey/Bastic) that:

 

A.      Council as the responsible authority grant its development consent under Section 80 and 80A of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No. DA/649/2006 & PROP000404 for the construction of an extension to the front of the existing first floor, an extension of the existing ground floor balcony at the rear of the dwelling and the erection of a new double carport in front of the building line of the existing dwelling at 24 Aboud Avenue, Kingsford, subject to the following conditions:-

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.         The development must be implemented substantially in accordance with the plans numbered 00, 01, 02 and 03 (Issue A), dated the 12th of April 2006 and received by Council on the 11th of August 2006, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.         The extension to the driveway must be deleted from the proposal. Details of compliance are to be provided on the construction certificate. Speak to Kerry

 

3.         The external materials, colours and finishes of the building are required to match, as closely as possible, the existing building.

 

Details of the proposed colours, materials and textures (i.e. a schedule and brochure/s or sample board) are to be submitted to and approved by Council’s Director of City Planning, in accordance with section 80A (2) of the Environmental Planning and Assessment Act 1979 prior to a construction certificate being issued for the relevant building works.

 

4.         The design, materials and colour of the roofing to the proposed extension are required to match, as closely as possible, the existing roof.

 

5.         No cooking facilities or sanitary fittings other than those indicated on the approved plans are to be installed in the premises without the prior written consent of the Council.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

6.         The consumption of water within the building shall be minimised by the use of triple A rated water efficient plumbing fixtures (taps and shower roses) and water efficient dual flush toilets.  Details of compliance are to be noted in the construction certificate plans or specifications.

 

7.         New external timber or metal framed and brick veneer walls and roofs are to be provided with insulation (i.e. bulk insulation and a reflective building membrane/reflective sarking/foil insulation), having a minimum total thermal resistance R–value of 3.0 in roofs and 1.5 in external walls.  The insulation and reflective building membrane is to be installed in accordance with the relevant requirements of the Building Code of Australia and the manufacturer’s details.

 

Details of compliance with the requirements for insulation are to be included in the construction certificate application.

 

8.         New hot water service pipes are to be provided with insulation and must also satisfy any relevant requirements of Building Code of Australia and AS 3500.

 

The following group of conditions have been applied to ensure that adequate drainage is provided from the premises and to maintain adequate levels of health and amenity in the locality:

 

9.         Surface water/stormwater must be drained and discharged to the street gutter or suitably designed absorption pit, to the satisfaction of the Certifying Authority and details are to be included in the construction certificate application for the development.

 

Absorption pits must be located not less than 3m from any adjoining premises and the stormwater must not be directed or flow onto any adjoining premises or cause a nuisance.

 

Details of any works proposed to be carried out in or on a public road/footway are to be submitted to and approved by Council prior to commencement of works.

 

10.       External paths and ground surfaces are to be constructed at appropriate levels and be graded and drained away from the building and adjoining premises, so as not to result in the entry of water into the building, or cause a nuisance or damage to the adjoining premises.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

11.       The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

12.       All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA), in accordance with Clause 98 of the Environmental Planning and Assessment Regulation 2000.

 

13.       Prior to the commencement of any building works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

14.       Prior to the commencement of any building works, the person having the benefit of the development consent must: -

 

i)       appoint a Principal Certifying Authority for the building work; and

 

ii)      appoint a principal contractor for the building work, or in relation to residential building work, obtain an owner-builder permit in accordance with the requirements of the Home Building Act 1989, and notify the Principal Certifying Authority and Council accordingly in writing; and

                                                  

iii)     unless the person having the benefit of the consent is the principal contractor (i.e. owner-builder), notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

iv)     give at least two days notice to the Council, in writing, of the person’s intention to commence building works.

 

            In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

15.       The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected in accordance with section 81A (2) (b1) (ii) of the Environmental Planning & Assessment Regulation 2000 and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Documentary evidence of the building inspections carried out and details of compliance with Council’s consent is to be maintained by the Principal Certifying Authority.  Details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council with the occupation certificate.

 

The principal contractor or owner-builder (as applicable) must ensure that the required critical stage and other inspections, as specified in the Principal Certifying Authority’s “Notice of Critical Stage Inspections”, are carried out to the satisfaction of the Principal Certifying Authority and at least 48 hours notice (excluding weekends and public holidays) is to be given to the Principal Certifying Authority, to carry out the required inspection, before carrying out any further works.

 

16.       A sign must be erected and maintained in a prominent position on the site, which contains the following details:

 

·       name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·       name, address and telephone number of the Principal Certifying Authority; and

·       a statement stating that “unauthorised entry to the work site is prohibited”.

 

17.       An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

18.       Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon and must also be provided to Council with the occupation certificate.

 

19.       In accordance with clause 98 of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition, that in the case of residential building work, a contract of insurance must be obtained and in force, in accordance with the provisions of the Home Building Act 1989.

 

Where the work is to be done by a licensed contractor, excavation or building work must not be carried out unless the Principal Certifying Authority (PCA): -

·       has been informed in writing of the licensee’s name and contractor number; and

·       is satisfied that the licensee has complied with the insurance requirements of Part 6 of the Home Building Act 1989, or

 

Where the work to be done by any other person (i.e. an owner-builder), excavation or building work must not be carried out unless the Principal Certifying Authority: -

·       has been informed of the person’s name and owner-builder permit number; or

·       has been given a declaration, signed by the owner of the land that states that the market cost of the labour and materials involved in the work does not exceed $5,000.

 

Details of the principal building contractor and compliance with the provisions of the Home Building Act 1989 (i.e. Details of the principal licensed building contractor and a copy of the Certificate of Insurance) are to be submitted to Council prior to the commencement of works, with the notice of appointment of the PCA / notice of intention to commence building work.

 

20.       The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

21.       Smoke alarms are required to be installed in each Class 1 building or residential dwelling in accordance with the relevant provisions of Part 3.7.2 of the B.C.A. – Housing Provisions.

 

Smoke alarms must comply with AS3786 – Smoke alarms and be connected to the consumer mains electric power supply and provided with a battery back-up.

 

The smoke alarms are to be installed in suitable locations on or near the ceiling, in any storey containing bedrooms; located between each part of the dwelling containing the bedrooms and the remainder of the dwelling, or where bedrooms are served by a hallway, the smoke alarms are to be located in that hallway; and smoke alarms are to be installed in any other storey not containing bedrooms, to the satisfaction of the certifying authority.

 

Smoke alarms are not to be located in ‘dead-air-spaces’, in the corner junction of walls and ceilings between exposed rafters/joists or at the apex of raked ceilings, as detailed in Part 3.7.2 of the Building Code of Australia – Housing Provisions.

 

Details of compliance with the provisions of the Building Code of Australia must be included in the plans/specification for the construction certificate.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

22.       The demolition, removal, storage, handling and disposal of building products and materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Conservation (formerly the Environment Protection Authority) and Randwick City Council policies and conditions, including:

 

·        Occupational Health and Safety Act 2000

·        Occupational Health and Safety (Hazardous Substances) Regulation 2001

·        Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·        WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·        Australian Standard 2601 (2001) – Demolition of Structures

·        The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

·        Relevant Department of Environment & Conservation (DEC) / Environment Protection Authority (EPA) and WorkCover NSW Guidelines.

·        Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

23.       A copy of the construction certificate, the approved plans & specifications and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

24.       All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

25.       Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

26.       Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant provisions of the Protection of the Environment Operations Act 1997 must be satisfied at all times.

           

27.       Public safety and convenience must be maintained at all times during demolition, excavation and construction works.

 

The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

A Road Opening Permit must be obtained from the Council and other relevant Authorities prior to excavating or opening-up the road or footway for services or the like.

 

28.       Building materials, sand, soil, waste materials or construction equipment must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council, unless the waste container is located upon the road in accordance with the Roads & Traffic Authority Guidelines and Requirements, and the container is exempt from an approval under Development Control Plan for Exempt & Complying Development and Council’s Local Approvals Policy.  Applications to place a waste container in a public place can be made to Council’s Building Services section.

 

29.       During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing

 

Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

A warning sign for soil and water management must be displayed in a prominent position on the building site, visible to both the public and site workers.  The sign must be displayed throughout the construction period.  Copies of a suitable warning sign are available at Council’s Customer Service Centre for a nominal fee.

 

30.       Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied.

 

31.       Any part of Council’s nature strip which is damaged as a result of the work must be back-filled, top-soiled and re-turfed with kikuyu turf prior to occupation or finalisation of the development, to Council’s satisfaction.

 

32.       A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·       Install or erect any site fencing, hoardings or site structures

·       Operate a crane or hoist goods or materials over a footpath or road

·       Placement of a waste skip (grater than 3m in length) or any container or other article.

 

The following group of conditions have been applied to ensure the structural adequacy and integrity of the proposed building and adjacent premises:

 

33.       A Certificate of Adequacy supplied by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to a construction certificate being issued for the development, certifying the structural adequacy of the existing structure to support the additional storey.

 

The following conditions are applied to maintain reasonable levels of public health, amenity and safety:

 

34.       The demolition, removal, storage, handling and disposal of products and materials containing asbestos must be carried out in accordance with Randwick City Council’s Asbestos Policy and the relevant requirements of WorkCover NSW and the NSW Department of Environment & Conservation (formerly the Environment Protection Authority), including:

 

·       Occupational Health and Safety Act 2000

·       Occupational Health and Safety (Hazardous Substances) Regulation 2001

·       Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·       WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·       Australian Standard 2601 (2001) – Demolition of Structures

·       The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

·       Relevant Department of Environment & Conservation (DEC) / Environment Protection Authority (EPA) and WorkCover NSW Guidelines.

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

ADVISORY MATTERS:

 

A1        Building or excavations works must not be commenced until a construction certificate has been obtained from Council's Building Certification Services or an Accredited Certifier and either Council's Building Certification Services or an Accredited Certifier has been appointed as the Principal Certifying Authority (PCA) for this development.

 

Failure to obtain a Construction Certificate and appoint a PCA before commencing works is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.

 

A2        The applicant is advised that the Construction Certificate plans and specification must comply with the provisions of the Building Code of Australia (BCA) and the construction certificate must not be inconsistent with the development consent.

 

In this regard, the development consent plans do not show compliance with the deemed-to-satisfy provisions of the BCA.

 

Details of compliance with the relevant provisions of the Building Code of Australia and conditions of development consent are to be provided in the plans and specifications for the construction certificate.

 

You are therefore advised to ensure that the development is not inconsistent with Council's consent and to consult with Council’s Building Certification Services or an accredited certifier prior to submitting your construction certificate application to enable these matters to be addressed accordingly.

 

MOTION: (Mayor, Cr. P. Tracey/Bastic) CARRIED – SEE RESOLUTION.

 

6.6       DEVELOPMENT APPLICATION REPORT - 2-8 JENNER STREET, LITTLE BAY.  (D/0472/2006)

 

H121   RESOLUTION:  (Belleli/Andrews) that:

 

A.      Council support the objection under State Environmental Planning No. 1 (SEPP No.1) in respect to non-compliance with Clauses 30A(2) and 30A(4) of the Randwick Local Environmental Plan 1998 (as amended), relating to maximum floor space ratio and maximum wall and building height, on the grounds that the proposed development is consistent with the relevant objectives of the clauses and will not adversely affect the amenity of the surrounding locality and that the Department of Planning be advised accordingly.

AND

 

B.      Council as the responsible authority grant its development consent under Section 80 and 80A of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No D/0472/2006 for the erection of two residential buildings over basement carparking comprising 55 dwellings, 77 carpark spaces, landscaping, strata subdivision being four storey and a loft level in height, at 2-8 Jenner Street, Little Bay, subject to the following conditions:-

 

1.       The development must be implemented substantially in accordance with the plans numbered AR.DA.2000 Issue 3, AR.DA.2101 Issue 3, AR.DA.2102 Issue 3, AR.DA.2103 Issue 3, AR.DA.2104 Issue 3, AR.DA.2105 Issue 3, AR.DA.3120 Issue 3, AR.DA.3130 Issue 3, AR.DA.3400 all dated 20 June 2006  and stamped received by Council on 1 August 2006, the draft strata plans in 14 sheets prepared by Denny Linker & Co. Surveyor’s Reference 050622 DSP dated/printed 14 June 2006 and stamped received by Council 22 June 2006, the Sustainability Report No S4053, Lot 6, Revision B, dated 19 June 2006 and received by Council on 14 June 2006, the application form, and on any supporting information received with the application, except as may be amended by the following conditions and the details approved pursuant to the deferred commencement conditions and as may be shown in red on the attached plans:

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

2.       The colours, materials and finishes of the external surfaces of the new building are to be consistent with that indicated in the sample board accompanying the subject development application and received by Council on 14 June 2006.

 

3.       An amended ground level plan and amended draft strata plan showing the proposed location of two additional carparking spaces on Millard Drive as indicated in the sketch plan dated 24/10/2006 by AJC and received under cover of e-mail dated 25 October 2006, shall be submitted to and approved by Council prior to a Construction Certificate being issued for the development.

 

4.       Each north-facing private courtyard (on the podium area above the carpark) adjoining the groundfloor dwelling Units No. A101, A102, A103, B101, B102 and B103 shall be provided with pergola structures to soften the visual impact of the podium hardstand. Details shall be submitted to and approved by Council prior to a Construction Certificate being issued for the development.

 

5.       An amended ground level plan and amended draft strata plan showing the proposed location of two additional carparking spaces on Millard Drive as indicated in the sketch plan dated 24/10/2006 by AJC and received under cover of e-mail dated 25 October 2006, shall be submitted to and approved by Council prior to a Construction Certificate being issued for the development.

 

6.       Details of bicycle storage in the basement indicating compliance with the Development Control Plan – Parking shall be submitted to and approved by Council prior to a Construction Certificate being issued for the development.

 

7.       Details of all fencing on site including all entrances and associated structures indicating compliance with Part 4.16 Fences of the Development Control Plan for Prince Henry Site shall be submitted to and approved by Council prior to a Construction Certificate being issued for the development.

 

8.       Each of the tandem carparking spaces shall be allocated to the same 2 or 3 bedroom unit.

 

9.       Street numbering must be provided to the premises in a prominent position, to the satisfaction of Council.

 

10.     The reflectivity index of glass used in the external façade of the development must not exceed 20 percent. 

 

11.     Lighting to the premises shall be designed so as not to cause a nuisance to nearby residents or motorists and to ensure that light overspill does not affect the amenity of the area.

 

The following conditions are applied to satisfy the provisions of Council’s environmental plans, policies and codes for subdivision works:

 

12.     Upon completion of the development and prior to the issuing of the occupation certificate, documentary evidence is to be submitted to the Council by the Principal Certifying Authority (or other suitably qualified person on behalf of the owner of the premises, to the satisfaction of Council) which confirms that the development has been carried out in accordance with the relevant development consent conditions.

 

13.     The registered proprietor of the land the subject of this consent shall enter into a positive covenant that no right of exclusive use and enjoyment of the whole or any specified part of the area or areas designated as common area or similar in the approved plans will be conferred on any person or persons without the prior approval of Randwick City Council.

 

14.     Where the plans which are the subject of this consent reserves parking spaces and/or courtyards for the exclusive use and enjoyment to an occupier of the land, the registered proprietor shall enter into a positive covenant that no change will be made to such reservations without the prior approval of Randwick City Council.

 

15.     A Section 73 Compliance Certificate under the Sydney water Act 1994 must be obtained. Application must be made through an authorized Water Servicing Coordinator. Please refer to “Your Business” section of Sydney Water’s web site at www.sydneywater.com.au then the “e-developer” icon or telephone 13 20 92.

 

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to release of the plan of subdivision.

 

The following conditions are applied to ensure the protection of heritage and archaeological significance of the site:

 

16.     Prior to any ground disturbance, further consultation should occur with the La Perouse Aboriginal Land Council (LPALC) to determine whether or not archaeological monitoring is required during the construction phase.

 

17.     Should Aboriginal objects be found, the Department of Environment and Conservation (DEC) is to be informed (as required by the provisions of the National Parks and Wildlife Act 1974).  Subject to an assessment of the extent, integrity and significance of any exposed objects, applications under either Section 87 or Section 90 of the National Parks and Wildlife Act may be required before work resumes.

 

18.     Prior to the commencement of the proposed works, all contractors and relevant personnel involved are to be made aware of the existence of Aboriginal archaeological remains at the Prince Henry site by way of an induction process and of the possibility that more as yet undiscovered Aboriginal cultural material may exist there.

 

19.     Site contractors are to be advised of their obligations under the National Parks and Wildlife Act 1974 (NSW) and notification procedures in the event that any Aboriginal cultural material is disturbed or exposed during site works.

 

20.     Prior to commencement of any subsurface disturbance (excavation), all those involved are to be made aware of the potential for historical archaeological relics to survive within the area.  This is to be done through a site induction, which also notifies all involved of their obligations under the Heritage Act 1977 (NSW).

 

21.     In the event that historical archaeological remains or deposits are exposed during the works, the excavation work shall cease immediately and an evaluation of their potential extent and significance should be undertaken and the Heritage Council of NSW notified under the requirements of the Heritage Act.

 

The following conditions are applied to meet the requirements of the Heritage Council of NSW:

 

22.     The development must be implemented substantially in accordance with the General Terms of Approval issued by the Heritage Council of NSW as detailed in the letter from the Council dated 17 October 2006.

The following conditions are applied to provide adequate provisions for access, transport and infrastructure:

 

23.     The applicant shall:

 

a)   Construct a heavy-duty concrete vehicular crossing and layback at kerb opposite the proposed vehicular entrance to the site in Millard Drive.

 

Note: It appears that the new crossing may be located over an existing kerb inlet pit. If the final design shows the new layback being located over the existing drainage pit, the applicant will be required to:

i)    Convert the existing kerb inlet pit to a grated inlet pit in the new layback; and

ii)   Construct a new kerb inlet pit immediately to the south of the new crossing to compensate for the lost inlet capacity.

 

b)   Remove any redundant concrete vehicular crossings and layback and to reinstate the area with concrete footpath, turf and kerb and gutter.

 

All civil works are to be in accordance with Australian Standard specifications for driveways, and in general accordance with Randwick City Council's ‘Standard Kerb and Gutter and Vehicular Crossing Detail’ (Drawing SD4) and Council’s ‘Standard DGGP with Extended Kerb Inlet Detail’ (Drawing SD7a).

 

24.     All new walls adjacent to vehicular crossings must be lowered to a height of 600mm above the internal driveway level for a distance of 1.50m within the site or splayed 1.5 metre by 1.5 metre to provide satisfactory sight lines.

 

25.     The driveway opening at the Millard Drive street frontage must be minimum 6.00 metres wide and located at least 1.5 metres clear of the side property.

 

Note: The submitted plan AR.DA.2101 demonstrates compliance with this requirement.

 

26.     The vehicular access into the site and the carpark layout (including, but not limited to, ramp grades, height clearances and space and aisle dimensions) shall be in accordance with AS2890.1:2004. The plans submitted for the construction certificate shall demonstrate compliance with this requirement.

The following conditions are applied to provide adequate provisions for future civil works in the road reserve:

 

27.     The Council’s Development Engineer has inspected the above site and has determined that the design alignment level (concrete/paved/tiled level) at the property boundary for driveways, access ramps and pathways or the like, shall be:

 

·    Jenner Street: Match the back of the existing footpath along the full site frontage.

·    MILLARD DRIVE: 2.5% ABOVE THE ADJACENT TOP OF KERB LEVEL ALONG THE FULL SITE FRONTAGE IN MILLARD DRIVE.

 

·    Anzac Parade: Match the back of the existing footpath along the full site frontage.

 

28.     The design alignment levels (concrete/paved/tiled level) issued by Council and their relationship to the kerb/footpath must be indicated on the building plans for the construction certificate.

 

The following conditions are applied to provide adequate consideration for service authority assets:

 

29.     A public utility impact assessment must be carried out on all public utility services on the site, roadway, nature strip, footpath, public reserve or any public areas associated with and/or adjacent to the development/building works and include relevant information from public utility authorities and exploratory trenching or pot-holing, if necessary, to determine the position and level of service.

 

30.     The applicant must meet the full cost for telecommunication companies, gas providers, Energy Australia and Sydney Water to adjust/repair/relocate their services as required.  The applicant must make the necessary arrangements with the service authority.

 

31.     Documentary evidence from the relevant public utility authorities confirming that their requirements have been satisfied, must be submitted to the certifying authority prior to a construction certificate being issued for the development.

 

32.     Any electricity substation required for the site as a consequence of this development shall be located within the site and shall be screened from view. The proposed location and elevation shall be shown on all detailed landscape drawings and specifications. The applicant must liaise with Energy Australia prior to lodging the construction certificate to determine whether or not an electricity substation is required for the development.

 

33.     A Section 73 Compliance Certificate under the Sydney water Act 1994 must be obtained. Application must be made through an authorised Water Servicing Coordinator. Please refer to “Your Business” section of Sydney Water’s web site at www.sydneywater.com.au then the “e-developer” icon or telephone 13 20 92.

 

Following application a “Notice of Requirements” will detail water and sewer extensions to be built and charges paid. Please make early contact with the Coordinator, since building of water/sewer extensions can be time consuming and may impact on other services and building, driveway or landscape design.

 

The Notice must be issued to the Principal Certifying Authority prior to the construction certificate being issued.

The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to release of the plan of subdivision.

 

The following conditions are applied to provide adequate provisions for drainage and associated infrastructure:

 

34.     Stormwater drainage plans have not been approved as part of this development consent. Engineering calculations and plans with levels reduced to Australian Height Datum in relation to site drainage (for Lot 6) shall be submitted to and approved by the certifying authority prior to a construction certificate being issued for the development. A copy of the engineering calculations and plans are to be forwarded to Council, prior to a construction certificate being issued, if the Council is not the certifying authority. The drawings and details shall include the following information:

 

a)         A detailed drainage design supported by a catchment area plan, at a scale of 1:100 or as considered acceptable to the Council or an accredited certifier, and drainage calculations prepared in accordance with the Institution of Engineers publication, Australian Rainfall and Run-off, 1987 edition.

 

b)         A layout of the proposed drainage system including pipe sizes, type, grade, length, invert levels, etc., dimensions and types of all drainage pipes and the connection into Council's stormwater system. 

 

c)         Generally all internal pipelines must be capable of discharging a 1 in 20 year storm flow.  However the minimum pipe size for pipes that accept stormwater from a surface inlet pit must be 150mm diameter.  The site must be graded to direct any surplus run-off (ie. above the 1 in 20 year storm) to the proposed drainage system.

 

d)         The separate catchment areas within the site, draining to each collection point or surface pit are to be classified into the following categories:

 

i.          Roof areas

ii.         Paved areas

iii.        Grassed areas

iv.        Garden areas

 

e)         Where buildings abut higher buildings and their roofs are "flashed in" to the higher wall, the area contributing must be taken as:  the projected roof area of the lower building, plus one half of the area of the vertical wall abutting, for the purpose of determining the discharge from the lower roof.

 

f)          Proposed finished surface levels and grades of car parks, internal driveways and access aisles which are to be related to Council's design alignment levels.

 

g)         The details of any special features that will affect the drainage design eg. the nature of the soil in the site and/or the presence of rock etc.

 

35.     All stormwater run-off naturally draining to Lot 6 must be collected and discharged through this property's stormwater system.  Such drainage must, if necessary, be constructed prior to the commencement of building work.

 

36.     Stormwater runoff from the site shall be managed in accordance with the Prince Henry drainage strategy prepared by Connell Wagner. This shall involve stormwater discharging to the underground drainage system in Anzac Parade via a new or existing kerb inlet pit.

 

Notes:

 

a.   All new kerb inlet pits shall be constructed in general accordance with Council’s standard drawing SD7a.

b.   With the exception of the site discharge pipe, all new pipelines constructed within council’s road reserve shall be minimum 375 mm diameter, spigot and socket rubber ringed jointed, steel reinforced concrete pipeline (RRRCP). Prior to backfilling, all pipelines in council’s road reserve shall be inspected and approved by the Hydraulic Engineer certifying the works and Council.

 

37.     Any Infiltration systems/Absorption Trenches must be designed in accordance with "Section 8.5 ABSORPTION TRENCHES" as stipulated in Randwick City Council's Private Stormwater Code.

 

38.     A childproof and corrosion resistant fastening system shall be installed on access grates over pits/trenches where water is permitted to be temporarily stored.

 

39.     Should a pump system be required to drain any portion of the site the system must be designed with a minimum of two pumps being installed, connected in parallel (with each pump capable of discharging at the permissible discharge rate) and connected to a control board so that each pump will operate alternatively. The pump wet well shall be sized for the 1 in 100 year, 2 hour storm assuming both pumps are not working.

 

The pump system must also be designed and installed strictly in accordance with "Section 8.4 PUMP SYSTEMS" as stipulated in Randwick City Council's Private Stormwater Code.

 

40.     A sediment/silt arrester pit must be provided:-

 

c)        within the site at or near the street boundary prior to the site stormwater discharging by gravity to the kerb/street drainage system; and

d)       prior to stormwater discharging into any absorption/infiltration system.

 

The sediment/silt arrester pit shall be constructed in accordance with the following requirements:-

 

·    The base of the pit located a minimum 300mm under the invert level of the outlet pipe.

 

·    The pit constructed from cast in-situ concrete, precast concrete or double brick.

 

·    A minimum of 4 x 90 mm diameter weep holes located in the walls of the pit at the floor level with a suitable geotextile material with a high filtration rating located over the weep holes.

 

·    A galvanised heavy-duty screen located over the outlet pipe/s (Mascot GMS multipurpose filter screen or equivalent).

 

·    The grate being a galvanised heavy-duty grate that has a provision for a child proof fastening system.

 

·    A child proof and corrosion resistant fastening system provided for the access grate (e.g. spring loaded j-bolts or similar).

 

·    A sign adjacent to the pit stating:

 

“This sediment/silt arrester pit shall be regularly inspected and cleaned.”

 

  Note:   Sketch details of a standard sediment/silt arrester pit may be obtained from Council’s Drainage Engineer.

 

41.     Three covered car washing bays shall be provided for this development.

 

a)         The car washing bays must be drained to sewer to the requirements of Sydney Water and proof of compliance is to be submitted to the certifying authority, prior to a construction certificate being issued for the proposed development.

 

b)         The car washing bays must be located outside any required/approved stormwater detention system.

 

c)         The car washing bays must be signposted with ‘Exclusive Carwash Bay Use Sat 2:00pm – 5:00pm and Sunday 10:00am – 2:00pm, Visitor parking at other times’

 

d)         The car washing bays must be constructed with a minimum 20mm bund around the perimeter of the car washing bays (or equivalent)

 

e)         A water tap shall be located adjacent to the car washing bays.

 

42.     Prior to the issuing of an occupation certificate, the applicant shall submit to Council, a works-as-executed drainage plan prepared by a registered surveyor and approved by a suitably qualified and experienced Hydraulic Engineer. The works-as-executed drainage plan shall be to the satisfaction of the Principal Certifying Authority (PCA) and shall include the following details:

 

e)           Finished site contours at 0.2 metre intervals (over Lot 6;

f)           The location, diameter, gradient and material (i.e PVC, RC etc) of all stormwater pipes;

g)          Details of any infiltration/absorption systems; and

h)          Details of any pumping systems installed (including wet well volumes).

 

43.     Prior to the issuing of an occupation certificate, the applicant shall submit to the Principal Certifying Authority (PCA) and Council, certification from a suitably qualified and experienced Hydraulic Engineer confirming that the design and construction of the stormwater drainage system complies with the conditions of development consent. The certification must be provided following inspection/s of the site stormwater drainage system by the certifying engineers and shall be provided to the satisfaction of the PCA.

 

The following conditions are applied to provide adequate provisions for waste management:

 

44.     The waste storage areas shall be sized to contain a total of 56 x 240 litre bins (28 garbage bins & 28 recycle bins) whilst providing satisfactory access to these bins.

 

45.     The waste storage areas are to be provided with a tap and hose and the floor is to be graded and drained to the sewer to the requirements of Sydney Water.

 

46.     The waste storage areas shall be clearly signposted.

 

47.     Prior to the issuing of an occupation certificate, the applicant shall submit documentation confirming that a caretaker has been employed on an ongoing basis to manage the waste systems as described in the Waste Management Plan (prepared by J D MacDonald Waste Management Consultants for Stockland Development dated June 2006) submitted as part of the development application.

 

48.     Prior to the issuing of a construction certificate, the applicant shall submit to Council for approval, details of the mechanical device proposed to be used for the transfer of full bins to the kerbside for collection.

 

49.     Prior to the issuing of an occupation certificate, the applicant shall install suitable signage within the site adjacent to Millard Drive advising visitors to the site that the area is a combined visitor parking and bin collection area and restricting the use of the two ground level visitor parking spaces during the 24 hour bin storage and collection period.

 

50.     Prior to the issuing of a construction certificate for the proposed development the applicant is to submit to Council and have approved by Council’s Manager of Waste Services, a Waste Management Plan detailing waste and recycling storage and disposal for the development site.

 

The plan shall detail the type and quantity of waste to be generated by the development; demolition waste; construction waste; materials to be re-used or recycled; facilities/procedures for the storage, collection recycling & disposal of waste and the on-going management of waste.

 

The following conditions are applied to satisfy the provisions of Council’s environmental plans, policies and codes for subdivision works:

 

51.     The applicant shall create suitable right of carriageway, easements for services and internal stormwater lines, as required. The applicant shall be advised that the minimum easement width for any internal stormwater line is 0.9 metres.

 

52.     All conditions of development consent must be satisfied and all public roads and reserves must be satisfactorily restored prior to endorsement of the subdivision plans.

 

53.     The applicant shall provide Council with a survey plan of the property prior to endorsement of the subdivision plans.

 

The following conditions are applied to provide adequate provisions for landscaping and to maintain reasonable levels of environmental amenity:

 

54.     The Preliminary Landscape Plan submitted by Oculus, project number S05-044, drawing number DA L 01, issue D, dated 26.7.06 and stamped received at Council on 1st August 2006, shall be amended in order to comply with the Landscape Performance Criteria and Controls set out in the Prince Henry Site Development Control Plan dated December 2004, for Precinct P1, to the satisfaction of the certifying authority, prior to the issue of a construction certificate, including:

 

a.         Selection of an alternative species to that of Liquidambar styraciflua (Liquidambar) along the length of the northern boundary of the site as it will dominate rather than complement the adjoining bushland given its large size at maturity. Concerns are also held for the potential of this species to overshadow the bushland upon maturity, with seasonal leaf fall entering the northern bushland park given its deciduous habit, also an issue. As such, a more appropriate and acceptable species shall be selected for this area.

 

b.         A pot/container size of 5 litres for the Banksia integrifolia (Coastal Banksia) street trees proposed along the length of the southern boundary (Jenner Street) is inadequate, and shall be increased to a minimum pot size of 25 litres. Further, these street trees need to be planted in a straight line along the nature strip rather than slightly staggered as has been shown.

 

c.         Similarly, relevant details regarding the planting of Eucalyptus haemastoma (Scribbly Gum) along the eastern boundary (Millard Avenue) frontage needs to be provided.

 

d.         Written confirmation from a suitably qualified and professional bush regenerator confirming that none of the species proposed in the indicative plant schedule will have the capacity to invade the northern bushland park adjacent the site’s northern boundary.

 

e.         Plant quantities included in the indicative plant schedule as well as on the landscape plan, with all plants to be drawn at their mature size (height & spread) together with proposed staking methods when applicable.

 

d.         Additional notation showing soil and mulch details, edging, paving, fencing details, surface finishes, retaining wall details, and any other landscape elements in sufficient detail to fully describe the proposed landscape works.

 

e.         All planter boxes and garden beds constructed on slab must have a minimum soil depth of 600mm and all lawn areas must have a minimum soil depth of 300mm. Planter box details shall be submitted with the detailed landscape plans.

 

f.          Appropriate articulation to, and setback (from the boundary) of, the 1.3m high wall that forms a low level connection between Buildings 1 and 2, and the provision of a buffer with a planter bed.

 

55.     Documentary evidence is to be obtained from a suitably qualified Landscape Architect and submitted to the principal certifying authority (PCA) (and Council, if Council is not the PCA) prior to the issuing of a final occupation certificate, confirming that the landscape works have been completed in accordance with the approved landscaping plans and relevant conditions of development consent, to the satisfaction of the PCA.

 

56.     That part of the naturestrip upon Council's footway which is damaged during the course of the proposed works shall be excavated to a depth of 150mm, backfilled with topsoil equivalent with 'Organic Garden Mix' as supplied by Australian Native Landscapes, and re-turfed with Kikuyu Turf or similar. Such works shall be installed prior to the issue of a final Occupation Certificate.

 

57.     Any substation required shall be screened from view. The proposed location, elevation and screening method shall be shown on all detailed landscape drawings and specifications.

 

58.     All detention tanks and below ground stormwater infiltration systems located within the landscaped areas shall have a minimum soil cover of 600mm to ensure sufficient soil depth to permit the establishment of landscaping on top of these services as stipulated by these conditions of development consent.

 

All stormwater documentation submitted for the construction certificate application shall show the top of the detention tanks and stormwater infiltration devices being 600mm below the finished ground level of the landscaped areas.

 

The following conditions are applied to maintain reasonable levels of environmental amenity and public health safety.

 

59.     Any fill importation to the site is to be monitored and classified by the Site Auditor appointed for remediation of the site or a person with his qualifications. Only ‘Virgin Excavated Natural Material’ (VENM) is to be imported to the site, as defined within the NSW EPA ‘Environmental Guidelines; Assessment, Classification and management of Liquid and Non-Liquid Wastes. 1999’.

 

60.     Any new information which comes to light during construction works which has the potential to alter previous conclusions about site contamination shall be notified to the Council and the Principal Certifying Authority immediately.

 

61.     The works shall not give rise to environmental pollution or public nuisance or, result in an offence under the Protection of the Environment Operations Act 1997 or NSW Occupational Health & Safety Act (2000) & Regulations (2001).

 

The following conditions have been applied to ensure that noise emissions from the development satisfy legislative requirements and maintain reasonable levels of amenity to the area:

 

62.     The proposed use of the premises and the operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

In this regard, the operation of the premises and plant and equipment shall not give rise to a sound pressure level at any affected premises that exceeds the background (LA90), 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A).  The source noise level shall be assessed as an LAeq, 15 min and adjusted in accordance with the NSW Environmental Protection Authority’s Industrial Noise Policy 2000 and Environmental Noise Control Manual (sleep disturbance).

 

63.     The report titled Stockland Development (PHH) Pty Ltd Super Lot 6 Prince Henry Little Bay Acoustic Assessment for DA submission report number 20C-05-3105-TRP-149214-2 prepared by Vipac Engineers & Scientists Ltd dated 16 June 2006, and the recommendations contained within, form part of this consent.

 

64.     The use of the premises and the operation of plant and equipment shall not give rise to the transmission of a vibration nuisance or damage to other premises.

 

65.     A report, prepared by a suitably qualified and experienced consultant in acoustics, shall be submitted to the Council prior to a construction certificate being issued for the development, which demonstrates and certifies that noise and vibration emissions from the development comply with the relevant provisions of the Protection of the Environment Operations Act 1997, NSW Environmental Protection Authority Noise Control Manual & Industrial Noise Policy and conditions of Council’s approval, to the satisfaction of Council’s Manager Environmental Health & Building Services.

 

The following conditions are applied to satisfy the relevant pollution control criteria and to maintain reasonable levels of health, safety and amenity to the locality:

 

66.     The use and operation of the premises shall not give rise to an environmental health or public nuisance and there are to be no emissions or discharges from the premises, which will give rise to a public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

67.     An application for installation of the proposed grey water recycling system, in accordance with Section 68 of the Local Government Act 1993 and the Local Government (General) Regulation 2005 is to be submitted to and approved by Council prior to works commencing. Details of compliance with relevant Department of Energy, Utilities and Sustainability (DEUS) guidelines are to be provided with the application.

 

68.     An application for the operation of the proposed grey water system, in accordance with Section 68 of the Local Government Act 1993 and the Local Government (General) Regulation 2005 is to be submitted to and approved by Council prior to the commissioning of the grey water recycling system. Details of compliance with relevant Department of Energy, Utilities and Sustainability (DEUS) guidelines are to be provided with the application.

 

69.     The installation of rainwater tanks and grey water treatment systems shall comply with the following noise control requirements:-

 

a)      The operation of all plant and equipment shall not give rise to an ‘offensive noise’ as defined in the Protection of the Environment Operations Act 1997 and Regulations.

 

          In this regard, the operation of the plant and equipment shall not give rise to an LAeq, 15 min sound pressure level at any affected premises that exceeds the background LA90, 15 min noise level, measured in the absence of the noise source/s under consideration by more than 5dB(A) in accordance with relevant NSW Department of Environment & Conservation Noise Control Guidelines.

 

b)      Plant and equipment associated with rainwater tank(s) and grey water treatment systems are to be enclosed in a sound absorbing enclosure or installed within a building, to minimise noise emissions and possible nuisance to nearby residents.

 

c)       The operation of plant and equipment associated with the rainwater tank(s) and grey water treatment systems are to be restricted, if the noise emitted can be heard within a habitable room in any other residential premises:

 

·       before 8.00am or after 8.00pm on weekends or public holiday; or

·       before 7.00am or after 8.00pm on weekdays.

 

70.     The location and height of the discharge of mechanical ventilation and exhaust systems are required to satisfy the relevant provisions of the Building Code of Australia and AS 1668 and details are to be provided in the relevant plans / specifications for the construction certificate.

 

71.     There are to be no emissions or discharges from the premises which give rise to a public nuisance or result in an offence under the Protection of the Environment Operations Act 1997 and Regulations.

 

72.     Liquid trade waste materials or similar are to be disposed of in accordance with the requirements of the Sydney Water. Details of compliance are to be submitted to the certifying authority prior to the commencement of works

 

73.     The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

          Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

74.     All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA), in accordance with Clause 98 of the Environmental Planning and Assessment Regulation 2000.

 

75.     Prior to the commencement of any building works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

76.     Prior to the commencement of any building works, the person having the benefit of the development consent must:-

 

i)       appoint a Principal Certifying Authority for the building work, and

 

ii)      appoint a principal contractor for the building work, or in relation to residential building work, obtain an owner-builder permit in accordance with the requirements of the Home Building Act 1989, and notify the Principal Certifying Authority and Council accordingly in writing, and

 

iii)     unless the person having the benefit of the consent is the principal contractor (i.e. owner-builder), notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority, and

 

iv)     give at least two days notice to the Council, in writing, of the person’s intention to commence building works.

 

          In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

77.     The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

          The Principal Certifying Authority must specify the relevant stages of construction to be inspected in accordance with section 81A (2) (b1) (ii) of the Environmental Planning & Assessment Regulation 2000 and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

          Documentary evidence of the building inspections carried out and details of compliance with Council’s consent is to be maintained by the Principal Certifying Authority.  Details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council with the occupation certificate.

 

          The principal contractor or owner-builder (as applicable) must ensure that the required critical stage and other inspections, as specified in the Principal Certifying Authority’s “Notice of Critical Stage Inspections”, are carried out to the satisfaction of the Principal Certifying Authority and at least 48 hours notice (excluding weekends and public holidays) is to be given to the Principal Certifying Authority, to carry out the required inspection, before carrying out any further works.

 

78.     A sign must be erected and maintained in a prominent position on the site, which contains the following details:

 

·        name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)

·        name, address and telephone number of the Principal Certifying Authority,

·        a statement stating that “unauthorised entry to the work site is prohibited”.

 

79.     An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

             An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

80.     Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

          Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon must also be provided to Council with the occupation certificate.

 

81.     In accordance with clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition, that in the case of residential building work, a contract of insurance must be obtained and in force, in accordance with the provisions of the Home Building Act 1989.

 

82.     Where the work is to be done by a licensed contractor, excavation or building work must not be carried out unless the Principal Certifying Authority (PCA):

 

·        has been informed in writing of the licensee’s name and contractor number; and

·        is satisfied that the licensee has complied with the insurance requirements of Part 6 of the Home Building Act 1989, or

 

          Where the work to be done by any other person (i.e. an owner-builder), excavation or building work must not be carried out unless the Principal Certifying Authority:

 

·        has been informed of the person’s name and owner-builder permit number, or

·        has been given a declaration, signed by the owner of the land that states that the market cost of the labour and materials involved in the work does not exceed $5,000.

 

          Details of the principal building contractor and compliance with the provisions of the Home Building Act 1989 (i.e. Details of the principal licensed building contractor and a copy of the Certificate of Insurance) are to be submitted to Council prior to the commencement of works, with the notice of appointment of the PCA / notice of intention to commence building work.

 

83.     The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

          At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.2% of the cost of the works.

 

84.     The building is required to be provided with a smoke alarm system complying with Clause 3 of Specification E2.2a of the Building Code of Australia or a smoke detection system complying with Clause 4 of Specification E2.2a of the Building Code of Australia or a combination of a smoke alarm system within the sole-occupancy units and a smoke detection system in areas not within the sole-occupancy units.  The smoke detectors located within the stairway, corridors or the like must be interconnected.

 

          Additional requirements regarding the design and installation of the smoke detection and alarm system may be specified in the construction certificate for the development.

 

The following group of conditions have been applied to ensure the structural adequacy and integrity of the proposed building and adjacent premises:

 

85.     Documentary evidence prepared by a suitably qualified professional geotechnical engineer shall be submitted to the certifying authority prior to the issuing of a construction certificate, certifying the suitability and stability of the site for the proposed building and certifying the suitably and adequacy of the proposed design and construction of the building for the site.

 

86.     A report shall be prepared by a professional engineer and submitted to the certifying authority prior to the issuing of a construction certificate, detailing the proposed methods of excavation, shoring or pile construction, including details of potential vibration emissions.  The report, must demonstrate the suitability of the proposed methods of construction to overcome any potential damage to nearby land/premises.

 

          Any practices or procedures specified in the engineer’s report in relation to the avoidance or minimisation of structural damage to nearby premises, must be fully complied with and incorporated into the documentation for the construction certificate.

 

          A copy of the engineers report is to be submitted to the Council, if the Council is not the certifying authority.

 

87.     Driven type piles/shoring must not be provided unless a geotechnical engineer’s report is submitted to the certifying authority, prior to the issuing of a construction certificate, which demonstrates that damage should not occur to any adjoining premises and public place as a result of the works.

 

          Any practices or recommendations specified in the engineer’s report in relation to the avoidance or minimisation of structural damage to nearby premises or land must be fully complied with and incorporated into the documentation for the construction certificate.

 

88.     The installation of ground or rock anchors underneath any adjoining premises including (a public roadway or public place) must not be carried out without specific written consent of the owners of the affected adjoining premises and (where applicable) details of compliance must be provided to the certifying authority prior to the commencement of any excavation or building works.

89.     A Certificate of Adequacy prepared by a professional engineer shall be submitted to the certifying authority (and the Council, if the Council is not the certifying authority) prior to occupation of the building, certifying the structural adequacy of the building and that the building works satisfy the relevant structural design requirements of the Building Code of Australia.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

90.     A copy of the construction certificate, the approved plans & specifications and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

91.     All excavations and backfilling associated with the erection or demolition of a building must be executed safely in accordance with appropriate professional standards and excavations are to be properly guarded and supported to prevent them from being dangerous to life, property or buildings.

 

             Retaining walls, shoring or piling must be provided to support land which is excavated in association with the erection or demolition of a building, to prevent the movement of soil and to support the adjacent land and buildings, if the soil conditions require it.  Adequate provisions are also to be made for drainage.

 

          Retaining walls, shoring, or piling must be designed and installed in accordance with appropriate professional standards and the relevant requirements of the Building Code of Australia and Australian Standards.  Details of proposed retaining walls, shoring or piling are to be submitted to and approved by the Principal Certifying Authority for the development prior to commencing such excavations or works.

 

92.     All building, demolition and associated site works must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive, between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and public holidays, except with the specific written authorisation of Council’s Manager of Environmental Health and Building Services.

 

93.     The use of any rock excavation machinery or any mechanical pile drivers is restricted to the hours of 8.00am to 5.00pm (maximum), Monday to Friday inclusive and from 8.00am to 1.00pm on Saturday, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

94.     Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant provisions of the Protection of the Environment Operations Act 1997 must be satisfied at all times.

 

95.     Noise and vibration from any rock excavation machinery and pile drivers (or the like) must be minimised by using appropriate plant and equipment and silencers and a construction noise and vibration minimisation strategy, prepared by a suitably qualified consultant is to be implemented during the works, to the satisfaction of the Principal Certifying Authority.

 

96.     A report prepared by a suitably qualified and experienced consultant in acoustics/vibration shall be submitted to the Principal Certifying Authority and the Council upon commencement of works, certifying that noise and vibration emissions from the construction of the development complies with the provisions of the Protection of the Environment Operations Act 1997, the Noise Control Manual published by the Environment Protection Authority and relevant conditions of approval.  In support of the above it is necessary to submit all relevant readings and calculations made.

 

          Should noise and vibration emissions not comply with the terms and conditions of consent, work must cease forthwith and is not to recommence until details of compliance are submitted to Council.

 

97.     A Registered Surveyor’s check survey certificate or compliance certificate is to be forwarded to the principal certifying authority (and a copy is to be forwarded to the Council, if the Council is not the principal certifying authority), detailing compliance with Council’s approval at the following stage/s of construction:

 

a)      Prior to construction of the first completed floor/floor slab (prior to pouring of concrete), showing the area of land, building and boundary setbacks and verifying that the building is being construction at the approved levels.

 

b)      On completion of the erection of the building showing the area of the land, the position of the building and boundary setbacks and verifying the building has been constructed at the approved levels.

 

98.     Temporary toilet facilities are to be provided, at or in the vicinity of the work site throughout the course of demolition and construction, to the satisfaction of WorkCover NSW and the toilet facilities must be connected to a public sewer or other sewage management facility approved by Council.

 

99.     Public safety and convenience must be maintained at all times during demolition, excavation and construction works.

 

          The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

          A Road Opening Permit must be obtained from the Council and other relevant Authorities prior to excavating or opening-up the road or footway for services or the like.

 

100.   Building materials, sand, soil, waste materials or construction equipment must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

101.   Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council, unless the waste container is located upon the road in accordance with the Roads & Traffic Authority Guidelines and Requirements, and the container is exempt from an approval under Development Control Plan for Exempt & Complying Development and Council’s Local Approvals Policy.  Applications to place a waste container in a public place can be made to Council’s Building Services section.

 

102.   A Construction Site Management Plan is to be submitted to and approved by the principal certifying authority prior to the commencement of demolition, excavation or building works. The site management plan must include the following measures, as applicable to the type of development:

 

·        location and construction of protective fencing / hoardings to the perimeter of the site;

·        location of site storage areas/sheds/equipment;

·        location of building materials for construction;

·        provisions for public safety;

·        dust control measures;

·        site access location and construction

·        details of methods of disposal of demolition materials;

·        protective measures for tree preservation;

·        provisions for temporary sanitary facilities;

·        location and size of waste containers/bulk bins;

·        details of proposed sediment and erosion control measures;

·        construction noise and vibration management.

 

          The site management measures are to be implemented prior to the commencement of any site works and be maintained throughout the works, to maintain adequate levels of public health and safety.  A copy of the approved Construction Site Management Plan must be maintained on site and be made available to Council officers upon request.

 

103.   During demolition excavation and construction works, dust emissions must be minimised, so as not to result in a nuisance to nearby residents or result in a potential pollution incident.

 

          Adequate dust control measures must be provided to the site prior to the works commencing and the measures and practices must be maintained throughout the demolition, excavation and construction process, to the satisfaction of Council.

 

          Dust control measures and practices may include:-

 

·        Provision of geotextile fabric to all perimeter site fencing (attached on the prevailing wind side of the site fencing).

·        Covering of stockpiles of sand, soil and excavated material with adequately secured tarpaulins or plastic sheeting.

·        Installation of a water sprinkling system or provision hoses or the like.

·        Regular watering-down of all loose materials and stockpiles of sand, soil and excavated material.

·        Minimisation/relocation of stockpiles of materials, to minimise potential for disturbance by prevailing winds.

·        Revegetation of disturbed areas.

 

104.   During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing

 

          Details of the proposed sediment control measures are to be detailed in a site management plan and must be submitted to and approved by the principal certifying authority prior to the commencement of any site works.  The sediment and erosion control measures must be implemented prior to the commencement of any site works and be maintained throughout construction.  A copy of the approved details must be forwarded to the Council and a copy is to be maintained on-site and be made available to Council officers upon request.

 

          Details of proposed sediment and erosion control measures shall include; a site plan; indicating the slope of land, access points & access control measures, location and type of sediment & erosion controls, location of existing vegetation to be retained, location of material stockpiles and storage areas, location of building operations and equipment, methods of sediment control, details of drainage systems and details of existing and proposed vegetation.

 

105.   Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

          Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

          A warning sign for soil and water management must be displayed in a prominent position on the building site, visible to both the public and site workers.  The sign must be displayed throughout the construction period.  Copies of a suitable warning sign are available at Council’s Customer Service Centre for a nominal fee.

 

106.   The applicant/builder is required to hold Public Liability Insurance, with a minimum liability of $5 million and a copy of the Insurance cover is to be provided to Council.

 

107.   Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied.

 

          A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

          If the work involved in the erection or demolition of a building is likely to cause pedestrian or vehicular traffic in a public place to be obstructed or rendered inconvenient or the building involves the enclosure of a public place, a hoarding or fence must be erected between the work site and the public place.

 

             If necessary, an awning is to be erected sufficiently to prevent any substance from, or in connection with, the work from falling into the public place or adjoining premises.

 

          Temporary fences or hoardings are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

          If it is proposed to locate any site fencing, hoardings or amenities upon a footpath or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

108.   A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road or nature strip or in any public place:-

 

·        Install or erect any site fencing, hoardings or site structures

·        Operate a crane or hoist goods or materials over a footpath or road

·        Placement of a waste skip (grater than 3m in length) or any container or other article.

 

The following conditions are applied to provide reasonable levels of access for people with disabilities:

 

109.   Access, facilities and car parking for people with disabilities must be provided in accordance with the relevant provisions of the Building Code of Australia and AS1428.1, AS4299 and 2890.1 and Council’s development control plan for multi-unit housing to the satisfaction of the Certifying Authority.  Details of the proposed access, facilities and car parking for people with disabilities are to be included in the plans / specifications for the construction certificate.

 

ADVISORY MATTERS:

 

1.       The applicant is advised that the Construction Certificate plans and specification must comply with the provisions of the Building Code of Australia (BCA).

 

          In this regard, the development consent plans do not show compliance with the deemed-to-satisfy provisions of the BCA, including:

a)      Clause D1.4         -           Exit travel distances (in carpark)

 

          Details of compliance with the relevant provisions of the Building Code of Australia and conditions of development consent are to be provided in the plans and specifications for the construction certificate.

 

          You are advised to ensure that the development is not inconsistent with Council's consent and if necessary consult with Council’s Building Certification Services or your accredited certifier prior to submitting your construction certificate application to enable these matters to be addressed accordingly.

 

2.       The applicant/owner is advised that this approval does not guarantee compliance with the provisions of the Disability Discrimination Act 1992 and the applicant should therefore consider their liability under the Act.  In this regard, the applicant is advised that compliance with the requirements of the Building Code of Australia and Australian Standard 1428.1 - Design for Access and Mobility does not necessarily satisfy the objectives of the Disability Discrimination Act 1992.

 

          The applicant/owner is requested to give consideration to providing access and facilities for people with disabilities in accordance with Australian Standard 1428 Parts 1, 2, 3 and 4 - Design for Access and Mobility, which may be necessary to satisfy the objectives of the Disability Discrimination Act 1992.

 

3.       A Site Audit Statement and Summary Site Audit Report have been issued for the subject land. The applicant is to note that an unexpected finds protocol is included in the Summary Site Audit Report.

 

          Based on the consideration by the NSW EPA accredited Site Auditor, it has been concluded that the ground water should not be used (in the unlikely event that it is accessed), and that site soils are acceptable for residential end use.

 

4.       A Site Audit Statement and Summary Site Audit Report has been issued for Lot 6 by Rod Harwood (SAS number 32 dated 5 May 2005). The applicant is to note that an unexpected finds protocol is included in the Summary Site Audit Report.

 

5.       The applicant is to advise Council in writing and/or photographs of any signs of existing damage to the Council roadway, footway, or verge prior to the commencement of any building/demolition works.

 

MOTION: (Belleli/Andrews) CARRIED – SEE RESOLUTION.

 

6.7       DEVELOPMENT APPLICATION REPORT - 102 PRINCE EDWARD STREET MALABAR.  (DA/397/2006 & PROP039341)

 

H122   RESOLUTION:  (Matson/Woodsmith) that Council as the responsible authority refuse development consent under Section 80 of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No. DA/397/2006 for proposal to construct a first floor addition to the existing dwelling house, new front and rear balconies and associated alterations and additions at 102 Prince Edward Street, Malabar for the following reasons:

 

1.         the proposal will adversely impact on the amenity of 25 Napier Street, Malabar, in terms of view loss and does not satisfy the Objectives and Performance requirements of the DCP – Dwelling Houses and Attached Dual Occupancies in relation to the sharing of views;

 

2.         the proposed first floor balconies do not satisfy the Objectives and Performance Requirements as stated in the DCP - Dwelling Houses and Attached Dual Occupancies, in relation to visual and acoustic privacy; and

 

3.         the proposed first floor side setbacks do not satisfy the Objectives and Performance Requirements of the DCP - Dwelling Houses and Attached Dual Occupancies and exacerbate the view loss from 25 Napier Street.

 

MOTION: (White/Andrews) that Council as the responsible authority grant development consent under Sections 80 and 80A of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No. DA/397/2006 for proposal to construct a first floor addition to the existing dwelling house, new front and rear balconies and associated alterations and additions at 102 Prince Edward Street, Malabar subject to standard conditions. LOST.

 

MOTION: (Matson/Woodsmith) CARRIED – SEE RESOLUTION.

 

6.8       DEVELOPMENT APPLICATION REPORT - 24 HELENA STREET, RANDWICK.  (DA/532/2006 & PROP042994)

 

H123   RESOLUTION:  (Andrews/Procopiadis) that Council, as the consent authority, grant development consent under Section 80 and 80A of the Environmental Planning and Assessment Act 1979 (as amended) to Development Application No. DA/532/2006 for permission for an additional first floor storage area over existing garage fronting Helena Lane at 24 Helena Street, RANDWICK  NSW  2031 subject to the following conditions: -

 

The following conditions are applied to satisfy the provisions of section 79C of the Environmental Planning and Assessment Act 1979 and to maintain reasonable levels of environmental amenity:

 

1.                  The development must be implemented substantially in accordance with the plans numbered DWG No. 1, dated 07/2006 and received by Council on 3rd July 2006, the application form and on any supporting information received with the application, except as may be amended by the following conditions and as may be shown in red on the attached plans:

 

2.                  The external materials, colours and finishes of the building are required to match, as closely as possible, the existing building.

 

3.                  Metal roof sheeting is to be painted or colour bonded to minimise reflection and to be sympathetic and compatible with the building and surrounding environment.

 

4.                  There must be no encroachment of the structure/s onto any adjoining premises or onto Council’s road reserve, footway or public place, unless permission has been obtained from the owner/s of the adjoining land accordingly.

 

5.                  No cooking facilities or sanitary fittings other than those indicated on the approved plans are to be installed in the premises without the prior written consent of the Council.

 

The following conditions are imposed to promote ecologically sustainable development and energy efficiency.

 

6.                  The consumption of water within the building shall be minimised by the use of triple A rated water efficient plumbing fixtures (taps and shower roses) and water efficient dual flush toilets.  Details of compliance are to be noted in the construction certificate plans or specifications.

 

7.                  New hot water service pipes are to be provided with insulation and must also satisfy any relevant requirements of Building Code of Australia and AS 3500.

 

The following conditions are applied to ensure that the development satisfies the provisions of the Environmental Planning and Assessment Act 1979 and Regulations:

 

8.                  The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times.

 

Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of `on-the-spot` penalty infringements or service of a notice and order by Council.

 

9.                  All new building work must be carried out in accordance with the provisions of the Building Code of Australia (BCA), in accordance with Clause 98 of the Environmental Planning and Assessment Regulation 2000.

 

10.              Prior to the commencement of any building works, a construction certificate must be obtained from the Council or an accredited certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000.

 

11.              Prior to the commencement of any building works, the person having the benefit of the development consent must: -

 

i)       appoint a Principal Certifying Authority for the building work; and

 

ii)      appoint a principal contractor for the building work, or in relation to residential building work, obtain an owner-builder permit in accordance with the requirements of the Home Building Act 1989, and notify the Principal Certifying Authority and Council accordingly in writing; and

                                                  

iii)     unless the person having the benefit of the consent is the principal contractor (i.e. owner-builder), notify the principal contractor of the required critical stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and

 

iv)     give at least two days notice to the Council, in writing, of the persons intention to commence building works.

 

            In relation to residential building work, the principal contractor must be the holder of a contractor licence, in accordance with the provisions of the Home Building Act 1989.

 

12.              The building works must be inspected by the Principal Certifying Authority (or another certifying authority if the Principal Certifying Authority agrees), in accordance with sections 109 E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.

 

The Principal Certifying Authority must specify the relevant stages of construction to be inspected in accordance with section 81A (2) (b1) (ii) of the Environmental Planning & Assessment Regulation 2000 and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceeding to the subsequent stages of construction or finalisation of the works (as applicable).

 

Documentary evidence of the building inspections carried out and details of compliance with Council’s consent is to be maintained by the Principal Certifying Authority.  Details of critical stage inspections carried out and copies of certification relied upon must also be forwarded to Council with the occupation certificate.

 

The principal contractor or owner-builder (as applicable) must ensure that the required critical stage and other inspections, as specified in the Principal Certifying Authority’s “Notice of Critical Stage Inspections”, are carried out to the satisfaction of the Principal Certifying Authority and at least 48 hours notice (excluding weekends and public holidays) is to be given to the Principal Certifying Authority, to carry out the required inspection, before carrying out any further works.

 

13.              A sign must be erected and maintained in a prominent position on the site, which contains the following details:

 

·              name, address, contractor licence number and telephone number of the principal contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable);

·              name, address and telephone number of the Principal Certifying Authority; and

·              a statement stating that “unauthorised entry to the work site is prohibited”.

 

14.              An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.

 

An Occupation Certificate must not be issued for the development if the development is inconsistent with the development consent.  The requirements of the Environmental Planning & Assessment Act 1979 and conditions of development consent must be satisfied prior to the issuing of an occupation certificate.

 

15.              Prior to the issuing of an interim or final occupation certificate, a statement is required to be obtained from the Principal Certifying Authority, which confirms that the development is not inconsistent with the development consent and the relevant conditions of development consent have been satisfied.

 

Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon and must also be provided to Council with the occupation certificate.

 

16.              In accordance with clause 98 of the Environmental Planning and Assessment Regulation 2000, it is a prescribed condition, that in the case of residential building work, a contract of insurance must be obtained and in force, in accordance with the provisions of the Home Building Act 1989.

 

Where the work is to be done by a licensed contractor, excavation or building work must not be carried out unless the Principal Certifying Authority (PCA): -

 

·              has been informed in writing of the licensee’s name and contractor number; and

·              is satisfied that the licensee has complied with the insurance requirements of Part 6 of the Home Building Act 1989, or

 

Where the work to be done by any other person (i.e. an owner-builder), excavation or building work must not be carried out unless the Principal Certifying Authority: -

 

·              has been informed of the person’s name and owner-builder permit number; or

·              has been given a declaration, signed by the owner of the land that states that the market cost of the labour and materials involved in the work does not exceed $5,000.

 

Details of the principal building contractor and compliance with the provisions of the Home Building Act 1989 (i.e. Details of the principal licensed building contractor and a copy of the Certificate of Insurance) are to be submitted to Council prior to the commencement of works, with the notice of appointment of the PCA / notice of intention to commence building work.

 

17.              The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.

 

At the time of this development consent, Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works.

 

The following conditions are applied to ensure that the development satisfies relevant standards of construction, and to maintain adequate levels of health, safety and amenity during construction:

 

18.              The demolition, removal, storage, handling and disposal of building products and materials must be carried out in accordance with the relevant requirements of WorkCover NSW, the NSW Department of Environment & Conservation (formerly the Environment Protection Authority) and Randwick City Council policies and conditions, including:

 

·        Occupational Health and Safety Act 2000

·        Occupational Health and Safety (Hazardous Substances) Regulation 2001

·        Occupational Health and Safety (Asbestos Removal Work) Regulation 2001

·        WorkCover NSW Code of Practice for the Safe Removal of Asbestos

·                Australian Standard 2601 (2001) – Demolition of Structures

·                The Protection of the Environment Operations Act 1997 and Protection of the Environment Operations (Waste) Regulation 1996.

·                Relevant Department of Environment & Conservation (DEC) / Environment Protection Authority (EPA) and WorkCover NSW Guidelines.

·                Randwick City Council Asbestos Policy (adopted 13 September 2005)

 

A copy of Council’s Asbestos Policy is available on Council’s web site at www.randwick.nsw.gov.au in the Building & Development section or a copy can be obtained from Council’s Customer Service Centre.

 

19.              A copy of the construction certificate, the approved plans & specifications and development consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.

 

20.              Except with the written approval of Council’s Manager of Health, Building & Regulatory Services, all building, demolition and associated site works (including site deliveries) must only be carried out between the hours of 7.00am to 5.00pm on Monday to Friday inclusive and between 8.00am to 5.00pm on Saturdays and all building activities are strictly prohibited on Sundays and Public Holidays.

 

In addition, the use of any rock excavation machinery or any mechanical pile drivers or the like, is restricted to the hours of 8.00am to 5.00pm (maximum) on Monday to Friday only, to minimise the noise levels during construction and loss of amenity to nearby residents.

 

21.              Noise and vibration emissions during the construction of the building and associated site works must not result in damage to nearby premises or result in an unreasonable loss of amenity to nearby residents and the relevant provisions of the Protection of the Environment Operations Act 1997 must be satisfied at all times.

           

22.              Public safety and convenience must be maintained at all times during demolition, excavation and construction works.

 

The roadway, footpath and nature strip must be maintained in a good, safe condition and free from any obstructions, materials, soils or debris at all times.  Any damage caused to the road, footway or nature strip must be repaired immediately, to the satisfaction of Council.

 

A Road Opening Permit must be obtained from the Council and other relevant Authorities prior to excavating or opening-up the road or footway for services or the like.

 

23.              Building materials, sand, soil, waste materials or construction equipment must not be placed upon the footpath, roadway or nature strip at any time and the footpath, nature strip and road must be maintained in a clean condition and free from any obstructions, soil and debris at all times.

 

Bulk bins/waste containers must not be located upon the footpath, roadway or nature strip at any time without the prior written approval of the Council, unless the waste container is located upon the road in accordance with the Roads & Traffic Authority Guidelines and Requirements, and the container is exempt from an approval under Development Control Plan for Exempt & Complying Development and Council’s Local Approvals Policy.  Applications to place a waste container in a public place can be made to Council’s Building Services section.

 

24.              During construction stages, sediment laden stormwater run-off shall be controlled using the sediment control measures outlined in the manual for Managing Urban Stormwater – Soils and Construction, published by the NSW Department of Housing

 

Stockpiles of soil, sand, aggregate or other materials must not be located on any footpath, roadway, nature strip, drainage line or any public place and the stockpiles must be protected with adequate sediment control measures.

 

Building operations such as brick cutting, washing tools or equipment and mixing mortar are not permitted on public footpaths, roadways, nature strips, in any public place or any location which may lead to the discharge of materials into the stormwater drainage system.

 

A warning sign for soil and water management must be displayed in a prominent position on the building site, visible to both the public and site workers.  The sign must be displayed throughout the construction period.  Copies of a suitable warning sign are available at Council’s Customer Service Centre for a nominal fee.

 

25.              Public safety must be maintained at all times and public access to the site and building works, materials and equipment on the site is to be restricted, when work is not in progress or the site is unoccupied.

 

A temporary safety fence is to be provided to protect the public, located to the perimeter of the site (unless the site is separated from the adjoining land by an existing structurally adequate fence, having a minimum height of 1.5 metres).  Temporary fences are to have a minimum height of 1.8 metres and be constructed of cyclone wire fencing, with geotextile fabric attached to the inside of the fence to provide dust control, or other material approved by Council.

 

Temporary site fences are to be structurally adequate, safe and be constructed in a professional manner and the use of poor quality materials or steel reinforcement mesh as fencing is not permissible.

 

The public safety provisions and temporary fences must be in place prior to the commencement of any demolition, excavation or building works and be maintained throughout construction.

 

If it is proposed to locate any site fencing, hoardings or amenities upon a footpath or public place, the written consent from Council’s Building Services section must be obtained beforehand and detailed plans are to be submitted to Council for consideration, together with payment of the weekly charge in accordance with Council’s adopted fees and charges.

 

26.              Any part of Council’s nature strip which is damaged as a result of the work must be back-filled, top-soiled and re-turfed with kikuyu turf prior to occupation or finalisation of the development, to Council’s satisfaction.

 

27.              A local approval application must be submitted to and be approved by Council's Building Services section prior to commencing any of the following activities on a footpath, road, nature strip or in any public place:-

 

·              Install or erect any site fencing, hoardings or site structures

·              Operate a crane or hoist goods or materials over a footpath or road

·              Placement of a waste skip (grater than 3m in length) or any container or other article.

 

28.              A WorkCover licensed demolition or asbestos removal contractor must undertake removal of more than 200 m2 of bonded asbestos (or as otherwise specified by WorkCover or relevant legislation). Removal of friable asbestos material must only be undertaken by contractor that holds a current friable asbestos removal licence.

 

29.              On demolition sites involving the removal of asbestos, a  professionally manufactured sign must be clearly displayed in a prominent visible position at the front of the site, containing the words ‘DANGER ASBESTOS REMOVAL IN PROGRESS” and include details of the licensed contractor. The sign shall measure not less than 400mm x 300mm and the sign is to be installed prior to demolition work commencing and is to remain in place until such time as all asbestos has been safely removed from the site.

 

30.              Asbestos waste must be stored, transported and disposed of in compliance with the Protection of the Environment Operations Act 1997 and the Protection of the Environment Operations (Waste) Regulation 1996.

 

Asbestos waste must be disposed of at an approved waste disposal depot (refer to the DEC or Waste Service NSW for details of sites). Copies of all receipts detailing method and location of disposal must be maintained on site and be provided to Council officers upon request, as evidence of correct disposal.

 

ADVISORY MATTERS:

 

A1        Building or excavations works must not be commenced until a construction certificate has been obtained from Council's Building Certification Services or an Accredited Certifier and either Council's Building Certification Services or an Accredited Certifier has been appointed as the Principal Certifying Authority (PCA) for this development.

 

Failure to obtain a Construction Certificate and appoint a PCA before commencing works is an offence, which renders the responsible person liable to a maximum penalty of $1.1 million under the Environmental Planning & Assessment Act 1979.

 

A2        The applicant is advised that the Construction Certificate plans and specification must comply with the provisions of the Building Code of Australia (BCA) and the construction certificate must not be inconsistent with the development consent.

 

In this regard, the development consent plans do not show compliance with the deemed-to-satisfy provisions of the BCA.

 

Details of compliance with the relevant provisions of the Building Code of Australia and conditions of development consent are to be provided in the plans and specifications for the construction certificate.

 

You are therefore advised to ensure that the development is not inconsistent with Council's consent and to consult with Council’s Building Certification Services or an accredited certifier prior to submitting your construction certificate application to enable these matters to be addressed accordingly.

 

MOTION: (Andrews/Procopiadis) CARRIED – SEE RESOLUTION.

 

7.                  CONFIDENTIAL ITEMS (CLOSED SESSION).

 

Nil.

 

8.                  NOTICES OF RESCISSION MOTIONS.

 

8.1       Notice of Rescission Motion by Councillors Hughes, Woodsmith & Matson – Ordinary Council Meeting – Tuesday, 24th October, 2006 – Item 6.7 – Development Application Report – 96-98 St Paul Street, Randwick. (D1082/2004 & PROP000231)

 

MOTION: (Hughes/Matson) that the resolution passed at the Ordinary Council Meeting held on 24th October, 2006 reading as follows:-

 

“A.    THAT Council as the responsible authority grant its consent under Section 96 (2) of the Environmental Planning and Assessment Act 1979 (as amended) to modify Development Consent No.1082/2004 on property at 96-98 St Pauls Street, Randwick, in the following manner:

 

Amend Condition No. 1 to read:

 

1.       The development must be implemented substantially in accordance with the plans numbered 020, 030-036, 040-044, 050-055, all Issue B, dated 1 23/03/05, prepared by Buzacottwebber and received by Council on 24/03/05, the application form and on any supporting information received with the application, except as may be amended by the details approved with the deferred commencement conditions and as amended by the Section 96 plans numbered 030 Issue F, 031 Issue E, both dated 16/01/2006 and received by Council on 17/01/2006; 032 Issue D, 033 Issue E, 034 Issue F, 035 Issue D, 036 Issue D, 040 Issue F, 041 Issue F, 042 Issue E, 043 Issue E, 044 Issue F, 050 Issue D, 051 Issue D, 052 Issue D, 053 Issue D,  all dated 27/10/2005 and received by Council on 28/10/2005; 054 Issue E, dated 17/11/2005 and received by Council on 20/12/2005; 055 Issue E, dated 17/11/2005 and received by Council on 18/11/2005, only so far as they relate to the modifications detailed in the Section 96 application, except as may be amended by the Section 96 plans numbered 030 Issue H, 031 Issue G, 032 Issue F, 033 Issue H, 034 Issue I, 035 Issue F, 036 Issue F, 037 Issue E, 040 Issue I, 041 Issue 1, 042 Issue H, 043 Issue G,  044 Issue H, 050 Issue G, 051 Issue F, 052 Issue G, 055, 053 Issue F, 054 Issue H, 055 Issue H, all dated 1/8/2006 and received by Council on 3 August, 2006 only so far as they relate to the modifications detailed in the Section 96 application, except as may be amended by  the following conditions and as may be shown in red on the attached plans:

 

Amend Condition No. 134 to read:

 

134.   Balconies of Units 4, 8, 10, 12 and 18 shall have fixed external louvre screens along the full length of their western elevation located adjacent to the inner face of the balustrade, with the louvres fixed in a horizontal position in order to restrict overlooking to the private open space and windows of 94 St Pauls Street, while Units 16 and 20 shall have a fixed external louvre screens along the western edge of the roof for the extent of the living room and balcony with the louvres fixed in a horizontal position in order to restrict overlooking to the private open space and windows of 94 St Pauls Street.  Details shall be shown on the construction certificate plans prior to the issue of the construction certificate.

 

Amend Condition No. 135 to read:

 

135.   Balconies of Units 7, 9, 11 and 17 shall have fixed external louvre screens along the full length of their eastern elevation located adjacent to the inner face of the balustrade, with the louvres fixed in a horizontal position in order to restrict overlooking to the private open space of 14C Dudley Street and 14E Dudley Street, while Units 15 and 19 shall have a fixed eternal louvre screens along the eastern edge of the roof for the extent of the living room and balcony with the louvres fixed in a horizontal position in order to restrict overlooking to the private open space14C Dudley Street and 14E Dudley Street .  Details shall be shown on the construction certificate plans prior to the issue of the construction certificate.

 

Amend numbering of following conditions:

 

136.   The bedroom door of Unit 19 shall be relocated to allow separate access to the bathroom.  Details shall be shown on the construction certificate plans prior to the issue of the construction certificate.

 

137.   Mechanical car stackers shall be deleted from the approval and the three spaces designated with double car stackers shall be used only as single car spaces.  Details shall be shown as such on the plans prior to the issue of the construction certificate

 

138.   The basement carpark in the development must allocate not less than one (1) car parking space to each residential unit and two (2) spaces as visitor spaces, one of which shall also be designated as a carwash space.  Details of compliance with this condition are to be shown on the relevant plans for the construction certificate prior to the issue of the construction certificate.

 

139.   Access to the St Pauls Street shall be provided from the point of exit from the fire isolated passageway and details of such shall be shown on the construction certificate plans prior to the issue of the construction certificate.

 

140.   The landscape plan shall be revised to be consistent with the amended Section 96 architectural plans as approved and conditions of consent prior to the issue of the construction certificate

 

Additional conditions

 

141.     Side and rear boundary fences behind the front building alignment shall be a maximum of 1.8m high and the landscape plan shall be amended accordingly prior to the issue of the construction certificate.

 

142.     The fixed screening along the western elevation of the balcony of Unit 18 (Level 4) shall be returned along its northern elevation for a length of 1m and shall be detailed as such on the construction certificate plans to the satisfaction of the certifying authority  prior to the issue of the construction certificate

 

143.     All external privacy screens shall be non reflective and consist of anodised fixed horizontal aluminium bar screening and shall be detailed as such on the construction certificate plans prior to the issue of the construction certificate.

 

144.     The front entry doors to the building at the basement floor levels shall be re-located a further 1.3m to the south to remove the apparent conflict with the access door to the garbage room.  Details in accordance with this requirement shall be shown on the construction certificate plans prior to the issue of the construction certificate.

 

145.     Prior to the issue of the construction certificate the landscape plans shall be amended to show consistency with the architectural plans with particular respect to terrace areas and planted areas adjacent to Units 1, 2 and 14.  In this regard the paved terrace area on the eastern side of Unit 1 and the western side of Unit 2 shall have a maximum depth of 1.2m in front of the kitchen and the full width of Bedroom 2, and shall follow the line of the balconies above these units. The reclaimed areas of terrace shall be detailed as planted areas in both the architectural and landscape plans.

 

146.     Eaves 1m in depth shall be provided to north facing balcony walls of Units 7, 8, 15, 16, 19 and 20 with the eaves to be integrated into the existing roof form and the retractable awnings on Units 7 and 8 shall be deleted from the design.  Details shall be shown on the construction certificate plans to the satisfaction of the certifying authority prior to the issue of the construction certificate.

 

147.     Ventilated skylights shall be provided to the ensuites of Units 19 and 20, with the skylights to be of a translucent polycarbonate material, with a minium size of 900mm x 900mm.  Details be shown on the construction certificate plans to the satisfaction of the certifying authority prior to the issue of the construction certificate

 

148.          Weather protection shall be provided to the rear (southern) balconies by extending the non-trafficable roof of the building over the balconies of Units 19 and 20 by approximately 1m to align with the rear (southern most) walls adjacent to the west and east respectively to the balconies.  Details in accordance with this requirement shall be shown on the construction certificate plans prior to the issue of the construction certificate.

 

149.          Weather protection shall be provided to the rear (southern) access door of the building by the provision of a glazed canopy projecting 1m from the building its width in alignment with the access path. Details in accordance with this requirement shall be shown on the construction certificate plans prior to the issue of the construction certificate.

 

150.          In order to make the rear (southern) access door of similar proportions to windows along the rear (southern) elevation, the Bedroom 1 of Unit 19 shall be relocated to the east to align with the window of Bedroom 3 of Unit 17 below and the rear (southern) access door shall be fully glazed and increased in width to the width of the internal access corridor. A new glazed window shall also be provided above the door aligned with and matching the door, with the top of the window in alignment with the top of window of Bedroom 3 of Unit 17. Details in accordance with these requirements shall be shown on the construction certificate plans prior to the issue of the construction certificate.”

 

BE AND IS HEREBY RESCINDED. LOST.

 

A division on the rescission motion was called for by Crs Hughes and Matson. Voting was as follows:-

 

 

For                                          Against

 

Hughes                         Andrews

Notley-Smith                            Bastic

Matson                         Belleli

Woodsmith                               Nash

                                                Procopiadis

                                                Seng

                                                Sullivan

                                                Mayor, Cr. P. Tracey

                                                White

 

 

The meeting closed at 8.30 p.m.

 

 

 

 

 

 

……………………………………….